Observations d

S.NO

1
2

3
4

5
6

7
8

9
10

11
12

13
14

15
16

17
18

19
20

21
22

23
24

25
Observations during iron
Description

Ship Un-loader - 1 &2 Grab hard facing to be required to avoid grab lip plate wear( Grab is
designed for coal handling so additional grab required for iron ore handling).
Conveyor R1A additional support is required for zone 2 area

Conveyor R1A additional support is required for zone 2 area


Conveyor R1A additional support is required for zone 2 area

Conveyor R1A additional support is required for zone 2 area


Conveyor R1A additional support is required for zone 2 area

Conveyor R1A additional support is required for zone 2 area


Conveyor R1A additional support is required for zone 2 area

Conveyors R1A snub pulley lagging to be replaced for reduceing spillage.


R1A stinger support (3no’s) proper welding is required in head end right side.

Additional spillage tray is required in R2A conveyor.


Conveyor R1A,R2A discharge chute spillage to be control by additional scrapper to be
provided in nearby spillage dray

Primary and secondary scrapper pad is required for every iron vessel in receiving conveyors.
Conveyor R3A,RD1&2additional support is required for receiving area (05no’s) and also
Head end side(05no’s)

Conveyor R3A spillage tray to be modify for avoid R4A conveyor manually Scoop out.
ConveyorR2A head end duck sheet bent and damage to be rectified

Conveyor RD1&2 receiving and also SR1&2 tipper chute liner plate to be replace.
R1A idler shell got damaged while handling iron ore.

R3A idler shell got damaged while handling iron ore.


R2A idler shell got damaged while handling iron ore.

R1 A Duck sheet bent and damage sheet to be replaced


R1 A Duck sheet bent and damage sheet to be replaced

Bent in R1A coneveyor stringer support


Additional welding with support required in stringer post

R1A stringer support damage in zone 2 area


tions during iron ore vessel
Location

SUL-1 Grab
R1A zone 2 area Frame
no 62

Frame no-56
Frame no-39

Frame no-45
Frame no-51

Frame no-58
Frame no-55

Head end
Frame no 2,3,4

Head End
Head End

R1,R2,R3
Tail end

Head End
Head End

Head end
Zone-1

Zone1
Zone 1

Head End
Tail End

Frame no-8
Frame no-5

Frame no-64
g iron ore vessel
Photo