The Demand Driven Operating Model Pyramid: Position, Protect & Pull
The Demand Driven Operating Model Pyramid: Position, Protect & Pull
Fundamental Principle
FLOW
The Demand Driven Operating Model Formula
Net Profit
∆Flow → ∆Cash Velocity → ∆ ( Investment ) → ∆ROI
Plossl’s First Law of Manufacturing and the Demand Driven Model
Cash velocity is the rate of net cash generation; sales dollars minus truly
variable costs (aka contribution margin) minus period operating expense.
Net Profit
∆Visibility → ∆Variability → ∆Flow → ∆Cash Velocity → ∆ ( Investment ) → ∆ROI
Core Conflict Area Plossl’s First Law of Manufacturing and the Demand Driven Model
Cash velocity is the rate of net cash generation; sales revenue minus truly
variable costs (aka contribution margin) minus period operating expense.
Demand Actual
Driven MRP Demand
Demand Driven
Capacity Scheduling
Demand Driven
Execution
CDDL and CDDL Positions in the DDOM Schema
Demand Sales
Driven MRP Orders
Demand Driven
Capacity Scheduling
Demand Driven
Execution
Demand Driven S&OP (DDS&OP)
Definition
DDS&OP is a bi-directional integration point in a Demand Driven Adaptive
System between the strategic (annual, quarterly and monthly) and tactical
(hourly, daily and weekly) relevant ranges of decision making. DDS&OP sets
key parameters of a Demand Driven Operating Model based on business
strategy, market intelligence and key business objectives (strategic
information and requirements). DDS&OP also projects the model
performance based on the strategic information and requirements and
various model settings. Additionally, DDS&OP uses variance analysis based on
past model performance (reliability, stability and velocity) to adapt the key
parameters of a Demand Driven Operating Model and/or recommend
strategic alterations to the model and project their respective impact on the
business.
Demand Driven S&OP Schema
Demand Driven
Plan Parameters Model Projections
Model Parameter Management
NEW
PORTFOLIO
ACTIVITIES
Demand Sales
Promise Dates Driven MRP Orders
Demand Driven
Capacity Scheduling
Supply Orders (PO, MO, STO)
with Net Flow Priority
Work Order Releases
Planned
Part Profile
Buffer Profiles Adjustment Part ADU
Assignment
Factors
External Orders
for Components
(Sales Orders)
DDMRP
Inventory (Supply Order Product
Record File Generation and Structure file
Execution Alerts)
Demand Driven
Capacity
Scheduling Demand Driven
All material and content © Execution
copyright 2015 Demand
Driven Institute. All rights
reserved.
Certified Demand Driven
Explaining Each Component
The groupings and settings for replenished parts (part type,
Buffer Profiles
variability and lead time)
Time Buffer
Time Buffer Resource Resource Part Profile
Profiles Assignment Properties Properties Assignment
Demand Manufacturing
Driven Orders with request
All material and content © dates (from DDMRP)
copyright 2015 Demand Scheduling
Driven Institute. All rights
reserved.
Certified Demand Driven
Explaining Each Component
Time Buffer
Profiles The time buffer groupings and settings for scheduled parts
Resource Management
Part Management
NEW
PORTFOLIO
ACTIVITIES
Warning (High)
Optimal
Warning (Low)
Extreme Low
Too Little
Demand Driven
Plan Parameters Model Projections
CAPABILITIES PERFORMANCE
TARGETS DEMAND
NEW
PORTFOLIO
ACTIVITIES
Projected Projected
Capabilities ADU
Capacity Load
Impact
Working
MODEL AND PART
Capital
PARAMETERS Impact
Demand Driven
Variance Analysis
Demand Driven Space Impact
Operating Model
Projected Change to XYZ Projected Change to ZYX
2500 1400
2000 1200
1000
1500 800
1000 600
400
500 200
0 0
XYZ (now) XYZ (projected) ZYX (now) ZYX (projected)
Green 500 563 Green 250 263
Yellow 500 750 Yellow 350 525
Red 563 845 Red 263 395
Average OH 813 1126.5 Average OH 388 526.5
Red Yellow Green Average OH Red Yellow Green Average OH
Demand Driven
Operating Model Strategic Planning
Actual orders
Business Plan (market intelligence,
(DDMRP, DDDRP, Demand
(financial expectations) business objectives,
Driven Scheduling &
Execution) strategic decisions)
Sub-
Foundry Component
Assembler
OEM
DISTORTIONS TO RELEVANT
WHY? INFORMATION
WHY? WHY?
MRP is loaded with
WHY?
forecasts
Cumulative Manufacturing and MRP Plans (timing and
Procurement Times are much longer quantity requirements) are
than customer tolerance times MRP treats everything built using all dependencies
as dependent
WHY?