Rehabilitation and up-gradation of Cuttack -Angulsection of N.H-42 (New N.H. No-55 )from Km. 62.200to Km.112.

000 in the state of Odisha under NHDP Phase- iv on


E.P.C mode
HUME PIPE CULVERT
L.H.S. R.H.S.
Chainage as Design
Sl. Appron/ Size Proposal Drawing status Pipe Appron/ Remark
Pipe laying Craddle P.C.C. Excavation per D.P.R chainage Excavation P.C.C. Craddle
No. Wing wall laying Wing wall
1 61+061 61+056 2x.90m widening APPROVED SPS-2
2 61+462 61+454 2x.90m widening APPROVED SPS-2
3 62+031 62+023 2x1.20m widening APPROVED SPS-3
4 62+388 62+330 1x1.20m Recon. APPROVED
5 63+534 63+528 2x.90m widening APPROVED SPS-2
6 63+811 63+805 2x.90m widening APPROVED SPS-3
7 64+826 64+820 2x.90m widening APPROVED SPS-2
8 65+387 65+387 2x.90m widening APPROVED SPS-3
9 work done without approval of drawing 67+313 2x1.20m widening work done without approval of drawing
10 67+516 67+510 2x1.20m widening APPROVED SPS-4
11 68+563 68+555 1x1.20m widening APPROVED SPS-4
12 69+200 69+201 1x1.20m Recon. Additional SPS-5
13 70+947 70+947 2x1.20m Recon. APPROVED SPS-10
14 72+167 72+154 2x1.20m widening APPROVED SPS-3
15 73+711 73+698 2x1.20m Recon. APPROVED SPS-5
16 77+060 77+049 3x1.20m Recon. APPROVED SPS-5
17 77+886 77+877 1x1.00m widening APPROVED SPS-3
18 78+800 78+813 1x1.00m widening APPROVED SPS-3
19 78+961 78+953 1x.900m widening APPROVED SPS-4
20 79+523 79+523 1x1.20m Recon. Additional Road workcompleted without construction of culvert SPS-4
21 79+827 79+816 1x1.00m widening
22 80+923 80+911 1x1.00m widening APPROVED Road workcompleted without construction of culvert SPS-4
23 81+324 81+323 1x1.20m Recon. Additional SPS-5
24 81+794 81+785 4x.900m widening APPROVED SPS-3
25 82+435 82+432 2x1.20m Recon. Additional SPS-3
26 85+798 85+778 1x.900m widening
27 86+955 86+948 1x1.00m widening
28 87+216 87+209 3x.900m widening
29 87+710 87+703 3x1.20m widening APPROVED SPS-5
30 87+820 87+813 1x1.20m Recon. APPROVED SPS-5
31 87+895 87+882 1x1.00m widening APPROVED SPS-5
32 89+750 89+750 1x1.20m New con APPROVED
33 90+250 90+250 1x1.20m New con APPROVED SPS-12
34 90+750 90+750 1x1.20m New con APPROVED SPS-12
35 91+250 91+250 1x1.20m New con APPROVED SPS-12
36 91+750 91+750 1x1.20m New con APPROVED
37 92+250 92+250 1x1.20m New con APPROVED SPS-8
38 92+750 92+750 1x1.20m New con APPROVED SPS-8
39 93+250 93+250 1x1.20m New con APPROVED SPS-8
40 93+750 93+750 1x1.20m New con APPROVED SPS-8
41 94+250 94+250 1x1.20m New con APPROVED SPS-11
42 94+750 94+750 1x1.20m New con APPROVED SPS-12
43 95+250 95+250 1x1.20m New con APPROVED SPS-12
44 95+750 95+750 1x1.20m New con APPROVED
45 96+250 96+250 1x1.20m New con APPROVED
46 96+750 96+750 1x1.20m New con APPROVED
47 97+250 97+250 1x1.20m New con APPROVED
48 97+750 97+750 1x1.20m New con APPROVED
49 98+250 98+250 1x1.20m New con APPROVED
50 98+750 98+750 1x1.20m New con APPROVED
51 99+250 99+250 1x1.20m New con APPROVED
52 99+750 99+750 1x1.20m New con APPROVED SPS-12
53 100+250 100+250 1x1.20m New con APPROVED SPS-12
54 100+750 100+750 1x1.20m New con APPROVED SPS-12
55 101+250 101+250 1x1.20m New con APPROVED
56 101+750 101+750 1x1.20m New con APPROVED
57 102+250 102+250 1x1.20m New con APPROVED SPS-11
58 102+750 102+750 1x1.20m New con APPROVED SPS-11
59 103+250 103+250 1x1.20m New con APPROVED SPS-11
60 103+750 103+750 1x1.20m New con APPROVED SPS-11
61 104+250 104+250 1x1.20m New con APPROVED SPS-11
62 104+750 104+750 1x1.20m New con APPROVED SPS-8
63 105+250 105+250 1x1.20m New con APPROVED SPS-8
64 105+750 105+750 1x1.20m New con APPROVED SPS-8
65 106+250 106+250 1x1.20m New con APPROVED SPS-12
66 106+750 106+915 1x1.20m New con APPROVED SPS-8
67 107+250 107+295 1x1.20m New con APPROVED SPS-8
68 107+750 107+795 1x1.20m New con APPROVED SPS-8
69 108+250 108+253 1x1.20m New con APPROVED SPS-8
70 108+750 108+795 1x1.20m New con APPROVED SPS-8
71 109+750 109+220 1x1.20m New con APPROVED SPS-3
72 109+250 109+290 1x1.20m New con APPROVED SPS-2
73 110+250 110+050 1x1.20m New con APPROVED SPS-3
74 110+750 110+786 1x1.20m New con APPROVED SPS-12
75 111+250 111+290 1x1.20m New con APPROVED
76 111+400 111+400 1x1.20m New con APPROVED

Reconstruction 5 Total 76 (72+4)


Widening 22 As per D.P.R 72
New construction 45
C.O.S 4
Total 76
work tackled 36

note :- 60+595 1x1.200 HPC missing Rec. widening New


completed 4 14 12
in progress 3 3 2
7 17 14
38
Rehabilitation and up-gradation of Cuttack -Angulsection of N.H-42 (New N.H. No-55 )from Km. 62.200to Km.112.000 in the state of Odisha under NHDP Phase- iv on
E.P.C mode
BOX CULVERT
L.H.S. R.H.S.
Chainage as Drawing
Sl. Retaining/ Bottom Design chainage Span (m) Propasal Bottom Retaining/ Remark
Top slab Wall P.C.C. Excavation per D.P.R status Excavation P.C.C. Wall Top slab
No. Return wall Raft Raft Return wall
1 62+175 62+168 1x3x2.25 Recon. APPROVED SPS-5
2 62+711 62+706 1x3.75x3.5 Recon. APPROVED SPS-5
3 62+834 62+826 1x2.0x1.75 Recon. APPROVED SPS-4
4 63+000 62+994 1x2.0x1.0 Recon. APPROVED SPS-4
5 64+232 64+226 1x4.0x3.2 Recon. APPROVED SPS-4
6 65+009 65+002 1x1.5x1.25 Widening APPROVED
7 65+109 65+109 1x1.5x1.5 Widening Work has been done without approval of drawing
8 65+542 65+536 1x2.5x1.25 Widening APPROVED
9 65+911 66+002 1x2.0x2.0 APPROVED SPS-11
10 66+236 66+230 1x2.0x2.5 Widening APPROVED SPS-10
11 66+384 66+378 1x1.0x.75 Widening APPROVED SPS-11
12 66+503 66+495 1x1.5x1.25 Recon. APPROVED SPS-11
13 66+542 1x1.50x1.50 Road workcompleted without construction of culvert
14 66+730 1x2.0x1.50 Road workcompleted without construction of culvert
15 66+850 66+760(66+810) 1x1.2x2.0 Recon. APPROVED SPS-11
16 66+975 66+969 1x3.0x1.0 Widening work done without approval of drawing SPS-11
17 67+620 67+612 1x1.0x2.0 Recon. APPROVED
18 67+765 67+757 1X1.50X1.75 Widening APPROVED
20 68+050 68+042 1x1.5x1.25 Widening APPROVED SPS-10
21 68+264 68+256 1x3.25x1.5 Recon. APPROVED
22 69+595 69+595 1x1.5x4.25 Widening APPROVED SPS-10
24 70+745 70+790 1x1.20x1.50 Widening APPROVED SPS-10
25 71+834 71+822 1x4.0x3.5 Widening APPROVED
26 73+113 73+101 1x3.75x3.75 Recon. APPROVED SPS-5
27 73+826 73+813 1x1.5x1.75 Widening APPROVED SPS-4
28 74+304 74+292 1x2.0x2.75 Widening APPROVED
29 74+617 74+605 1x1.5x1.75 Widening APPROVED
30 74+916 74+832 1x1.0x2.25 Widening APPROVED
31 75+438 75+425 1x1.0x4.0 Widening APPROVED
32 75+780 75+767 1x2.0x1.5 Recon. APPROVED
33 76+272 76+259 1x2.5x3.0 Widening APPROVED
34 76+451 76+437 1x2.0x1.25 Recon. APPROVED
35 HPC 77+431 77+422 1x1.0x1.0 Widening APPROVED BOX SPS-4
36 77+586 77+576 1x1.25x1.25 Recon. APPROVED SPS-4
37 78+218 78+208 1x1.0x1.0 Widening APPROVED SPS-4
38 80+189 80+178 1x1.0x1.0 Widening APPROVED SPS-11
39 80+557 80+546 1x1.0x1.0 Widening APPROVED SPS-10
40 work done with out drawing 3x1 83+392 83+383 1x2.0x2.0 Widening
41 Road workcompleted without construction of culvert 83+566 1x2.0x2.0 Widening Road workcompleted without construction of culvert
42 83+705 83+697 1x2.0x2.0 Widening APPROVED
43 86+037 86+017 1x1.5x1.5 Widening
44 86+405 86+398 1x1.5x1.5 Recon. APPROVED
45 89+105 89+096 1x1.0x2.4 Recon. APPROVED
46 95+195 1x3.0x7.20
47 97+902 1x5.09x2.0
48 98+556 1x2.45x1.50
49 99+960 1x3.0x2.0
50 101+466 1x6.0x7.09
51 102+680 1x3.0x2.0
52 105+780 1x3.0x2.0
53 107+642 1x4.0x4.0
54 110+200 1x4.0x3.0
55 110+840-SR 1x2.0x1.50
56 110+840-MCW 1x2.0x1.50

Reconstruction 15 work tackled 28


Widening 25
Total 40 Rec. widening New
C.O.S 17 completed 1 11
Additonal Box culvert in progress 11 6
12 17
Chainage Adjoining ch. 29
70+790 70+745
67+757 67+757
65+910 65+536
66+730 66+495
66+542 66+495
95+195 94+750
97+902 97+750
98+556 98+250
99+960 99+750
101+466 101+250
102+680 102+250
105+780 105+750
107+642 107+295
110+200 110+050
110+840-SR 110+786
110+840-MCW 110+786

HUME PIPE CULVERT

69+201 68+555
79+522 78+953
81+323 80+911
82+432 81+785

MINOR BRIDGE

91+796 91+750
99+620 99+250
101+073 101+088
106+000 105+750
Rehabilitation and up-gradation of Cuttack -Angulsection of N.H-42 (New N.H. No-55 )from Km. 62.200to Km.112.000 in the state of Odisha under NHDP
Phase- iv on E.P.C mode

STATUS OF VUP /AUP


Cast In-
Sub
SL. Excavat Found. Abt/Pier situ/Prec Erection Deck Crash Approach Retaining
Part Side Raft Structu Proposal Remarks
NO ion PCC Cap ast of Girders Slab Barrier Slab wall
re
Girders

1 AUP 61+565 (1X14.00M )


A1
LHS
A2
DRAWING
APPROVED
A1
RHS
A2

2 AUP 65+650 (1X14.00M )


A1
LHS
A2
DRAWING
APPROVED
A1
RHS
A2

3 AUP 74+835 (1X14.00M )


A1
LHS
A2
DRAWING
APPROVED
A1
RHS
A2

4 VUP 91+551 (1X14.00M ) up to sub structure #11 sps 11 RHS

A1
LHS
A2
DRAWING
APPROVED
A1
RHS
A2

5 VUP 95+196 ( 1X14.00M )


A1
LHS
A2
DRAWING
APPROVED
A1
RHS
A2

6 VUP 101+476 (1X14.00M )


A1
LHS
A2
DRAWING
APPROVED
A1
RHS
A2
7 VUP 104+223 (1X14.00M )
A1 Up to sub foundation sps-8 BHS
LHS
A2
DRAWING
APPROVED
A1
RHS
A2

8 VUP 108+014 (1X14.00M )


A1 Up to sub structure sps-8 BHS
LHS
A2
DRAWING
APPROVED
A1
RHS
A2

EUP VUP
work tackled 2 work tackled 3

Rec. widening New Rec. widening New


completed 0 0 0 completed 0 0 0
in progress 0 0 2 in progress 3
Rehabilitation and up-gradation of Cuttack -Angulsection of N.H-42 (New N.H. No-55 )from Km. 62.200to Km.112.000 in the state of Odisha
under NHDP Phase- iv on E.P.C mode

STATUS OF FLYOVERS
Sub Cast In- Erection
Excava Found. Abt/Pier Crash Approach Retaining
Part Side Raft Struct situ/Precast of Deck Slab Proposal Remarks
tion PCC Cap Barrier Slab wall
ure Girders Girders

Flyover 90+005 ( 1x 30m ) Up to sub structure SPS 11 LHS

A1
LHS
A2
DRAWING APPROVED
A1
RHS
A2

Flyover 110+873 (1 x 30m )


A1 Up to sub structure sps-5 BHS
LHS
A2
DRAWING APPROVED
A1
RHS
A2

work tackled 1

Rec. widening New


completed 0 0 0
in progress 0 0 1
Rehabilitation and up-gradation of Cuttack -Angulsection of N.H-42 (New N.H. No-55 )from Km. 62.200to Km.112.000 in the state of Odisha under
NHDP Phase- iv on E.P.C mode

STATUS OF MAJOR BRIDGES


Found Cast In-
Excava Sub Abt/Pier Erection Deck Crash Approa Retaining
Part side tion ation Raft
Structure Cap
situ/Precast
of Girders Slab Barrier ch Slab wall
Proposal Remarks
PCC Girders

Major Bridge at Ch: 69+829 (68+854) ( 5X12.00m )


A1
P1 Existing Bridbe to be
P2 retaind and
DRAWING
RHS additional new 3 lane
P3 breidge shall be APPROVED
P4 constructed
A2
Major Bridge at Ch: 79+679 (3X 37.50m )

A1 Existing Bridbe to be
retaind and
Up to 50% foundation
P1 DRAWING sps-8
RHS additional new 3 lane & sub structure
P2 breidge shall be APPROVED
constructed
A2

Major Bridge at 106+750 ( 2X33.75m )


A1
P1 LHS Existing Bridbe to be
A2 retaind up to opning
of Angul by pass and DRAWING
additional new Two 3 APPROVED
A1 lane breidge shall be
P1 RHS constructed

A2

work tackled 2

Rec. widening New


completed 0 0 0
in progress 0 1 1
Rehabilitation and up-gradation of Cuttack -Angulsection of N.H-42 (New N.H. No-55 )from Km. 62.200to Km.112.000 in the state of Odisha under NHDP
Phase- iv on E.P.C mode

STATUS OF Minor BRIDGES


Cast In-
Excavat Found. Sub Abt/Pier Erection of Deck Crash Approach Retaining
SL.NO Part Side Raft situ/Precas Proposal Remarks
ion PCC Structure Cap Girders Slab Barrier Slab wall
t Girders

1 Minor Bridge at Ch: 60+902 ( 1X31.50m )


A1
LHS
A2 Existing Bridge to be
DRAWING
Replased by new 6
APPROVED
A1 lane bridge
RHS
A2
2 Minor Bridge at Ch: 73+537 (1X31.50m )
A1 Up to sub structure sps-8
LHS
A2
Existing Bridge to be
DRAWING
Replased by new 6
A1 inprogress APPROVED
lane bridge
RHS
A2 inprogress

3 Minor Bridge at Ch: 75+910 (3X 10.50m )


A1 N/A N/A Existing Bridge to be Up to sub structure sps-5
retaind and
P1 N/A N/A DRAWING
LHS additional new 3
APPROVED
P2 N/A N/A lane bridge shall be
A2 N/A N/A provided

4 Minor Bridge at Ch: 76+826 ( 1X 15.00m )


A1 Up to sub structure sps-5
LHS
A2 Existing Bridge to be
DRAWING
Replased by new 6
APPROVED
A1 lane bridge
RHS
A2
5 Minor Bridge at Ch: 84+305 ( 1X 16.50m )
A1 Up to sub structure sps-5
LHS
A2 Existing Bridge to be
DRAWING
Replased by new 6
APPROVED
A1 lane bridge
RHS
A2
6 Minor Bridge at Ch: 101+088 ( 1X 33.75m )
A1
LHS
A2 Existing Bridge to be
Replased by new 6
A1 lane bridge
RHS
A2
7 Minor Bridge at Ch: 101+212 (1X 33.75m )
A1
LHS
A2 Existing Bridge to be
Replased by new 6
A1 lane bridge
RHS
A2
8 Minor Bridge at Ch: 108+964 (1X16.50m )
Existing Bridbe to be
A1 retaind up to opning of Up to sub structure sps-4 super str. Sps-11
Angul by pass and DRAWING
BHS additional new Two 3 APPROVED
lane breidge shall be
A2 constructed

8 Minor Bridge at Ch:91+796 (2X6.50m )


A1
P1 LHS
A2

A1
P1 RHS
A2
8 Minor Bridge at Ch:99+620 (1X10.00m )
A1
LHS
A2

A1
RHS
A2
8 Minor Bridge at Ch: 106+00 (2X6.00 )
A1
P1 LHS
A2

A1
P1 RHS
A2
8 Minor Bridge at Ch:101+073 (1X33.75m )
A1
BHS
A2

work tackled 5

Rec. widening New


completed 0 0 0
in progress 0 1 4
Total
BOX CULVERT
1 Chainage Adjoining ch.
2 70+790 70+745
3 67+757 67+757
4 65+910 65+536
5 66+730 66+495
6 66+542 66+495
7 95+195 94+750
8 97+902 97+750
9 98+556 98+250
10 99+960 99+750
11 101+466 101+250
12 102+680 102+250
13 105+780 105+750
14 107+642 107+295
15 110+200 110+050
16 110+840-SR 110+786
17 110+840-MCW 110+786

HUME PIPE CULVERT


Chainage Adjoining ch.
1 69+201 68+555
2 79+522 78+953
3 81+323 80+911
4 82+432 81+785

MINOR BRIDGE
Chainage Adjoining ch.
1 91+796 91+750
2 99+620 99+250
3 101+073 101+088
4 106+000 105+750