H5161.16-Form 1.0.

2 Laying of pipelines and trunking


1.0.1 This chapter is applicable to the quality acceptance of steel pipes for power use, lighting steel pipes, plastic pipes, and trunkings of 1KV below in buildings and structures
1.0.2 The quality acceptance of the laying and installation of pipelines and trunking shall meet the requirements of Table 1.0.2

Process Test Items Nature Quality standard Quality acceptance Quality standard

Model, specification, material Mee the requirements of design


documents

No damage on the outer surface, no


Exterior cracks, no distortion, no burrs on the
inner surface, no impurities

Path, location, way Mee the requirements of design


documents

Ming with cather >6D( when there is only one bend


between two junction box)
Bending
Pipeline Concealed in concrete
radius >6D
preparation
Underground match >10D

Flatness No wrinkles, four sinks and seams

Nozzel Flat and smooth

Model Matching with switch and socket


cover

Junction box Installation Location Mee the requirements of design


Installation documents

Fixed Firm, no easy to damage

The thread length of the pipe and


Ordinary thread connection should not be less than 1/2 of the pipe
joint; after connection, the thread
Steel
should be exposed 2~3 buckles
pipe

Casing connection The length of the new tube should not be less
than 2.2 times tha outer diameter of the tube

Pipe route groove Plastic pipe Strongly glued


coonection
Steel lock nut fit 2 buttons~3 buttons
Into the box
Steel pipe welding 3mm~5mm higher than the inner wall, falt welding
coordination
Direct enry
3mm~5mm higher than the inner wall welding
Into the floor distribution box
50mm 80mm higher than the bottom of the box,
neatly arranged
Protect with hose Nozzel bangage tightly
Trasitional
With special joint hose Reliable connection and good sealing
Pipe route groove
coonection Connection interface Straigth, tight groove cover should be complete,
no warped angle

Connection, fixed bolt Cross from inside to outside, nut on outside

General road level, vertical error Exposure method, deviation <1.5mm


Master
overall length deviation < 10mm
Count in parallel Master Hot Water> 300m steam >1000mm
Laying of pipe Distance to
route trough heating Lat below or horizontally parallel Master 200mm for hot water, steam> 500mm
pipeline
Cross laying Master Hot water> 100mm, steam >300mm
Fixed Evenly spaced, firm and reliable

Isolation seal filler Master Smooth, no cracks

Mate seal Good

Anti-corrosion treatment should be done for non


locking zinc steel pipes and the clean galvanized
Anticorrosion of pipelines and accessories layer(steel pipes are buried in the concrete, and
the outer wall may not be treated for corrosion
protection)

It shall be gounded reliably and shall not be used


Other
Upper control as a connecting conductor for other equipment
gournding

Metal Wire structure The beginning of the trunking should be reliably


Master
Grounded grounded

When the total length exceeds 30m, increase and


1 Control
ground protection every 20m~30m

Steel pipe It can be connected to the main grounding grid.


Master
Good jumper continuity
Acceptance conclusion:

Signature of Acceptance unit

Construction unit

Supervision unit
H5161.16-Form2.0.2 Wiring
2.0.1 This chapter applies to the installation quality acceptance of power lighting wiring with a rated voltage of 1KV and below.
2.0.2 The power and lighting wiring inspection quality acceptance shall meet the requirements of Table 2.0.2

Process Test Items Nature Quality standard Quality acceptance Result

Model, specification Meet the requirements of design


Wiring documents
inspection
Insulation protection layer Intact, no damage

Unblocked, no debris, stangnant


In-pipe inspection
water
Meet the requirements of design
Circuit layout
documents
Not more than 40% of the space
The conductor occupies the space in the protection tube, and the
in the protection tube total number of wires is not
Wiring
official, 8wires
Nozzel protector complete

No damage, no knots
Wire through tube
The AC signal core does not fit
in the steel pipe alone
In-tube wire No head press
NO distortion, broken strands,
Visual inspection of steel cable
rust
Cable terminal pull ring installaton Reliable call

Wire rope Gear distance<50m, installed at one end


installation of flower basket bolt 50m< Gear distance<100m, installed
wiring
at both ends
Slack <100m
Distance between fixed supports
Meet the requirements of GB 50575
for cable wiring
Stripping No damage to the core

Wiring Single copper wire is hinged and


Wire Tight, good contact
welded
connection
Casing connection Wire and casing specifications match

After Protective ground connection Master Reliable


wiring Cover plate Complete, fixed and tight
Acceptance Conclusion :

Signature of Acceptance Unit

Construction unit

Supervision unit