BAR BENDING SCHEDULE

TITLE: COMMERCIAL BLDG CUTTING LIST ITEM: FOOTING/COLUMN/BEAMS/SLABS/STAIRS DATE :


REF. DWG. NO. : SHEET NO. :
PROJECT : SJU AUTO PERFORMANCE SCHEME 2 REV. NO. :

BAR DIA NO. OF DIMENSIONS (M) CUTTING TOTAL ORDER UNIT WT TOTAL WEIGHT
SL NO. BAR MARK QTY (PCS) TOTAL SHAPE QUANTITY REMARKS
(MM) MEMBER LENGTH (M) LENGTH (M) LENGTH (KG/M) (KG)
a b c d e f g

3 C1/STIRRUPS 10 45 9 405 S4 0.170 0.170 0.170 0.170 0.060 0.060 0.800 324.000 6.00 57.000 - 7.00
5 C2/STIRRUPS 10 27 8 216 S4 0.170 0.170 0.170 0.170 0.060 0.060 0.800 172.800 6.00 30.000 - 7.00
FTB/ALONG A-
7 10 37 5 185 S4 0.320 0.120 0.320 0.120 0.060 0.060 1.000 185.000 6.00 30.000 - 6.00
G/STIRRUPS
FTB/ALONG
9 10 31 1 31 S4 0.320 0.120 0.320 0.120 0.060 0.060 1.000 31.000 6.00 5.000 - 6.00
3/STIRRUPS
FTB ALONG GL
11 10 84 2 168 S4 0.320 0.120 0.320 0.120 0.060 0.060 1.000 168.000 6.00 28.000 - 6.00
2&4/STIRRUPS
12 WF1/ALONG E-G 10 5 2 10 S1 6.000 6.000 60.000 6.00 10.000 - 1.00
WF1/ALONG E-
13 10 27 2 54 S3 0.220 0.120 0.120 0.460 24.840 6.00 4.000 - 13.00
G/STIRRUPS
14 WF1/ALONG A 10 3 1 3 S1 6.000 6.000 18.000 6.00 3.000 - 1.00
WF1/ALONG
15 10 17 1 17 S3 0.220 0.120 0.120 0.460 7.820 6.00 1.000 - 13.00
A/STIRRUPS
16 WF1/ALONG GL 1&4 10 3 2 6 S1 6.000 6.000 36.000 6.00 6.000 - 1.00
WF1/ALONG GL
17 10 21 2 42 S3 0.220 0.120 0.120 0.460 19.320 6.00 3.000 - 13.00
1&4/STIRRUPS
18 WF1/ALONG GL 1-4 10 2 4 8 S1 6.000 6.000 48.000 6.00 8.000 - 1.00
WF1/ALONG GL 1-
19 10 14 4 56 S3 0.220 0.120 0.120 0.460 25.760 6.00 4.000 - 13.00
4/STIRRUPS
23 B1/STIRRUPS 10 20 6 120 S4 0.120 0.270 0.120 0.270 0.060 0.060 0.900 108.000 6.00 20.000 - 6.00
27 B1/STIRRUPS 10 31 3 93 S4 0.120 0.270 0.120 0.270 0.060 0.060 0.900 83.700 6.00 15.000 - 6.00
29 B2/STIRRUPS 10 31 1 31 S4 0.120 0.270 0.120 0.270 0.060 0.060 0.900 27.900 6.00 5.000 - 6.00
31 CB1/STIR 10 9 3 27 S4 0.120 0.270 0.120 0.270 0.060 0.060 0.900 24.300 6.00 4.000 - 6.00
33 RB/STIR 10 45 2 90 S4 0.120 0.220 0.120 0.220 0.060 0.060 0.800 72.000 6.00 12.000 - 7.00
35 RB/STIR 10 31 2 62 S4 0.120 0.220 0.120 0.220 0.060 0.060 0.800 49.600 6.00 8.000 - 7.00
36 SOG/FRONT/LAT 10 30 1 30 S1 4.000 4.000 120.000 6.00 30.000 - 1.00
37 SOG/FRONT/LONG 10 11 2 22 S1 6.000 6.000 132.000 6.00 22.000 - 1.00
38 SOG/STORE/LAT 10 20 1 20 S1 5.000 5.000 100.000 6.00 20.000 - 1.00
39 SOG/STORE/LONG 10 14 1.3 19 S1 6.000 6.000 114.000 6.00 19.000 - 1.00
40 SOG/WORKAREA/LAT 10 36 1 36 S1 6.000 6.000 216.000 6.00 36.000 - 1.00
SOG/WORKAREA/LON
41 10 20 2.5 50 S1 6.000 6.000 300.000 6.00 50.000 - 1.00
G
42 SOG/STORAGE/LAT 10 30 0.5 15 S1 3.000 3.000 45.000 6.00 7.000 - 2.00
43 SOG/STORAGE/LONG 10 10 2 20 S1 6.000 6.000 120.000 6.00 20.000 - 1.00
46 STEEL DECK/LAT 10 23 1 23 S1 6.000 6.000 138.000 6.00 23.000 - 1.00
47 STEEL DECK/LONG 10 18 1.2 22 S2 6.000 6.000 132.000 6.00 22.000 - 1.00

1
49 STAIRS FOOTING STIR 10 5 2 10 S3 0.350 0.060 0.060 0.470 4.700 6.00 1.000 - 12.00
53 STAIRS/STEPS 10 5 3 15 S1 6.000 6.000 90.000 6.00 15.000 - 1.00
54 STAIRS HB 10 32 2 64 S1 1.000 1.000 64.000 6.00 10.000 - 6.00
56 RB/STIRRUPS 10 45 2 90 S4 0.220 0.120 0.220 0.120 0.060 0.060 0.800 72.000 6.00 12.000 - 7.00
58 RB/STIRRUPS 10 31 2 62 S4 0.220 0.120 0.220 0.120 0.060 0.060 0.800 49.600 6.00 8.000 - 7.00
20 B1/CTB/CBB 12 6 3 18 S1 6.000 6.000 108.000 6.00 18.000 - 1.00
21 B1/XTB 12 4 3 12 S1 1.700 1.700 20.400 6.00 4.000 - 3.00
22 B1/XBB 12 2 3 6 S1 2.000 2.000 12.000 6.00 2.000 - 3.00
24 B1/CTB/CBB 12 4 3 12 S1 6.000 6.000 72.000 6.00 12.000 - 1.00
25 B1/XTB 12 4 3 12 S1 1.250 1.250 15.000 6.00 3.000 - 4.00
26 B1/XBB 12 2 3 6 S1 1.700 1.700 10.200 6.00 2.000 - 3.00
28 B2/CTB/CBB 12 6 1 6 S1 6.000 6.000 36.000 6.00 6.000 - 1.00
44 LC/VB 12 1 10 10 S1 6.000 6.000 60.000 6.00 10.000 - 1.00
45 LB/HB 12 2 3 6 S1 6.000 6.000 36.000 6.00 6.000 - 1.00
48 STAIRS FOOTING HB 12 4 2 8 S1 1.000 1.000 8.000 6.00 1.000 - 6.00
50 STAIRS COLUMN VB 12 5 2 10 S1 1.000 1.000 10.000 6.00 1.000 - 6.00
51 STAIRS BB 12 5 2 10 S1 6.000 6.000 60.000 6.00 10.000 - 1.00
52 STAIRS TB 12 5 2 10 S1 6.000 6.000 60.000 6.00 10.000 - 1.00
1 F1 16 12 17 204 S3 0.850 0.150 0.150 1.150 234.600 6.00 40.000 - 5.00
2 C1 16 9 9 81 S1 6.000 6.000 486.000 6.00 81.000 - 1.00
4 C2 16 4 8 32 S1 6.000 6.000 192.000 6.00 32.000 - 1.00
6 FTB/ALONG A-G 16 4 5 20 S1 6.000 6.000 120.000 6.00 20.000 - 1.00
8 FTB/ALONG GL 3 16 4 1 4 S1 6.000 6.000 24.000 6.00 4.000 - 1.00
10 FTB ALONG GL 2 &4 16 10 2 20 S1 6.000 6.000 120.000 6.00 20.000 - 1.00
30 CB1 16 3 3 9 S1 6.000 6.000 54.000 6.00 9.000 - 1.00
32 RB/TB/BB 16 6 2 12 S1 6.000 6.000 72.000 6.00 12.000 - 1.00
34 RB/TB/BB 16 4 2 8 S1 6.000 6.000 48.000 6.00 8.000 - 1.00
55 RB/TB/BB 16 4 3 12 S1 6.000 6.000 72.000 6.00 12.000 - 1.00
57 RB/TB/BB 16 4 2 8 S1 6.000 6.000 48.000 6.00 8.000 - 1.00
0 - - - #DIV/0!
- -

THIS PAGE SUMMARY


BAR DIA WEIGHT (KG)
10MM #REF!
12MM #REF!
16MM #REF!

2
d 20MM
e 22MM
b f 25MM
a a b a c c b 28MM
a TOTAL #REF!
S1 S2 S3 S4 TOTAL (TON) #REF!

PREPARED BY : JCA SUBMITTED BY: APPROVED :

SIGNATURE :
NAME : J. ARCA
DATE :

3
CONTRACTOR: --

PROJECT : Commercial Bldg


Commercial Building INHOUSE ESTIMATES
SCOPE : Design & Build

CONTRACT NO :

S/N Description Length Width Depth Nos 10 % Wastage/ Quantity Unit Remarks
m m m Contingency

gil tolentino:
EARTHWORKS with working
space
EXCAVATIONS sq.m.
89.784
22.390 11.510 167.925 sq.m.

BACKFILLING 10.359 cu.m

ftg 1.000 1.000 1.000 17 10.359 6.641

ftb 54.360 0.200 0.350 1 3.805

GRAVEL BEDDING (50mm thick) 18.043 cu.m

OPEN AREA 22.500 4.200 0.050 1.05 4.961 cu.m

F1 1.000 1.000 0.050 17 1.05 0.893 cu.m

FTB ALONG GL A-G 26.360 0.200 0.050 1 1.05 0.277 cu.m

FTB ALONG 1-4 23.000 0.200 0.050 2 1.05 0.483 cu.m

FTB ALONG 1-4 5.000 0.200 0.050 1 1.05 0.053 cu.m

WF1 ALONG A-G 16.800 0.300 0.050 1 1.05 0.265 cu.m

WF1 ALONG GL 1-4 23.040 0.300 0.050 1 1.05 0.363 cu.m

SOG 11.510 26.000 0.050 1 1.05 10.750 cu.m

SITE CLEARING - sq. m.

WHOLE AREA - sq. m.

LAY OUT AND STAKING

SOIL POISONING 163.436 sq. m.

WHOLE AREA 11.510 26.000 163.436 sq. m. 135.824

gil tolentino:
STRUCTURAL WORKS with working
space
gil tolentino:
with working 57.751 cu.m 519.757
CONCRETING
space
F1 1.000 1.000 0.350 17 1.1 6.545 cu.m

C1 ALONG GL E-G 0.250 0.250 7.400 9 1.1 4.579 cu.m

C2 ALONG GL A-D 0.250 0.250 4.400 8 1.1 2.420 cu.m

FTB ALONG A-G 26.400 0.200 0.400 1 1.1 2.323 cu.m

FTB ALONG 1-4 33.000 0.200 0.400 1 1.1 2.904 cu.m

WF1 ALONG A-G 16.810 0.300 0.200 1 1.1 1.109 cu.m

WF1 ALONG 1-4 22.000 0.300 0.200 1 1.1 1.452 cu.m

BEAM 1 34.200 0.200 0.350 1 1.1 2.633 cu.m

BEAM 2 5.000 0.200 0.350 1 1.1 0.385 cu.m

CB1 3.450 0.200 0.350 1 1.1 0.266 cu.m

SOG FRONT 11.510 4.000 0.100 1 1.1 5.064 cu.m

SOG WORK AREA 7.550 19.000 0.100 1 1.1 15.780 cu.m

SOG OFFICE/ROOM 3.260 11.510 0.050 1 1.1 2.064 cu.m

LC 3.000 0.100 0.200 10 1.1 0.660 cu.m

LB 17.000 0.100 0.200 1 1.1 0.374 cu.m

STEEL DECK SLAB 33.150 1.000 0.100 1 1.1 3.647 cu.m

STAIRS 1.490 1.000 1.000 2 1.1 3.278 cu.m

STAIRS COL 0.290 1.000 1.000 2 1.1 0.638 cu.m

ROOF BEAM 24.700 0.200 0.300 1 1.1 1.630 cu.m

4 of
REBARS 979.000 kgs.

10MM DSB X 6.0M 1.1 648.000 L

12MM DSB X 6.0M 1.1 85.000 L

16MM DSB X 6.0M 1.1 246.000 L


gil tolentino:
with working
space
gil tolentino:
with working 283.879 sq. m. 23.841
FORMWORKS
space
F1 4.000 1.000 0.350 17 1.1 26.180 sq. m.

C1 ALONG GL E-G 1.000 1.000 7.400 9 1.1 73.260 sq. m.

C2 ALONG GL A-D 1.000 1.000 4.400 8 1.1 38.720 sq. m.

FTB ALONG A-G 26.400 2.000 0.400 1 1.1 23.232 sq. m.

FTB ALONG 1-4 33.000 2.000 0.400 1 1.1 29.040 sq. m.

WF1 ALONG A-G 16.810 2.000 0.200 1 1.1 7.396 sq. m.

WF1 ALONG 1-4 22.000 2.000 0.200 1 1.1 9.680 sq. m.

BEAM 1 34.200 0.900 1.000 1 1.1 33.858 sq. m.

BEAM 2 5.000 0.900 1.000 1 1.1 4.950 sq. m.

CB1 3.450 0.900 1.000 1 1.1 3.416 sq. m.

STAIRS SLAB 5.700 1.000 1.000 2 1.1 12.540 sq. m.

STAIRS STEPS 0.200 1.000 16.000 2 1.1 7.040 sq. m.

STAIRS COL 2.000 1.000 1.000 2 1.1 4.400 sq. m.

ROOF BEAM 24.700 0.800 0.300 1 1.1 6.521 sq. m.

STEEL DECK SLAB 33.150 1.000 0.100 1 1.1 3.647 sq. m.

ARCHITECTURAL WORKS

- sq. m. 0.000
15cm CHB

- sq. m.

- sq. m.

- sq. m.

- sq. m.

OPENING
10cm CHB 188.790 sq. m.

REAR SIDE FIRE WALL 11.510 1.800 1.000 1 1.1 22.790 sq. m. 92.087

LEFT SIDE FIRE WALL 4.260 1.800 1.000 1 1.1 8.435 sq. m.

LEFT SIDE FIRE WALL 1.370 10.000 1.000 1 1.1 15.070 sq. m.

RIGHT SIDE FIREWALL 3.280 1.800 1.000 1 1.1 6.494 sq. m.

RIGHT SIDE FIREWALL 10.200 1.200 1.000 1 1.1 13.464 sq. m.

RIGHT SIDE FIREWALL 2.550 6.250 1.000 1 1.1 17.531 sq. m.

RIGHT SIDE FIREWALL 7.400 0.750 1.000 1 1.1 6.105 sq. m.

RIGHT SIDE FIREWALL 7.400 0.540 0.500 1 1.1 2.198 sq. m.

SLEEPING QUARTERS 5.930 3.900 1.000 1 1.1 22.320 sq. m. 3.120

1.420
TOILET 1.300 3.900 1.000 1 1.1 4.157 sq. m.

STORAGE 11.780 3.900 1.000 1 1.1 48.856 sq. m. 1.680

STORE GROUND FLOOR 2.530 3.900 1.000 1 1.1 10.854 sq. m.

STORE GROUND FLOOR 1.000 5.000 1.000 1 1.1 5.500 sq. m.

STORE 2ND FLOOR 22.800 0.200 1.000 1 1.1 5.016 sq. m.

1 1.1 - sq. m.

1 1.1 - sq. m.

1 1.1 - sq. m.

SAND FOR MORTAR AND PLASTERING 14.310 CU.M.

MORTAR FOR 4" CHB 188.790 0.044 1 8.269 CU.M.

PLASTERING 188.790 0.016 2 1 6.041 CU.M.

5 of
CEMENT FOR MORTAR AND PLASTERING 207.857 BAG

MORTAR FOR 4" CHB 188.790 0.525 1 99.115 BAG

PLASTERING 188.790 0.288 2 1 108.743 BAG

OPENING
PLASTERING #REF! sq. m.

CEILING #REF! sq. m.

OPENING
TILES 22.008 sq. m.

FLOOR TILES AT SLEEPING QRTR CR 1.300 1.610 1.000 1 1.1 2.302 sq. m.
1.420
WALL TILES AT SLEEPING QRTR CR 5.820 2.800 1.000 1 1.1 16.506 sq. m.

FLOOR TILES AT STORE CR 1.150 2.530 1.000 1 1.1 3.200 sq. m.


1.420
WALL TILES AT STORE CR 7.360 2.800 1.000 1 1.1 21.249 sq. m.

20cm x 100cm CERAMIC TILE (WOOD PLANK PROFILE) 1.150 6.700 1.000 1 1.1 8.476 sq. m. 42.378

708.994 sq. m. OPENING


PAINTING

fire wall left 98.700 2 1.1 217.140 sq. m.

fire wall right 105.000 2 1.1 231.000 sq. m.

firewall reear 48.340 2 1.1 106.348 sq. m.

int wall 70.230 2 1.1 154.506 sq. m.

1.1 - sq. m.

1.1 - sq. m.

1.1 - sq. m.

1.1 - sq. m.

1.1 (1.890) sq. m. 1.890

1.1 (1.680) sq. m. 1.680

1.1 - sq. m.
2.520
1.1 (2.520) sq. m.

1.1 (2.940) sq. m. 2.940

1.1 - sq. m.

1.1 - sq. m.

1.1 - sq. m.

ROOFING

GA. 26 LONG SPAN ROOFING 4.000 9.150 1.000 1 1 36.600 li. m.

GA. 26 LONG SPAN ROOFING 1.000 11.000 1.000 1 1 11.000 li. m.

GA. 26 LONG SPAN ROOFING 14.000 7.000 1.000 1 1 98.000 li. m.

GA. 26 LONG SPAN ROOFING 4.000 10.000 1.000 1 1 40.000 li. m.

GA. 26 LONG SPAN ROOFING 8.000 4.000 1.000 1 1 32.000 li. m.

GA. 26 LONG SPAN ROOFING 2nd flr 7.000 8.000 1.000 1 1 56.000 li. m.

BENDED GUTTER 2.440 2 1.1 2.000 PC

BENDED GUTTER 2.440 6.666666667 1.1 7.000 PC

BENDED WALL CAP FLASHING 2.440 5.231818182 1.1 6.000 pc

BENDED WALL CAP FLASHING 2.440 6.666666667 1.1 7.000 pc

BENDED WALL CAP FLASHING 2.440 3.571428571 1.1 4.000 pc

BENDED FASCIA 2.440 5.480952381 1.1 6.000 pc

BENDED FASCIA 2.440 4.095238095 2 8.000 pc

BENDED FASCIA 2.440 3.571428571 1 4.000 pc

RAILINGS

6 of
1-1/2" SS PIPE HAND RAIL 5.000 1.000 1.000 2 1.1 11.000 li. m. 2.000

2.000
1-1/2" SS PIPE HAND RAIL VERTICAL 1.000 1.000 5.000 2 1.1 11.000 li. m.

STAINLESS STEEL WELDING ROD

ACCESSORIES

DOORS AND WINDOWS

ROLL UP DOORS (3m x 3.18m) 1.1 4.000 SET

D1 - 0.8mx2.1m FLUSH DOOR ON WDJ 1.1 2.000 SET

D2 - 0.6mx2.1m PVC DOOR WITH LOUVER 1.1 2.000 SET

W1 - AWNING WINDOW W/ ALUMINUM FRAME 1/4" THK BRONZE GLASS 2.000 SET

1.4M X 1.2M SLIDING WINDOW 2.000 SET

2.4m x 2.9m FOLDING GRILLS

ROOF FRAMING
3.000
2"x6" C-Purlins Rafter storage area 9.000 1.000 1.000 2 1 18.000 li. m.

2"x6" C-Purlins Rafter storage area 11.000 1.000 1.000 1 1 11.000 li. m. 2.000

11.000
2"x6" C-Purlins Rafter WORKING AREA 7.000 1.000 1.000 8 1.1 61.600 li. m.

2"x6" C-Purlins Rafter PARKING SPACE 4.000 1.000 1.000 6 1.1 26.400 li. m. 5.000

8.000
2"x6" C-Purlins Rafter PARKING SPACE/DRIVEWAY 10.000 1.000 1.000 4 1.1 44.000 li. m.

2"x6" C-Purlins Rafter 2ND FLR 7.000 1.000 1.000 5 1.1 38.500 li. m. 7.000

42.000
10MM DSB WEBBING - li. m.

RAFTER BEAM 1:
9.000
1.5"x1.5"x1/4" ANGLE BAR/TC/BC/PARKING 4.000 1.000 4.000 3 1.1 52.800 li. m.

16MM DSB WEBBING VERT 0.300 1.000 15.000 3 1.1 14.850 li. m. 3.000

16MM DSB WEBBING DIAG 0.420 1.000 14.000 3 1.1 19.404 li. m. 3.000

1.5"x1.5"x1/4" ANGLE BAR/TC/BC/PARKING 11.510 1.000 4.000 1 1.1 50.644 li. m. 9.000

16MM DSB WEBBING VERT 0.300 1.000 40.000 1 1.1 13.200 li. m. 3.000

16MM DSB WEBBING DIAG 0.420 1.000 39.000 1 1.1 18.018 li. m. 3.000

RAFTER BEAM 2:
21.000
2"x2"x1/4" ANGLE BAR/TC/BC/WORK SPACE 14.000 1.000 4.000 2 1.1 123.200 li. m.

16MM DSB WEBBING VERT 0.300 1.000 48.000 2 1.1 31.680 li. m. 6.000

8.000
16MM DSB WEBBING DIAG 0.420 1.000 47.000 2 1.1 43.428 li. m.

2"x2"x1/4" ANGLE BAR/TC/BC/WORK SPACE 5.000 1.000 4.000 1 1.1 22.000 li. m. 4.000

1.000
16MM DSB WEBBING VERT 0.300 1.000 18.000 1 1.1 5.940 li. m.

16MM DSB WEBBING DIAG 0.420 1.000 17.000 1 1.1 7.854 li. m. 2.000

5.000
2"x3"x1.4mm C-PURLINS SLEEPING QRTER 4.000 1.000 1.000 6 1.1 26.400 li. m.

2"x3"x1.4mm C-PURLINS WORKSPACE 17.000 1.000 1.000 7 1.1 130.900 li. m. 22.000

11.000
2"x3"x1.4mm C-PURLINS WORKSPACE 14.000 1.000 1.000 4 1.1 61.600 li. m.

2"x3"x1.4mm C-PURLINS PARKING 3.800 1.000 1.000 10 1.1 41.800 li. m. 7.000

17.000
2"x3"x1.4mm C-PURLINS PARKING 11.000 1.000 1.000 8 1.1 96.800 li. m.

2"x3"x1.4mm C-PURLINS 2ND FLR 8.350 1.000 1.000 12 1.1 110.220 li. m. 19.000

WELDING ROD

ELECTRICAL

LIGHTINGS 23 - PC

CONVENIENCE OUTLET 11 PC

1 GANG SWITHC 4 - PC

2 GANG SWITCH 2 - PC

3.5 SQUARE MM THHN WIRE - BOX

20MM DIAMETER PVC PIPE L


0.000
5.5 SQUARE MM THHN WIRE L

7 of
NO. 8 THW WIRE BOX

32MM DIA. RMC PIPE L

15A, 2P CIRCUIT BREAKER 2 UNIT

20A, 2P CIRCUIT BREAKER 1 UNIT

30A,2P CIRCUIT BREAKER 1 UNIT

11A, 2P CIRCUIT BREAKER 1 UNIT

32 SQUARE MM THW

40MM DIA. RMC PIPE

FLEXIBLE HOSE 1/2"

SERVICE ENTRANCE CAP

SERVICE DROP

PLUMBING

WATER CLOSET 3 - UNIT

LAVATORY SINK 3 UNIT

4" DIA. PVCPIPE 25.000 1.000 1.000 1 1.1 27.500 LI. M.

2" DIA. PVC PIPE - PC

1/2" DIA. WATER LINE PVC PIPE - BOX

SEPTIC TANK
0.124
GRAVEL BEDDING 2.100 1.600 0.100 1 1.1 0.370 CU. M.

15CM CHB 1.600 1.600 1.000 4 1.1 11.264 SQ. M.

15CM CHB 2.100 1.600 1.000 2 1.1 7.392 SQ. M.

MANHOLE COVER 3 SET

10MM DSB MATTING 2.100 1.000 2.000 9 1.1 41.580 LI. M.

10MM DSB MATTING 1.600 1.000 2.000 12 1.1 42.240 LI. M.

10MM VERTICAL BARS 1.600 1.000 1.000 20 1.1 35.200 LI. M.

10MM HORIZONTAL BARS 7.400 1.000 1.000 5 1.1 40.700 LI. M.

CATCH BASIN 0.600 0.600 0.700 1 1.1 0.277

4" DIA. PVC DRAIN PIPE

2" DIA. PVC DRAIN PIPE

COUPLINGS

PVC SOLVENT

CEMENT 2.100 1.600 0.100 18 1.1 6.653

MIXING SAND 2.100 1.600 0.100 1 1.1 0.370

GRAVEL 3/4" 2.100 1.600 0.100 2 1.1 0.739

PLASTERING:

CEMENT 2.100 1.600 0.288 2 1.1 2.129

CEMENT 1.600 1.600 0.288 6 1.1 4.866

SAND 2.100 1.600 0.016 2 1.1 0.118

SAND 1.600 1.600 0.016 6 1.1 0.270

MORTAR:

CEMENT 2.100 1.600 1.013 2 1.1 7.488

CEMENT 1.600 1.600 1.013 4 1.1 11.410

SAND 2.100 1.600 0.084 2 1.1 0.624

SAND 1.600 1.600 0.084 4 1.1 0.951

NO. OF
LENGTH WT. OF BAR QTY MEMBER TOTAL WT.

SUMMARY OF QUANTITIES INHOUSE Unit Cost

EARTHWORKS (RW)

EXCAVATION - cu.m

BACKFILLING #REF! cu.m

8 of
50mm LEANCONCRETE (for Foundation) 18.043 cu.m

GRAVEL BEDDING (for Perforated Pipe) 283.879 cu.m

FORMWORKS

RW FOUNDATIONS 278.679 sq.m

RW WALLS #REF! sq.m

CONCRETING 4000 PSI

RW FOUNDATIONS #REF! cu.m

RW WALLS - cu.m

REBARS

RW FOUNDATIONS #REF! kgs.

RW WALLS #REF! kgs.

150 MM PERFORATED PIPE

150mm PVC PIPE #REF! pcs

FILTER CLOTH #REF! sq.m

BACKFILLING & COMPACTION

FOR FUTURE EXPANSION AREA & #REF! cu.m

In Between Roads and Fence

TOTAL AMOUNT

PREPARED BY: AGREED BY :

JCA ---

Signed by : ___________________________ Signed by : ___________________________

NAME : NAME :

DESIGNATION : DESIGNATION :

DATE : DATE :

9 of
62.00

28.50

10 of
416.75

2,359.87 5.24 104.88

1,151.09

20/36 R/A

R= 20A/36

1,208.78

11 of
6.40

45.85

8.89

59.02

12 of
199.50 36.00

13 of
3,500.00 10,500.00

1,500.00 1,500.00

22.00 88.00

22.00 44.00

0.00

170.00 1,530.00

170.00 2,040.00

170.00 3,400.00

170.00 850.00

3,500.00 3,500.00

0.00

0.00

0.00

0.00

210.00 3,780.00

1,400.00 1,400.00

1,500.00 3,000.00

0.00

0.00

0.00

0.00

14 of
Project Name : Proposed Commercial Building
Location : Lot 13, Block 6, La Villa De Guadalupe, Brgy. Alijis, Bacolod City, Neg. Occ.
Owner :
Subject : Bill of Materials
Date : July 12, 2021

Item # Description Qty Unit

I. Siteworks/Earthworks
1.0 Lay-out and Staking 1.00 lot
2.0 Excavation 167.93 sq.m.
3.0 Gravel Bedding 18.04 cu.m.
4.0 Soil Poisoning 155.69 sq.m.
5.0 Backfill and Compaction
- Excavated Materials 27.00 cu.m.
6.0 Hauling and Disposal 1.00 lot

II. Structural Works


1.0 Formworks and Scaffolding
- 4'x8'x3/4" Phenolic Board 24.00 pc
- 2"x2"x10' Coco Lumber 450.00 pc
- Common Nail #4 4.00 box
- Common Nail #2-1/2 2.00 box
- Common Nail #2 2.00 box
- Concrete Nail #3 10.00 kgs.
- Steel Deck 37.50 li. m.

2.0 Rebars
- 16mm x 6.0m DSB 246.00 pc
- 12mm x 6.0m DSB 85.00 pc
- 10mm x 6.0m DSB 648.00 pc
- Tie Wire 3.00 roll

3.0 Concrete
- Cement 510.00 bag
- Gravel 3/4" 57.00 cu.m.
- Mixing Sand 29.00 cu.m.

4.0 Roof Framing / 2nd Floor Framing Works


- 2"x6"x1.4mm C-Purlins Rafter 36.00 length
- 10mm x 6.0m DSB Webbing 42.00 pc
- 2"x2"x1/4"6.0m Angle Bar 25.00 length
- 1-1/2"x1-1/2"x1/4"6.0m Angle Bar 18.00 length
- 16mm x 6.0m DSB Webbing 29.00 pc
- 2"x3"x1.4mm C-Purlins 81.00 length
- G.I. Pipe 4" Sched. 40 2.00 length
- Consumables 1.00 lot

5.0 Roofing Works


- Long Span Roofing 0.4mm 275.00 li. m.
- Fascia Board 18.00 pc
- Bended Wall Cap Flashing 17.00 pc
- Bended Gutter 9.00 pc
- Consumables 1.00 lot

III.
Architectural Works
1.0 Masonry Works
- 10cm CHB Perimeter/Fire Wall 1,150.00 pc
- 10cm CHB Interior Wall 1,200.00 pc
- Sand 15.00 cu.m.
- Cement 210.00 bag

2.0 Tileworks (as specified)


- Floor Tiles (Toilets Only) 0.6m x 0.6m 18.00 pc
- Wall Tiles (Toilets Only) 0.6m x 0.6m 105.00 pc
- Wall Ceramic Tile 20cm x 100cm 45.00 pc

3.0 Painting
- Perimeter Walls / Firewall 554.50 sq.m.
- Interior Walls 154.50 sq.m.
- Ceiling 64.00 sq.m.

4.0 Railings (including finishes)


- 1-1/2"" Ø x 6.0m Stainless Steel Pipe 4.00 pc
- Consumables 1.00 lot

5.0 Doors and Windows


- Roll Up Doors (2.8m x 2.7m) 4.00 panels
- 2.4m x 2.9m Folding Grills Door 1.00 sets
- D01: 0.80x2.10 Flush Door (Incl. jambs and locksets) 2.00 sets
- D02: 0.60x2.10 PVC Door with Louver (incl. Jambs and 3.00 sets
locksets)
- W01: 0.4m x 0.4m Awning Window with Aluminum
2.00 sets
Frame 1/4" Thick Bronze Glass
- 1.4m x 1.2m Sliding Glass Window 1.00 sets

IV. Plumbing Works (including Septic Tank and catch basins) 1.00 lot

V. Electrical Works 1.00 lot

Total Direct Cost


Indirect Cost (20% of Direct Cost)
Total Project Cost
Material Cost Labor Cost Total Direct Cost
Unit Cost Amount Unit Cost Amount Unit Cost Amount

- 5,000.00 5,000.00 5,000.00 5,000.00


- 550.00 92,361.50 550.00 92,361.50
1,400.00 25,256.00 250.00 4,510.00 1,650.00 29,766.00
60.00 9,341.40 15.00 2,335.35 75.00 11,676.75
-
- 170.00 4,590.00 170.00 4,590.00
- 6,000.00 6,000.00 6,000.00 6,000.00

1,070.00 25,680.00 450.00 10,800.00 1,520.00 36,480.00


150.00 67,500.00 70.00 31,500.00 220.00 99,000.00
1,500.00 6,000.00 470.00 1,880.00 1,970.00 7,880.00
1,590.00 3,180.00 470.00 940.00 2,060.00 4,120.00
1,590.00 3,180.00 470.00 940.00 2,060.00 4,120.00
85.00 850.00 32.00 320.00 117.00 1,170.00
410.00 15,375.00 185.00 6,937.50 595.00 22,312.50

425.30 104,623.80 142.00 34,932.00 567.30 139,555.80


240.00 20,400.00 80.00 6,800.00 320.00 27,200.00
166.00 107,568.00 56.00 36,288.00 222.00 143,856.00
1,620.00 4,860.00 490.00 1,470.00 2,110.00 6,330.00

210.00 107,100.00 73.50 37,485.00 283.50 144,585.00


1,600.00 91,200.00 525.00 29,925.00 2,125.00 121,125.00
1,250.00 36,250.00 490.00 14,210.00 1,740.00 50,460.00

1,150.00 41,400.00 350.00 12,600.00 1,500.00 54,000.00


166.00 6,972.00 56.00 2,352.00 222.00 9,324.00
1,400.00 35,000.00 455.00 11,375.00 1,855.00 46,375.00
1,050.00 18,900.00 330.00 5,940.00 1,380.00 24,840.00
425.30 12,333.70 142.00 4,118.00 567.30 16,451.70
735.00 59,535.00 230.00 18,630.00 965.00 78,165.00
3,904.50 7,809.00 1,000.00 2,000.00 4,904.50 9,809.00
3,500.00 3,500.00 1,050.00 1,500.00 4,550.00 5,000.00

590.00 162,250.00 260.00 71,500.00 850.00 233,750.00


1,130.00 20,340.00 518.00 9,324.00 1,648.00 29,664.00
850.00 14,450.00 518.00 8,806.00 1,368.00 23,256.00
1,300.00 11,700.00 518.00 4,662.00 1,818.00 16,362.00
10,000.00 10,000.00 3,500.00 3,500.00 13,500.00 13,500.00

16.00 18,400.00 9.00 10,350.00 25.00 28,750.00


16.00 19,200.00 9.00 10,800.00 25.00 30,000.00
1,250.00 18,750.00 490.00 7,350.00 1,740.00 26,100.00
210.00 44,100.00 73.50 15,435.00 283.50 59,535.00

250.00 4,500.00 81.00 1,458.00 331.00 5,958.00


250.00 26,250.00 81.00 8,505.00 331.00 34,755.00
150.00 6,750.00 45.00 2,025.00 195.00 8,775.00

190.00 105,355.00 160.00 88,720.00 350.00 194,075.00


170.00 26,265.00 160.00 24,720.00 330.00 50,985.00
170.00 10,880.00 160.00 10,240.00 330.00 21,120.00

1,350.00 5,400.00 620.00 2,480.00 1,970.00 7,880.00


4,000.00 4,000.00 1,800.00 1,800.00 5,800.00 5,800.00

19,500.00 78,000.00 - 19,500.00 78,000.00


10,440.00 10,440.00 3,650.00 3,650.00 14,090.00 14,090.00
3,075.00 6,150.00 1,500.00 3,000.00 4,575.00 9,150.00
1,510.00 4,530.00 525.00 1,575.00 2,035.00 6,105.00
750.00 1,500.00 - - 750.00 1,500.00
4,000.00 4,000.00 - - 4,000.00 4,000.00

60,000.00 60,000.00 30,000.00 30,000.00 90,000.00 90,000.00

97,500.00 97,500.00 52,500.00 52,500.00 150,000.00 150,000.00

1,584,523.90 760,139.35 2,344,663.25


468,932.65
2,813,595.90
#REF!
576.15
80.77
807.69
856.15
856.15
45.77
220.77

316,170.00 5,474.81 924.81

402.50
58.10
490.00
367.50
148.86
257.25
1,366.58
1,225.00

43,935.00 189
232.46

87.50

1,076.25
528.50
area 205.4
cost/sqm 13,698.13

0.6758002029
0.3241997971