ITEM: TEMP DOOR PROCESS RESPONSIBILITY: Production Manager FMEA NUMBER: PFMEA /11
MODEL YEAR(S)/VEHICLE(S): B515 KEY DATE: 18.11.2013 PREPARED BY: U BalaRaghavan
CORE TEAM: Core Team: E.Vijayakkumar, U.BalaRaghavan A.R.Loganathan, K.Ganesh ,Elango FMEA DATE(ORIG.): 06.06.2013
ITEM NUMBER: VPBE2H-18K413-AB FMEA DATE(REV.):30.05.2021
C
CURRENT PROCESS CONTROL ACTION RESULTS
PROCESS S L O D R RECOMME RESP.& TARGET
POTENTIAL FAILURE POTENTIAL CAUSE(S) S O D R
FUNCTION/ POTENTIAL EFFECTS OF FAILURE E A C E P NDED COMPLETION
MODE S /MECHANISM(S) OF FAILURE PREVENTION DETECTION ACTIONS TAKEN E C E P
REQUIREMENTS V C T N ACTION (S) DATE
S V C T N
Material Misusing, Traceability Training Provided/Raw
Grade & Properties Un Trained Operator/Standard not
confusion & Prosperities not 4 3 Material Inspection Standard Check the QC at the time of receiving 7 84
Spec Vs Actual Variation Available
meet the requirements Provided
OP #10 To Receive Raw Material Appearance Packing Damage, Foreign Un Trained Operator/improper Raw Material Inspection
Raw Material as per Incoming 2 5 Check the QC at the time of receiving 7 70
Conformance Material Mix Up & Wet Handling Standard Provided-
Receiving Inspection Inspection Raw Material
Standard Variation in Weighing
Quantity/ Weight Less Quantity(Quantity not meet Balance/Untrained Sampling Plan done by using
3 4 1 Bag/1 Lot 7 84
Variation as per Requirement) Operator/Improper Material Weighing Scale
Handling due to transport
Operator check the Loader
OP #20 Insufficient Jobs not meet as per
Hopper loader Loader Problem Material not free flowing 3 2 regularly instructed by Qc Loader to be done auto feed 6 36
Hopper Conveying Customer Requirements
Inspector
Product Quality effected(Molding Untrained Operator / variation in Process Parameter freeze in Checked By QC/Supervisor at the
Wrong Parameters 7 3 4 84
Defect occur) Controller Display Spec sheet Start Time & every 2hrs Once
Process Parameter
Virgin Material not monitoring during start up & Checked By QC/Supervisor at the
Twist Issue Fitment problem 6 2 5 60
used/Temperature variation check on the issue slip for Start Time & every 2hrs Once
virgi material entry.
Process Parameter
OP #30 monitoring during start up Checked By QC/Supervisor at the
To Provide the Moulding Short length Fitment problem 6 HRS Temperature Variation 2 5 60
Plastic Injection and product length variation Start Time & every 2hrs Once
Parts as per Drawing during start up and patrol
Moulding
Component Validation at the
Check first Off Piece at the time of
Visual Improper Aesthetic 5 Mould Problem 2 time of Mould Procurement 5 50
mould loading
Or Rectification
Product Quality effected(Molding Untrained Operator / variation in Process Parameter freeze in Checked By QC/Supervisor at the
Wrong Parameters 7 3 4 84
Defect occur) Controller Display Spec sheet Start Time & every 2hrs Once
OP#60
To remove Unwanted Burr Not Removed / Operator not Training Provided to Visual Inspection Standard Displayed
De - Flashing & Flashes Appearance Not Good 5 3 5 75
Material trained Operator near the De flashing Area
visual Inspection
Production date and shift not Training has been given and
Traceability details mentioned 5 2 educated and location fixed 5 50
above the Ford Logo
Characteristics Methods
Part/ Process Name / Machine. Special Product/Process Evaluation/ Sample Reaction Plan
Process Operation Device Jig. Char Mistake Proofing
Number Description Tools For Mtg No Product Process Class Specification Measurement Size Freq Control Method IN CHARGE
& Corrective Action
Tolerance Technique
1 Free Movement of Material Temperature 70℃ ±10℃ Temp. Controller 100% Every shift Daily production report Production Hopper to be checked for it's proper working.
PP 40% Operator to be instructed
20 Raw Material Hopper Dryer
Preheating Free Movement of Material
2 Rubber Material No Preheating - - - - Daily production report Production -
TPE
Pressure, Time, As per POS ; check for all parameter Setting approval
as per SOS during start up. Incase of Every Setting report ,daily QC Inspector
RM ONLY VIRGIN TO BE USED Speed, any parameter out of spec,inform to PLC - every shift production report,Material issue slip monitoring & Operator Check for PLC
Temperature production manager for rectification monitoring on FML on patrol report.
Visual/Checking
A Appearance Free from Flashes,short mold & Twist 100% Every shift Operator
Fixture
40 WIP Storage Packing Bins Free from Deformation As per packing Every Lot FIFO Packing slip Operator R4
Standard
Pressure, Time, As per POS Every Setting Setting approval
QC Inspector
Speed, PLC - report ,daily Check for PLC
Temperature every shift production report
Operator
70 Final Inspection As per final inspection standard (QUA/D/18) Final Inspection Report QC Inspector R3
Every out going
80 Packing Packing Bins Free from Deformation As per packing Counting 100% from Final Packing slip Operator R4
Standard inspection
90 Dispatch Logistics Packing quantity - - Every dispatch DC & Invoice Operator R4
Reaction plan Corrective action
R2:Inform to shop supervisor,Check 100 %,Rework the Material,Scrap the rejection,Analyze the problem
R3:Reject / rework & Finalinspector's to be strictly instructed for following the sampling plan properly & inspect the job with proper lighting
R4:Recounting, enter the correct quantity in slip & Packing operator to be instructed severely to ensure the packing Qty with Packing standard