RCC Slab Culvert Widening 1X3.0

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

12000 ℄ OF THE

OVERALL DECK WIDTH STRUCTURE


500 11000 500 ℄ OF THE ℄ OF THE
7400 CARRIAGE WAY 4600
RCC CRASH EXP. JOINT EXP. JOINT RCC CRASH 225
B EXISTING STRUCTURE ℄ OF THE STRUCTURE WIDENING
100
RCC CRASH BARRIER 20 mm 20 mm BARRIER
BARRIER F.R.L. 65 mm THK. EXP. F.R.L. EXP.
℄ OF THE EXISTING WEARING COAT
SLOPE -2.50 %
STRUCTURE SLOPE -2.50 % JOINT JOINT
RETAINING 300 mm STONE

750
1.5 1.5 WALL
300 PITCHING ON

U/S
1 1
D/S 150 mm FILTER

1100
300
1000 MIDEA
SOFFIT 1.5 1.5

350
3000 (MIN.) 3000 (MIN.) (TYP.) R25
FLEXIBLE APRON RIGID FLOOR APRON 0

(TYP.)
ABT. CAP

1000
BL
INV. LVL. 1 5000 (MIN.)
RIGID FLOOR APRON
6000 (MIN.)
FLEXIBLE APRON
1 450 3000 450 1

250
WEEP R50
HOLES

100
EARTHEN
TOE CANAL
WALL
FSL CONSTRUCTUION
2000

FOUNDATION

2500
COMPACTED COMPACTED JOINT

450
EARTH EARTH
A INV. LVL.
CURTAIN WALL CURTAIN WALL
(TYP - II)
SECTION B-B
(TYP - I)

RETAINING WALL
RETAINING WALL
3500
DETAIL B OF CRASH
3500
3900
BARRIER

STRUCTURE

STRUCTURE
A

EXISTING
℄ OF THE

℄ OF THE
150 THK.
LEVELLING VEIW A-A
COURSE M15
300 mm THK.

300 mm THK.
STONE

STONE
REVETMENT

REVETMENT
GRADE

12000
DECK WIDTH L.B.L
11000 AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP

500 CARRIAGEWAY 500

300
ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW

ROW ROW ROW ROW ROW


ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW

HALF TOP
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW

ROW ROW ROW ROW ROW ROW


ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
EXP.
℄ OF THE

JOINT

ROW ROW ROW ROW ROW ROW


ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW

ROW ROW ROW ROW


ROW ROW ROW ROW
STRUCTURE

ROW ROW ROW ROW


ROW ROW ROW ROW
ROW ROW ROW ROW
ROW ROW ROW ROW
ROW ROW ROW ROW
ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW

DRAINAGE

D/S
SPOUT

1200
COMPACTED AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP
℄ OF

AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP


AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
THE

PLAN
EARTH
U/S

150 mm THK.
SLOPE -2.50 % SLOPE -2.50 % LEVELING COURSE IN 300

HALF BOTTOM
PCC M-15 GRADE 100

DETAIL-`A'
℄ OF THE

NOTES: -
1. TYPE OF STRUCTURE - HIGH LEVEL BRIDGE
JOINT
EXP.

2. SPAN ARRANGEMENT - 1X3.00 M


B B 3. TOTAL LENGTH OF BRIDGE - 10.940 M
SKEW ANGLE 0° 4. OVERALL WIDTH - 12.0 M
5. CARRIAGEWAY - 11.0 M
EXTRA WIDENING 0 mm 6. FLEXIBLE APRON SHALL BE PROVIDED AS PER THE
SPECIFICATION/ DETAIL MENTIONED IN PLATE-22 OF
IRC:SP:13-2004.
SUPER ELEVATION 0%
7. CONCRETE SHALL BE OF DESIGN MIX AND SHALL HAVE MINIMUM
28 DAYS CHARACTERISTIC CUBE STRENGTH AS FOLLOW:-
a. RCC BOX ----M30
b. CURTAIN WALL (P.C.C.) ----M20
300 mm THK.

300 mm THK.
REVETMENT

REVETMENT

c. RETAINING WALL ----M30


d. LEVELING COURSE ----M15
STONE

STONE

e. RCC CRASH BARRIER ----M40


4. REINFORCING STEEL SHALL BE OF THERMO MECHANICALLY
TREATED(TMT)BARS. (GRADE DESIGNATION
Fe500D)CONFORMING TO IS:1786-2008.
7400 4600 5. BACKFILL GRANULAR SOIL MATERIAL BEHIND WALL SHALL BE
A EXISTING STRUCTURE WIDENING
F.R.L. 600mm THK. FILTER MATERIAL BEHIND WALL SHALL BE LAID AS
500
PER APPENDIX 6 OF IRC: 78-2014. THE PROPERTIES ARE C = 0,
STONE Ø=>30°, γ= 20 kN/CU.M
APRON 300 6. 100mm Ø PVC WEEP HOLES SPACED AT 1000c/c BOTH
COMPACTED STONE APRON 100Ø PVC PIPE WEEP HORIZONTALLY AND VERTICALLY SHALL BE PROVIDED IN A
200 EARTH COMPACTED EARTH HOLES SPACED @ STAGGERED MANNER.
125 125 1000 C/C STAGGERED

1604
125 200 125 7. THE SAFE BEARING CAPACITY ASSUMED IN THE DESIGN IS 20
VERTICALLY AND
T/SQ.M. ANY VARIATION ON SITE SHOULD BE INFORMED TO THE
HORIZONTALLY
150 300

300

DESIGN ENGINEER FOR NECESSARY ACTION.


450

450

(SLOPE 1:20)
8. THE RCC BOX SHOULD BE CONSTRUCTED FIRST AND THE SIDE
750

750

150

600 THK. FILLING & COMPACTION SHALL BE DONE AS PER MoRTH


FILTER MEDIA SPECIFICATIONS.
750

750

150 mm THK. LEVELING 150 450 9. LEVELS ON UP STREAM AND DOWN STREAM SIDE OF THE RIVER
2000

150 mm THK. LEVELING


COURSE IN PCC M-15 GRADE 425 450 425 COURSE IN PCC M-15 GRADE SHOULD BE CHECKED AT THE SITE BEFORE STARTING THE
2500

OUTER FACE EARTH FACE WORK.


COMPACTED EARTH COMPACTED EARTH
(TYP.) 10. DRAINAGE SPOUTS OF 100mm Ø AS SHOWN SHALL BE PROVIDED
(TYP.)
750

2000
800

IN TOP SLAB.
450 750 450 P.C.C M-20 11. ALL LEVELS SHOWN IN THIS DRAWING SHOULD BE VERIFIED AT
600 550 1100 SITE WITH RESPECT TO PLAN & PROFILE BEFORE EXECUTION OF
P.C.C M-20 P.C.C M-15 WORK
550

100 1300 100 250 12. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE MENTIONED.
ONLY WRITTEN DIMENSIONS TO BE FOLLOWED. NO DIMENSION
150

P.C.C M-15 200


SHALL BE SCALED
DETAILS OF CURTAIN
150

100 1650 100 2250 13. ALL DIMENSIONS ARE INDICATIVE AND WILL BE FINALIZED AFTER
WALL TYPE - II DETAILED DESIGN.
DETAILS OF CURTAIN DETAIL OF RETAINING WALL
14. 600mm THK. FILTER MEDIA SHALL BE PROVIDED BEHIND
RETAINING WALL.
WALL TYPE - I

You might also like