OWNING & OPERATION COST FOR 200 TPH CRUSHING PLANT
15 Average Production in Tons per Hour (90% site efficiency) INR 153.00 Ton/Hr Total Owning Cost per Ton INR
Crushing Plant OPERATING COST:
17 Cost of Fuel per ton INR 31.05 18 Cost of Lubricants, Grease, etc and Filters per ton INR 3.00 19 Cost of Manpower, Admn. & Overhead per ton INR 7.00 20 Cost of Wear and Spare Items per ton* INR 27.00 21 Mining cost/cost of raw material INR 100.00 22 Per Ton Cost Of Loading INR 23.00 Total Operating Cost per Ton INR 191.05 Crushing Cost