Guiding Boss

Boss Direction

Gap Direction

Fasten Screw Remove Dust Cap Guiding Gap Tightening Force Tightening Force
0.6-1N·m
0.6-1N·m

insertion force≤60N

Step 2: Checking the cable guiding


Step 1:Install or check the iRCU Step 3:Insert the cable connector to the Step 4: Repeat the step 1-3, connect
gap and module guiding boss, ensure
module,fasten the screw, remove module under 60N force,and tighten the the output of IRCU(female connector)
the correct installation direction.
the dust gap. nut within 0.6-1Nm force. with AISG cable male connector to
set up the daisy chain connection.

Preparation before installation:


1. Check if the iRCU and antenna are unbroken;
2. Aloft working preparation, guarantee the safety, and set the
lighting protection.
3. Regular maintaining and repairing.

Attention!
1. No hot-line work during the installation.
2. The iRCU can't be inserted and extracted randomly.
3. No violent installation, no destroy the cable or module
when connecting.
Waterproof on
the connector Riser vent 4. The nut should be tightened.
junction 5. Waterproof is recommended on the connector junction.
6. Spare the riser vent, avoid blocking.
Step 5: Connector junction protect, spare the riser vent,
Installation instruction
fix the cable, power on and configure the antenna.
IRCU-502-QI 1-0-0