CURRENT STATUS OF
ACADEMIC BLOCK NIT
ANDHRA PRADESH
Abhay Kondru
i
ii
CURRENT STATUS OF
ACADEMIC BLOCK
NIT ANDHRA PRADESH
ABSTRAC
T
Pradesh. The academic block is under constructions from inside but the outside
framework
already stands strong with a layer of white coating .The construction has been done
based on
basically a process in which the 3d model of the slab or each wall is already made and
pre baked
and cooled. All that needs to be done was assembling and providing it with rigid
joints. The
internal layer of tile has been placed to some extent. The pace of construction is
considerably
fast, because they need to start academics and the other activities for first- and
second-year
students by next semester. As the deadline is close the worker are working day night to
complete
this project on
time.
ii
i
INDEX
1.
Introduction
2. Academic
Block
2.1.
Color
2.2. Method of
Construction
2.3. Workers
Employed
2.4. Stages of
Construction
2.5. Current
status
2.6.
Cost
3.
Conclusion
4.
References
1
1. INTRODUCTION
government the construction came into enforcement when the Supreme court
started taking
matter seriously. The foundation rock was laid by the reputed ex-central HRD
minister Smriti
Irani. The construction rate has increased from July 2019. There are going to be four
replications
This project is being made keeping in mind that it should be able to hold classes
for almost
other administrative purpose related rooms. The Academic block is made, keeping in
mind the
2. ACADEMIC BLOCK
2.1. Color
Scheme
• Yellow
• Cream white
• Pink
Whereas from inside it will be plain white in color, the tiles will be an extension of
white and
cream. Even the grills and the windowpane are white in
color.
2
2.2. Method of
Construction
The method which was used for this large-scale construction is Precast
Concrete
Foundation. This process is employed for the rapid construction of foundation. This
method is
more a bespoke
design.
factory (off site) and brought to the site and assembled. The manufactured product
must have the
the systems are connected. These foundation systems help in increasing the
productivity,
2.3. Workers
Employed
The number of workers employed for the completion of this project are around 70.
A crane
was also provided to help them place the slabs of concrete in right place. This was
supervised at
many stages for the accurate and on time completion of the project. Currently
they have
decreased the number of workers as only painting and tiling work are
pending.
3
2.4. Stages of
Construction
Stage
1
The concrete was transported into the campus at temporary layout for
factory, where
molding, blasting, cooling and drying will be done. Here the precast is made
and kept
until required for construction. The temporary layout is at a central zone where
the crane
Stage
2
A big pit was dug at the construction site of Academic block, where the
strength and
support bars will be placed. Which is important for rigidity and hence now we
had strong
Stage
3
Then the transportation of the precast to the construction site is done and at the
same time
it is placed with accuracy with the help of a crane and workers. This is a long
process as
the joints of all the precast must be connected and cemented properly. After
this process
Stage
4
Now the weather coating from inside and outside needs to be done. Then
further we
whitewash the whole surface. And with a little finishing this stage is
completed.
Stage
5
This is the stage where the interior is taken into consideration, the tiling
and water
proofing of the washrooms are done. The windowpane is placed in the slot for
window,
Stage
6
In this stage a final quality check is done. We ensure the safety feature by
checking wall
extruded polystyrene and expanded polystyrene are valued for their insulation
properties.
The windowpane and some quality checks are already done, a layer of
whitewash
has also been coated both inside and outside. The work pending are the ones
which will
The construction is at its final stage and even its deadline is just around
the corner,
2.6. Cost
charges the whole projected costed around 7.5 – 8 crores. There was a
little extra
3. CONCLUSION
completed before the deadline. The weather has been a troubling factor and a
prominent
reason for delay. But keeping this all aside the project is very close to
completion with
minimal construction errors. The cost was also not a big flip. Henceforth
hoping the
project will be
successful.