Download as pdf
Download as pdf
You are on page 1of 35
BOSS TECHNICAL SERVICES > COMPETENT PERSON A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact O11 - 45652723, +91 9811144107, +91 9212714782 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145025 Examination Report of Lifting Machines / Lifting Tackles Under Rule 60A, Section 29 of FACTORIES ACT 1948 BTSIPIIS-12 Name of Factory / site : Mis Tata Projects Ltd. Address of the factory / site : Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Distinguishing number of mark, if any and : Fixed Tower Crane, Capacity - 10 Ton description sufficient to identify liting machine, Make - Zoomilion, Model No.- TC7013 chain, rope or the lifting tackle Present Height - 60 mtrs, ID No.- TC-01 Sr. No. 2012TC01500388, Location - Pour -2 Date when the lifting machine / tackle was first: As per company record taken to use in the factory Date and number of the certificate relating to any : As per company record test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. Date of each periodical thorough examination _; First time tested by us made under sub-clause (|!) of clause (a) of sub- section (1) of section 29 of the Act and sub rule (8) and by whom it was carried out. Date of annealing or other heat treatment of the chain and other lifting tackle made under Sub- rule (5) and by whom it was carried out. Particulars of any defects affecting the safe: rested on load & found ok working load found at any such thorough Test parameter as per cut off limit examination or after annealing and the steps Wire Rope Dia - 16.0 mm, Falls - 04 taken to remedy such defects. Boom Length - 70 mtrs Radius - 35 mtrs, Test Load - 3.4 Ton Present Capacity 5.0 Ton on 02 falls Testing done on : 17/3/2020 We certify that, I/We have thoroughly examined the above mentioned lifling Machine/ Chain/ Rope /Lifting tackle and the above is a correct report of the result. kar Competent Person ve apeaptne tity respornbiy wtronver® case cay aesenn map on wth nto ha me equ sant BB” BOSS TECHNICAL SERVICES COMPETENT PERSON “Haryana Govt. Competency Letter No, 2954, Validity - 31st Dee 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact E-mail O14 - 45652723, +91 9811144107, +91 9212714782 bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145001 Examination Report of Lifting Mact es / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPNS-12 1 Name of Factory 2 Address of the factory 3. Distinguishing number of mark, if any and description sufficient to identify lifting machine, chain, rope or the lifting tackle. 4. Date when the lifting machine / tackle was first taken to use in the factory 5 Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination made under sub-clause (|!) of clause (a) of ‘sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of the chain and other lifting tackle made under ‘Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing and the steps. taken to remedy such defects, Testing done on Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project ‘Sector - 59, Gurgaon (Haryana) Polyester Belt Sling, Capacity - 3.0 Ton Length - 6.0 mtrs, Width - 75 mm Make - Ferreterro, Sr. No.- 401684 Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 17/3/2020 We certify that, We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on ChY Ts Maar Head of institution ese: cee ei aby 16/3/2021 sonst he kar Competent Person quart 2s. timing BB BOSS TECHNICAL SERVICES (180) COMPETENT PERSON Someescoor™™ Haryeaa Govt. Competoncy Letter No, 1954, Validity - 31st Dec 2020 A2 1295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 140002 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIS-12 1 Name of Factory Mis Tata Projects Ltd. 2. Address of the factory Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) 3. Distinguishing number of mark, if any and : Polyester Belt Sling, Capacity - 3.0 Ton description sufficient to identify lifting Length - 6.0 mtrs, Width - 75 mm. machine, chain, rope or the lifting tackle. Make - Ferreterro, Sr. No. 401725 4 Date when the lifting machine / tackle was Yr. 2020 first taken to use in the factory 5 Date and number of the certificate relating to: New Item any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate 6 Date of each periodical thorough examination : First time Inspected by us made under sub-clause (II) of clause (a) of sub-section (1) of section 29 of the Act and Sub rule (5) and by whom it was carried out, 7 Date of annealing or other heat treatment of =: NA the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe: Physically inspected & found ok working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on : 17/3/2020 We certify that, I/We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result Next inspection due on : 16/3/2021 A T.S. Makkar Head of institution DISCLAMER Ths Repo fe We sese ra aby reer, senso Neer Competent Person lo ics te cndion of he Machine! Equpmen a on te date ot tcavorincave fey aside mishap t/t" To us moh BB “| BOSS TECHNICAL SERVICES COMPETENT PERSON mms Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 | 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145003 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTS/PIJS-12 1 Name of Factory 2. Address of the factory 3. Distinguishing number of mark, if any and description sufficient to identify lifting machine, chain, rope or the lifting tackle. 4 Date when the lifting machine / tackle was first taken to use in the factory 5 Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate, 6 Date of each periodical thorough examination made under sub-clause (I) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Sling, Capacity - 3.0 Ton Length - 6.0 mtrs, Width - 75 mm. Make - Ferreterro, Sr. No.- 380281 Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 17/3/2020 We certify that, I/We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on oe ed | if Le et T.S. Makkar Head of Institution DISCLANER: This Rept of Wo nesenina| abst ros cn! 14si07 pn: 981 ON oi 48682723 nator roe ro cet Seeover cave 16/3/2021 Competent Person * BOSS TECHNICAL SERVICES COMPETENT PERSON oe _ Govt. Competency Letter No. : 2954, Validity - 31st Dee 2020 eave" A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 014 - 45652723, +91 9611144107, +91 9212714782 45004 E - mail : bosstechnical@yahao.co.in, Website : www.bosstechnical.com _ 1 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTS/P/JS-12 1 Name of Factory : Mis Tata Projects Ltd, 2. Address of the factory Site - ITPG, Phase - 2 Project ‘Sector - 59, Gurgaon (Haryana) 3. Distinguishing number of mark, if any and Polyester Belt Sling, Capacity - 3.0 Ton description sufficient to identify liting Length - 6.0 mtrs, Width - 75 mm machine, chain, rope or the lifting tackle, Make - Ferreterro, Sr. No.- 401720 4 Date when the lifting machine / tackle was Yr. 2020 first taken to use in the factory 5 Date and number of the certificate relating to: “New Item any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination : First time Inspected by us made under sub-clause (Il) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of NA the chain and other lifting tackle made under Sub-rule (6) and by whom it was carried out. 8 Particulars of any defects affecting the safe: Physically Inspected & found ok working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on : 17/3/2020 We certify that, I/We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result Next inspection due on : 16/3/2021 Sarabjeet Singh Makkar Competent Person TS CLS TS. Makar Head of Institution DISCLAIMER. Thi Ropot of eration roc the ‘Wo accept no bay vospeniy, whatseavor case BB | BOSS TECHNICAL SERVICES COMPETENT PERSON omc Haryana Govt. Competency Letter No. ; 2954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Gontact : 011 - E-mail 45652723, +91 9811144107, +91 9212714782 bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145005 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIUS-12 1 Name of Factory 2 Address of the factory 3 Distinguishing number of mark, if any and description sufficient to identify lifting machine, chain, rope or the lifting tackle. 4 Date when the lifting machine / tackle was first taken to use in the factory 5 Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination made under sub-clause (I!) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of the chain and other lifting tackle made under ‘Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe working load found at any such thorough ‘examination or after annealing and the steps taken to remedy such defects. Testing done on Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) : Polyester Belt Sling, Capacity - 3.0 Ton Length - 6.0 mtrs, Width - 75 mm Make - Ferreterro, Sr. No 401744 Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 177312020 We cerify that, (We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on Head of | fratien DISCLAMER: THe Rago of examination rates 16/3/2021 sonar how Competent Person We acept no baby /esponey whatsoever cau BB BOSS TECHNICAL SERVICES COMPETENT PERSON iso Comeescae ‘Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dee 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 014 - 45652723, +91 9811144107, +91 9212714782 145006 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIJS-12 1 Name of Factory 2. Address of the factory 3. Distinguishing number of mark, if any and description sufficient to identify lifting machine, chain, rope or the lifting tackle. 4. Date when the lifting machine / tackle was first taken to use in the factory 5 Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination made under sub-clause (II) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Sling, Capacity - 3.0 Ton Length - 6.0 mtrs, Width - 75 mm Make - Ferreterro, Sr. No.- 401694 ‘Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 17/3/2020 We certify that, I/We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on ¢ he BLA T.S. Makkar Head of Institution ne tabity reeporsbey wnetsoeva' ase of ary accent 16/3/2021 sorarie beter Competent Person acne Espraat as on te dete fob BB | BOSS TECHNICAL SERVICES E2 COMPETENT PERSON 8 al Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 145007 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIJS-12 Name of Factory Address of the factory Distinguishing number of mark, if any and description sufficient to identify lifting machine, chain, rope or the lifting tackle. Date when the lifting machine / tackle was first taken to use in the factory Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. Date of each periodical thorough examination made under sub-clause (I) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. Date of annealing or other heat treatment of the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. Particulars of any defects affecting the safe ‘working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Sling, Capacity - 3.0 Ton Length - 6.0 mtrs, Width - 75 mm Make - Ferreterto, Sr. No.- 401714 Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 17/3/2020 We certify that, /We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on = = Shakes Head of institution DiscLAMEs We aesartna abit ospeneny wate 16/3/2021 sores Edt Maar Competent Person ‘ne Ropar ot exanation lace hn concn ofthe Machine / Espa the Sao sting rin eae any nest aap 0th 1 fs mane equine BOSS TECHNICAL SERVICES c COMPETENT PERSON Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dee 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 145008 E - mail : bosstechnical@yahoo.ca.in, Website : www.bosstechnical.com Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIJS-12 1 Name of Factory + Mis Tata Projects Ltd. 2 Address of the factory Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) 3 Distinguishing number of mark, if any and Polyester Belt Sling, Capacity - 3.0 Ton description sufficient to identify lifting Length - 6.0 mtrs, Width - 75 mm. machine, chain, rope or the lifting tackle. Make - Ferreterro, Sr. No.- 380310 4 Date when the lifting machine / tackle was ‘Yr. 2020 first taken to use in the factory 5 Date and number of the certificate relating to: New Item any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination: First time Inspected by us made under sub-clause (Il) of clause (a) of ‘sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of NA the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe: Physically Inspected & found ok working load found at any such thorough ‘examination or after annealing and the steps taken to remedy such defects Testing done on : 17/3/2020 ‘We certify that, I/We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result Next inspection due on : 16/3/2021 HAD. +5: fiaicear Sarabjeer Sinn Ar Head of Institution Competent Person oisct we secept, AINER! Ts Rapa of sar ly reponsiy atoover memset ry on eects he conan o i Macrin Eqs aon te tetra BIS”? BOSS TECHNICAL SERVICES ie COMPETENT PERSON we A Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 1295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 E - mail bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 4 A509 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPNS-12 1 Name of Factory Mis Tata Projects Ltd. 2. Address of the factory : Site - ITPG, Phase - 2 Project ‘Sector - 59, Gurgaon (Haryana) 3 Distinguishing number of mark, if any and : Polyester Belt Sling, Capacity - 3.0 Ton description sufficient to identify lifting Length - 6.0 mtrs, Width - 75 mm machine, chain, rope or the lifting tackle. Make - Ferreterro, Sr. No. 401709 4° Date when the lifting machine /tackle was: Yr. 2020 first taken to use in the factory 5. Date and number of the certificate relating to: New item any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate 6 Date of each periodical thorough examination: First time Inspected by us. made under sub-clause (II) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of |: NA the chein and other lifting tackle made under Sub-tule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe: Physically Inspected & found ok working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on : 17/3/2020 We certify that, IMWe have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on : 16/3/2021 AKAD TS. Makkar* SarabjeerSh ‘ar Head of Institution Competent Person DISCLAIMER: Ths Reser ol examination retain concton fhe Racine /Eqapmant son he date of eng We accop ola iy responsi watever case of ary acticenraghap on Wi! due othe echine equa * BOSS TECHNICAL SERVICES COMPETENT PERSON ‘Haryana Govt, Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145010 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIP/JS-12 1 Name of Factory 2 Mis Tata Projects Ltd. 2. Address of the factory 2 Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) 3 Distinguishing number of mark, if any and Polyester Belt Sling, Capacity - 3.0 Ton description sufficient to identify iting Length - 6.0 mtrs, Width - 75 mm machine, chain, rope or the lifting tackle. Make - Ferreterro, Sr. No.- 401697 4 Date when the lifting machine /tackie was: Yr. 2020 first taken to use in the factory 5 Date and number of the certificate relating to New Item any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination : First time Inspected by us made under sub-clause (II) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of NA the chain and other lifting tackle made under ‘Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe: Physically Inspected & found ok working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on : 17/3/2020 We certify that, I/We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result, Next inspection due on : 16/3/2021 Ph. 68rnraat07, 0ri-45e57723 Bs TS. Makkar sarah herter Head of Institution Competent Person We accept mo ht ty vanpone bay Ysching / Equip on th dae often ap n/a 0 oe machine | @gaprent BS” » BOSS TECHNICAL SERVICES COMPETENT PERSON ‘Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145011 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIIS-A2 1 Name of Factory 2. Address of the factory 3. Distinguishing number of mark, if any and description sufficient to identify lifting machine, chain, rope or the lifting tackle. 4. Date when the lifting machine / tackle was first taken to use in the factory 5 Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination made under sub-clause (II) of clause (a) of ‘sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of the chain and other lifting tackle made under ‘Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Sling, Capacity - 3,0 Ton Length - 6.0 mtrs, Width - 75 mm Make - Ferreterro, Sr. No- 379205 Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 17/3/2020 We cerfify that, We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on CTA T.S. Makkar Head of institution Discuan 16/3/2021 erat ttre Competent Person » BOSS TECHNICAL SERVICES COMPETENT PERSON Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145012 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIP/JS-12, Name of Factory Address of the factory Distinguishing number of mark, if any and description sufficient to identify lifting machine, chain, rope or the lifting tackle. Date when the lifting machine / tackle was first taken to use in the factory Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. Date of each periodical thorough examination made under sub-clause (II) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. Date of annealing or other heat treatment of the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing and the steps taken to remedy such defects Testing done on Mls Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Sling, Capacity - 3.0 Ton Length - 6.0 mtrs, Width - 75 mm Make - Ferreterro, Sr. No.- 401707 Yr, 2020 New Item First time Inspected by us NA Physically Inspected & found ok 17/3/2020 We cerfify that, We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on agape <7 Head of Institution 16/3/2021 sorcerer Competent Person + exarination intact he conaton of ne Machine /Equpmert as ont deo ttn ay. ahatsoever cas of ary Seiden rasrep Ow a8 fee maetine quant BES * BOSS TECHNICAL SERVICES SO) A COMPETENT PERSON wee ‘Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dee 2020 A2 / 295, Pankha Road, Janak Purl, New Delhi -110058 Contact : O11 - 45652723, +91 9811144107, +91 9212714782 5013 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 14 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIIS-42 1 Name of Factory : Mls Tata Projects Ltd. 2 Address of the factory Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) 3 Distinguishing number of mark, if any and : Polyester Belt Sling, Capacity - 5.0 Ton description sufficient to identify lifting Length - 6.0 mtrs, Width - 125 mm machine, chain, rope or the lifting tackle. Make - Ferreterro, Sr. No.- 410376 4 Date when the lifting machine / tackle was: Yr. 2020 first taken to use in the factory 5 Date and number of the certificate relatingto : New Item any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination : First time Inspected by us made under sub-clause (|I) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of NA the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out, 8 Particulars of any defects affecting the safe Physically Inspected & found ok working load found at any such thorough examination or after annealing and the steps taken to remedy such defects Testing done on : 17/3/2020 We certify that, We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on : 16/3/2021 T.S. Makkar Sarabjest on ar Head of Institution Competent Person DISCLAIMER: This Report of examinaton refit cndton cf he Mache! Equipment on he da We acorn Kbit /responsbtywnatsoever i cabeo ry acer masa on wth auto te ch * BOSS TECHNICAL SERVICES BE S COMPETENT PERSON Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 014 - 45652723, +91 9811144107, +91 9212714782 E - mail : bosstechnical@yahoo.co.in, Wabsite : www.bosstechnical.com 145014 Examination Report of Lifting Machines / Lifting Tack! Under Section 29 of FACTORIES ACT 1948 BTSIPIJS-A2 1. Name of Factory 2. Address of the factory 3 Distinguishing number of mark, if any and description sufficient to identify lifting machine, chain, rope or the lifting tackle. 4 Date when the lifting machine / tackle was first taken to use in the factory 5 Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination made under sub-clause (I!) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on Mis Tata Projects Ltd, Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Sling, Capacity - 5.0 Ton Length - 6.0 mtrs, Width - 125 mm Make - Ferreterro, Sr. No.- 410450 Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 17/3/2020 We certify that, /We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on SDA T.S. Makkar Head of Institution DISCLAIMER: This Rep of examaton rect the corona he crn 16/3/2021 sorati ei lun Competent Person a tng. BB BOSS TECHNICAL SERVICES COMPETENT PERSON Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dee 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact E - mail 011 - 45652723, +91 9811144107, +91 9212714782 bosstechnical@yahoo.co.in, Website : www.bossiechnical.com 145015 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIUS-12 Name of Factory Address of the factory Distinguishing number of mark, if any and description sufficient to identify lifting machine, chain, rope or the lifting tackle. Date when the lifting machine / tackle was first taken to use in the factory Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. Date of each periodical thorough examination made under sub-clause (Il) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. Date of annealing or other heat treatment of the chain and other lifting tackle made under ‘Sub-rule (5) and by whom it was carried out. Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing and the steps. taken to remedy such defects, Testing done on Mis Tata Projects Ltd Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Sling, Capacity - 5.0 Ton Length - 6.0 mtrs, Width - 125 mm Make - Ferreterro, Sr. No.- 410383 Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 17/3/2020 We certify that, Ie have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on Top. T.S. Makkar Head of Institution 16/3/2021 arent atc Competent Person AER: Ths Repo of sxaninabon acts te corso of he Racine /Eeupment 9. the dat often etna apenas, watssrcr a caen oon aciger | wahap on! wh eae Haryana Govt. Competency Letter No. BOSS TECHNICAL SERVICES COMPETENT PERSON enna coe 1954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 145016 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIJS-A2 Name of Factory Address of the factory Distinguishing number of mark, if any and description sufficient to identify lifting machine, chain, rope or the lifting tackle. Date when the lifting machine / tackle was first taken to use in the factory Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. Date of each periodical thorough examination made under sub-clause (|) of clause (a) of ‘sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. Date of annealing or other heat treatment of the chain and other lifting tackle made under ‘Sub-rule (5) and by whom it was carried out. Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing and the steps. taken to remedy such defects. Testing done on Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Siing, Capacity - 5.0 Ton Length - 6.0 mirs, Width - 125 mm Make - Ferreterro, Sr. No 410434 Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 17/3/2020 We certify that, Ie have thoroughly examined the above mentioned Polyester Belt Sling and the above is @ correct report of the result. Next inspection due on Ti SoD ap T.S. Makkar Head of institution DISCLAIMER Ts Repo of exnrinasen rics the cnc 16/3/2021 rae St ronan Competent Person BB COMPETENT PERSON BOSS TECHNICAL SERVICES ‘0 Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 145017 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIUS-12 Name of Factory Address of the factory Distinguishing number of mark, if any and description sufficient to identity lifting machine, chain, rope or the lifting tackle. Date when the lifting machine / tackle was first taken to use in the factory Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. Date of each periodical thorough examination made under sub-clause (II) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. Date of annealing or other heat treatment of the chain and other lifting tackle made under ‘Sub-rule (5) and by whom it was carried out. Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Sling, Capacity - §.0 Ton Length - 6.0 mtrs, Width - 125 mm Make - Ferreterro, Sr. No.- 340834 Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 17/3/2020 We certify that, We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on Hin. jakkar Head of Institution ER The Repro eeaminaton eles ho ably emery whee ease 16/3/2021 sora Sour bencar Competent Person BES BOSS TECHNICAL SERVICES COMPETENT PERSON Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 145018 E - mail : bosstechnical@yahoo.co.in, Website : www-bosstechnical.com Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIIS-12 1 Name of Factory Mls Tata Projects Ltd. 2 Address of the factory : Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) 3 Distinguishing number of mark, if any and : Polyester Belt Sling, Capacity - 5.0 Ton description sufficient to identify lifting Length - 6.0 mtrs, Width - 125 mm machine, chain, rope or the lifting tackle. Make - Ferreterro, Sr. No.- 340831 4 Date when the lifting machine /tackle was: Yr. 2020 first taken to use in the factory 5. Date and number of the certificate relating to: New Item any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate, 6 Date of each periodical thorough examination : First time Inspected by us made under sub-clause (II) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out, 7 Date of annealing or other heat treatment of =: NA the chain and other lifting tackle made under Sub-tule (5) and by whom it was carried out 8 Particulars of any defects affecting the safe: Physically Inspected & found ok working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on : 17/3/2020 We certify that, I/We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on : 16/3/2021 Pn TS. Makkar Head of Institution DISCLAMIER: Th Repo of exsmnaton rofets we acopt no amy respons. wars cores ebe Marc Competent Person BES » BOSS TECHNICAL SERVICES iA COMPETENT PERSON Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 oman A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 145019 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIJS-12 1 Name of Factory : Mls Tata Projects Ltd. 2 Address of the factory Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) 3. Distinguishing number of mark, if any and : Polyester Belt Sling, Capacity - 5.0 Ton description sufficient to identify lifting Length - 6.0 mtrs, Width - 125 mm machine, chain, rope or the lifting tackle. Make - Ferreterro, Sr. No.- 410437 4 Date when the lifting machine /tacklewas : Yr. 2020 first taken to use in the factory 5 Date and number of the certificate relating to: New Item any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination : First time Inspected by us made under sub-clause (I!) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of =: NA the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe: Physically Inspected & found ok working load found at any such thorough examination or after annealing and the steps. taken to remedy such defects. Testing done on : 17/3/2020 We certify that, I/We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on : 16/3/2021 sh 8), TS. Makar sores ater Head of Institution Competent Person DISCLANER: Ths Report of examina Wwe necon ty responsi, ata 9 conn of he Machine / Equipe on th de ottestng ase of any acim! mishap on Wh | uf hs marin equ nen BOSS TECHNICAL SERVICES COMPETENT PERSON Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 145020 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIP/JS-12 Name of Factory : Mis Tata Projects Ltd. Address of the factory Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Distinguishing number of mark, if any and: Polyester Belt Sling, Capacity - 5.0 Ton description sufficient to identify lifting Length - 6.0 mtrs, Width - 125 mm machine, chain, rope or the lifting tackle. Make - Ferreterro, Sr. No.- 410433, Date when the lifting machine / tackle was: Yr. 2020 first taken to use in the factory Date and number of the certificate relating to: New item any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate, Date of each periodical thorough examination : First time Inspected by us made under sub-clause (II) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. Date of annealing or other heat treatment of =: NA the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. Particulars of any defects affecting the safe: Physically Inspected & found ok working load found at any such thorough ‘examination or after annealing and the steps taken to remedy such defects. Testing done on : 17/3/2020 We certify that, We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on : 16/3/2021 Person, wa on: seurs4ate” Se pisse8272y TS. Makar ee Head of Institution Competent Person DISCLAIMER. Ths Resor of examinaton retest the conn of he Mactine)Eaipmant as on he dae of etn ‘Wo acept ne abil /respansny whatsoever Fease of any anagem! mishap on wih uc hs Pach /equprant BB BOSS TECHNICAL SERVICES COMPETENT PERSON Iso 01:20 al Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 E - mail : bosstechnical@yahoo.ca.in, Website : www. bosstechnical.com 145021 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPINS-12 1 Name of Factory 2 Address of the factory 3. Distinguishing number of mark, if any and description sufficient to identify iting machine, chain, rope or the lifting tackle, 4 Date when the lifting machine / tackle was first taken to use in the factory 5 Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination made under sub-clause (II) of clause (a) of ‘sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe working load found at any such thorough ‘examination or after annealing and the steps taken to remedy such defects, Testing done on Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Sling, Capacity - 5.0 Ton Length - 6.0 mtrs, Width - 125 mm Make - Ferreterro, Sr. No- 410436 ‘Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 17/3/2020 We certify that, We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result, Next inspection due on Brau T.S. Makkar Head of Institution 16/3/2021 sak ctifhestea Competent Person DISCLAIMER. This Reporof xamieaton rts the cordon of he Mace /Egument a on he dat cf tng 291s aby repose, amatsomeein care ay ent mishap on ath) 88 ns machina earn 6 ‘Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 BOSS TECHNICAL SERVICES COMPETENT PERSON © © A2 | 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145022 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSIPIJS-12 Name of Factory Address of the factory Distinguishing number of mark, if any and escription sufficient to identify liting machine, chain, rope or the lifting tackle. Date when the lifting machine / tackle was first taken to use in the factory Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. Date of each periodical thorough examination made under sub-clause (II) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. Date of annealing or other heat treatment of the chain and other lifting tackle made under ‘Sub-rule (5) and by whom it was carried out, Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on: Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Sling, Capacity - 5.0 Ton Length - 6.0 mtrs, Width - 125 mm Make - Ferreterro, Sr. No.- 340929 Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 1713/2020 We certify that, We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on T.S. Makkar Head of institution Competent Person DISCLAIMER: Ts Rep of ssaminstion rete ho cncton ae Machine / Equipment ator he cat of et >9 16/3/2021 ons Cadt ar ‘ie Sean na aby expert anatacever nese feng aoc maap on/ wan ues Ws macaref eugene BOSS TECHNICAL SERVICES COMPETENT PERSON ‘Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dec 2020 A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 46652723, +91 9811144107, +91 9212714782 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com J45023 Examination Report of Lifting Machines / Lifting Tackles Under Section 29 of FACTORIES ACT 1948 BTSI/P/JS-12 1 Name of Factory : Mis Tata Projects Ltd. 2 Address of the factory : Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) 3. Distinguishing number of mark, if any and: Polyester Belt Sling, Capacity - 5.0 Ton description sufficient to identity liting Length - 6.0 mtrs, Width - 125 mm machine, chain, rope or the lifting tackle. Make - Ferreterro, Sr. No.- 340927 4 Date when the lifting machine /tackle was: Yr. 2020 first taken to use in the factory 5. Date and number of the certificate relating to: New Item any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate. 6 Date of each periodical thorough examination : First time Inspected by us made under sub-clause (Il) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out. 7 Date of annealing or other heat treatment of 1 NA the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. 8 Particulars of any defects affecting the safe: Physically Inspected & found ok working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on : 17/3/2020 We certify that, We have thoroughly examined the above mentioned Polyester Belt Sling and the above is @ correct report of the result. eH Nb TD TAL TS. Makkar eo Head of institution Competent Person raat espe anna rice te cancion af he Mash /Equpme BB BOSS TECHNICAL SERVICES COMPETENT PERSON Haryana Govt. Competency Letter No. : 2954, Validity - 31st Dee 2020 A2 | 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 91 44107, +91 9212714782 E - mail: bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145024 Examination Report of Lifting Machines / Lifting Tackles Under Sec BTSIP/JS-12 Name of Factory Address of the factory Distinguishing number of mark, if any and description sufficient to identity iting machine, chain, rope or the lifting tackle. Date when the iting machine / tackle was first taken to use in the factory Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate, Date of each periodical thorough examination made under sub-clause (II) of clause (a) of sub-section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out Date of annealing or other heat treatment of the chain and other lifting tackle made under Sub-rule (5) and by whorn it was carried out. Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing and the steps taken to remedy such defects Testing done on tion 29 of FACTORIES ACT 1948 Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Polyester Belt Siing, Capacity - 5.0 Ton Length - 6.0 mtrs, Width - 125 mm Make - Ferreterro, Sr. No.- 340932 Yr. 2020 New Item First time Inspected by us NA Physically Inspected & found ok 1713/2020 ‘We certify that, We have thoroughly examined the above mentioned Polyester Belt Sling and the above is a correct report of the result. Next inspection due on TS. Makkar Head of institution ‘Wo acct nay respon, wats 16/3/2021 sora shdf err Competent Person ona he aching Espen a8 or te Seo est BOSS TECHNICAL SERVICES Iso s COMPETENT PERSON we A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, #91 9212714782 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145026 Examination Report of Lifting Machines / Lifting Tackl Under Rule 60A, Section 29 of FACTORIES ACT 1948 BTSIPIS-12 Name of Factory / site : M/s Tata Projects Ltd. ‘Address of the factory / site ITPG, Phase - 2 Project Sector - 58, Gurgaon (Haryana) Distinguishing number of mark, if any and : D Shackle, Capacity - 2.0 Ton description sufficient to identify iting machine, Pin Dia - 15 mm, Body Dia - 12 mm chain, rope or the lifting tackle. Make - RML, ID No. - D-1 Date when the lifting machine / tackle was first +. 2020 taken to use in the factory Date and number of the certificate relating to any: New item test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate Date of each periodical thorough examination _: First time Inspected by us made under sub-clause (I!) of clause (a) of sub- section (1) of section 29 of the Act and sub rule (6) and by whom it was carried out. Date of annealing or other heat treatment of the chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out. NA Particulars of any defects affecting the safe ‘working load found at any such thorough examination or after annealing and the steps taken to remedy such defects Physically Inspected & found Ok Testing done on : 17/3/2020 We certify that, /We have thoroughly examined the above mentioned lifting Machine/ Chain’ Rope /Lifting tackle and the above is @ correct report of the result Next inspection due on : 16/3/2021 CLGHu T.S. Makkar Sarabj kkar Head of Institution Competent Person DISCLAIMER: Ts Report of examination ee the comin oe Machine Equement son the ca of tstg oat lay respon iy wmsceves incase Far) Sen msn on sata Costa ie nactne equa w e COMPETENT PERSON | BOSS TECHNICAL SERVICES i A2/ 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 145 E - mail : bosstechnical@yahoo.co.in, Website : www. bosstechnical.com 027 Examination Report of Lifting Machines / Lifting Tackl Under Rule 60A, Section 29 of FACTORIES ACT 1948 BTSIPIJS-12 Name of Factory / site : Mis Tata Projects Ltd. ‘Address of the factory / site 1 Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) Distinguishing number of mark, if any and : D Shackle, Capacity - 2.0 Ton description sufficient to identify iting machine, Pin Dia - 15 mm, Body Dia - 12 mm chain, rope or the lifting tackle Make - RML, ID No. - D-2 Date when the lifting machine / tackle was first: Yr. 2020 taken to use in the factory Date and number of the certificate relating to any: New item test and examination made under rule (1) and (7) together with the name and address of the person who issued the certificate, Date of each periodical thorough examination _: First time Inspected by us made under sub-clause (|I) of clause (a) of sub- section (1) of section 22 of the Act and sub rule (5) and by whom it was carried out. Date of annealing or other heat treatment of the: NA chain and other lifting tackle made under Sub-rule (8) and by whom it was carried out. Particulars of any defects affecting the safe : Physically Inspected & found Ok working load found at any such thorough examination or after annealing and the steps taken to remedy such defects Testing done on : 17/3/2020 We certify that, !We heve thoroughly examined the above mentioned lifting Machine/ Chain/ Rope /Lifting tackle and the above is a correct report of the result. Next inspection 16/3/2021 ss52723/ a . SARs ~S. Makkar Sarabféet kar Head of institution Competent Person __ DISCLAIMER: This Repo of earn elects ne corona he Machine / Eup ato th cate of stg. "vo aca ay repenaibty,wmatscever Incase of ery eden marap an! wan Sunn re machina! ecasehent = »B OSS TECHNICAL SERVICES & A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 E - mail : bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145028 Examination Report of Lifting Machines / Lifting Tackles Under Rule 60A, Section 29 of FACTORIES ACT 1948 BTSIPHS-12 Name of Factory / site : Address of the factory / site : Distinguishing number of mark, i any and description sufficient to identify liting machi chain, rope or the fing tackle Date when the lifting machine / tackle was first: taken to use in the factory Date and number of the certificate relating to any test and examination made under rule (1) and (7) together with the name and adcress of the person who issued the certificate Date of each periodical thorough examination —: made under sub-clause (|I) of clause (a) of sub- section (1) of section 29 of the Act and sub rule (5) and by whom it was carried out Date of annealing or other heat treatment of the chain and other lifting tackle made under Sub-rule (8) and by whom it was carried out Particulars of any defects affecting the safe : ‘working load found at any such thorough examination or after annealing and the steps taken to remedy such defects. Testing done on : Mis Tata Projects Ltd. Site - ITPG, Phase - 2 Project Sector - 59, Gurgaon (Haryana) + D Shackle, Capacity - 2.0 Ton Pin Dia - 15 mm, Body Dia - 12 mm Make - RML, ID No, - D-3 Yr. 2020 + New item First time Inspected by us NA Physically Inspected & found Ok 17/3/2020 We certify that, Wve nave thoroughly examined the above mentioned lif—ing Machine/ Chain! Rope /Lifting tackle and the above is a correct report of the result. Next inspection due on : TS. Mena Head of Institution 16/3/2021 serail herr Competent Person DISCLAIMER. This Report of examinator refs the arto lhe Mace Eaugant a on ast ct eng. We accept no laity responaiby whatsoever case of ay aan misna on wih uy to Pa eae Saran COMPETENT PERSON * BOSS TECHNICAL SERVICES A2 / 295, Pankha Road, Janak Puri, New Delhi -110058 Contact : 011 - 45652723, +91 9811144107, +91 9212714782 E - mail: bosstechnical@yahoo.co.in, Website : www.bosstechnical.com 145029 Examination Report of Lifting Machines / Lifting Tackles Under Rule 60A, Section 29 of FACTORIES ACT 1948 BTS/P/JS-12 Name of Factory / site : Mls Tata Projects Ltd. Address of the factory / site : Site - ITPG, Phase - 2 Project ‘Sector - 59, Gurgaon (Haryana) Distinguishing number of mark, if any and : D Shackle, Capacity - 2.0 Ton description sufficient to identify lifting machine, Pin Dia - 15 mm, Body Dia - 12 mm. chain, rope or the lifting tackle. Make - RML, ID No. - D-4 Date when the lifting machine / tackle was first: Yr. 2020 taken to use in the factory Date and number of the certificete relating to any: New item test and exemination made under rule (1) and (7) together with the name and address of the person who issued the certificate Date of each periodical thorough examination _: First time Inspected by us made under sub-clause (\l) of clause (a) of sub- section (1) of section 29 of the Act and sub rule (5) and by whom it was carried cut Date of annealing or other heal treatment of the: NA chain and other lifting tackle made under Sub-rule (5) and by whom it was carried out Particulars of any defects affecting the safe working load found at any such thorough examination or after annealing end the steps taken to remedy sucti defects Testing done or 17/3/2020 We certify that, Ie have thoroughly examined the above mentioned lifting Machine! Chain! Rope /Lifling tackle and the above is a correct report of the result. Next inspection due on : 16/3/2021 TS. ies Sarabjset Sing! kar Head of Institution Competent Person DISCLAIMER: Tis Repor of examination reflect he cncion oh tacrine Equpment a on he da of estng ‘ve Steam tabiy espera wasoeverin Case of any asco muon wih eo fue Machine eupmant

You might also like