HARGA DASAR SATUAN UPAH

HARGA HARGA
No. URAIAN KODE SATUAN YG DIGUNAKAN SATUAN
( Rp.) ( Rp.)

1. Pekerja (L01) Jam 12.142,86 85.000,00


2. Tukang (L02) Jam 12.857,14 90.000,00
3. Mandor (L03) Jam 14.285,71 100.000,00
4. Operator (L04) Jam 21.428,57 150.000,00
5. Pembantu Operator (L05) Jam 12.142,86 85.000,00
6. Sopir / Driver (L06) Jam 14.285,71 100.000,00
7. Pembantu Sopir / Driver (L07) Jam 12.142,86 85.000,00
8. Mekanik (L08) Jam 21.428,57 150.000,00
9. Pembantu Mekanik (L09) Jam 12.142,86 85.000,00
10. Kepala Tukang (L10) Jam 15.714,29 110.000,00
11.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1 Pasir Pasang (Sedang) M01b M3 100.000,00


2 Pasir Beton (Kasar) M01a M3 124.566,00
3 Pasir Halus (untuk HRS) M01c M3 105.066,00
4 Pasir Urug (ada unsur lempung) M01d M3 84.006,00
5 Batu Kali M02 M3 95.000,00
6 Agregat Pecah Kasar M3 250.000,00
7 Agg. Halus LP A M3 160.674,62
8 Agregat Lolos # 1 " M3 130.356,61
9 Lolos screen1 ukuran ( 0 - 5) M3 270.000,00
10 Lolos screen2 ukuran ( 0 - 5) M3 280.000,00
11 Lolos screen2 ukuran ( 5 - 9,5) M3 260.000,00
12 Lolos screen2 ukuran ( 9.5 - 19,0) M3 250.000,00
13 Filler M05 Kg 1.014,00
14 Batu Belah / Kerakal M06 M3 104.052,00
15 Gravel M07 M3 201.708,00
16 Bahan Tanah Timbunan M08 M3 6.000,00
17 Bahan Pilihan M09 M3 8.000,00
18 Aspal M10 KG 11.500,00
19 Kerosen / Minyak Tanah M11 LITER 7.800,00
20 Semen / PC (50kg) M12 Zak 60.000,00
21 Semen / PC (kg) M12 Kg 1.200,00
22 Besi Beton M13 Kg 10.920,00
23 Kawat Beton M14 Kg 14.040,00
24 Kawat Bronjong M15 Kg 23.400,00
25 Sirtu M16 M3 116.610,00
26 Cat Marka (Non Thermoplas) M17a Kg 58.388,85
27 Cat Marka (Thermoplastic) M17b Kg 73.959,21
28 Paku M18 Kg 17.127,40
29 Kayu Perancah M19 M3 3.000.000,00
30 Bensin M20 LITER 6.630,00
31 Solar M21 LITER 7.410,00
32 Minyak Pelumas / Olie M22 LITER 31.200,00
33 Pipa Galvanis Dia. 6" M24 m1 109.200,00
34 Pipa Porus M25 M' 136.240,65
35 Agr.Base Kelas A M26 M3 325.000,00
36 Agr.Base Kelas B M27 M3 300.000,00
37 Agr.Base Kelas S M28 M3 270.000,00
38 Aspal Emulsi M31 Kg 12.144,88
39 Gebalan Rumput M32 M2 17.127,40
40 Thinner M33 LITER 35.033,31
41 Glass Bead M34 Kg 11.253,12
42 Pelat Rambu (Eng. Grade) M35a BH 0,00
43 Pelat Rambu (High I. Grade) M35b BH 0,00
44 Rel Pengaman M36 M' 585.000,00
45 Beton K-250 M37 M3 1.068.430,67
46 Baja Tulangan (Polos) U24 M39a Kg 6.600,00
47 Baja Tulangan (Ulir) D32 M39b Kg 6.600,00
48 Kapur M40 M3 1.479,18
49 Chipping M41 M3 231.219,85
50 Chipping (kg) M41kg Kg 122,68
51 Cat M42 Kg 35.033,31
52 Pasir Urug M44 M3 84.006,00
53 Beton K-125 M47 M3 690.452,29
54 Tiang Pancang Baja M49 M' 1.673.708,40
55 Tiang Pancang Beton Pratekan M50 M3 330.687,19
56 Kawat Las M51 Dos 35.033,31
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
59 Baja Tulangan (Polos) U32 M57a Kg 5.460,00
60 Baja Tulangan (Ulir) D39 M39c Kg 5.694,00
61 Baja Tulangan (Ulir) D48 M39d Kg 5.694,00
62 Beton K-300 M59 M3 1.037.764,71
63 Beton K-175 M60 M3 717.440,73
64 Cerucuk M61 M 3.892,59
65 Anti strpping agent M66 Kg 62.955,79
66 Bahan Modifikasi M67 Kg 780,00
67 Beton K-500 M68 M3 2.132.174,61
68 Beton K-400 M69 M3 1.384.096,78
69 Beton K-350 M72 M3 1.321.122,28
70 Multipleks 12 mm M73 Lbr 272.481,30
71 Elastomer jenis 1 M74a buah 895.295,70
72 Elastomer jenis 2 M74b buah 1.167.777,00
73 Elastomer jenis 3 M74c buah 1.401.332,40
74 Expansion Tipe Joint Asphaltic Plug M75d M 1.128.851,10
75 Expansion Join Tipe Rubber M75e M 1.362.406,50
76 Expansion Join Baja Siku M75f M 233.555,40
77 Marmer M76 Buah 272.481,30
78 Paving Block M78 m2 97.500,00
79 Oxygen M87 Botol 163.488,78
80 Pipa PVC Dia 3" M24a M 58.500,00
81 Pipa PVC Dia 2" M24b M 35.100,00
82 Agregat Pecah Mesin 0-5 mm M91 M3 210.600,00
83 Curing Compound M98 Ltr 59.561,25
84 Additive M67a Ltr 34.744,06
85 Pasir Tailing M3 337.513,77
86 Aditif anti pengelupasan Kg 76.011,50
87 Bahan Pengisi (Filler) Tambahan Kg 1.162,79
88 Aspal Modifikasi kg 1.804,75
89 Keramik M2 58.388,85
90 Koral Sikat Kg 5.838,89
91 PCI Girder L= 20 m Buah
92 PCI Girder L= 30 m Buah
93 PCI Girder L= 50 m Buah
94 Voided Slab L= 15 m Buah 117.000.000,00
95 Tiang Pancang Beton D 600 mm (Spun Pile) M 944.342,33
96 Geomembrane 1.5 mm M2 59.868,03
97 Pohon Mahoni Batang 11.895,00
98 Tiang Pancang Persegi 25 x 25 cm M-192 m 278.412,87
99 Besi Plat Kg 15.181,10
100 Deph Slab Buah 856.369,80
101 Pipa Galvanis Dia 3" M 233.555,40
102 Pipa Galvanis Dia 4" M 272.481,30