Areas 08/05/2021 19:54:00

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: PINLLO
VIA PINLLO
Autor:

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
0+000.00 -5.61 2675.00 3.41 2675.00 0.00 -5.61 2675.00 -4.90 2673.93 -0.38
3.41 2675.00 5.98 2675.55 0.71 -4.90 2673.93 -4.10 2673.93 -0.86
-4.10 2673.73 -3.50 2673.93 -0.70
-3.50 2673.33 0.00 2673.40 -5.72
0.00 2673.40 3.50 2673.33 -5.72
3.50 2673.93 4.10 2673.73 -0.70
4.10 2673.93 4.90 2673.93 -0.86
4.90 2673.93 5.98 2675.55 -0.28
0.71 -15.22 15.93
TOTAL AREAS(M2): 15.93 0.00
0+010.00 -6.27 2674.86 2.31 2674.57 -2.33 -6.27 2674.86 -4.90 2672.80 -1.58
2.31 2674.57 3.56 2674.61 -0.49 -4.90 2672.80 -4.10 2672.80 -1.75
3.56 2674.61 6.12 2674.72 -0.82 -4.10 2672.60 -3.50 2672.80 -1.37
-3.50 2672.20 0.00 2672.27 -9.62
0.00 2672.27 3.50 2672.27 -9.51
3.50 2672.87 4.10 2672.68 -1.33
4.10 2672.88 4.90 2672.89 -1.68
4.90 2672.89 6.12 2674.72 -1.44
-3.65 -28.28 24.63
TOTAL AREAS(M2): 24.63 0.00
0+020.00 -5.46 2672.24 -4.28 2672.20 -0.22 -5.46 2672.24 -5.07 2671.67 -0.17
-4.28 2672.20 3.81 2672.44 -0.74 -5.07 2671.67 -4.27 2671.67 -0.59
3.81 2672.44 5.32 2672.50 0.09 -4.27 2671.47 -3.67 2671.67 -0.50
-3.67 2671.07 0.00 2671.14 -4.79
0.00 2671.14 3.50 2671.21 -4.32
3.50 2671.81 4.10 2671.63 -0.41
4.10 2671.83 4.90 2671.86 -0.45
4.90 2671.86 5.32 2672.50 -0.10
-0.87 -11.34 10.47
TOTAL AREAS(M2): 10.47 0.00
0+030.00 -5.66 2670.03 -3.86 2670.07 0.26 -5.66 2670.03 -5.26 2670.43 0.13
-5.26 2670.43 -4.46 2670.45 0.42
-4.46 2670.25 -3.86 2670.46 0.27
0.26 0.82 -0.56
-3.86 2670.07 3.50 2670.22 1.76 -3.86 2669.86 0.00 2670.01 0.11
0.00 2670.01 3.50 2670.15 0.61
1.76 0.72 1.03
3.50 2670.22 4.33 2670.24 0.27 3.50 2670.75 4.10 2670.59 0.46
4.33 2670.24 5.02 2670.26 0.24 4.10 2670.79 4.90 2670.84 0.72
5.02 2670.26 5.48 2670.26 0.16 4.90 2670.84 5.48 2670.26 0.37
0.67 1.55 -0.89
TOTAL AREAS(M2): 1.03 -1.45
0+040.00 -7.90 2666.73 -3.43 2666.77 0.72 -7.90 2666.73 -5.45 2669.18 3.36
-3.43 2666.77 6.04 2667.20 3.75 -5.45 2669.18 -4.65 2669.21 2.09
6.04 2667.20 7.57 2667.14 0.89 -4.65 2669.01 -4.05 2669.24 1.52
-4.05 2668.64 0.00 2668.88 8.81
0.00 2668.88 3.50 2669.10 8.42
3.50 2669.70 4.10 2669.55 1.82
4.10 2669.75 4.90 2669.81 2.55
4.90 2669.81 7.57 2667.14 5.05
5.36 33.62 -28.26

Página 1
Areas 08/05/2021 19:54:00

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: PINLLO
VIA PINLLO
Autor:

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
TOTAL AREAS(M2): 0.00 -28.26
0+050.00 -10.00 2662.77 -7.39 2663.07 0.40 -10.00 2663.56 -5.64 2667.92 12.98
-7.39 2663.07 -3.75 2663.37 1.65 -5.64 2667.92 -4.84 2667.97 4.14
-3.75 2663.37 6.65 2663.56 7.24 -4.84 2667.77 -4.24 2668.01 3.07
6.65 2663.56 9.85 2663.62 2.61 -4.24 2667.41 0.00 2667.76 20.39
9.85 2663.62 10.00 2663.61 0.13 0.00 2667.76 3.50 2668.04 17.96
3.50 2668.64 4.10 2668.50 3.48
4.10 2668.70 4.90 2668.78 4.78
4.90 2668.78 10.00 2663.68 17.68
12.04 84.49 -72.45
TOTAL AREAS(M2): 0.00 -72.45
0+060.00 -10.00 2659.36 -8.21 2659.41 0.05 -10.00 2662.48 -5.80 2666.68 21.93
-8.21 2659.41 2.43 2659.54 1.25 -5.80 2666.68 -5.00 2666.75 5.88
2.43 2659.54 4.37 2660.00 0.80 -5.00 2666.55 -4.40 2666.79 4.39
4.37 2660.00 5.08 2660.00 0.46 -4.40 2666.19 0.00 2666.63 31.04
5.08 2660.00 5.73 2660.00 0.42 0.00 2666.63 3.50 2666.98 26.07
5.73 2660.00 10.00 2660.00 2.74 3.50 2667.58 4.10 2667.46 4.90
4.10 2667.66 4.90 2667.75 6.68
4.90 2667.75 10.00 2662.65 29.80
5.71 130.68 -124.97
TOTAL AREAS(M2): 0.00 -124.97
0+070.00 -10.00 2657.28 -7.34 2657.23 -0.08 -10.00 2661.41 -5.80 2665.61 26.17
-7.34 2657.23 4.41 2660.00 15.64 -5.80 2665.61 -5.00 2665.68 6.69
4.41 2660.00 9.64 2660.00 14.22 -5.00 2665.48 -4.40 2665.72 4.99
9.64 2660.00 10.00 2660.00 0.97 -4.40 2665.12 0.00 2665.56 35.47
0.00 2665.56 3.50 2665.91 29.60
3.50 2666.51 4.10 2666.39 5.50
4.10 2666.59 4.90 2666.68 7.48
4.90 2666.68 10.00 2661.58 34.93
30.75 150.83 -120.09
TOTAL AREAS(M2): 0.00 -120.09
0+080.00 -10.00 2656.31 5.94 2660.00 29.39 -10.00 2660.40 -5.80 2664.60 26.01
5.94 2660.00 10.00 2660.00 14.99 -5.80 2664.60 -5.00 2664.67 6.66
-5.00 2664.47 -4.40 2664.72 4.97
-4.40 2664.12 0.00 2664.56 35.31
0.00 2664.56 3.50 2664.91 29.47
3.50 2665.51 4.10 2665.38 5.48
4.10 2665.58 4.90 2665.67 7.45
4.90 2665.67 10.00 2660.57 34.74
44.37 150.08 -105.71
TOTAL AREAS(M2): 0.00 -105.71
0+090.00 -10.00 2655.99 3.72 2658.80 19.29 -10.00 2659.46 -5.80 2663.66 23.38
3.72 2658.80 9.09 2660.00 18.34 -5.80 2663.66 -5.00 2663.72 6.16
9.09 2660.00 9.63 2660.00 2.14 -5.00 2663.52 -4.40 2663.77 4.59
-4.40 2663.17 0.00 2663.61 32.55
0.00 2663.61 3.50 2663.96 27.27
3.50 2664.56 4.10 2664.43 5.10
4.10 2664.63 4.90 2664.73 6.95
4.90 2664.73 9.63 2660.00 30.12
39.77 136.12 -96.35
TOTAL AREAS(M2): 0.00 -96.35

Página 2
Areas 08/05/2021 19:54:00

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: PINLLO
VIA PINLLO
Autor:

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
0+100.00 -10.00 2656.34 -7.85 2656.97 0.67 -10.00 2658.56 -5.80 2662.76 18.14
-7.85 2656.97 3.99 2660.00 25.34 -5.80 2662.76 -5.00 2662.83 5.16
3.99 2660.00 7.69 2661.04 15.47 -5.00 2662.63 -4.40 2662.87 3.84
-4.40 2662.27 0.00 2662.71 27.07
0.00 2662.71 3.50 2663.06 22.91
3.50 2663.66 4.10 2663.54 4.35
4.10 2663.74 4.90 2663.83 5.95
4.90 2663.83 7.69 2661.04 17.02
41.47 104.45 -62.98
TOTAL AREAS(M2): 0.00 -62.98
0+110.00 -10.00 2656.76 0.06 2660.00 16.30 -10.00 2657.68 -5.80 2661.88 12.68
0.06 2660.00 5.78 2662.07 24.45 -5.80 2661.88 -5.00 2661.94 4.12
-5.00 2661.74 -4.40 2661.99 3.06
-4.40 2661.39 0.00 2661.83 21.34
0.00 2661.83 3.50 2662.18 18.36
3.50 2662.78 4.10 2662.65 3.57
4.10 2662.85 4.90 2662.95 4.91
4.90 2662.95 5.78 2662.07 5.07
40.76 73.11 -32.36
TOTAL AREAS(M2): 0.00 -32.36
0+120.00 -9.13 2657.61 -4.18 2659.19 5.26 -9.13 2657.61 -5.64 2661.11 7.08
-4.18 2659.19 -1.71 2660.00 5.57 -5.64 2661.11 -4.84 2661.16 3.04
-1.71 2660.00 1.09 2661.03 8.88 -4.84 2660.96 -4.24 2661.20 2.24
-4.24 2660.60 0.00 2660.94 14.53
0.00 2660.94 1.09 2661.03 3.98
19.71 30.87 -11.16
1.09 2661.03 1.92 2661.34 3.18 1.09 2661.03 3.50 2661.23 9.14
1.92 2661.34 5.30 2662.57 15.61 3.50 2661.83 4.10 2661.69 2.65
4.10 2661.89 4.90 2661.97 3.67
4.90 2661.97 5.30 2662.57 1.96
18.79 17.43 1.36
TOTAL AREAS(M2): 1.36 -11.16
0+130.00 -7.26 2658.54 -2.68 2659.89 6.81 -7.26 2658.54 -5.45 2660.35 3.11
-5.45 2660.35 -4.65 2660.39 2.11
-4.65 2660.19 -4.05 2660.41 1.54
-4.05 2659.81 -2.68 2659.89 2.91
6.81 9.67 -2.86
-2.68 2659.89 -2.32 2660.00 0.79 -2.68 2659.89 0.00 2660.06 6.01
-2.32 2660.00 6.27 2663.04 32.57 0.00 2660.06 3.50 2660.27 8.52
3.50 2660.87 4.10 2660.72 1.84
4.10 2660.92 4.90 2660.98 2.58
4.90 2660.98 6.27 2663.04 5.88
33.36 24.82 8.54
TOTAL AREAS(M2): 8.54 -2.86
0+140.00 -5.88 2658.94 -3.86 2659.54 3.07 -5.88 2658.94 -5.26 2659.56 0.96
-5.26 2659.56 -4.46 2659.58 1.48
-4.46 2659.38 -3.86 2659.59 1.06
3.07 3.49 -0.42
-3.86 2659.54 -2.30 2660.00 3.19 -3.86 2658.99 0.00 2659.15 5.20
-2.30 2660.00 6.88 2662.94 34.41 0.00 2659.15 3.50 2659.29 5.23
3.50 2659.89 4.10 2659.72 1.25

Página 3
Areas 08/05/2021 19:54:00

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: PINLLO
VIA PINLLO
Autor:

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
4.10 2659.92 4.90 2659.97 1.78
4.90 2659.97 6.88 2662.94 7.39
37.61 20.86 16.75
TOTAL AREAS(M2): 16.75 -0.42
0+150.00 -5.42 2659.23 -2.54 2659.97 4.46 -5.42 2659.23 -5.07 2658.71 0.32
-2.54 2659.97 -2.44 2660.00 0.20 -5.07 2658.71 -4.27 2658.71 0.52
-2.44 2660.00 -2.33 2660.03 0.21 -4.27 2658.51 -3.67 2658.71 0.33
-2.33 2660.03 7.10 2662.21 28.92 -3.67 2658.11 0.00 2658.18 0.33
0.00 2658.18 3.50 2658.25 0.56
3.50 2658.85 4.10 2658.67 0.42
4.10 2658.87 4.90 2658.90 0.67
4.90 2658.90 7.10 2662.21 5.51
33.78 8.66 25.11
TOTAL AREAS(M2): 25.11 0.00
0+160.00 -5.73 2658.94 -0.94 2660.00 7.06 -5.73 2658.94 -4.90 2657.70 0.27
-0.94 2660.00 4.25 2661.16 13.42 -4.90 2657.70 -4.10 2657.70 -0.24
4.25 2661.16 7.59 2661.81 11.65 -4.10 2657.50 -3.50 2657.70 -0.24
-3.50 2657.10 0.00 2657.17 -3.03
0.00 2657.17 3.50 2657.16 -2.92
3.50 2657.76 4.10 2657.57 -0.20
4.10 2657.77 4.90 2657.79 -0.17
4.90 2657.79 7.59 2661.81 4.84
32.13 -1.69 33.82
TOTAL AREAS(M2): 33.82 0.00
0+170.00 -6.13 2658.47 1.06 2660.00 11.43 -6.13 2658.47 -4.90 2656.63 -0.12
1.06 2660.00 8.02 2661.31 20.93 -4.90 2656.63 -4.10 2656.63 -0.81
-4.10 2656.43 -3.50 2656.63 -0.67
-3.50 2656.03 0.00 2656.10 -5.54
0.00 2656.10 3.50 2656.03 -5.54
3.50 2656.63 4.10 2656.43 -0.67
4.10 2656.63 4.90 2656.63 -0.81
4.90 2656.63 8.02 2661.31 4.12
32.37 -10.03 42.40
TOTAL AREAS(M2): 42.40 0.00
0+180.00 -6.36 2657.69 -0.63 2658.91 7.90 -6.36 2657.69 -4.90 2655.51 -0.47
-0.63 2658.91 3.81 2660.00 11.25 -4.90 2655.51 -4.10 2655.51 -1.13
3.81 2660.00 8.49 2660.89 16.48 -4.10 2655.31 -3.50 2655.51 -0.91
-3.50 2654.91 0.00 2654.98 -6.93
0.00 2654.98 3.50 2654.91 -6.93
3.50 2655.51 4.10 2655.31 -0.91
4.10 2655.51 4.90 2655.51 -1.13
4.90 2655.51 8.49 2660.89 4.57
35.63 -13.84 49.46
TOTAL AREAS(M2): 49.46 0.00
0+190.00 -6.33 2656.47 8.03 2660.00 38.28 -6.33 2656.47 -4.90 2654.33 -0.24
8.03 2660.00 8.77 2660.14 3.32 -4.90 2654.33 -4.10 2654.33 -0.99
-4.10 2654.13 -3.50 2654.33 -0.80
-3.50 2653.73 0.00 2653.80 -6.31
0.00 2653.80 3.50 2653.73 -6.31
3.50 2654.33 4.10 2654.13 -0.80
4.10 2654.33 4.90 2654.33 -0.99

Página 4
Areas 08/05/2021 19:54:00

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: PINLLO
VIA PINLLO
Autor:

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
4.90 2654.33 8.77 2660.14 6.45
41.59 -9.99 51.58
TOTAL AREAS(M2): 51.58 0.00
0+200.00 -5.62 2654.21 -3.10 2655.00 4.44 -5.62 2654.21 -4.90 2653.14 0.60
-3.10 2655.00 5.93 2657.24 29.60 -4.90 2653.14 -4.10 2653.14 0.23
5.93 2657.24 8.19 2658.07 10.89 -4.10 2652.94 -3.50 2653.14 0.12
-3.50 2652.54 0.00 2652.61 -0.95
0.00 2652.61 3.50 2652.54 -0.95
3.50 2653.14 4.10 2652.94 0.12
4.10 2653.14 4.90 2653.14 0.23
4.90 2653.14 8.19 2658.07 9.08
44.93 8.47 36.46
TOTAL AREAS(M2): 36.46 0.00
0+210.00 -5.37 2651.47 -4.10 2651.89 2.17 -5.37 2651.47 -4.90 2651.94 0.81
-4.90 2651.94 -4.10 2651.94 1.57
2.17 2.38 -0.21
-4.10 2651.89 3.91 2654.56 26.08 -4.10 2651.74 -3.50 2651.94 1.12
3.91 2654.56 5.06 2655.00 5.52 -3.50 2651.34 0.00 2651.41 4.91
5.06 2655.00 7.45 2655.96 13.19 0.00 2651.41 3.50 2651.34 4.91
7.45 2655.96 7.63 2656.03 1.06 3.50 2651.94 4.10 2651.74 1.12
4.10 2651.94 4.90 2651.94 1.57
4.90 2651.94 7.63 2656.03 10.95
45.84 24.58 21.26
TOTAL AREAS(M2): 21.26 -0.21
0+220.00 -6.47 2649.17 -4.48 2650.00 3.77 -6.47 2649.17 -4.90 2650.74 3.55
-4.48 2650.00 -3.50 2650.32 2.41 -4.90 2650.74 -4.10 2650.74 2.44
-4.10 2650.54 -3.50 2650.74 1.77
6.18 7.75 -1.57
-3.50 2650.32 3.38 2652.61 25.97 -3.50 2650.14 0.00 2650.21 8.68
3.38 2652.61 7.11 2654.06 21.05 0.00 2650.21 3.50 2650.14 8.68
3.50 2650.74 4.10 2650.54 1.77
4.10 2650.74 4.90 2650.74 2.44
4.90 2650.74 7.11 2654.06 10.40
47.01 31.96 15.05
TOTAL AREAS(M2): 15.05 -1.57
0+230.00 -7.81 2646.63 -2.12 2648.76 10.74 -7.81 2646.63 -4.90 2649.54 6.63
-2.12 2648.76 -1.61 2648.98 1.58 -4.90 2649.54 -4.10 2649.54 2.99
-4.10 2649.34 -3.50 2649.54 2.18
-3.50 2648.94 -1.61 2648.98 5.97
12.32 17.77 -5.44
-1.61 2648.98 0.84 2650.00 9.01 -1.61 2648.98 0.00 2649.01 5.12
0.84 2650.00 2.85 2650.67 9.08 0.00 2649.01 3.50 2648.94 11.09
2.85 2650.67 6.63 2652.13 21.13 3.50 2649.54 4.10 2649.34 2.18
4.10 2649.54 4.90 2649.54 2.99
4.90 2649.54 6.63 2652.13 8.68
39.23 30.06 9.17
TOTAL AREAS(M2): 9.17 -5.44
0+240.00 -8.07 2645.17 -1.49 2647.78 13.69 -8.07 2645.17 -4.90 2648.34 7.48
-4.90 2648.34 -4.10 2648.34 3.16
-4.10 2648.14 -3.50 2648.34 2.31
-3.50 2647.74 -1.49 2647.78 6.77

Página 5
Areas 08/05/2021 19:54:00

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: PINLLO
VIA PINLLO
Autor:

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
13.69 19.71 -6.02
-1.49 2647.78 -0.75 2648.07 2.60 -1.49 2647.78 0.00 2647.81 5.06
-0.75 2648.07 3.53 2650.00 19.87 0.00 2647.81 3.50 2647.74 11.83
3.53 2650.00 6.80 2651.19 20.25 3.50 2648.34 4.10 2648.14 2.31
4.10 2648.34 4.90 2648.34 3.16
4.90 2648.34 6.80 2651.19 10.19
42.72 32.54 10.18
TOTAL AREAS(M2): 10.18 -6.02

Página 6
Elevaciones 08/05/2021 19:54:00

ELEVACIONES Y ESPESORES DE TERRENO Y SUBRASANTE


Obra: PINLLO
VIA PINLLO
Autor:

ELEVACIONES(M) ESPESORES(M)
ESTACION
TERRENO SUBRASANTE CORTE TERRAPLEN
0+000.00 2675.00 2674.00 1.00
0+010.00 2674.65 2672.87 1.78
0+020.00 2672.33 2671.74 0.58
0+030.00 2670.15 2670.61 0.46
0+040.00 2666.92 2669.48 2.56
0+050.00 2663.44 2668.36 4.92
0+060.00 2659.51 2667.23 7.72
0+070.00 2658.72 2666.16 7.44
0+080.00 2658.37 2665.16 6.78
0+090.00 2658.04 2664.21 6.17
0+100.00 2658.94 2663.31 4.38
0+110.00 2659.98 2662.43 2.45
0+120.00 2660.62 2661.54 0.92
0+130.00 2660.82 2660.66 0.16
0+140.00 2660.74 2659.75 0.99
0+150.00 2660.57 2658.78 1.79
0+160.00 2660.21 2657.77 2.45
0+170.00 2659.77 2656.70 3.08
0+180.00 2659.06 2655.58 3.49
0+190.00 2658.03 2654.40 3.62
0+200.00 2655.77 2653.21 2.56
0+210.00 2653.26 2652.01 1.25
0+220.00 2651.49 2650.81 0.68
0+230.00 2649.65 2649.61 0.04
0+240.00 2648.41 2648.41 0.00

Página 7
Capas 08/05/2021 19:54:00

VOLUMENES DE CAPAS DE SECCION


Obra: PINLLO
VIA PINLLO
Autor:

CAPA ESTACION AREA(M2) D/2 (M) VOLUMEN(M3)


SUB BASE 0+000.00 2.10 0.00 0.00
0+010.00 2.10 5.00 21.00
0+020.00 2.15 5.00 21.26
0+030.00 2.21 5.00 21.80
0+040.00 2.26 5.00 22.36
0+050.00 2.32 5.00 22.93
0+060.00 2.37 5.00 23.45
0+070.00 2.37 5.00 23.70
0+080.00 2.37 5.00 23.70
0+090.00 2.37 5.00 23.70
0+100.00 2.37 5.00 23.70
0+110.00 2.37 5.00 23.70
0+120.00 2.32 5.00 23.45
0+130.00 2.26 5.00 22.92
0+140.00 2.21 5.00 22.36
0+150.00 2.15 5.00 21.80
0+160.00 2.10 5.00 21.26
0+170.00 2.10 5.00 21.00
0+180.00 2.10 5.00 21.00
0+190.00 2.10 5.00 21.00
0+200.00 2.10 5.00 21.00
0+210.00 2.10 5.00 21.00
0+220.00 2.10 5.00 21.00
0+230.00 2.10 5.00 21.00
0+240.00 2.10 5.00 21.00
TOTAL VOLUMEN SUB BASE (M3): 531.10
BASE 0+000.00 1.40 0.00 0.00
0+010.00 1.40 5.00 14.00
0+020.00 1.43 5.00 14.17
0+030.00 1.47 5.00 14.53
0+040.00 1.51 5.00 14.91
0+050.00 1.55 5.00 15.28
0+060.00 1.58 5.00 15.64
0+070.00 1.58 5.00 15.80
0+080.00 1.58 5.00 15.80
0+090.00 1.58 5.00 15.80
0+100.00 1.58 5.00 15.80
0+110.00 1.58 5.00 15.80
0+120.00 1.55 5.00 15.64
0+130.00 1.51 5.00 15.28
0+140.00 1.47 5.00 14.91
0+150.00 1.43 5.00 14.53
0+160.00 1.40 5.00 14.17
0+170.00 1.40 5.00 14.00

Página 8
Capas 08/05/2021 19:54:00

0+180.00 1.40 5.00 14.00


0+190.00 1.40 5.00 14.00
0+200.00 1.40 5.00 14.00
0+210.00 1.40 5.00 14.00
0+220.00 1.40 5.00 14.00
0+230.00 1.40 5.00 14.00
0+240.00 1.40 5.00 14.00
TOTAL VOLUMEN BASE (M3): 354.07
CARPETA 0+000.00 0.70 0.00 0.00
0+010.00 0.70 5.00 7.00
0+020.00 0.72 5.00 7.09
0+030.00 0.74 5.00 7.27
0+040.00 0.75 5.00 7.45
0+050.00 0.77 5.00 7.64
0+060.00 0.79 5.00 7.82
0+070.00 0.79 5.00 7.90
0+080.00 0.79 5.00 7.90
0+090.00 0.79 5.00 7.90
0+100.00 0.79 5.00 7.90
0+110.00 0.79 5.00 7.90
0+120.00 0.77 5.00 7.82
0+130.00 0.75 5.00 7.64
0+140.00 0.74 5.00 7.45
0+150.00 0.72 5.00 7.27
0+160.00 0.70 5.00 7.09
0+170.00 0.70 5.00 7.00
0+180.00 0.70 5.00 7.00
0+190.00 0.70 5.00 7.00
0+200.00 0.70 5.00 7.00
0+210.00 0.70 5.00 7.00
0+220.00 0.70 5.00 7.00
0+230.00 0.70 5.00 7.00
0+240.00 0.70 5.00 7.00
TOTAL VOLUMEN CARPETA (M3): 177.03

Página 9
SOBREELEVACIONES Y SOBREANCHOS

CAMINO:
TRAMO: ESTACION:
SUB-TRAMO: ORIGEN:

BOMBEO AMPLIACION (Ac) Ancho Total de Calzada ENSANCHES (Talud)


DESCRIPCION ESTACION
IZQ DER IZQ DER IZQ DER IZQ DER
0+000.00 -2.0 % -2.0 % 0.00 0.00 3.50 3.50 0.71 1.08
0+010.00 -2.0 % -0.2 % 0.00 0.00 3.50 3.50 1.37 1.22
0+020.00 -2.0 % 1.9 % 0.17 0.00 3.67 3.50 0.38 0.42
0+030.00 -4.0 % 4.0 % 0.36 0.00 3.86 3.50 0.40 0.58
0+040.00 -6.1 % 6.1 % 0.55 0.00 4.05 3.50 2.45 2.67
0+050.00 -8.2 % 8.2 % 0.74 0.00 4.24 3.50 4.36 5.10
0+060.00 -10.0 % 10.0 % 0.90 0.00 4.40 3.50 4.20 5.10
0+070.00 -10.0 % 10.0 % 0.90 0.00 4.40 3.50 4.20 5.10
0+080.00 -10.0 % 10.0 % 0.90 0.00 4.40 3.50 4.20 5.10
0+090.00 -10.0 % 10.0 % 0.90 0.00 4.40 3.50 4.20 4.73
0+100.00 -10.0 % 10.0 % 0.90 0.00 4.40 3.50 4.20 2.79
0+110.00 -10.0 % 10.0 % 0.90 0.00 4.40 3.50 4.20 0.88
0+120.00 -8.2 % 8.2 % 0.74 0.00 4.24 3.50 3.50 0.40
0+130.00 -6.1 % 6.1 % 0.55 0.00 4.05 3.50 1.81 1.37
0+140.00 -4.0 % 4.0 % 0.36 0.00 3.86 3.50 0.62 1.98
0+150.00 -2.0 % 1.9 % 0.17 0.00 3.67 3.50 0.35 2.20
0+160.00 -2.0 % -0.2 % 0.00 0.00 3.50 3.50 0.83 2.69
0+170.00 -2.0 % -2.0 % 0.00 0.00 3.50 3.50 1.23 3.12
0+180.00 -2.0 % -2.0 % 0.00 0.00 3.50 3.50 1.46 3.59
0+190.00 -2.0 % -2.0 % 0.00 0.00 3.50 3.50 1.43 3.87
0+200.00 -2.0 % -2.0 % 0.00 0.00 3.50 3.50 0.72 3.29
0+210.00 -2.0 % -2.0 % 0.00 0.00 3.50 3.50 0.47 2.73
0+220.00 -2.0 % -2.0 % 0.00 0.00 3.50 3.50 1.57 2.21
0+230.00 -2.0 % -2.0 % 0.00 0.00 3.50 3.50 2.91 1.73
0+240.00 -2.0 % -2.0 % 0.00 0.00 3.50 3.50 3.17 1.90

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
1
2
3
4 CAMINO:
5 TRAMO: ESTACION:
6 SUBTRAMO: ORIGEN:
7
8 ESTACION ELEVACION
DISTANCIA
ELEVACIONES
9 IZQ DER
10
11 0+000.000 2,674.000 0.000 2,674.000
12 5.613 2,675.000
13 4.900 2,673.930
14 4.100 2,673.930
15 4.100 2,673.730
16 3.500 2,673.930
17 3.500 2,673.930
18 4.100 2,673.730
19 4.100 2,673.930
20 4.900 2,673.930
21 5.982 2,675.553
22 0+010.000 2,672.871 0.000 2,672.871
23 6.272 2,674.859
24 4.900 2,672.801
25 4.100 2,672.801
26 4.100 2,672.601
27 3.500 2,672.801
28 3.500 2,672.865
29 4.100 2,672.677
30 4.100 2,672.877
31 4.900 2,672.891
32 6.120 2,674.721
33 0+020.000 2,671.742 0.000 2,671.742
34 5.455 2,672.242
35 5.073 2,671.669
36 4.273 2,671.669
37 4.273 2,671.469
38 3.673 2,671.669
39 3.500 2,671.810
40 4.100 2,671.633
41 4.100 2,671.833
42 4.900 2,671.864
43 5.324 2,672.501
44 0+030.000 2,670.613 0.000 2,670.613
45 5.659 2,670.032
46 5.261 2,670.431
47 4.461 2,670.447
48 4.461 2,670.247
49 3.861 2,670.459
50 3.500 2,670.754
51 4.100 2,670.590
52 4.100 2,670.790
53 4.900 2,670.838
54 5.481 2,670.257
55 0+040.000 2,669.484 0.000 2,669.484
56 7.902 2,666.727
57 5.448 2,669.181
58 4.648 2,669.213
59 4.648 2,669.013

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
60 4.048 2,669.238
61 3.500 2,669.698
62 4.100 2,669.546
63 4.100 2,669.746
64 4.900 2,669.811
65 7.571 2,667.139
66 0+050.000 2,668.355 0.000 2,668.355
67 10.000 2,663.558
68 5.636 2,667.923
69 4.836 2,667.972
70 4.836 2,667.772
71 4.236 2,668.009
72 3.500 2,668.642
73 4.100 2,668.503
74 4.100 2,668.703
75 4.900 2,668.784
76 10.000 2,663.684
77 0+060.000 2,667.234 0.000 2,667.234
78 10.000 2,662.482
79 5.800 2,666.682
80 5.000 2,666.746
81 5.000 2,666.546
82 4.400 2,666.794
83 3.500 2,667.584
84 4.100 2,667.456
85 4.100 2,667.656
86 4.900 2,667.752
87 10.000 2,662.652
88 0+070.000 2,666.165 0.000 2,666.165
89 10.000 2,661.413
90 5.800 2,665.613
91 5.000 2,665.677
92 5.000 2,665.477
93 4.400 2,665.725
94 3.500 2,666.515
95 4.100 2,666.387
96 4.100 2,666.587
97 4.900 2,666.683
98 10.000 2,661.583
99 0+080.000 2,665.156 0.000 2,665.156
100 10.000 2,660.404
101 5.800 2,664.604
102 5.000 2,664.668
103 5.000 2,664.468
104 4.400 2,664.716
105 3.500 2,665.506
106 4.100 2,665.378
107 4.100 2,665.578
108 4.900 2,665.674
109 10.000 2,660.574
110 0+090.000 2,664.209 0.000 2,664.209
111 10.000 2,659.457
112 5.800 2,663.657
113 5.000 2,663.721
114 5.000 2,663.521
115 4.400 2,663.769
116 3.500 2,664.559
117 4.100 2,664.431
118 4.100 2,664.631

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
119 4.900 2,664.727
120 9.627 2,660.000
121 0+100.000 2,663.315 0.000 2,663.315
122 10.000 2,658.563
123 5.800 2,662.763
124 5.000 2,662.827
125 5.000 2,662.627
126 4.400 2,662.875
127 3.500 2,663.665
128 4.100 2,663.537
129 4.100 2,663.737
130 4.900 2,663.833
131 7.693 2,661.040
132 0+110.000 2,662.429 0.000 2,662.429
133 10.000 2,657.677
134 5.800 2,661.877
135 5.000 2,661.941
136 5.000 2,661.741
137 4.400 2,661.989
138 3.500 2,662.779
139 4.100 2,662.651
140 4.100 2,662.851
141 4.900 2,662.947
142 5.781 2,662.066
143 0+120.000 2,661.543 0.000 2,661.543
144 9.132 2,657.614
145 5.635 2,661.111
146 4.835 2,661.160
147 4.835 2,660.960
148 4.235 2,661.197
149 3.500 2,661.829
150 4.100 2,661.690
151 4.100 2,661.890
152 4.900 2,661.971
153 5.298 2,662.569
154 0+130.000 2,660.657 0.000 2,660.657
155 7.262 2,658.540
156 5.448 2,660.354
157 4.648 2,660.387
158 4.648 2,660.187
159 4.048 2,660.411
160 3.500 2,660.870
161 4.100 2,660.719
162 4.100 2,660.919
163 4.900 2,660.984
164 6.272 2,663.042
165 0+140.000 2,659.746 0.000 2,659.746
166 5.884 2,658.939
167 5.260 2,659.563
168 4.460 2,659.579
169 4.460 2,659.379
170 3.860 2,659.591
171 3.500 2,659.886
172 4.100 2,659.722
173 4.100 2,659.922
174 4.900 2,659.970
175 6.879 2,662.938
176 0+150.000 2,658.781 0.000 2,658.781
177 5.421 2,659.230

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
178 5.073 2,658.708
179 4.273 2,658.708
180 4.273 2,658.508
181 3.673 2,658.708
182 3.500 2,658.849
183 4.100 2,658.672
184 4.100 2,658.872
185 4.900 2,658.903
186 7.102 2,662.206
187 0+160.000 2,657.765 0.000 2,657.765
188 5.730 2,658.941
189 4.900 2,657.695
190 4.100 2,657.695
191 4.100 2,657.495
192 3.500 2,657.695
193 3.500 2,657.760
194 4.100 2,657.571
195 4.100 2,657.771
196 4.900 2,657.785
197 7.586 2,661.814
198 0+170.000 2,656.697 0.000 2,656.697
199 6.128 2,658.469
200 4.900 2,656.627
201 4.100 2,656.627
202 4.100 2,656.427
203 3.500 2,656.627
204 3.500 2,656.627
205 4.100 2,656.427
206 4.100 2,656.627
207 4.900 2,656.627
208 8.019 2,661.305
209 0+180.000 2,655.577 0.000 2,655.577
210 6.358 2,657.694
211 4.900 2,655.507
212 4.100 2,655.507
213 4.100 2,655.307
214 3.500 2,655.507
215 3.500 2,655.507
216 4.100 2,655.307
217 4.100 2,655.507
218 4.900 2,655.507
219 8.487 2,660.887
220 0+190.000 2,654.404 0.000 2,654.404
221 6.326 2,656.473
222 4.900 2,654.334
223 4.100 2,654.334
224 4.100 2,654.134
225 3.500 2,654.334
226 3.500 2,654.334
227 4.100 2,654.134
228 4.100 2,654.334
229 4.900 2,654.334
230 8.770 2,660.140
231 0+200.000 2,653.206 0.000 2,653.206
232 5.618 2,654.213
233 4.900 2,653.136
234 4.100 2,653.136
235 4.100 2,652.936
236 3.500 2,653.136

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
237 3.500 2,653.136
238 4.100 2,652.936
239 4.100 2,653.136
240 4.900 2,653.136
241 8.189 2,658.069
242 0+210.000 2,652.007 0.000 2,652.007
243 5.365 2,651.472
244 4.900 2,651.937
245 4.100 2,651.937
246 4.100 2,651.737
247 3.500 2,651.937
248 3.500 2,651.937
249 4.100 2,651.737
250 4.100 2,651.937
251 4.900 2,651.937
252 7.628 2,656.029
253 0+220.000 2,650.809 0.000 2,650.809
254 6.472 2,649.167
255 4.900 2,650.739
256 4.100 2,650.739
257 4.100 2,650.539
258 3.500 2,650.739
259 3.500 2,650.739
260 4.100 2,650.539
261 4.100 2,650.739
262 4.900 2,650.739
263 7.112 2,654.056
264 0+230.000 2,649.610 0.000 2,649.610
265 7.812 2,646.628
266 4.900 2,649.540
267 4.100 2,649.540
268 4.100 2,649.340
269 3.500 2,649.540
270 3.500 2,649.540
271 4.100 2,649.340
272 4.100 2,649.540
273 4.900 2,649.540
274 6.627 2,652.131
275 0+240.000 2,648.411 0.000 2,648.411
276 8.067 2,645.174
277 4.900 2,648.341
278 4.100 2,648.341
279 4.100 2,648.141
280 3.500 2,648.341
281 3.500 2,648.341
282 4.100 2,648.141
283 4.100 2,648.341
284 4.900 2,648.341
285 6.798 2,651.188

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
1
2
3
4
5
6
7
8 DESCRIPCION
9
10
11 CL
12 Cero
13 Hombro Subrasante
14
15
16
17
18
19
20 Hombro Subrasante
21 Cero
22 CL
23 Cero
24 Hombro Subrasante
25
26
27
28
29
30
31 Hombro Subrasante
32 Cero
33 CL
34 Cero
35 Hombro Subrasante
36
37
38
39
40
41
42 Hombro Subrasante
43 Cero
44 CL
45 Cero
46 Hombro Subrasante
47
48
49
50
51
52
53 Hombro Subrasante
54 Cero
55 CL
56 Cero
57 Hombro Subrasante
58
59

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
60
61
62
63
64 Hombro Subrasante
65 Cero
66 CL
67 Cero
68 Hombro Subrasante
69
70
71
72
73
74
75 Hombro Subrasante
76 Cero
77 CL
78 Cero
79 Hombro Subrasante
80
81
82
83
84
85
86 Hombro Subrasante
87 Cero
88 CL
89 Cero
90 Hombro Subrasante
91
92
93
94
95
96
97 Hombro Subrasante
98 Cero
99 CL
100 Cero
101 Hombro Subrasante
102
103
104
105
106
107
108 Hombro Subrasante
109 Cero
110 CL
111 Cero
112 Hombro Subrasante
113
114
115
116
117
118

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
119 Hombro Subrasante
120 Cero
121 CL
122 Cero
123 Hombro Subrasante
124
125
126
127
128
129
130 Hombro Subrasante
131 Cero
132 CL
133 Cero
134 Hombro Subrasante
135
136
137
138
139
140
141 Hombro Subrasante
142 Cero
143 CL
144 Cero
145 Hombro Subrasante
146
147
148
149
150
151
152 Hombro Subrasante
153 Cero
154 CL
155 Cero
156 Hombro Subrasante
157
158
159
160
161
162
163 Hombro Subrasante
164 Cero
165 CL
166 Cero
167 Hombro Subrasante
168
169
170
171
172
173
174 Hombro Subrasante
175 Cero
176 CL
177 Cero

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
178 Hombro Subrasante
179
180
181
182
183
184
185 Hombro Subrasante
186 Cero
187 CL
188 Cero
189 Hombro Subrasante
190
191
192
193
194
195
196 Hombro Subrasante
197 Cero
198 CL
199 Cero
200 Hombro Subrasante
201
202
203
204
205
206
207 Hombro Subrasante
208 Cero
209 CL
210 Cero
211 Hombro Subrasante
212
213
214
215
216
217
218 Hombro Subrasante
219 Cero
220 CL
221 Cero
222 Hombro Subrasante
223
224
225
226
227
228
229 Hombro Subrasante
230 Cero
231 CL
232 Cero
233 Hombro Subrasante
234
235
236

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
237
238
239
240 Hombro Subrasante
241 Cero
242 CL
243 Cero
244 Hombro Subrasante
245
246
247
248
249
250
251 Hombro Subrasante
252 Cero
253 CL
254 Cero
255 Hombro Subrasante
256
257
258
259
260
261
262 Hombro Subrasante
263 Cero
264 CL
265 Cero
266 Hombro Subrasante
267
268
269
270
271
272
273 Hombro Subrasante
274 Cero
275 CL
276 Cero
277 Hombro Subrasante
278
279
280
281
282
283
284 Hombro Subrasante
285 Cero

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
CAMINO:
TRAMO: ESTACION:
SUB-TRAMO: ORIGEN:

NOTA: Los conceptos que se incluirán


SIMBOLOGIA en el cálculo de volúmenes aparecen
DC DESPALME EN CORTE subrayados. Se ha considerado el
DT DESPALME EN TERRAPLEN
terreno ya despalmado al calcular áreas
y volúmenes de corte y terraplén.
C CORTE
T TERRAPLEN
SB SUB BASE
BH BASE
CA CARPETA

COORDENADA INICIAL DE CURVA


MASA 10,000.00 AREAS
SECCIONES DE ELEVACIONES ESPESORES DESPALME Factor de
TN SEMI-
LEVANTADAS
C T SB BH CA abundamiento DISTANCIA
EN CAMPO TN SUBRASANTE C T DC DT en corte

0+000.000 2675.000 2674.000 1.00 0.00 0.00 0.00 15.93 0.00 2.10 1.40 0.70
0+010.000 2674.647 2672.871 1.78 0.00 0.00 0.00 24.63 0.00 2.10 1.40 0.70 1.00 5.00
0+020.000 2672.326 2671.742 0.58 0.00 0.00 0.00 10.47 0.00 2.15 1.43 0.72 1.00 5.00
0+030.000 2670.150 2670.613 0.00 0.46 0.00 0.00 1.03 1.45 2.21 1.47 0.74 1.00 5.00
0+040.000 2666.922 2669.484 0.00 2.56 0.00 0.00 0.00 28.26 2.26 1.51 0.75 1.00 5.00
0+050.000 2663.437 2668.355 0.00 4.92 0.00 0.00 0.00 72.45 2.32 1.55 0.77 1.00 5.00
0+060.000 2659.512 2667.234 0.00 7.72 0.00 0.00 0.00 124.97 2.37 1.58 0.79 1.00 5.00
0+070.000 2658.721 2666.165 0.00 7.44 0.00 0.00 0.00 120.09 2.37 1.58 0.79 1.00 5.00
0+080.000 2658.374 2665.156 0.00 6.78 0.00 0.00 0.00 105.71 2.37 1.58 0.79 1.00 5.00
0+090.000 2658.036 2664.209 0.00 6.17 0.00 0.00 0.00 96.35 2.37 1.58 0.79 1.00 5.00
0+100.000 2658.938 2663.315 0.00 4.38 0.00 0.00 0.00 62.98 2.37 1.58 0.79 1.00 5.00
0+110.000 2659.978 2662.429 0.00 2.45 0.00 0.00 0.00 32.36 2.37 1.58 0.79 1.00 5.00
0+120.000 2660.625 2661.543 0.00 0.92 0.00 0.00 1.36 11.16 2.32 1.55 0.77 1.00 5.00
0+130.000 2660.819 2660.657 0.16 0.00 0.00 0.00 8.54 2.86 2.26 1.51 0.75 1.00 5.00
0+140.000 2660.737 2659.746 0.99 0.00 0.00 0.00 16.75 0.42 2.21 1.47 0.74 1.00 5.00
0+150.000 2660.571 2658.781 1.79 0.00 0.00 0.00 25.11 0.00 2.15 1.43 0.72 1.00 5.00
0+160.000 2660.211 2657.765 2.45 0.00 0.00 0.00 33.82 0.00 2.10 1.40 0.70 1.00 5.00
0+170.000 2659.774 2656.697 3.08 0.00 0.00 0.00 42.40 0.00 2.10 1.40 0.70 1.00 5.00
0+180.000 2659.065 2655.577 3.49 0.00 0.00 0.00 49.46 0.00 2.10 1.40 0.70 1.00 5.00
0+190.000 2658.027 2654.404 3.62 0.00 0.00 0.00 51.58 0.00 2.10 1.40 0.70 1.00 5.00
0+200.000 2655.770 2653.206 2.56 0.00 0.00 0.00 36.46 0.00 2.10 1.40 0.70 1.00 5.00
0+210.000 2653.255 2652.007 1.25 0.00 0.00 0.00 21.26 0.21 2.10 1.40 0.70 1.00 5.00
0+220.000 2651.488 2650.809 0.68 0.00 0.00 0.00 15.05 1.57 2.10 1.40 0.70 1.00 5.00
0+230.000 2649.649 2649.610 0.04 0.00 0.00 0.00 9.17 5.44 2.10 1.40 0.70 1.00 5.00
0+240.000 2648.411 2648.411 0.00 0.00 0.00 0.00 10.18 6.02 2.10 1.40 0.70 1.00 5.00
VOLUMENES
DESPALME
RESUMEN (ORDENADAS DE LA
C T SB BH CA
CURVA MASA)
DC DT

0+000.000 10,000.00
0.00 0.00 202.84 0.00 21.00 14.00 7.00 0+010.000 10,202.84
0.00 0.00 175.52 0.00 21.26 14.17 7.09 0+020.000 10,378.36
0.00 0.00 57.51 7.25 21.80 14.53 7.27 0+030.000 10,428.62
0.00 0.00 5.16 148.57 22.36 14.91 7.45 0+040.000 10,285.21
0.00 0.00 0.00 503.56 22.93 15.28 7.64 0+050.000 9,781.65
0.00 0.00 0.00 987.12 23.45 15.64 7.82 0+060.000 8,794.53
0.00 0.00 0.00 1225.31 23.70 15.80 7.90 0+070.000 7,569.22
0.00 0.00 0.00 1128.98 23.70 15.80 7.90 0+080.000 6,440.24
0.00 0.00 0.00 1010.32 23.70 15.80 7.90 0+090.000 5,429.91
0.00 0.00 0.00 796.68 23.70 15.80 7.90 0+100.000 4,633.23
0.00 0.00 0.00 476.69 23.70 15.80 7.90 0+110.000 4,156.55
0.00 0.00 6.78 217.57 23.45 15.64 7.82 0+120.000 3,945.75
0.00 0.00 49.49 70.09 22.92 15.28 7.64 0+130.000 3,925.15
0.00 0.00 126.47 16.40 22.36 14.91 7.45 0+140.000 4,035.22
0.00 0.00 209.32 2.11 21.80 14.53 7.27 0+150.000 4,242.43
0.00 0.00 294.66 0.00 21.26 14.17 7.09 0+160.000 4,537.09
0.00 0.00 381.09 0.00 21.00 14.00 7.00 0+170.000 4,918.18
0.00 0.00 459.31 0.00 21.00 14.00 7.00 0+180.000 5,377.50
0.00 0.00 505.21 0.00 21.00 14.00 7.00 0+190.000 5,882.70
0.00 0.00 440.17 0.00 21.00 14.00 7.00 0+200.000 6,322.87
0.00 0.00 288.56 1.07 21.00 14.00 7.00 0+210.000 6,610.36
0.00 0.00 181.51 8.93 21.00 14.00 7.00 0+220.000 6,782.94
0.00 0.00 121.08 35.07 21.00 14.00 7.00 0+230.000 6,868.94
0.00 0.00 96.75 57.29 21.00 14.00 7.00 0+240.000 6,908.39