Professional Documents
Culture Documents
Hatch Frame Width A: Section - B 3
Hatch Frame Width A: Section - B 3
Lifting Handle
01/09X01M TSH
HST M10X90/10
HST M10X90/10
HST M10X90/10
RSA perimeter
frame
SCHEDULE
HST M10X90/10 HST M10X90/10
Leaf Length B
1 Howrah Maidan UA-01 HUA1A 1.30 1.25 1.25 1.69 2 HOURS 1 NEW ADDITION
Leaf Length A
1.314
2 Howrah Maidan UA-01 HOM-A/1122 HUA1B 1.314 1.30 1.25 1.25 1.69 2 HOURS 1 NEW ADDITION
3 Howrah Maidan UA-01 HOM-A/1122 HUA1C 1.314 1.30 1.25 1.25 1.69 2 HOURS 1 NEW ADDITION
@max centres
Lifting
HST M10X90/10
HST M10X90/10
HST M10X90/10
HST M10X90/10
B
Steel Stopper
SCALE 1:5 MTS
Detail 2 Detail 3
Detail 1 50x50x6mm thk
Steel fixing lugs
using anchor bolts @
A DETAIL -1 500mm max centres.
003 SCALE 1:5 MTS
Hatch Leaf
HST M10X90/10 HST M10X90/10 HST M10X90/10 HST M10X90/10
Steel stopper
Structural Width Opening Structural Width Opening
Steel fixing lugs
2 SECTION -A 4 SECTION -A (Open Position)
003 SCALE 1:10 MTS 004 SCALE 1:10 MTS
C DETAIL -3
003 SCALE 1:5 MTS
This drawing must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of KMRC. DRAWN BY: PROJECT MANAGER MYCEL PROJECT MANAGER /SUB CONTRUCTOR
R.S
MYCEL DESIGNER
TPAHC
JOINT VENTURE
CTPO
CHECKED BY:
R.E KOLKATA METRO RAIL CORPORATION LTD.
EAST-WEST METRO
TRANSTONNELSTROY - AFCONS JOINT VENTURE PROJECT
VERIFIED BY:
E.B
DATE OF ISSUE:
KOLKATA METRO - DURASTEEL ACCESS HATCH
0 PRELIMINARY DESIGN R.S R.E E.B 05-APR-2021 05-APR-2021
REV. SCALE AT A1: SUBMITTAL STAGE: STATUS:
REV. PARTICULARS DRN. CHD. VER. DATE UG1-AFC-310-ARC-DWG-003 (SHEET 1 OF 1) X As Noted W WORKING DRAWING