The document provides a cost estimate for a PO finishing tower condenser air cooler. It estimates the total Canadian dollar cost to be $354,679 based on an 8,011 square foot bare tube area, 5 tube rows, a tube length of 30 feet, a design pressure of 150 psi, and construction from carbon steel. It lists various factors that were applied to calculate the cost, such as duty, freeze protection, tube length, materials, and pressure.
The document provides a cost estimate for a PO finishing tower condenser air cooler. It estimates the total Canadian dollar cost to be $354,679 based on an 8,011 square foot bare tube area, 5 tube rows, a tube length of 30 feet, a design pressure of 150 psi, and construction from carbon steel. It lists various factors that were applied to calculate the cost, such as duty, freeze protection, tube length, materials, and pressure.
The document provides a cost estimate for a PO finishing tower condenser air cooler. It estimates the total Canadian dollar cost to be $354,679 based on an 8,011 square foot bare tube area, 5 tube rows, a tube length of 30 feet, a design pressure of 150 psi, and construction from carbon steel. It lists various factors that were applied to calculate the cost, such as duty, freeze protection, tube length, materials, and pressure.
PO FINISHING TOWER CONDENSER AIR COOLER COST 08/06/2021
PIKULIK AIR COOLER COST ESTIMATE AS IN ASPEN
Bare Tube Area/Section, sf = 8,011 Range 2000 to 7000 sq ft.
No. of Sections 1 Best to use total Area and not break up into sections. Design Pressure, psia = 150 Enter 150, 250 or 500 psi Tube Length, ft. = 30 Enter 16, 24, 30, or 40. Default = 16. (for Tube Length Factor) Material of Construction 1 1= cs, 2 = 304 ss, 3 = 316 SS, 4= Alum (Select 1 to 4) No. of tube rows 5 Enter 4,5, or 6, Default = 5 (for Tube Row Factor) Time Period = 1st Qrt 88 Fab Eqt Index= 325.1 Base Index = 253.7 1st qrt 79 Conversion to CDN$ = 1.3 $CDN/$U.S. Duty factor 1.225 Now made in Canada, Max 1.225 duty may be applicable. Freeze Protection = 1.1 Range = 1.1 to 1.3. Default = 1.1. Explosion Proof Motors = 1.0 Range = 1.1 to 1.2. Default = 1.1. (1.0 = Non Explosion Proof).
Base $U.S. = $183,647 $22.92 U.S.$/sm = $246.75
U.S. $/SF = CDN $ Cost = $354,679 $44.27 CDN$/sm = $476.55 CDN$/SF = Total Cost = $354,679 CDN $ Tube Row Factor Cost Includes/Excludes 4 1.15 5 1.05 0 FOB Manufacturere's Shop 6 1 1.05 Finned Tubes Tube Row Factor = 0 Steel Supporting Structure 1.05 Plenum Chambers Tube Length Factor Axial-flow Fans 16 1.17 Louvers 24 1.1 0 Fan Guard 30 1.05 0 Positioner 40 1 1.05 Tube Length Factor = 0 No Freeze Protection (Add 10 / 30% if Req'd) 1.05 Fan Motors not Explosion Proof (Add 10 / 20%). Material Of Construction Factor 1 cs 1 2 304 ss 1 0 Fab Eqt Index % Escalation 2.00% 3 316 ss 2 0 1988 325.18 4 Aluminum 2.5 0 1989 331.68 Material Factor = 1.5 1 1990 338.31