PO FINISHING TOWER CONDENSER AIR COOLER COST 08/06/2021

PIKULIK AIR COOLER COST ESTIMATE AS IN ASPEN

Bare Tube Area/Section, sf = 8,011 Range 2000 to 7000 sq ft.


No. of Sections 1 Best to use total Area and not break up into sections.
Design Pressure, psia = 150 Enter 150, 250 or 500 psi
Tube Length, ft. = 30 Enter 16, 24, 30, or 40. Default = 16. (for Tube Length Factor)
Material of Construction 1 1= cs, 2 = 304 ss, 3 = 316 SS, 4= Alum (Select 1 to 4)
No. of tube rows 5 Enter 4,5, or 6, Default = 5 (for Tube Row Factor)
Time Period = 1st Qrt 88 Fab Eqt Index= 325.1 Base Index = 253.7 1st qrt 79
Conversion to CDN$ = 1.3 $CDN/$U.S.
Duty factor 1.225 Now made in Canada, Max 1.225 duty may be applicable.
Freeze Protection = 1.1 Range = 1.1 to 1.3. Default = 1.1.
Explosion Proof Motors = 1.0 Range = 1.1 to 1.2. Default = 1.1. (1.0 = Non Explosion Proof).

Base $U.S. = $183,647 $22.92 U.S.$/sm = $246.75


U.S. $/SF =
CDN $ Cost = $354,679 $44.27 CDN$/sm = $476.55
CDN$/SF =
Total Cost = $354,679
CDN $
Tube Row Factor Cost Includes/Excludes
4 1.15
5 1.05 0 FOB Manufacturere's Shop
6 1 1.05 Finned Tubes
Tube Row Factor = 0 Steel Supporting Structure
1.05 Plenum Chambers
Tube Length Factor Axial-flow Fans
16 1.17 Louvers
24 1.1 0 Fan Guard
30 1.05 0 Positioner
40 1 1.05
Tube Length Factor = 0 No Freeze Protection (Add 10 / 30% if Req'd)
1.05 Fan Motors not Explosion Proof (Add 10 / 20%).
Material Of Construction Factor
1 cs 1
2 304 ss 1 0 Fab Eqt Index % Escalation 2.00%
3 316 ss 2 0 1988 325.18
4 Aluminum 2.5 0 1989 331.68
Material Factor = 1.5 1 1990 338.31

Pressure Factor
150 1
250 1.05 1
500 1.1 0
Pressure Correction Factor = 0