Rehabilitation and up-gradation of Cuttack -Angulsection of N.H-42 (New N.H. No-55 )from Km. 62.200to Km.112.000 in the state of Odisha under NHDP
Phase- iv on E.P.C mode
A1
LHS
A2
DRAWING
APPROVED
A1
RHS
A2
EUP VUP
work tackled 2 work tackled 3
STATUS OF FLYOVERS
Sub Cast In- Erection
Excava Found. Abt/Pier Crash Approach Retaining
Part Side Raft Struct situ/Precast of Deck Slab Proposal Remarks
tion PCC Cap Barrier Slab wall
ure Girders Girders
A1
LHS
A2
DRAWING APPROVED
A1
RHS
A2
work tackled 1
A1 Existing Bridbe to be
retaind and
Up to 50% foundation
P1 DRAWING sps-8
RHS additional new 3 lane & sub structure
P2 breidge shall be APPROVED
constructed
A2
A2
work tackled 2
A1
P1 RHS
A2
8 Minor Bridge at Ch:99+620 (1X10.00m )
A1
LHS
A2
A1
RHS
A2
8 Minor Bridge at Ch: 106+00 (2X6.00 )
A1
P1 LHS
A2
A1
P1 RHS
A2
8 Minor Bridge at Ch:101+073 (1X33.75m )
A1
BHS
A2
work tackled 5
MINOR BRIDGE
Chainage Adjoining ch.
1 91+796 91+750
2 99+620 99+250
3 101+073 101+088
4 106+000 105+750