Proposal of Rooftop Solar Plant – 3 KWp
SMT. KANEKAR ROHINI RAVINDRA
KHEND, CHIPLUN TAL.CHIPLUN DIST.RATNAGIRI CHIPLUN 415605

Savings on expensive grid tariff


Reduced dependence on expensive grid
Snapshot – for 3 KWp
electricity: Solar energy produced reduces expensive
power purchased from Grid.The current average Capacity 3 KWp
cost per unit of electricity is Rs.9.46 per unit. Total Area required 300 Sq ft
By installing 3 KWp solar plant, the average cost Generation p.a. 4320 kwh
will go down to Rs.0.35 per unit resulting in CO2 saved 90 tons
significant savings.

Increased savings every year: Grid tariff


Summary
increases by around 4% p.a. Hence, savings
keep increasing every year. Capacity 3 KWp
Yearly bill (pre-solar) ₹ 34,362
Savings round the clock: Excess electricity generated
during the day is fed into the grid & is offset against Yearly bill (post-solar) ₹ 1,253
electricity consumed at night. Annual Saving ₹ 33,109
Monthly Saving in bill ₹ 2,759
Low maintenance: Solar PV is a proven technology.
A plant lasts for 25 years & requires minimal
Saving on Electricity bill 96.35%
maintenance every year.
Cost ₹ 225,000
Thus the Solar panels installation will
Save 96.36% on the current electricity bill. Payback Period, Years 6.7
Project details
This project was designed to propose a plan for a solar installation.
This installation will be made on rooftop of SMT. KANEKAR ROHINI RAVINDRA
capacity 3 KWp

Project Data :
Address KHEND, CHIPLUN TAL.CHIPLUN DIST.RATNAGIRI CHIPLUN 415605

Latitude 19.142382 

Longitude 72.823763 

Max. temperature 44 C

Mini temperature 22C

Sanction Load 0.5 KW

D.G. N.A
Component details - BOM
Make : Vikram/Trina or equivalent
Solar Panels Category: TIER 1 Type: Polycrystalline
Quantity : 10 Nos.

Make : ABB/Delta/Solaredge/Solax/Polycab or equivalent


Inverter
Quantity : 1 Nos. Capacity: 3 kW

Panels shall be mounted on Hot dip galvanized GI


Mounting Structures
framed structure or Aluminium based on roof structure.

Cables will confirm to IS 694 & Interconnections, array to boxes ,


junction boxes to PCU etc will be selected near to PV panel to keep
voltage drop & losses minimum.
Electrical Accessories
The bright Temperature Range: 0 deg C to +65 deg C
Size : Suitable Size
Color codes: Red, Yellow, Black, Blue, Green.

Earthing & lightning As per MNRE guidelines & with respect to actual site requirement.
arrester system
How rooftop solar plant works
Net Meter – keeps account of
Sun – Natural electricity Generated & electricity
source of energy u lized

DISCOM
GRID

SMT. KANEKAR ROHINI RAVINDRA

PV panels- convert solar


radiation into Direct Solar Inverter- Converts DC
Current (DC) into AC (act as a brain of the
system)

Maishree Solar offers end to end solar installation and maintenance solutions to it’s customers
Our value proposition
Optimal
Regulatory Maintenance
Design and
approvals and Support
installation

• Rooftop design for for • Approvals from • 1 year maintenance


optimal sizing and regulatory bodies for included
performance net-metering • All components to be
• Quality installation covered by
services manufacturer’s
• Value for money guarantee
components
Offer details
Commercial Offer Warrantees
The above offer is inclusive of annual
Project Cost ₹ 225,000.00 maintenance for 1 year with warrantee on
all components & installation

Subsequently, all components shall continue


to have warrantees provided by manufacturers.

All components shall conform to the highest


quality standards & shall be from suppliers
Payable Cost is Two Lakhs Twenty Five Thousand Rupees Only
approved by MNRE.

Payment Milestones & Dates Project Schedule


Payment terms – Rooftop Solar The below given 3 processes are sequential
20% on confirmation of order ₹ 45,000.00 and the entire process takes 10 weeks
40% on MEDA approval ₹ 90,000.00 Process Duration
30% on supply of PV Panels ₹ 67,500.00 Pre-project formality Tentatively 2 Weeks
10% on commissioning ₹ 22,500.00 Project execution 4 Weeks
₹ 225,000.00 DISCOM approval Tentatively 4 Weeks
DISCOM approval is a regulatory approval and usually take 2-4 weeks.
Other Commercial Terms
Way Forward
1. Acceptance of budgetary offer and payment of advance (20%).
2. Preparation of detailed design of the system keeping in view the structural strength of the roof.
3. Approval of net metering from DISCOM.
4. Approval of subsidy from MEDA.
5. Installation and Commissioning.

Contact Us :