RA11 9.86° 917 2879 2125 405 4.03° 1481 2807 1705 351 RA11 2219 70 400 2155 28 400
RB8 9.08° 911 2879 2131 398 0.0° 1600 2800 1600 313 RB8 2195 64 400 2150 0 400
RC6 9.0° 904 2865 2166 394 9.04° 908 2879 2134 402 RC6 2221 64 400 2221 62 400
RC11 7.84° 900 2879 2142 387 9.8° 1015 2829 2127 411 RC11 2206 56 400 2170 69 400
3
3
4 4
(AT GRID RA8, RA11, RB8, RC6 & RC11) REV. REVISION/ISSUE DATE
PROJECT:
GRID
GRID
MALIR EXPRESSWAY PROJECT
GRID GRID
CLIENT:
C:\Users\Moazzam Jamil\Desktop\ATEEB FOLDER\Drawings Concrete Loops & Ramps (27)\RAMPS\09-LOYA-ZI-MEW-QB SUB STR RAMPS-09 RA8, RA11, RB8,
(C)
LOCAL GOVERNMENT
DEPARTMENT
GOVERNMENT OF SINDH
(E)
DRAWING TITLE:
2
DIMENSIONAL DETAIL OF PIER
GRID RA8, RA11, RB8, RC6 & RC11
QUAIDABAD INTERCHANGE-04
SECTION
2
DESIGN BY: SHEET NO:
A.F/M.H
CHECKED BY:
SECTION NOTES : DATE: