Bapki sand calculation

Chainage name pre Av. D of C Length (ft)


(ft)

ch=34+00 to 36+00 8.61 200

ch=40+00 to 42+00 6.065 200


200
ch=44+00 to 46+00 7.165 200
Total
pki sand calculation was given to shobuj vai

Complete Av. Av.width(ft) Pre Dredging Remark


Length (ft) Volume(m3) volume(m3)

70 160 7802.00 1721.64


0.00
100 120 4121.88 2219.09
0.00
120 65 2637.62 1250.00
5190.73