Presentation Guidelines: Case Study - Zero Defect Drive by Laxmikant Mishra
Presentation Guidelines: Case Study - Zero Defect Drive by Laxmikant Mishra
58 Plants Globally
15 Joint Ventures
8 R&D Centers
DOOR LAMP
PANEL SWITCHES
SWITCH
People
• Trained, Passionate & Capable
• Attitude of continuous improvement.
• TEI through Kaizens, Quality circle etc.
• Learning opportunities.
We Needed to Step Back, Reinvent ourselves & Reinforce Quality mind-set with
target of Zero defect…
PFMEA
Review of Through TQM -
Happened and Advance Quality
May-Happen Cases Tools
Total
Element wise break up of process Poka Yoke
975
20
7
Shop Floor Rule Adherence 13/28
Daily Review
DHC
Red Point
Process Equipment Leader
Daily Audit
Level Level
6-Production Daily Audit DHC
DHC DHC
Rule as per Check
Process 6-Production Equipment
Sheet Rule
1. ANDON
2. Production Control Board
3. Quality Control Board
4. Inventory
5. Kanban
6. Standard Work
Continual Improvement 14/28
Assembly Head
(3 Team Leaders)
Moulding
Line Leader Line Leader Line Leader Line Leader Line Leader Head
(8~9 (8~9 (8~9 (8~9 (8~9
associates) associates) associates) associates) associates)
Area
Areawise
wiseManpower
ManpowerDeployed
DeployedininRQC
RQC(Before)
(After)
Receiving Quality
Control Department
Inspector-6 Inspector-6
Inspector-7 Inspector-7
Inspector-8 Inspector-8
Theory to Practice based DOJO Centre 17/28
Focus only on SPEED: Skill level redefined into 4 Contact Ht. Check. L-3 L-2
levels:
Riveting Manual riveting. L-3 L-3
Skill level L-1 Under training
Vision testing. L-3 L-3
Can do L-3
Final testing Contact Gap testing L-3
L-2 Can work independently Final Testing. L-3 L-3
Multiskilling & Refresh Training Schedule Are aligned as per Skill Inventory Gap.
Supplier Support 19/28
BEFORE
AFTER
Separate Cell for
Supplier Quality Assurance Receiving Quality Control
Supplier Up-gradation
Quality Gate Deployment Change Management Deployment on Shop floor PQCDSM Monitoring Red Bin analysis Daily Basis
92% 1.1%
85%
PPM
83% 0.6% 0.4%
Tier-2 Supplier 0.32% Monitor to meet
PPM
3 0 0 0 0 0.11% 0.07%
PQCDSM FY 17- FY 18- FY 19- FY 20- FY 21- FY 22- FY 17- FY 18- FY 19- FY 20- FY 21- FY 22-
the requirement
FY 17- FY 18- FY 19- FY 20- FY 21- FY 22-
18 19 20 21 22 23 18 19 20 21 22 23 18 19 20 21 22 23
(P) (P) (P) (P) (P) (P) (P) (P) (P) (P) (P) (P)
YEAR YEAR YEAR
3E Program
Supplier Training Best Practices Deployment Kaizens at suppliers
20
feedback Score
Tier 2 Cluster / 14 16 10
12
870 1020 Collection
3E Program 6 590
Expansion of Tier 2
Effectiveness Program 12/24/36
2017-18 2018-19 2019-20 2017-18 2018-19 2019-20 2017-18 2018-19 2019-20 month
Single Piece Flow 22/28
AFTER
BEFORE
Sub-Assy. Merged Main Line Problem:-
60 • One Piece flow not
maintained on line.
Effect on Quality:-
Sub-Assy.
Station- Station- Main LineStation-
Station- Station- • FIFO not maintained.
40 Takt Time - 36
01 02 01 02 03 • No immediate
recognition of Flaw.
• Chances of Part mix-up.
Station-01 Station-02 Station-03 Station-04 Station-05 20 33 34 34 33
0
Stock Pile-up
removed after
Op-01 Op-02 Op-03 Op-04
Line Balancing.
Line Balancing
One-Piece Flow Maintained by commonizing Sub-Assy & Main Line.
FIFO maintained for Child Parts as well as Final Products.
Immediate recognition of flaw.
Mfg. Speed synchronized with Customer Demand.
Mould Maintenance Initiatives 23/28
3. Lock plate provision to avoid mold 4. Strict use of copper rod for stuck part 5. Silicon free spray to reduce rust
opening during loading / unloading removal to avoid core / cavity damage formation
Tool Duplication & Flash Free Drive 24/28
At Mindarika At Suppliers
Tool Duplication Status 18-19 Tool Duplication Status 18-19
35 49
31
36
No of tools
No of tools
Plan Actual Plan Actual
Flash free Drive Status 18-19 Flash free Drive Status 18-19
46 132
116
No of tools
No of tools
30
Nos
Nos
Nos
Quality reviews through DWM – Daily Work Management Quality Obeya Meeting
Thank You