Item no description Necessary material installation/work መለኪያ መጠን
1 crom gate valve crom gate valve 1/2" No 20
near hall 2
wash basin 21inch*18 inch No 4
sipnon 1/2" No 4
irrigation 2
2 hand wash basin with complete accesseries angle valve 1/2" No 4
RHS 20*20*2mm to carry
the hand wash basin m 6
crom gate valve 1/2" No 4
flexible pipe 1/2" No 4
wash basin 21inch*18 inch No 2
sipnon 1/2" No 2
crom gate valve 1/2" No 2
angle valve1/2" No 2
1/2" GI pipe to connect with
exiting distribution line m 6
1/2" GI elbow 2.5m away from No 2
2.1 hand wash basin with complete accesseries
50mm pvc pipe café house m 6
50mm pvc elbow No 2
Pvc Tee 75*50*75mm No 2
1/2" GI Tee No 2
RHS 20*20*2mm to carry
the hand wash basin m 6
flexible pipe 1/2" No 2
Aluminium door with acceseries 70*190 neer garrage
100cm sheded glass
3
neer hall
70cm length mica panel
No 6
Aluminium door with acceseries 90*190
100cm length sheded glass
4 neer hall
70cm length mica panel No 2
front of belachew
5 drainage pipe office 1 and land
sipnon 1/2" use 2 No 3
duoble sink basin
118cm*50cm No 1
sipnon 1/2" No 1
movable crom gate valve
1/2" No 1
angle valve1/2" No 1
1/2" GI pipe to connect with
exiting distribution line m 3
6 duoble sink for kitchen 1/2" GI elbow café No 3
50mm pvc pipe m 3
50mm pvc elbow No 3
Pvc Tee 75*50*75mm No 1
Pvc tee 50*50*50mm No 1
1/2" GI Tee No 1
RHS 20*20*2mm to carry
the hand wash basin m 3
flexible pipe 1/2" No 1
toilet water flush to be repair after skill man near halland in
7 identify the problem front of belachew
office No 2
shower to be repair after skill man identify the near hall 1 and
8 problem garrage 2 No 3
supply and install siphon from soil chemistry
room to drain the water properly and use
9 chemicals to unclog the waste pipe Using siphon loboratory
vinegar, baking soda with hot water
No 4
10 install the external ribed toilet door neer garrage door hinge garrage No 3
To repair at connection of EGA-300 roof sheet
11 metal with J-volt main office
silicone sealant No 10
To repair at connection of EGA-300 roof sheet metal plastering putty(metal
11.1 metal Cracking main office
stuko) gallon 6
12 Varnish to paint café house bamboo Varnish café gallon 3
Paving 13m walkway to café and 2m serounding select material it is better to
café by brick use 0.2cm agreggate or best
qulity redash m3 32
best quality sand m3 28
13 to level the ground excavate around café
20cm from OGL and cart _ _
away
locally available brick size
not more than 50cm*50cm m2 136
7 drainage pipes of 75mm pvc of length 0.7m to
drain rain water. Cheasiling the concrete surfaces
and plastering of the joints with cement mortar
transition slab neer
1:1.5:2 ratio using epoxy materials at joints.
hall
Finally plastering the whole area
14 15 kuntal cement m2 43.04