Professional Documents
Culture Documents
33kV DS C.Bank
33kV DS C.Bank
Engineer: 7/28/2021
Descrip: 33kV DS
ASDIP Foundation 3.2.2 COMBINED FOOTING DESIGN www.asdipsoft.com
Column to Column Distance .... m Gross Allow. Soil Pressure ......... KN/m²
Exterior Interior Overburden Pressure ................. 23.95 KN/m²
Column Length (X) ........ cm Reaction Force ........................... 26.1 KN
Column Width (Z) .......... cm Reaction Eccentricity .................. 0.23 m
Edge Distance (X) ......... m NG Ftg. Area in Contact with Soil ...... 99.8 %
Footing Width (Z) ........... m Exterior Interior
Footing Thickness .................. cm OK Bearing Pressure .......... 49.78 0.00 KN/m²
Soil Cover ............................... m Bearing Ratio ................ 0.47 0.00 OK
Pedestal Height ...................... m
Vertical P = 11.3 KN
Moment Mz = 0.0 KN-m
Shear Vx = 0.0 KN
Arm = 1.35 + 25.0 / 100 = 1.60 m Moment = 0.0 * 1.60 = 0.0 KN-m
Overturning moment Z-Z = 0.0 + 0.0 = 0.0 KN-m
Pedestal weight = 25.0 / 100 * 25.0 / 100 * 1.4 * 24.00 = 2.0 KN
Vertical P = -7.8 KN
Moment Mz = 0.0 KN-m
Shear Vx = 0.0 KN
Arm = 1.35 + 25.0 / 100 = 1.60 m Moment = 0.0 * 1.60 = 0.0 KN-m
Overturning moment Z-Z = 0.0 + 0.0 = 0.0 KN-m
Pedestal weight = 25.0 / 100 * 25.0 / 100 * 1.4 * 24.00 = 2.0 KN
Footing SW = (0.75 + 0.75) / 2 * 1.40 * 25.0 / 100 * 24.00 = 6.3 KN
Soil cover =
= ((0.75 + 0.75) / 2 * 1.40 - 25.0 / 100 * 25.0 / 100 - 25.0 / 100 * 25.0 / 100) * 1.00 * 16 = 14.8 KN
1 of 10
SPECTRA Project: Page # ___
Engineer: 7/28/2021
Descrip: 33kV DS
ASDIP Foundation 3.2.2 COMBINED FOOTING DESIGN www.asdipsoft.com
Bearing area % =
= (((0.75 - 0.75) / 1.40 * 1.40 + 0.75) / 2 * 1.40 / 1.1 * 100 = 100 %
2 of 10
SPECTRA Project: Page # ___
Engineer: 7/28/2021
Descrip: 33kV DS
ASDIP Foundation 3.2.2 COMBINED FOOTING DESIGN www.asdipsoft.com
Concrete f'c = 20.0 MPa Steel fy = 500.0 MPa Soil density = 16 KN/m³
d Top X-dir = 25.0 - 7.5 - 1.2 / 2 = 16.9 cm
d Bot X-dir = 25.0 - 7.5 - 1.2 / 2 = 16.9 cm
d Top Z-dir = 25.0 - 7.5 - 1.2 - 1.2 / 2 = 15.7 cm
d Bot Z-dir = 25.0 - 7.5 - 1.2 - 1.2 / 2 = 15.7 cm
-ϕVcx = 0.166 * 0.75 * √(20) * 0.75 * 100 * 16.3 / 10 = 68.1 KN ACI Eq. (11-3)
+ϕVcx = 0.166 * 0.75 * √(20) * 0.75 * 100 * 16.3 / 10 = 68.1 KN
Vux (- Side) = 2.4 KN < 68.1 KN OK
Vux (+ Side) = 5.8 KN < 68.1 KN OK
-ϕVcx = 0.166 * 0.75 * √(20) * 0.75 * 100 * 16.3 / 10 = 68.1 KN ACI Eq. (11-3)
+ϕVcx = 0.166 * 0.75 * √(20) * 0.75 * 100 * 16.3 / 10 = 68.1 KN
Vux (- Side) = 5.7 KN < 68.1 KN OK
Vux (+ Side) = 1.1 KN < 68.1 KN OK
4 of 10
SPECTRA Project: Page # ___
Engineer: 7/28/2021
Descrip: 33kV DS
ASDIP Foundation 3.2.2 COMBINED FOOTING DESIGN www.asdipsoft.com
5 of 10
SPECTRA Project: Page # ___
Engineer: 7/28/2021
Descrip: 33kV DS
ASDIP Foundation 3.2.2 COMBINED FOOTING DESIGN www.asdipsoft.com
6 of 10
SPECTRA Project: Page # ___
Engineer: 7/28/2021
Descrip: 33kV DS
ASDIP Foundation 3.2.2 COMBINED FOOTING DESIGN www.asdipsoft.com
7 of 10
SPECTRA Project: Page # ___
Engineer: 7/28/2021
Descrip: 33kV DS
ASDIP Foundation 3.2.2 COMBINED FOOTING DESIGN www.asdipsoft.com
9 of 10
SPECTRA Project: Page # ___
Engineer: 7/28/2021
Descrip: 33kV DS
ASDIP Foundation 3.2.2 COMBINED FOOTING DESIGN www.asdipsoft.com
10 of 10