Alternative Fuels Questionnaire: Client: Contact Person: Address / Phone / E-Mail

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

A TEC GmbH

Kasernstrasse 16-18 Alternative Fuels


3500 Krems
AUSTRIA Questionnaire

Client:

Contact person:

Address / phone / e-mail:

Date:

Aim of client:

1) AVAILABLE QUANTITIES OF WASTE


x Tons/year
Domestic waste
Industrial waste
Bulky waste
Wood waste
Waste oil or solvents
Tires
Animal meal
Something else:

2012/10 Page 1 of 5
A TEC GmbH
Kasernstrasse 16-18 Alternative Fuels
3500 Krems
AUSTRIA Questionnaire

2) PRE-TREATMENT OF WASTE
Pre- Treatment of Waste by others YES: NO:
If yes:
Max. Size 2d mat. [mm] [mm]
Max. Size 3d mat. [mm] [mm]
Heavy items removed YES: NO:
Organic removed YES: NO:
Metals removed YES: NO:

3) DELIVERY CONDITIONS OF WASTE OR PRE-TREATED WASTE


Loose: YES: NO:
Bales: YES: NO:
Truck YES: NO:
If yes, kind of truck (e.g. walking floor trailer, dumper, etc.)
Rail YES: NO:
Bulk YES: NO:
Packed (e.g. big bags) YES: NO:
Delivery in [t/day]
Capacity of Storage (in days, weeks ore month)
Specific weight [kg/m3]
Distance storage to RDF preparation line [m]

4) RDF- PREPARATION
Required RDF
Main burner Calciner
YES: NO: YES: NO:
How much days/week waste is delivered to the plant
How much days/week preparation plant should be in operation
How much shifts/day for operation
Distance gas removal (inert) to mill for drying [m]
Capacity of Storage for waste and treated fraction(s) in days,
weeks or months.
Distance storage to kiln burner [m]

2012/10 Page 2 of 5
A TEC GmbH
Kasernstrasse 16-18 Alternative Fuels
3500 Krems
AUSTRIA Questionnaire

5a) WASTE COMPOSITION AND CHARACTERISTICS – incoming waste

For characterization of incoming waste as much as available information as below shall be given

Waste type domestic industrial bulky wood oil tires animal other
waste waste waste waste solvents meal

C m% waf
H m% waf
N m% waf
O m% waf
S m% waf
Cl m% waf
Total m% waf 100 100 100 100 100 100 100 100
ash m% wf
moisture m%

NCV (LHV) of actual sample kcal/kg


GCV (HHV) of dry sample kcal/kg
bulk density kg/m3

particle size distribution m% 2d > 100 mm


2d < 30 mm
2d < 15 mm
2d < 5 mm

particle size distribution m% 3d > 100 mm


3d < 30 mm
3d < 15 mm
3d < 5 mm

2d = 2 dimensional such as foils, paper


3 d = 3 dimensional such as stones…

2012/10 Page 3 of 5
A TEC GmbH
Kasernstrasse 16-18 Alternative Fuels
3500 Krems
AUSTRIA Questionnaire

5b) PREPARED AF COMPOSITION AND CHARACTERISTICS

For characterization of prepared AF as much as available or required information as below shall


be given

AF type RDF RDF whole shredded oil other


mainburner calciner tires tires solvents

C m% waf
H m% waf
N m% waf
O m% waf
S m% waf
Cl m% waf
Total m% waf 100 100 100 100 100 100
ash m% wf
moisture m%

NCV (LHV) of actual sample kcal/kg


GCV (HHV) of dry sample kcal/kg
bulk density kg/m3

particle size distribution m% 2d > 100 mm


2d < 30 mm
2d < 15 mm
2d < 5 mm

particle size distribution m% 3d > 100 mm


3d < 30 mm
3d < 15 mm
3d < 5 mm

2d = 2 dimensional such as foils, paper


3 d = 3 dimensional such as stones…

2012/10 Page 4 of 5
A TEC GmbH
Kasernstrasse 16-18 Alternative Fuels
3500 Krems
AUSTRIA Questionnaire

Other Information needed

1) What is the expected project schedule


a. tender issue
b. tender closing day
c. contract award
d. start of commercial production

2) What is the scope of supply


a. turn-key contract
b. process engineering and supply of key component
c. supply of mechanical and electrical equipment incl. supervision

3) Are there any preferred local suppliers to be incorporated

4) What are the available services at site


a. electrics
b. compressed air
c. water
d. hot gas for drying
e. fuel for drying

5) What is the available site area; drawing preferable

6) Are there any local rules/regulation to be followed in terms of waste treatment plants or
environmental condition

2012/10 Page 5 of 5