Professional Documents
Culture Documents
Plant Location: Preheater Feed Preheater String - Calciner Type
Plant Location: Preheater Feed Preheater String - Calciner Type
Date 1/25/2007
Plant Location Tabouk Cement, Saudi Arabia Country Code SAU
Plant Location
level above sea ambient temperature rel. humidity of air
[m] [ °C ] [%]
mean maximum mean maximum
0
Type
Preheater bag filter 1
Clinker Cooler reverse air filter 2
Bypass ESP 3
Raw Mill cyclones only 4
Pyro-Section History
Original Supply Modification
Year Supplier Capacity Year Supplier Comments
Preheater
Calciner
Kiln
Cooler
Bypass
ID-Fan
Fuel Utilised
Quantity [t/h] Temperature [°C] Heat Value Hu [kcal / kgfuel]
fuels (as fired) kiln calciner kiln calciner kiln calciner
coal
pet coke
gas
oil
Gas Data
volume [Am³/h] temperature [°C] pressure [Pa]
main burner calciner main burner calciner main burner calciner
primary air
secondary air
tertiary air (before calciner)
bypass gas before cooling / / /
exhaust gas before preheater / / /
Preheater Fan
pressure temperature volume speed power
[Pa] [°C] [Am³/h] [rpm] [kW]
design
actual
String 1
Measuring temp pressure O2 CO NOx SO2
Point [ °C ] [ Pa ] [%] [%] [%] [%]
outlet 1
downcomer duct
inlet 2
outlet 3
cyclone 1
inlet 4
outlet 5
cyclone 2
inlet 6
outlet 7
cyclone 3
inlet 8
outlet 9
cyclone 4
inlet 10
outlet 11
cyclone 5
inlet 12
outlet 13
cyclone 6
inlet 14
calciner loop duct, kiln outlet 15
riser inlet 16
outlet 17
combustion chamber
inlet 18
outlet 21
tertiary air duct
inlet 22
orifice 23
kiln inlet chamber
kiln 24
outlet 48
inlet 49
outlet 50
inlet 51
52
53
Project No.: TD-07-01-ph-s Kiln no. 0 Date 1/25/2007
String 2
Measuring temp pressure O2 CO NOx SO2
Point [ °C ] [ Pa ] [%] [%] [%] [%]
outlet 25
downcomer duct
inlet 26
outlet 27
cyclone 1
inlet 28
outlet 29
cyclone 2
inlet 30
outlet 31
cyclone 3
inlet 32
outlet 33
cyclone 4
inlet 34
outlet 35
cyclone 5
inlet 36
outlet 37
cyclone 6
inlet 38
calciner loop duct, outlet 39
kiln riser inlet 40
outlet 41
combustion chamber
inlet 42
outlet 45
tertiary air duct
inlet 46
orifice 47
kiln inlet chamber
kiln 24
outlet 54
inlet 55
outlet 56
inlet 57
58
59
Project No.: APO-08-02-ph-s Kiln no. 3 Date 2/2/2008
Plant Location Orizaba-Apasco-Holcim 0 0 Country Code MEX
for square cyclone inlet give data for "a" and "b" only
raiser duct to bottom cyclone = kiln raiser or loop duct
stage Unit 1 2 3 4 5 6
number of cyclones nocyc /
total cyclone height ht mm
cylindrical height of cyclone hc mm
diam. of cyclone dc mm
diam. of meal pipe dm mm
excentricity of cyclone inlet c mm
height of cyclone inlet a mm
vertical section of cycl. inlet a1 mm
width of cyclone inlet b mm
horizontal section of cycl. inlet b1 mm
dip tube diameter do mm
dip tube height hd mm
inlet spiral angle αE deg.
steel thickness dip tube sd mm
material of dip tube dmat /
steel thickness cyclone ssteel mm
lining thickness cyclone s1lining mm
lining thickness cyclone roof shlining mm
Project No.: APO-08-02-ph-s Kiln no. 3 Date 2/2/2008
Plant Location Orizaba-Apasco-Holcim 0 0 Country Code MEX
calciner, kiln
down comer 2 => 1 3 => 2 4 => 3 5 => 4 6 => 5 riser
type /
number of raiser ducts norais /
cyclone inlet height a mm
cyclone inlet width b mm
riser duct diam. at dip tube d1 mm = orifice
riser duct diam. at middle section d2 mm
steel thickness riser duct ssteel mm
lining thickness riser duct s1lining mm
insulation outside steel s2insul mm
h mm = total length
h1 mm
k mm
k1 mm
m mm
h3 mm
e mm
f mm
n mm
bR deg.
h2 mm
Project No.: TD-07-01-ph-s Kiln no. 0 Date 1/25/2007
Plant Location Tabouk Cement, Saudi Arabia 0 0 Country Code SAU
Drive
Max. Speed [Rpm]
installed power [ kW]
operat at [ kW]
Project No.: TD-07-01-ph-s Kiln no. 0 Date 1/25/2007
Plant Location Tabouk Cement, Saudi Arabia 0 0 Country Code SAU
Flow T° P
[m³/h] [ °C ] [ Pa ]
Secondary air
Tertiary air
Coal mill take-off
Raw mill take-off
Vent air
Flow T° Flow
[liter/h] [ °C ] [ kg/h ]
Vent air water spray
required received
general arrangement preheater incl. all levels
structural arrangement incl. beam sizes
kiln
clinker cooler
arrangement down comer duct
tertiary air duct
preheater meal feed
ID-fan
existing bypass system
detail drawings incl. lining stage 1 cyclone
riser duct 2-1
stage 2-cyclone
riser duct 3-2
stage 3 cyclone
riser duct 4-3
stage 4 cyclone
riser duct 5-4
stage 5 cyclone
kiln riser / calciner
combustion chamber
kiln inlet chamber
kiln orifice
fan curves ID-fan
raw mill filter fan
cooling fan bypass
filter fan bypass
clinker cooler filter fan
other technical information plant flow sheet
CCR print out of all plant sections
°C Pa °C Pa
°C
°C Pa
°C Pa
°C Pa
°C
°C Pa °C Pa °C Pa
Pa °C Pa
°C Pa °C Pa
°C
°C Pa °C Pa
°C
Pa °C Pa
°C Pa String 1
Sep. Eff.
Press [mbar] Press. Diff.
[%]
stage 5 -54.00 12.00
°C Pa stage 4 -42.00 8.00
stage 3 -34.00 7.00
stage 2 -27.00 7.00
stage 1 -20.00 7.00
calciner -13.00 8.00
kiln inlet -5.00 5.00
Pa
Pa
String 1
String 2
E F