Problem-1:
A lap contains 2% trash after processed in B/R having a cleaning efficiency of
80%. Find the trash % in raw cotton.
Solution:
We know,
…………………..2%
=> 80 = ………………….
…………….Total Trash
Problem-2:
Bottom calender roller dia = 7 inches, rpm = 10 & wt. of every yds lap is 12 oz and
cleaning efficiency 75%. Find out the production of B/R per hour.
Solution:
…………………………………..3.14 x 7 x 10 x 60 x 75 x 12
Production/hr of B/R = ……………………………………….
……………………………………………….36 16 x 100
= 206.06 lb (Ans.)
Problem-3:
If lap length constant is 720, then set the change pinion for 40 yds lap.
Solution:
……720
= ………..
…….40
= 18 T (Ans)
Problem-4:
If lap wt. is 15 oz per yds, find the hank.
Solution:
Problem-5:
If lap wt. – (a) 15 lb/yds, (b) 15 lb/m, (c) 15 grain/ yds, (d) 15gt/m, (e) 15gm/yd,
(f) 15gm/m. Find the hank.
Solution:
………………….1 m x1 lb
b. Hank = ……………..……….
……………….840 yds x15 lb
……..1.1 yds x1 lb
= ………………………
…..840 yds x15 lb
= 0.0000873 (Ans)
………………..1 m x 7000 gr
d. Hank = …………………………
………………..840 yds x15 gr
….1.1 x 7000
= ……………….
……840 x15
= 0.611 (Ans).
……………..1 m x 453.6 gm
f. Hank = ………………………
……………..840 yds x15 gm
…..1.1 x 453.6
= …………………
…….840 x 15
= 0.0396. (Ans)
Problem-6:
Find the no. of lapper hour in scutcher m/c of Bottom calender roller dia = 7
inch, rpm = 12, efficiency 80%. Lap length 40 yds.
Solution:
………………………………π x 7 x12 x 80 x 60
Production of m/c = ………………………….. yds
…………………………………….36 x 100
= 351.85 yds.
……………………351.85
No. of lap = ………………
………………………40
= 8.79
= 9 (ANS)
Problem-7:
Find the no. of lap per hour in scutcher m/c of Bottom calender roller dia = 7
inch, rpm = 12, efficiency 80%, lap wt. 14 oz/yds.
Solution:
= 2461.76 lbs
…..2461.76
= ……………. metric ton
……..2204
Problem-8:
If in a xsutcher m/c, rpm of B.C.R. is 10, dia 7 inches, lap wt. 12 oz/yd. Find the
production/hr at 90% efficiency.
Solution:
……………………..3.14 x 7 x 10 x 12 x 60 x 90
Production = ………………………………………….. lbs
……………………………….36 x 16 x 100
Problem-9:
Calculation of Blow Room line with 2 scutchers if B.C.R. dia = 7 inch, rpm = 10,
Efficiency 90%, wastes 4%, lap wt. 14oz/yd.
Solution:
Solution:
Problem-11:
Find the B/R cleaning efficiency, if the waste in Raw cotton = 6%, waste in sliver
= 0.4%. Carding, cleaning efficiency 75%.
Solution:
……………x – 0.4
=> 75 = …………. x 100
………………..x
=> x = 1.6%.
………………………………………6 – 1.6
B/R cleaning efficiency = …………….. x 100
……………………………………………6
= 73% (Ans.)
Problem-12:
The trash control of feed cotton is 3%. After passing the beater 2% waste is
extracted, of which 15% is good fibre, what is the cleaning efficiency of the
beater?
Solution:
……………………………..100-15
2% waste extraction, ……..…… x 2 = 1.7% of the original trash has been taken out
by beater.
………………………………..100
(3-1.7) = 1.3% trash remains in the mtls, which are delivered from the beater.
…..3-1.3
= ……….. x 100
………3
= 56.66% (Ans.)
Problem-13:
Find out beats/inch from the following data- Beater r.p.m. = 720, no. of striker =
16, Feed roller r.p.m. = 24, Dia of feed roller = 3 inch.
Solution:
……………………….11520
Beats / inch = ……………….
………………………226.80
= 50.96 (Ans.)
Problem-14:
The trash content of cotton as fed to Beater 3.6%. The waste extraction is 1.5% of
which 80% is trash. What is the cleaning efficiency of the beater?
Solution:
…………………………………80
1.5% waste extraction, ……… x 2 = 1.2% of the original trash has been taken out by
beater.
………………………………..100
(3.6-1.2) = 2.4% trash remains in the mtls, which is delivered from the beater.
…..3.6-2.4
= …………… x 100
……..3.6
= 33.3% (Ans.)
Problem-1:
Find out the blow room efficiency, when
………4.5 – 1.73
= …………………… X 100%
…………..4.5
= 61.11 % (ANS)
Problem-2:
Find out beats/inch from the following, When
………………………………………Beat/min
Beat/inch = …………………………………………………………
…………………….The surface speed of the feed roller
……720 X 16
= …………………..
……Π X 3 X 24
= 76.43 or 76 (ANS)
Problem-3:
Find out the production of blow room line with 2 scutchers.
It contains,
36 inch = 1 Yard;
1 Lea = 120 Yards;
1 Meter = 1.09 Yards;
1 Pound(lb) = 453.6 Gram = 16 Oz;
840 Yard = 7 Lea = 1 Hank;
1 Pound (lb) = 7000 Grains;
1 Meter = 39.37 Inch;
1 KG = 2.205 Pound (lb)
Hank or count means the number of 840 yards length that weigh exactly one
pound.
Solution:
Trash = (80/100) x 1.6 = 1.28% of the trash has been taken out by beater.
3.2 – 1.28 = 1.92% waste remains in the material delivered from the beater.
= (3.2-1.92)/3.2 = 40% (Ans.)
Surface Speed of Feed Roller = π x Feed Roller Dia x Feed Roller RPM = 3.1416 x
3 x 26
Solution:
Output = 12000 kg
Example: The production per scutcher per hour in a 2 scutcher blow room line
is 325 lbs. Waste from whole blow room line is 700 kg/day. Calculate the no of
bales required per day for given blow room line. (1 bale = 167 kg)
Solution:
Example: 65 bales of cotton are being fed daily in a blow room line consisting of
2 scutchers. The blow room is to be kept stopped for one hour after each shift for
maintenance, if waste% is 6%, then what will be the production per scutcher in a
day (in kg/hour), while 1 bale = 165 kg.
Solution:
Waste% = 6%
Solution:
Here,
= 9474.67 lbs/hour (Ans)
Example: If lap weight is 15 oz per yard. Find out the lap hank.
Solution:
Here,
= 3351.04 lb (Ans)
Solution:
B.C.R RPM, G = 10
= 1566.88 lb (Ans)
Example: 80 bales of cotton are being fed in a blow room line daily. If the pure
weight of cotton per bale is 170 kg and waste% of blow room line is 5%. What will
be the weight of cotton lap received per day from scutcher? Calculate the no of
laps prepared per day if the weight of one lap is 20 kg.
Solution:
Waste% = 5% = 0.05
Output = 13600 – 680 = 12920 kg/day (This is the cotton lap received per day)
Problem-1:
A lap contains 2% trash after processed in B/R having the cleaning efficiency of 80%. Find the trash % in
raw cotton.
Solution:
We know,
2%
=> 80 = ..........................
Total Trash
=> Total Trash = 2/100 x 80
=> Total Trash = 2.5%. (Ans.)
Problem-2:
Bottom calender roller dia = 7 inch, rpm = 10 & wt. of every yds lap is 12 oz and cleaning efficiency 75%.
Find out the production of B/R per hour.
Solution:
= 206.06 lb (Ans.)
Problem-3:
If lap length constant is 720, then set the change pinion for 40 yds lap.
Solution:
720
= ………..
40
= 18 T (Ans)
Problem-4:
If lap wt. is 15 oz per yds, find the hank.
Solution:
= 0.0012 hank. (ANS)
Problem-5:
If lap wt. – (a) 15 lb/yds, (b) 15 lb/m, (c) 15 grain/yds, (d) 15gt/m, (e) 15gm/yd, (f) 15gm/m. Find the hank.
Solution:
1 m x1 lb
b. Hank = ………........….
840 yds x15 lb
= 0.611 (Ans).
= 0.0396. (Ans)
Problem-6:
Find the no. of lap per hour in scutcher m/c of Bottom calender roller dia = 7 inch, rpm = 12, efficiency
80%. Lap length 40 yds.
= 351.85 yds.
351.85
No. of lap = …………
40
= 8.79 = 9 (ANS)
Problem-7:
Find the no. of lap per hour in scutcher m/c of Bottom calender roller dia = 7 inch, rpm = 12, efficiency
80%, lap wt. 14 oz/yds.
Solution:
= 2461.76 lbs
2461.76
= ……………. metric ton
2204
Problem-8:
If in a xsutcher m/c, rpm of B.C.R. is 10, dia 7 inch, lap wt. 12 oz/yd. Find the production/hr at 90%
efficiency.
Solution:
= 247.275 lbs (ANS)
Problem-9:
Production of B/R line with 2 scutchers if B.C.R. dia = 7 inch, rpm = 10, Efficiency 90%, wastes 4%, lap
wt. 14oz/yd.
Solution:
= 553.896 lbs. (Ans)
Problem-10:
Calculate production/he of a B/R line if, r.p.m. of B.C.R. = 14, Dis = 18 cm,, lap hank = 0.0012, efficiency
80%, no. of scutcher = 2.
Solution:
= 822.2 lbs. (Ans)
Problem-11:
Find the B/R cleaning efficiency, if waste in Raw cotton = 6%, waste in sliver = 0.4%. Carding, cleaning
efficiency 75%.
Solution:
x - 0.4
=> 75 = …….... x 100
x
=> x = 1.6%.
6 – 1.6
B/R cleaning efficiency = ……...… x 100
6
= 73% (Ans.)
Problem-12:
The trash control of feed cotton is 3%. After passing the beater 2% waste is extracted, of which 15% is
good fibre, what is the cleaning efficiency of the beater?
Solution:
100-15
2% waste extraction, ……..… x 2 = 1.7% of the original trash has been taken out by beater.
100
(3-1.7) = 1.3% trash remain in the mtls, which is delivered from the beater.
3-1.3
= ………. x 100
3
= 56.66% (Ans.)
Problem-13:
Find out beats/inch from the following data- Beater r.p.m. = 720, no. of striker = 16, Feed roller r.p.m. =
24, Dia of feed roller = 3 inch.
Solution:
11520
Beats / inch = ……………….
226.80
= 50.96 (Ans.)
Problem-14:
The trash content of a cotton as fed to Beater 3.6%. The waste extraction is 1.5% of which 80% is trash.
What is the cleaning efficiency of the beater?
Solution:
80
1.5% waste extraction, ……… x 2 = 1.2% of the original trash has been taken out by beater.
100
(3.6-1.2) = 2.4% trash remain in the mtls, which is delivered from the beater.
3.6-2.4
= ………….. x 100
3.6
= 33.3% (Ans.)