☐ Prefer cPVC Brass Threaded Elbows & 'T' fittings ☐ After cPVC pipeline is installed (before plaster concealing) test waater flow with main line supply ☐ Tiles laying plan should be freezed before doing plumbing ☐ Decide which Tiles will be used - 300x600, 300x900 ☐ Make sure Tiles design dont get cut due to Bathroom Fittings ☐ Bathroom Fitting should be in Tile center or on a joint (not offcenter) ☐ Faucet / Tap / Mixer / Divertor - If any leakage, call company technician, use warranty ☐ Secure Bathroom Fitting Warranty cards ☐ For installing WC - Avoid Coach Bolts & Screws - instead use chair bracket ☐ Bathroom flooring Pipeline should be thoroughly checked. Avoid Cast Iron ☐ Waterproofing of Flooring & wall should be done ☐ 4 day testing should be done of waterproofing before installing flooring ☐ Take Photo of conceal pipes before plaster conceal. For future reference ☐