W5161.

13-2 Rectifier and inverter cabinet installation


2.0.1This chaper is applicable to the installation quality acceptance of DC screens, uninterruptible power supply cabinets, power generation control cabinets, high voltage inverter cabinet and excitation
cabinets and excitation regulator cabinets.
2.0.2 The Installation quality acceptance of DC screen, uninterruptible power supply cabinet and electric dust control shall meet the requirements of Table 2.0.2

Project Number Table Number

Installation location

Installation
Voltage level
location

Model
Manufacture
specification

Process Test Item Nature Quality Standard Q-A Result Conclusion

Exterior No damage frame

Equipment layout The cabinet is painted, the locks and glass


doors are intact

Vertically Meet the design document requirements

Horizontal Two adjacent cabinet tops <1.5mm/m


Cabinet
Installation error
Column top <2mm
Two adjacnet cabinets <5mm
Disk
error Rows of countertops <1mm

Cabinet indirect seam <5mm


Cabinet fixed <2mm

Cabinet ground Firm, galvanized fasteners are intact ,


Master
complete
Ground
Ground opening for screen door The Grounding cell is well connected
the grounding mark is obvious

Visual inspection of various parts Multi-strand cross-sectional area is not less


than 4mm, soft steel wire

Each type of specification Meet the design document requirements


Equipment
inspection Implant retention Master Intact, reliable connection
in the
cabinet Hard busbar installation Comply with GB50149

The wiring is correct, the connection is


Wiring in the cabinet reliable, the marking is clear, and the 4
cable screen is grounded correctly

Air cooling Fall installation Install fast ,turn inside and work correct,
system turn flexibly.
inspection Filter inspection Clean

Air insulation>20mm
Live part Interphase and ground distance Master composite insulation meets product
inspection
techincal documentation requirements
Acceptance Conclusion: