Innovation

… in Material Handling System

Engineering Solutions
WHAT WE DO FOR MATERIAL HANDLING
Introduction of Sinonn’s Material Handling Technologies
Shanghai Sinonn New Energy Investment Co., Ltd. is a global high-tech enterprise owning complete material handling solutions.
In ash handling, Sinonn possess Pressure Dense-phase, Pressure dDlute-phase and Vacuum Pressure conveying technologies; In slurry
disposal, Sinonn owns Wet and Dry handling technologies. In addition, we also have pneumatic handling technologies applicable to limestone
powder and coal mill reject in power plants, steel mills, cement plants and oil renery plants.

With independent Research & Development center, Sinonn has been at frontier of world advanced technology in its eld to maintain the safety, reliability
and progressiveness of material handling technologies.

ENGINEERING FIELD ENGAGING IN


Stack

Boiler Boiler Economizer

Electrostatic
Precipitator

S02 Fabric Filter


Reactor

Bottom Ash Hopper Flue Gas Fan


Tank for Absorbent

Submerged Drag Chain

S02 Residue
Silo
Ash Pond
Fly Ash Silo

Harbor Silo
Dry Outlet Chute

Dewatering System

Bucket Elevator

Phase Ⅰ Accumulation Phase Ⅱ Fluidization & Pressurization


Inlet valve OPEN Inlet valve CLOSED
Outlet valve CLOSED Outlet valve CLOSED
Air valve CLOSED Air valve OPEN
Function: Material accumulates in the blow tank until a level sensor Function: Compressed air enters blow tank through the uidizing disc at
initiates uidization Phase the base, pressurizing the blow tank and thoroughly uidizing
the material. At completion, the pressure switch initiates the
discharge phase
Phase Ⅲ Discharging Phase Ⅳ Conveying
Inlet valve CLOSED Inlet valve CLOSED
Outlet valve OPEN Outlet valve OPEN
Air valve OPEN Air valve OPEN
Function: Fluidized material is discharged into the pipeline by Function: Material is being conveyed through the pipeline to a silo. The
compressed air in the form of a continuous dense column. pressure switch senses completion of conveying and Phase I
begins again.

www.sinofinn.cn
WHAT WE ARE SPECIALISED

1 FLY ASH HANDLING SYSTEM 3 LIMESTONE POWDER HANDLING SYSTEM

2 BOTTOM ASH HANDLING SYSTEM 4 COAL MILL REJECT HANDLING SYSTEM

FLY ASH HANDLING SYSTEM

Composition & Work Flow of Dense-Phase Pneumatic Conveying

Fly Ash Handling By Upper Leading-type Vessel

www.sinofinn.cn
Fly Ash Handling by Underneath Leading-Type Vessel
Underneath Leading-Type Vessel+ PIP Conveying

Coarse Material Handling by Middle Leading-Type Vessel

Fluidizing Pad for


New Middle Leading
-Type Vessel

www.sinofinn.cn
LARGE OUTPUT CONVEYING CAPACITY TECHNOLOGY
Ash Flow Direction

Continuous Conveying:
Design Mechanism: two groups of conveying vessels with same output capacity
share same conveying pipeline. That is one group of vessels conveys while the
other group collects ash. Stop the rst group after all of the ash in this group has
been conveyed into the pipeline, and meanwhile start to convey the ash in the
other group. Repeat this operation for these two groups on regular basis to
guarantee that there is always ash available in the pipeline, so that the ash can be
continuously conveyed to ash silos.

Air Flow Direction

Ash Flow Direction

Air Flow Direction

Conveying by Multiple Big Conveying Vessels in Tandem:


Adopt three or four 5m³ above vessels in tandem, and use PIP (Pipe-in-Pipe) conveying to boost output capacity at each conveying circulation,
reduce the blowing time and conveying frequency and increase conveying output of the system

www.sinofinn.cn
LONG CONVEYING DISTANCE TECHNOLOGY OF PIP

1. Convey Vessel
2. Ash-gas Mixer
3. Air Supply
4. Pipe-In-Pipe Line
5. Ash Discharge Pipeline
6. Ash Silo
7. Bag Filter
8. Level Transmitter

www.sinofinn.cn
MERITS OF SINOFINN’S PNEUMATIC FLY ASH HANDLING SYSTEM
Safe and Reliable Structure Large ash-gas Ratio Low Conveying Velocity Widely Applicable

Key Equipment in Fly Ash Handling System - Convey Vessel

LPT-type Vessel L-type Vessel PD-type Vessel

SPT-type Vessel T—type vessel PT-type vessel

Key Equipment in Fly Ash Handling System-Dome Valve

Used as : Ash Feeding Valve, Vent Valve and Ash Discharge Valve, etc.
Material of Main Parts :
Body : WCB
Seal ring : Imported Rubber
Valve Flap : Wear-resisting Alloy

Advanced Air-tight Structure


Flexible Switch-on/off
Special Design and Reliable Performance
Long Working Life and Easy Maintenance
Exceptive Sealing Surface Material for Resisting High Temperature

www.sinofinn.cn
Key Equipment in Fly Ash Handling System-Double Disc Gate Valve
The sealing set adopts wear-resisting alloy to increase the valve’s wear-resisting property and working life.
By using self tightening sealing, the valve plate can achieve low pressure double-direction sealing to remove
dragging or ash deposition.
In view of different temperatures for different media, these valves are available with ambient temperature and
high temperature also.
They are mainly used as ash feeding valves, vent valves, ash-relief valve and pipeline switch valves, etc.

Vacuum Pressure Fly Ash Handling System


Separation Equipment
1. Conveying power from : Vacuum Blower or Water Ring Vacuum Pump
2. Conveying pressure : Below atmospheric pressure
3. Conveying velocity : high speed
Conveying features :
4.
No ash leakage - guarantee a clean working environment
Simplied system, less equipment and reliable & safe operation

Ash Silo
Ash Collection Hopper

Air Inlet

Vacuum
Ash Inlet Blower

Ash Unloading Area

Key Equipment in Vacuum Pressure Fly Ash Handling


Combination Bag Filter

Bag Cleaning
Clean Outlet
Disc
Filter Bag

Inlet
Conveying Line
Separator Part
Seat
Plate Upper Swinging Door
Maintenance Hole
Air-Lock Filter Bucket

Lower Swinging Door

Ash Feeding Valve Cleaning Hole Fly Ash Silo

www.sinofinn.cn
Key Equipment in Vacuum Pressure Fly Ash Handling

Ash Feeding Valve

Air Intake Valve Combinatorial Ash Collector

Vacuum Pressure Fly Ash Handling


Typical Features of Vacuum Pressure Fly Ash Handling System

A Features
a Less than 200-meter Conveying Distance
b Maximum System Output at 50t/h
c Reliable System and Advance Technology
d Clean Environment and Low Investment and Maintenance Cost
e High Degree oif Automation
B Main equipments
a Ash Feeding Valve
b Air Intake Valve
c Combinatorial Bag Filter

Bottom Ash Handling System


Introduction of Bottom Ash Handling System

A Wet-type BA Handling System


2.1 BA Handling System Comprised of Water Impounded Bottom Ash Hopper + Ejector Pump
2.2 Submerged Scraper Conveyor System
B Dry-type BA Handling System
2.1 BA Handling System of Circulating Fluidized Bed
2.2 BA Handling System of Large Pulverized Coal Boiler

www.sinofinn.cn
BA Handling System comprised of Water Impounded BA hopper + Ejector Pump

Key Equipment in Wet BA Handling

Feed Gate Clinker Grinder

Ejector Pump

www.sinofinn.cn
BA Handling System comprised of Submerged Scraper Conveyor

Sinonn’s Non-Overow SSC System

www.sinofinn.cn
Sinonn’s Non-Overow SSC System

600MW SSC + Hydro-extractor Silo 600MW SSC + Belt Conveyor

BA Handling System comprised of Circulating Fluidized Bed


Rolling Slag Cooling Machine

www.sinofinn.cn
BA Handling System comprised of Circulating Fluidized Bed

BA Handling System of Large Pulverized Coal Boiler

www.sinofinn.cn
BA Handling System of Large Pulverized Coal Boiler

Key Equipment in Dry BA Handling

Dry Slag Machine Extrusion Device of Large Slag

www.sinofinn.cn
Advantages of Dry Slag Machine
Non-consumption of Water Power Consumption Is 20〜30% Lower Compared to Hydraulic Slag Conveying

Floor Area Occupied Is 20〜30% Lower Compared to Hydraulic Slag Conveying Less Operation and Maintenance Work

High Use-value of Dry Slag Clean Environment Low Annual Operation Cost High System Reliability

Limestone Powder Handling System


1 System Introduction : To Convey the Limestone Powder to Material Receiving area by Compressed Air

2 Two Primary Functions of System :

Desulphurization. That is, via Limestone’s Dissolution(Ca2CO3) and a series of other reactions, to convert the sox in Flue Gas
Into Solid CaSO4, Which Will Be Discharged By Slag Removal System. The Desulphurization Efciency in current work condition can
achieve at least 85%. .

Exchange Of Materials On Bed. Maintain the stability of materials circulation amount by adding limestone powder, which is good
for adjusting bed temperature and further guarantee the steady running of Boiler

Typical Flow Diagram of Limestone Powder Handling System

www.sinofinn.cn
Key Equipment in Limestone Powder Handling System
Air-Filled Sealing Air Lock
Shaft Sealing Air Inlet

Mixer

Pipeline Distributor

Coal Mill Reject Handling System


1.1 Pneumatic Conveying System for Coal Mill Reject 1.2 Mechanical Conveying System for Coal Mill Reject

Pneumatic Conveying for Coal Mill Reject Handling

Process of Pneumatic Conveying

coal mill discharge big size removed manually & small size

into mill reject hopper feed valve convey vessel

air inlet valve open coal mill reject silo discharge to bunker

www.sinofinn.cn
Typical Equipment for Coal Mill Reject Conveying System
Coal Mill Reject Hopper

Mechanical Conveying for Coal Mill Reject Handling

Process of Mechanical Conveying


Feeding valve coal mill reject hopper discharge valve scraper conveyor
bucket elevator coal mill reject silo dry/wet discharge

www.sinofinn.cn
Layout of Mechanical Conveying for Coal Mill Reject

HOW WE GET SPECIALISED

Efcient and Scientic Management & Quality Assurance Systems


Management System & Quality Assurance System

Sinonn has been certied by GB/T19001-2008/ISO9001 : 2008,GB/T 50430-2007, GB/T28001-2001, GB/T24001-2004 and
ISO14001 : 2004, and obtained many qualications including environmental protection engineering, electrical installing and safe
production.

Sinonn has been awarded with the titles of Hi-Tech Enterprise and AAA-Grade Credit Enterprise, for in consecutive 5 years since
2007, also has been awarded as the Excellent Tax-Payer Enterprise and Innovative Enterprise in Shanghai, China.

Reserve of Talent Personnel and Patents Obtained

Reserve of Talent Personnel

Currently there are more than 180 staff working in the company, 82% of them are technical engineers specializing in design,
process, equipment procurement, installation, site management and commissioning. More than 73% of the staff graduate from
universities.

Patents obtained

We possesses 20 patents currently, and application procedure of another 7 patents is going on.

www.sinofinn.cn
RESEARCH & DEVELOPMENT CENTER
In order to ensure the safety and reliability of material conveying systems, our company built an exclusive experiment platform of
industrial scale for ash handling system. The optimum parameter match-up obtained from the platform provides the design
basis for us. .

Typical Curve from Coal Mill Reject Conveying Test

www.sinofinn.cn
ACCOMPLISHMENTS

Achievements of 600MW Above Pneumatic Material Handling Projects


Sr. Material System Conveying
Project Description Unit Capacity Conveyed Capacity Year
No. Distance

I Domestic Projects

1 JINTANG Power Plant of China GUODIAN 2×600MW Ash from ESP 116 t/h 370 m 2006
Corporation, Sichuan Province and Eco

2 FEIXIAN Power Plant of China GUODIAN 2×600MW Ash from ESP 85 t/h 550 m 2007
Corporation, Shandong Province

3 HUANGDAO Phase III Power Plant, 2×660MW Ash from ESP 110 t/h 540 m 2008
Shandong Province and Eco

4 DANGTU Power Generation Co., Ltd., 2×660MW Ash from ESP 112 t/h 430 m 2009
Anhui Province

5 DATANG GUIGUAN HESHAN Electric Power 1x670MW Ash from ESP 150 t/h 380 m 2011
Co., Ltd., Guangxi Province and Eco

6 HAMI Power Plant of HAMI 4x660MW Ash from De- 120 t/h 590m 2014
Coal Power Co., Ltd. Nox and Eco

7 FENGJIE Power Plant Expansion Project of 2x600MW Ash from ESP 142 t/h 550m Under
HUADIAN, Power International Corporation Ltd. and Eco Execution

II International Projects

1 Jharsuguda Independent Power Plant, India 6x600MW Ash from ESP, 1st stage : 341 t/h 1st stage : 205m 2010
Eco and APH 2nd stage : 341 t/h 2nd stage : 405m

2 Adani Power Plant, India 5x660MW Ash from ESP 2011


Ash Handling : 30 t/h Ash Handling : 450 m
& Eco + Coal
Mill Reject Coal Mill Reject : 2.5t/h Coal Mill Reject : 130m

3 Mahanadi Pre-critical Coal Power Plant 6x600MW Ash from ESP 1st stage : 200 t/h 1st stage : 150 m 2012
(WPCPL), India & APH 2nd stage : 240 t/h 2nd stage : 1000 m

4 Talwandi Ultra Mega Coal Power Plant, India 3x660MW Ash from ESP, 345 t/h 470m 2012
Eco and APH

5 Cuddalore Coal Power Plant of ITPCL, India 2x600MW Ash from ESP, 30 t/h 390m Under
Eco and APH Commissioning

6 Sasan Ultra Mega Power Plant of 6x660MW EPC of Fly Ash, 160 t/h 1st stage : 480 m 2013
Reliance Group, India BA and Slurry 2nd stage : 860 m

7 Zetes Phase III 2x660MW Power Plant, 2x660MW Ash from Eco, 51 t/h 365m Under .
Turkey ESP and De-Nox Execution

8 Qasim Power Plant, Pakistan 2x660MW Ash from ESP 85 t/h 450m Under
and Eco Execution

www.sinofinn.cn
高 瞻 远 瞩 &合 作 共 赢 !
Looking Forward to a Long Term &
Mutually Benecial Business Relationship

www.sinofinn.cn
Building No.5, No.3000, Longdong Avenue, Pudong New Area,
Shanghai, China. Pin Code - 201203.

www.sinofinn.cn