PMD 2.2 Assessment-Tasks
PMD 2.2 Assessment-Tasks
PMD 2.2 Assessment-Tasks
STUDENT DECLARATION
I declare that: (please tick each point as you read them)
I am submitting work in this assessment pack that is my own, except where acknowledgement/s of sources are made.
I have not copied in part, or in whole, or otherwise plagiarised the work of others.
I declare that the material does not infringe the intellectual property/copyright of a third party, and I understand that the
evidence may undergo electronic detection and used to make comparisons with other evidence submitted by current or previous
students.
The Units of Competency, Elements and Performance Criteria which I studied during the course were explained, and I was
provided with adequate resources which enable me to complete this assessment.
The assessment tasks, assessment criteria and assessment due date(s) for this course were explained.
I was advised, and I am aware of The Academy's Policies including the Assessment Policy and the Assessment Appeals
Process.
I was given assistance from the trainer and/or other Academy staff during the study of this course when it was requested.
I understand that my feedback will be used for reporting purposes and continuous improvement.
2.
Policy and procedure
3.
Policy and procedure
4.
Policy and procedure
1.4. Review the table below, research typical business systems and requirements organisations should have in place and explain why
each would be needed for successful operations. (Guide: 25+ words each)
Business systems and
Explain why each is needed
requirements
knowledge management system
quality system
business sustainability system
environmental sustainability
system
performance management system
1.5. Research information on quality assurance topics listed in the table below and complete the table. (Guide: 35+ words for each)
Quality assurance topics Explanations
What are project quality
standards that apply in the
organisation
What are, quality assurance and
control techniques, key tools and
methodologies
What are, the roles and
responsibilities of quality
management personnel
c) Conduct the communication activity and collect feedback from the appointed team members.
- Quality Specialist must help to determine quality objectives and standards and the Sponsor is to check if the quality
standards and objectives are suitable to the project
- The communication must determine any deficiencies of the quality objectives and standards, and
- Come up with ideas on how to overcome these pitfalls/deficiencies
- Use the space below to take notes from feedback collected
Take notes in this space of any collected feedbacks.
d) Document the following Communications Matrix, which will be used for communication processes during the progression of
the project. Complete the template below (Guide: 30+ words)
Communication matrix
Communication Description Frequency Format Participants/ Deliverable Owner
Type Distribution
e) Based on the collected feedback and confirmed project quality objectives and standards, collect further feedback on ‘Quality
Assurance and Quality Control’. The feedback should address, management methods, techniques and tools for tracking and
establishing quality levels and resolving any quality issues Complete the following Quality Requirements Summary.
Quality Requirements Summary
<A deliverable as specified in the <List all quality requirements this <High level description of the <High level description of the
Scope Plan> may include: stakeholder applicable quality assurance applicable quality control
requirements, negotiated trade-offs processes> processes>
with cost, schedule and
performance, standards. This
should include quality metrics to
enable measurement>
2.2. In this activity you are required to develop and prepare a quality management plan and quality metrics based on the customer
relationship strategy and the measurements of performance of all departments of the Business Case.
When preparing the quality management plan and metrics, you must address and use the following points:
a) Development of quality metrics:
- Quality metrics must include details for the project and product output to define acceptable levels of quality
- Gauge how effectiveness of the quality management of the project at later stages
- include time, cost, resources, scope, quality, and action items in the quality metrics
- Indicate how the project quality metrics will be measured
b) Quality criteria (framework for working towards achieving quality requirements)
- Australian and international standards
- Codes of conduct
- Legislation and regulation requirements.
c) Identify the quality issues in the project given in the business case.
d) Resolve these quality issues using the following quality management methods, techniques and tools:
- Control charts
- Brainstorming
- Continuous improvement process
e) List of agreed quality and performance requirements (as determined in part 2 of this assessment task) in the project
management plan and implement these quality requirements as basis for performance measurement.
Quality management plan
Version number / date:
Purpose of Quality Management
Plan:
Quality Management Plan
Components
Organisation, Responsibilities,
and Interfaces
Role Quality Responsibility
Quality Planning
Quality Assurance
Analyse Project Quality
Decision-making, participation
processes, stakeholder
responsibilities
Communication processes
information dissemination on
improvements
Improve Project Quality and
continuous improvement
processes
Quality Control
Training and development,
success and / or maintenance of
Project Quality
Project Quality Management Plan Acknowledgement:
Approval
The following persons have reviewed the Project Quality Management Plan and agree with the
approach it presents.
Changes to this Project Quality Management Plan will be coordinated with and approved by the
undersigned or their designated representatives
c) Use all feedback to improve and amend the Quality management plan. Save the updated quality management with a
new version in the space below to demonstrate that you have listened and registered and acted on stakeholder’s
feedback.
3.2. Assess quality and identify causes of variance. You are now required to assess the quality of the project considering the
current scenario/problems and identify the variations to quality metrics of the project and document: (Guide: 100+ words)
- Variances that occurred during the quality control
- Root cause of the variance.
- Remedial action
- Use the template below.
You must use the template attached to this unit to document your outcomes.
Variances (any 4) Root cause of the variance Remedial action (30-50 words)
b) Collect feedback from your Director. You must either complete Communication Report (if you held a meeting) or
copy and paste the Director’s email with his approval using the space below. (Guide: 50+ words)
Note: if you are conducting a meeting, use the communication report template used in a previous assessment task.
c) Once the approval was received from CCB, prepare a project life cycle document and specify how these changes will
be implemented at all stages of the project life cycle. (Guide: 30+ words for each)
Note: If some changes cannot be implemented, specify ‘not applicable’ in the specific areas.
STAGES OF PROJECT LIFE CYCLE
Initiation Planning
Execution Closure
4.2. Coaching and mentoring activity
Please note: oral communication and team work is a mandatory part of the unit: Manage project quality and coaching is a
mandatory part of the unit: Facilitate continuous improvement. These skills are requirements set by the Australian
government and must be demonstrated and observed by your assessor who will complete an observation checklist. Skills
you must demonstrate include:
b) Contact the team leader and the new team member (your colleagues) and conduct the coaching session/s.
You will be observed by your assessor who will complete a checklist.
You may choose to use MS TEAMS and record your coaching activities and upload as directed by assessor, or you may choose
to organise this coaching at the academy, face to face. To successfully complete this activity, you must:
- Present information to a using appropriate structure and language
- Listen and ensure that you understand information received from your team leader and the new team member
- Ensure that the Team leader and the new team member understand what is expected of them
- Team leader and the new team member must confirm understanding what you have been explaining
- Ensure to ask questions and use active listening to make sure that you have not missed any feedback from the
team leader and the new team member.
4.3. You are now to review the quality management plan for quality management. (refer to assessment task 3) and compare
against the performance requirements specified in the Quality Management Plan. Determine the effectiveness of quality-
management processes and procedures and review:
- Improved Quality of Service
- Reduced Operational Costs
- Improved Decision Making and Communication processes
- Meets sustainability requirements
4.4. Consider all requirements collect feedback and address the table below and explain:
- Whether the quality management plan prepared was effective based on the performance requirements?
- List any quality issues experienced in the project.
- Lessons learnt during the project.
- Recommendations for future projects and other areas of improvement.
EFFECTIVENESS OF COACHING