PROJECT NUMBER SHEET NUMBER

PROJECT: The Bridges Phase 1


60520157 1
PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION
CALCULATION TITLE:
Transformer Room
Ventilation Calculation KAMLESH 10-Mar-17 TANVEER 10-Mar-17 OZAIR 10-Mar-17 A

REFERENCES/ NOTES: (1) To control the maximum temperature of the Transformer room to 55°C
HEAT DISPATION METHOD

GROUND FLOOR TRANSFORMER ROOM VENTILATION CALCULATION

Transformer Load 2000 KVA

Transformer Qty 2.0

Total Transformer Load 4000 KVA

Heat Dissipation from FROM ELECTRICAL


25.0 kW
Transformer (Q) DATA
Maximum Allowable Room
Temperature (T1) 55.0 ºC

Design Room Temperature (T2) 50.0 ºC

Ambient Temperature (T3) 46.0 ºC

Required Air Flow (m) 5.79 m3/s m=Q/(1.08*(T2-T3))

Required Air Flow 5787 L/s

Say 5800 L/s

No. of Exhaust Fan 1 No.

Each Exhaust fan Capacity 5800 L/s

Louvre velocity for Exhaust 2.50 m/s

Exhaust Air Louvre Area 2.32 m2

Say 2.30 m2 Storm Resistant


Louvre
Louvre velocity for Fresh Air 1.0 m/s

Fresh Air Louvre Area 5.80 m2

Say 5.80 m2 Sand Trap Louvre