Professional Documents
Culture Documents
Alternative Fuels Questionnaire: Client: Contact Person: Address / Phone / E-Mail
Alternative Fuels Questionnaire: Client: Contact Person: Address / Phone / E-Mail
Alternative Fuels Questionnaire: Client: Contact Person: Address / Phone / E-Mail
Client:
Contact person:
Date:
Aim of client:
2012/10 Page 1 of 5
A TEC GmbH
Kasernstrasse 16-18 Alternative Fuels
3500 Krems
AUSTRIA Questionnaire
2) PRE-TREATMENT OF WASTE
Pre- Treatment of Waste by others YES: NO:
If yes:
Max. Size 2d mat. [mm] [mm]
Max. Size 3d mat. [mm] [mm]
Heavy items removed YES: NO:
Organic removed YES: NO:
Metals removed YES: NO:
4) RDF- PREPARATION
Required RDF
Main burner Calciner
YES: NO: YES: NO:
How much days/week waste is delivered to the plant
How much days/week preparation plant should be in operation
How much shifts/day for operation
Distance gas removal (inert) to mill for drying [m]
Capacity of Storage for waste and treated fraction(s) in days,
weeks or months.
Distance storage to kiln burner [m]
2012/10 Page 2 of 5
A TEC GmbH
Kasernstrasse 16-18 Alternative Fuels
3500 Krems
AUSTRIA Questionnaire
For characterization of incoming waste as much as available information as below shall be given
Waste type domestic industrial bulky wood oil tires animal other
waste waste waste waste solvents meal
C m% waf
H m% waf
N m% waf
O m% waf
S m% waf
Cl m% waf
Total m% waf 100 100 100 100 100 100 100 100
ash m% wf
moisture m%
2012/10 Page 3 of 5
A TEC GmbH
Kasernstrasse 16-18 Alternative Fuels
3500 Krems
AUSTRIA Questionnaire
C m% waf
H m% waf
N m% waf
O m% waf
S m% waf
Cl m% waf
Total m% waf 100 100 100 100 100 100
ash m% wf
moisture m%
2012/10 Page 4 of 5
A TEC GmbH
Kasernstrasse 16-18 Alternative Fuels
3500 Krems
AUSTRIA Questionnaire
6) Are there any local rules/regulation to be followed in terms of waste treatment plants or
environmental condition
2012/10 Page 5 of 5