2 - STRUCTURE WORK
2 STRUCTURAL WORKS
2.1.1 FONDATION & SOIL WORKS
A Foundation Work
Mobilization - Demobilization of m' 2720.00 2720.00 0.00
material and equipment/tool
Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 2720.00 2720.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
Pile Driving Analyzer Test ttk 4.00 4.00 0.00
Cut the Head of Pole size 40x40 ttk 68.00 68.00 0.00
B Earthwork (Provisional)
Soil quarrying with heavy m3 408.81 432.19 -23.39
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
manual soil quarrying m3 209.08 206.09 2.98
Soil Disposal m3 598.56 579.82 18.74
Anti-termite spray on soil before m2 809.50 785.86 23.64
construction
Dewatering System including OTHER BUILDING (GWT, STP, LS 1.00 1.00 0.00
pumps and other equipment. WASTE CONTAINER)
D Work of Slab
backfill Sand, 300mm thick m3 197.32 244.80 -47.48
working floor, 50mm thick m3 34.54 40.78 -6.24
Ready Mix Concrete concrete K250 m3 143.01 134.43 8.58
Reinforcement Reinforcement BJTD-40 kg 13229.98 13167.13 62.85
formwork Formwork of Block m2 43.95 68.47 -24.52
E Work of Column
Ready Mix Concrete concrete K250 m3 20.18 19.27 0.91
Reinforcement Reinforcement BJTD-40 kg 5483.09 5266.80 216.29
formwork Formwork from multiplex 12mm m2 205.59 197.19 8.40
F Work of stair
Ready Mix Concrete concrete K250 m3 3.43 3.11 0.32
Reinforcement Reinforcement BJTD-40 kg 408.50 448.14 -39.64
formwork Formwork from multiplex 12mm m2 36.87 28.33 8.54
Work of Column
Ready Mix Concrete concrete K250 m3 39.06 41.70 -2.64
Reinforcement Reinforcement BJTD-40 kg 10629.52 11465.54 -836.02
formwork Formwork from multiplex 12mm m2 361.26 385.23 -23.97
Work of Beam
Ready Mix Concrete concrete K250 m3 114.99 112.94 2.05
Reinforcement Reinforcement BJTD-40 kg 20314.83 19775.16 539.67
formwork Formwork from multiplex 12mm m2 866.40 869.76 -3.36
Work of Slab
Ready Mix Concrete concrete K250 m3 145.71 156.79 -11.08
Reinforcement Reinforcement BJTD-40 kg 16815.30 18085.25 -1269.95
formwork Formwork from multiplex 12mm m2 1094.10 1175.19 -81.09
Work of stair
Ready Mix Concrete concrete K250 m3 6.85 5.89 0.96
Reinforcement Reinforcement BJTD-40 kg 817.00 903.66 -86.66
formwork Formwork from multiplex 12mm m2 743.52 55.53 687.99
E Other Work
Lightweight steel frame 1.2 Truss AHU, Utility Building m2 426.75 426.75 0.00
Profil "S" 0.75mm
Cover roof Spandex depth 0.45 AHU, Utility Building m2 426.75 426.75 0.00
mm, includes nok, and
Insulations, and accessories :
Gutter on roof, depth 0.45 AHU, Utility Building m1 55.22 55.22 0.00
mm,includes frame plate strip
and other accessories :
Steel Structure
CNP 150x65x20x2.3 kg 336.60 336.60 0.00
Plate thickness 8 mm kg 25.94 25.94 0.00
Chemical anchor dia. 16 mm, 200 mm length bh 163.20 163.20 0.00
Grouting thickness 3 mm Formwork of Block m3 0.00 0.00 0.00
Zincromate paint kg 362.54 362.54 0.00
Duco paint finish kg 362.54 362.54 0.00
2 STRUCTURAL WORKS
2.1.1 FONDATION & SOIL WORKS
A Foundation Work
Mobilization - Demobilization of m' 2720.00 2720.00 0.00
material and equipment/tool
Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 2720.00 2720.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
Pile Driving Analyzer Test ttk 4.00 4.00 0.00
Cut the Head of Pole size 40x40 ttk 68.00 68.00 0.00
B Earthwork (Provisional)
Soil quarrying with heavy m3 408.81 432.19 -23.39
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
manual soil quarrying m3 209.08 206.09 2.98
Soil Disposal m3 598.56 579.82 18.74
Anti-termite spray on soil before m2 809.50 785.86 23.64
construction
Dewatering System including OTHER BUILDING (GWT, STP, LS 1.00 1.00 0.00
pumps and other equipment. WASTE CONTAINER)
E Other Work
Lightweight steel frame 1.2 Truss AHU, Utility Building m2 426.75 426.75 0.00
Profil "S" 0.75mm
Cover roof Spandex depth 0.45 AHU, Utility Building m2 426.75 426.75 0.00
mm, includes nok, and
Insulations, and accessories :
Gutter on roof, depth 0.45 AHU, Utility Building m1 55.22 55.22 0.00
mm,includes frame plate strip
and other accessories :
FIX (6/408)
Floor hardener 3kg/m2 including STP m2 7.17 19.50 -12.33
trowel finish dan floor plate
reveals ex. Fosroc or equal
approved
Steel Structure
CNP 150x65x20x2.3 kg 336.60 336.60 0.00
Plate thickness 8 mm kg 25.94 25.94 0.00
Chemical anchor dia. 16 mm, 200 mm length bh 163.20 163.20 0.00
Grouting thickness 3 mm Formwork of Block m3 0.00 0.00 0.00
Zincromate paint kg 362.54 362.54 0.00
Duco paint finish kg 362.54 362.54 0.00
FIX (7/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT RAB ENG & QS RAP SELISIH
2 STRUCTURAL WORKS
2.1.1 FONDATION & SOIL WORKS
A Foundation Work
Mobilization - Demobilization of m' 2720.00 2720.00 0.00
material and equipment/tool
Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 2720.00 2720.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
Pile Driving Analyzer Test ttk 4.00 4.00 0.00
Cut the Head of Pole size 40x40 ttk 68.00 68.00 0.00
B Earthwork (Provisional)
Soil quarrying with heavy m3 408.81 432.19 -23.39
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
manual soil quarrying m3 209.08 206.09 2.98
Soil Disposal m3 598.56 579.82 18.74
Anti-termite spray on soil before m2 809.50 785.86 23.64
construction
Dewatering System including OTHER BUILDING (GWT, STP, LS 1.00 1.00 0.00
pumps and other equipment. WASTE CONTAINER)
Lightweight steel frame 1.2 Truss AHU, Utility Building m2 426.75 426.75 0.00
Profil "S" 0.75mm
Cover roof Spandex depth 0.45 AHU, Utility Building m2 426.75 426.75 0.00
mm, includes nok, and
Insulations, and accessories :
Gutter on roof, depth 0.45 AHU, Utility Building m1 55.22 55.22 0.00
mm,includes frame plate strip
and other accessories :
Steel Structure
CNP 150x65x20x2.3 kg 336.60 336.60 0.00
1 P-000 PRELIMINAIRIES
P-820 ATK, Keperluan Kantor,Peralatan Kantor & Foto Copy bln 10.00
Jumlah Preliminaries :
2 M-000 MATERIAL
M-210 Bata Ringan 60x20x10 cm ex. Leicht Brick m3 319.00 307 276
M-210 Ongkos Kirim Bata Ringan 60x20x10 cm m3 319.00
M-210 Batako Trass 36x17x8cm bh 12,296.00
M-500 Beton
M-800 Keramik, HT
M-800 HT 60x60 Granite texture ex. Frontino m2 49.13
M-800 HT uk. 60 x 60 cm Double Loading ex. Frontino m2 748.27
M-800 HT 60x60 cm Rustic Cementum ex. Frontino m2 123.61
M-800 Dinding CT 30x60 cm ex. Roman m2 356.47
M-800 Dinding CT 30x30 cm ex. Roman m2 188.48
M-800 Lantai CT 30x30 cm ex. Roman Gol B m2 182.70
M-800 Skirting Hospital HT 10x60 cm keping 727.00
M-800 Skirting Hospital HT 8x30 cm ex. Roman keping 31.00
M-800 Ongkos Cutter step nose keping 28.00
M-800 Ongkos Kirim Material HT & Keramik m2 1,693.02
M-820 Sanitairy
M-820 Closet type CW 421 J ex. Toto unit 8.00
M-820 Shower Spray TB 19 CSMCR ex. Toto unit 8.00
M-820 Lavatory LW897CJ + Faucet TX109LD ex. Toto unit 19.00
M-820 Floor Drain TX 1 EB ex. Toto unit 9.00
No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
RAP R0 RAB ENG & QS
M-830 Cat
M-830 Cat zinchromate kg 1,390.62
Jumlah Material :
3 S-000 SUBKON
S-100 STRUKTUR
S-106 Waterproofing
S-106 Waterproofing Integral ex. Fosroc m3 144.17 147.06 153.85
S-106 Water Stop ex. Fosroc m1 63.96 65.24 33.05
S-106 Waterproofing coating ex. Fosroc m2 233.31
S-106 Waterproofing membrane ex. Fosroc m2 227.78
S-106 Floor Hardener 3 kg m2 213.49 7.17 19.50
S-106 Floor Hardener 5 kg m2 11.72 TIDAK ADA
S-202 Cat
S-202 Cat dinding antibacterial emulsion ex. Jotun Majestic TB care m2 4,128.94
S-202 Cat dinding acrylic emulsion ex. Jotun Majestic TB Care m2 1,076.07
S-202 Cat enamel ex. Majextic TB sheen m2 137.45
S-202 Cat weathershield emulsion ex. Jotun Jotashield antifade m2 2,039.27
S-202 Skirting oil paint 10 cm m1 60.02
S-202 Epoxy 500 Micron m2 124.42
S-210 Pintu & Jendela Kaca Alumunium ex. Alexindo Finish Anodized
S-210 DW1 (3350 X 3000) unit 1.000.00
S-210 D6 (1000 X 2150) unit 1.000.00
S-210 SD4 (900 X 2150) unit 1.000.00
S-210 W1 (825 X 3000) unit 1.000.00
S-210 W1A (1800 X 3000) unit 2.000.00
S-210 W2 (3350 X 3000) unit 1.000.00
S-210 W2A (3350 X 3000) unit 1.000.00
S-210 W3 (900 X 1700) unit 3.000.00
S-210 W3A (600 X 1700) unit 4.000.00
S-210 W3A-1 (600 X 1700) unit 1.000.00
S-210 W3B (300 X 1700) unit 2.000.00
S-210 W4 (1800 X 1700) unit 4.000.00
S-210 W4A (1200 X 1700) unit 4.000.00
S-210 W4A-1 (1200 X 1700) unit 1.000.00
S-210 W4B (1500 X 1700) unit 2.000.00
S-210 W4C (1000 X 1700) unit 3.000.00
S-210 W4D (1200 X 1700) unit 2.000.00
S-210 W4E (2700 X 1700) unit 1.000.00
S-210 W4F (2050 X 1700) unit 1.000.00
S-210 W5 (800 X 1200) Radiologi (Jasa Pasang) unit 2.000.00
S-210 BV1 (750 X 400) unit 2.000.00
S-210 BV3 (2000 X 400) unit 1.000.00
S-210 BV4 (250 X 400) unit 2.000.00
S-210 BV5 (300 X 400) unit 4.000.00
S-210 DW5 (5700 X 3000) unit -
S-210 DW6 (3660 X 3000) unit 1.000.00
S-210 DW7 (2850 X 3000) unit -
S-210 DW2 (2560 X 2150) unit 1.000.00
S-210 DW3 (2050 X 2150) unit 2.000.00
S-210 D2B (900 X 2150) unit 3.000.00
S-210 W6 (1200 X 1200) unit 3.000.00
S-210 Ongkos Kirim ls 1.000.00
S-213 Railling
S-213 Railling Tangga darurat m1 28.405.18
S-213 Hand Railling darurat m1 47.080.18
S-214 MEP
S-214 Plumbing ls 1.00 1.000.00 1.000.00
S-214 Mekanikal & Elektrikal ls 1.00 1.000.00 1.000.00
S-214 VAC ls 1.00 1.000.00 1.000.00
S-214 Lift ls 1.00 1.000.00 1.000.00
Jumlah Subcon :
4 U-000 UPAH
U000 UPAH LAINNYA
U-000 Upah Potong Kepala Pancang ttk 68.00
U-000 Upah pasang pasir urug m3 250.90
U-000 Upah Rangka Atap baja ringan m2 442.96
U-000 Upah Pasang Penutup Atap m2 442.96
U-000 Upah Pasang Flashing & Nok m1 45.11
U-000 Upah Pasang Talang Atap metal m1 58.99
U-000 Upah gelas Glasswool / Insulation m2 442.96
U-000 Dinding Wiremesh ruang genset + Material m2 9.36
U-000 Dinding Wiremesh ruang AHU + Material bh 71.64
U100 STRUKTUR
U-100 Upah Trowel m2 225.21
U-200 FINISHING/ARSITEKTUR
No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
RAP R0 RAB ENG & QS
U-900 BAJA
U-900 Fabrikasi & Material bantu kg 1,467.34
U-900 Erection kg 1,467.34
U-900 Upah Pasang Angkur bh 244.00
U-900 Upah Pasang Mur Baut bh 39.79
U-900 Ongkos Kirim kg 1,467.34
Jumlah Upah :
5 A-000 ALAT
Jumlah Alat :
GRAND TOTAL
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY VOL
FORKON
3.00 EXISTING MAIN BUILDING RENOVATION ARCHITECTURAL WORK
3.1.1 INTERIOR WALLS AND WALL FINISHES
E Skirting PVC 150 mm height off white colour, m' 604.246.00 578.450.00
including fixing accessories and flatten ex.
Tarkett or equal approved (VP)
F Skirting oil paint 100 mm height ex. jotun, m' 60.022.50 46.760.00
including fixing accessories and flatten (PT2)
###
B Gypsum board ceiling water resistance 9 mm m2 ###
thick ex. Jayaboard or equal approved, with
boral metal system frame, including fixing
accessories, instalation and flatten (GB2)
SUBTOTAL
#REF!
M-800 Keramik, HT
M-800 HT 60x60 Granite texture ex. Frontino m2 - - - 0.00 46 - -
M-800 HT uk. 60 x 60 cm Double Loading ex. Frontino m2 - - - 299.83 289 - -
M-800 HT 60x60 cm Rustic Cementum ex. Frontino m2 - - - 0.00 116 - -
M-800 Dinding CT 30x60 cm ex. Roman m2 - - - 0.00 67 - -
M-800 Dinding CT 30x30 cm ex. Roman m2 - - - 83.96 - 162 -
M-800 Lantai CT 30x30 cm ex. Roman Gol B m2 - - - 33.40 47 80 -
M-800 Skirting Hospital HT 10x60 cm keping - - - 181.08 650 - -
M-800 Skirting Hospital HT 8x30 cm ex. Roman keping - - - 0.00 - 42 -
M-800 Ongkos Cutter step nose keping - - - 0.00 33 - -
M-800 Ongkos Kirim Material HT & Keramik m2 - - - 428.06 605 243 -
RAB VOL FORKON (ENG & QS)
A STRUKTUR 0
Mob demob pancang m1 2,720.00 - - - - 2,720.00 2,080.00 280.00 360.00 - - - - 2,720.00
Pondasi pancang 40x40 m1 2,720.00 - - - - 2,720.00 2,080.00 280.00 360.00 - - - - 2,720.00
Pondasi pancang 25x25 m1 - - - - - - - - - - - - - -
PDA tes ttk 4.00 - - - - 4.00 1.00 1.00 2.00 - - - - 4.00
Potong kepala pancang 40x40 ttk 68.00 - - - - 68.00 52.00 7.00 9.00 - - - - 68.00
Potong kepala pancang 25x25 ttk - - - - - - - - - - - - - -
anti rayap Safe 1 200 SL m2 809.50 - - - - 809.50 333.00 357.91 94.95 - - - - 785.86
Dewatering ls 1.00 - - - - 1.00 - - 1.00 - - - - 1.00
Beton K300 (Pile Cup, Tie Beam) m3 26.76 - - - - 26.76 - - 18.89 - - - - 18.89
Beton K300 (Kolom, dinding) m3 15.35 - - - - 15.35 - - 21.60 - - - - 21.60
Beton K300 (Plat, Balok) m3 5.61 - - - - 5.61 - - 6.53 - - - - 6.53
WF 250x125x6x9 kg - - - - - - - - - - - - - -
WF 150x75x5x7 kg 465.50 - - - - 465.50 402.85 - - - - - - 402.85
WF 200x100x5.5x8 kg - - - - - - - - - - - - - -
CNP 150x60x20x2.3 kg 882.89 - - - - 882.89 528.72 - 336.60 - - - - 865.32
Plate 12 mm kg - - - - - - - - - - - - - -
Plate 10 mm kg - - - - - - - - - - - - - -
Plate 8 mm kg 62.87 - - - - 62.87 31.65 - 25.94 - - - - 57.59
Plate 6 mm kg 39.79 - - - - 39.79 36.27 - - - - - - 36.27
Ikatan Angin kg - - - - - - - - - - - - - -
Trekstang kg 23.40 - - - - 23.40 21.28 - - - - - - 21.28
Angkur Dia. 16 bh 247.20 - - - - 247.20 84.00 - 163.20 - - - - 247.20
Bolt dia. 16 bh 39.79 - - - - 39.79 112.00 - - - - - - 112.00
Bolt dia. 12 bh - - - - - - - - - - - - - -
Grouting baja m3 0.01 - - - - 0.01 0.01 - 0.00 - - - - 0.01
Grouting baja 20x25x0.25 bh - - - - - - - - - - - - - -
Cat Zincromate kg 1,397.73 - - - - 1,397.73 952.85 - 362.54 - - - - 1,315.39
Finishing Cat Duco ls 362.54 - - - - 362.54 - - 362.54 - - - - 362.54
Dinding dalam bata ringan m2 - 158.68 2,529.48 350.76 26.26 3,065.17 - - - 148.99 2,284.67 302.07 26.26 2,761.99
Dinding Luar bata ringan m2 - - - - - - - - - - - - - -
Plester + Aci dinding dalam m2 - 144.08 2,162.66 546.13 52.52 2,905.39 - - - 144.08 2,162.66 444.52 52.52 2,803.77
Plester + Aci dinding luar m2 - - 1,025.12 - - 1,025.12 - - - - 1,025.12 - - 1,025.12
Plesteran dinding dalam m2 - 86.04 425.81 125.00 - 636.84 - - - 62.27 425.81 161.59 - 649.67
Plesteran dinding luar m2 - - - - - - - - - - - - - -
Dinding CT 30x60 cm ex. Roman m2 - 150.24 170.87 - - 321.11 - - - 73.32 170.87 - - 244.19
Dinding Jamb Lift HT 30x60 cm ex. Frontino m1 - - 13.60 - - 13.60 - - - - 13.60 - - 13.60
Dinding HT luar 60x60 Granite texture ex. Frontino m2 - - 46.14 - - 46.14 - - - - 46.14 - - 46.14
HT uk. 60 x 60 cm Double Loading ex. Frontino m2 - 308.16 338.18 - - 646.34 - - - 299.83 289.43 - - 589.26
Lantai HT 60x60 cm Rustic Cementum series type m2 - - 116.07 - - 116.07 - - - - 116.07 - - 116.07
NA60CM015 ex. Nara Ceramica
Lantai HT 30x60 cm ex. Frontino (Grove line + bevel) m2 - - 56.25 - - 56.25 - - - - 66.81 - - 66.81
Skirting HT 10x60 cm polish ex. Frontino m' - 120.73 315.49 - - 436.22 - - - 108.65 390.17 - - 498.82
Dinding CT 30x30 cm ex. Roman m2 - 51.15 - 125.00 - 176.15 - - - 83.96 - 161.59 - 245.55
Lantai CT 30x30 cm ex. Roman Gol B m2 - 32.44 44.55 100.67 - 177.66 - - - 33.40 47.10 80.08 - 160.58
Skirting CT 10x30 cm ex. Roman m' - - - 9.25 - 9.25 - - - - - 12.55 - 12.55
Cat dinding antibacterial emulsion ex. Jotun Majestic TB care m2 - 1,378.33 2,750.61 - - 4,128.94 - - - 1,292.56 2,681.32 - - 3,973.88
Cat dinding acrylic emulsion ex. Jotun Majestic TB Care m2 - - 330.25 719.55 26.26 1,076.07 - - - - 333.09 401.14 26.26 760.49
Cat enamel ex. Majextic TB sheen m2 - - 137.45 - - 137.45 - - - - 137.45 - - 137.45
Cat weathershield emulsion ex. Jotun Jotashield antifade m2 - - 1,671.50 131.26 286.37 2,089.13 - - - - 1,671.50 162.59 286.37 2,120.46
Trowel Finish + Floor Hardener 3 kg m2 7.17 - 122.08 84.38 - 213.63 - - 19.50 - 122.08 118.07 - 259.65
Trowel Finish + Floor Hardener 5 kg m2 - - - - 13.26 13.26 - - - - - - 13.26 13.26
Waterproofing coating ex. Fosroc + Screed Pretection m2 - - 59.64 - 190.57 250.21 - - - - 59.64 - 190.57 250.21
Waterproofing membrane with Profex Torchseal 3 PV ex m2 - - 227.78 - - 227.78 - - - - 227.78 - - 227.78
Fosroc
Screed with wiremesh M4 m2 - - 181.33 - 21.59 202.92 - - - - 181.33 - 21.59 202.92
Lantai vinyl Somplan 360 ex. Tarkett m2 - - 450.27 - - 450.27 - - - - 396.00 - - 396.00
Lantai vinyl IQ Toro SC ex. Tarkett m2 - - 84.40 - - 84.40 - - - - 71.78 - - 71.78
Skirting PVC 15 cm vinyl ex. Tarkett m' - 205.65 398.60 - - 604.25 - - - 225.46 352.99 - - 578.45
Lantai vinyl Somplan 360 ex. Tarkett (Renovasi Main Building) m2 - 255.74 - - - 255.74 - - - 225.82 - - - 225.82
FACILITY BUILDING 0 - - - - - - - - - - - - - -
D1A-DP uk. 1600x2150 (Facility Building) unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
D4 uk. 900x2150 unit - - 2.00 - - 2.00 - - - - 3.00 - - 3.00
D4-A uk. 800x2150 mm unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
D4-K uk. 900x2150 unit - - 2.00 - - 2.00 - - - - 3.00 - - 3.00
D4-DP uk. 900x2150 unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
D5-K uk. 800x2150 unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
D5A-K uk. 900x2150 unit - - 6.00 - - 6.00 - - - - 6.00 - - 6.00
D5B-K uk. 1000x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
MAIN BUILDING 0 - - - - - - - - - - - - - -
D1A-DP uk. 1600x2150 (Main Building) unit - 1.00 - - - 1.00 - - - 1.00 - - - 1.00
D4-K1 uk. 900x2150 unit - 5.00 - - - 5.00 - - - 5.00 - - - 5.00
D4B uk. 900x2150 unit - 1.00 - - - 1.00 - - - 1.00 - - - 1.00
D5A-K1 uk. 900x2150 unit - 5.00 - - - 5.00 - - - 5.00 - - - 5.00
Door D2A-K uk. 1400x2150 unit - 8.00 - - - 8.00 - - - 8.00 - - - 8.00
FACILITY BUILDING 0 - - - - - - - - - - - - - -
D2 uk. 900x2150 unit - - 5.00 - - 5.00 - - - - 5.00 - - 5.00
D2A uk. 1400x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
D2A-LD2 uk. 1400x2150 unit - - 3.00 - - 3.00 - - - - 3.00 - - 3.00
D2A-LD4 uk. 1400x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
FDB uk. 1100x2150 unit - - 4.00 - - 4.00 - - - - 4.00 - - 4.00
PB uk. 600x1000 unit - - 7.00 - - 7.00 - - - - 7.00 - - 7.00
SD uk. 900x2150 unit - - 4.00 - - 4.00 - - - - 4.00 - - 4.00
SD-LD2 uk. 900x2150 mm unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
SDB uk. 1100x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
SD1 uk. 1000x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
SD2 uk. 1600x2150 unit - - 1.00 - 1.00 2.00 - - - - 1.00 - 1.00 2.00
SD5 uk. 1100x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
UTILITY BUILDING 0 - - - - - - - - - - - - - -
Door Louver DW4 uk. 1600x2150 + (1800+1160)x580 unit - - - 2.00 - 2.00 - - - - - 2.00 - 2.00
Louver BV2 uk. 1200x580 unit - - - 6.00 - 6.00 - - - - - 6.00 - 6.00
FACILITY BUILDING 0 - - - - - - - - - - - - - -
DW1 (3350 X 3000) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
D6 (1000 X 2150) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
SD4 (900 X 2150) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
MAIN BUILDING 0 - - - - - - - - - - - - - -
DW5 (5700 X 3000) unit - - - - - - - - - - - - - -
DW6 (3660 X 3000) unit - 1.00 - - - 1.00 - - - 1.00 - - - 1.00
DW7 (2850 X 3000) unit - - - - - - - - - - - - - -
UTILITY BUILDING 0 - - - - - - - - - - - - - -
DW2 (2560 X 2150) unit - - - 1.00 - 1.00 - - - - - 1.00 - 1.00
DW3 (2050 X 2150) unit - - - 2.00 - 2.00 - - - - - 2.00 - 2.00
D2B (900 X 2150) unit - - - 3.00 - 3.00 - - - - - 3.00 - 3.00
W6 (1200 X 1200) unit - - - 3.00 - 3.00 - - - - - 3.00 - 3.00
Closet type CW 421 J ex. Toto pcs - 3.00 5.00 - - 8.00 - - - 3.00 5.00 - - 8.00
Shower Spray TB 19 CSMCR ex. Toto pcs - 3.00 5.00 - - 8.00 - - - 3.00 5.00 - - 8.00
Lavatory LW897CJ + Faucet TX109LD ex. Toto pcs - 11.00 8.00 - - 19.00 - - - 11.00 8.00 - - 19.00
Floor Drain TX 1 EB ex. Toto pcs - 3.00 6.00 - - 9.00 - - - 3.00 6.00 - - 9.00
Robe Hook TS 118 WSB ex. Toto pcs - 3.00 5.00 - - 8.00 - - - 3.00 5.00 - - 8.00
Slop sink SK33 + Wall Faucet TX133AUN13C ex. Toto pcs - 1.00 2.00 - - 3.00 - - - 1.00 2.00 - - 3.00
Kran T 23 BQ13N ex. Toto pcs - - 3.00 - - 3.00 - - - - 3.00 - - 3.00
Paper holder TX 703 AESV1 ex. Toto pcs - 3.00 5.00 - - 8.00 - - - 3.00 5.00 - - 8.00
Kitchen Faucet TX603KM ex. Toto pcs - - 3.00 5.00 - 8.00 - - - - 3.00 5.00 - 8.00
Scrub.sink pcs - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
Kitchen Sink double ex. Lokal pcs - - 3.00 5.00 - 8.00 - - - - 3.00 5.00 - 8.00
Roof Drain Ironmongeries ex. Antasan pcs - - 9.00 - - 9.00 - - - - 9.00 - - 9.00
Cermin 600x900 pcs - 3.00 5.00 - - 8.00 - - - 3.00 5.00 - - 8.00
DAFTAR HARGA BAHAN
No MATERIAL
Beton Raft
BEKISTING
1 Plywood 6 mm
2 Plywood 9 mm
3 Plywood 12 mm
4 Plywood 15 mm
5 Kayu Kaso 6/6 -
6 Kayu 6/12 -
7 Kayu Kaso 5/7
8 Concrete form work
9 Paku
10 Plastic Concrete spacer
11 Mould oil
12 Tie Rod
13 Colbond
14 Bondek
15 Curing
Transport
1 Transport Besi Beton
2 Container 20' @ 21 ton uk 5.75 m x 2.35 m x 2.38 m
3 Container 40' @ 24 ton
4 ongkos kirim keramik
5 ongkos kirim sanitary kecil
5 ongkos kirim sanitary closet, washtafel, Urinal
5 ongkos kirim bata ringan
6 ongkos kirim mortar
7 ongkos kirim semen di lokal
BATA RINGAN
37 Bataringan ex. Super bata
Bataringan ex. Power Block
Bataringan ex. Grand Elephant
Bataringan ex. Mercusuar
Bata Ringan Ex. Thermoblock
Bata Ringan ex. Leicht Brick
READYMIX MORTAR
MORTAR UTAMA
LAIN-LAIN
WF & H Beam
BENDING 400
BENDING 300
Hot dip galvanized
HB 400 X100x13x21
HB 350 X 350 X 12 X 19
HB 300x300x10x15
HB 200x200x8x12
1 WF 150X 75 X 5 X 7
2 WF 200 X 100 X 5.5 X 8
1 WF 250 X 125 X 6 X 9
2 WF 300 X 150 X 6.5 X 9
4 WF 350 X 175 X 7 X 11
3 WF 400 X 200 X 8 X 13
WF 450 X 200x11x7
1 WF 600x200x11x7
25 Plat 6 x 40 x 300
26 Steel Bar dia 22 mm
27 HTB ø 32 mm
28 HTB ø 25 mm
29 HTB ø 22 mm
30 HTB ø 19 mm
31 HTB ø 16 mm
31 HTB ø 13 mm
32 HTB ø 12 mm
33 Baut 10 mm
34 Braching ø 16 mm + Turn Buckle ø 19 mm
35 Braching ø 19 mm + Turn Buckle ø 19 mm
36 Trekstang ø 12 mm untuk atap
37 Trekstang Besi dia.13 mm pjg=1,3 m
35 Angkur bout ø 13 mm l 200 mm
36 Angkur bout ø 13 mm l 300 mm
37 Angkur bout ø 16 mm l 500 mm
38 Angkur bolt dia19 panjang 760 mm
39 Anchor bolt dia22 Panjang 880 mm
40 Angkur bout ø 25 mm, l = 880 mm
Anchor bolt M14 x 15 mm
Anchor M12
41 Longdrat M16, l = 850 mm
42 Steorofoam tebal 1 cm uk 1 m x 2 m
43 Pemasangan pipa dia 1.5"
Aluminium U 25.4x25.4x1.6
DRAINASE
U Dith 30x30 (p =1.2m)
U Dith 40x40 (p =1.2m)
Udith cover 300 Light Duty
Udith cover 400 Light Duty
Udith cover 300 Heavy Duty
Udith cover 400 Heavy Duty
Box culvert beban gandar 14.5T
BC 500x500x1000
BC 800x800x1000
Box culvert beban gandar 21T
BC 500x500x1000 Bina Marga
BC 800x800x1000 Bina Marga
RC Cover 125 mm(Heavy duty)
RC Sorround 190 mm (heavy duty)
KERAMIK DINDING
1 Keramik Dinding 20x30 ex. Platinum Bonza
1 Keramik Dinding 25x40 ex Platinum
1 Keramik Dinding 20x40 ex Roman Interloc dTravessa
2 Stepnosing granity uk 10 x 30
3 Stepnosing sand stone 100 x 200 G 224000
KERAMIK LANTAI
1 Keramik Dinding 30x30 ex. Roman Gol B
1 Keramik Lantai 20x20 ex. Platinum
1 Keramik Lantai 30x30 ex. Roman Gol B
1 Keramik Lantai 33x33 ex. Roman Gol B
1 Keramik Lantai 40x40 ex. Roman Gol B
1 Keramik Lantai 50x50 ex. Roman Gol B
1 Keramik Dinding 30x60 ex. Roman Gol D
HOMOGENOUSE TILE
1 HT uk. 30 x 60 cm polished type pearlwhite ex. Granito
2 HT uk. 30 x 60 cm polished type latte ex. Granito
3 HT uk. 60 x 60 cm polished type frostwhite ex. Granito
4 HT uk. 30 x 60 cm polished type frostwhite stepnosing ex. Gr
5 HT uk. 60 x 60 cm rustic type espresso ex. Granito
6 HT uk. 60 x 60 cm matt type summer ex. Granito
7 HT uk. 60 x 60 cm unpolish type cofee ex. Granito
Plint Keramik10x30
Plint Keramik10x50
Plint Keramik10x60
Plint Keramik10x80
Ambalan 400 mm
Ambalan 250 mm
WAIRU STONE
Wairu Stone type Paving uk. 35x17x4.5 Chacroal
Coating batu
BATU ALAM
MARMER
550x900 mm
550x1555 mm
550x1705 mm
SUBKON VINYL
Prelim subkon Vinyl
Gerfloor Vinyl Roll Homogenus Bakteri & fungal tebal 2mm termas
Leveling + polymer
Skirting pvc 80/100mm
Biaya pasang lantai Vinyl
Biaya pasang skirting
SANITARY
1 Closet duduk ex. Toto CW 660NJ/SW660J
1 Closet duduk ex. Toto type CW705ELNJ (tanpa TC365)
2 Eco washer ex. Toto type TCW 04 SF2
3 Closet Jongkok type CE6
3 Closet duduk ex. Toto type CW637J + Shower Spray THX20
4 Closet duduk ex. Toto type CW421J
4 Closet duduk ex. Toto type C51/T150NL
4 Eco Washer ex. Toto type TCW07S
4 Wastafel ex. Toto type LW103JT1 area toilet HCP
5 Lavatory ex. Toto type LW240CJ
6 Lavatory ex. TOTO LW521 V1 A
7 Lavatory ex. TOTO (LW7CJ)
8 Lavatory ex. TOTO (LW523NJ)
9 Lavatory ex. TOTO (LW536CJ)
10 Lavatory ex. TOTO (LV38V1)
11 Faucet type T205M ex. TOTO
12 Lavatory ex. TOTO (TX115LESBR)
13 Faucet type T205M ex. TOTO
9 Floor drain ex. TOTO (TX1BN).
10 Robe hook ex. TOTO (TS118WSB).
11 Robe hook ex. TOTO (TX704AEZV1).
11 Towel bar ex. TOTO (TX726AES).
12 Paper holder ex. TOTO (TX720ACRB)
13 Paper holder ex. TOTO (TX703AESV1).
14 Paper holder ex. TOTO (TX8).
13 Hand dryer ex. TOTO (TYC322WF).
14 Urinoir ex. TOTO (U57).
15 Urinoir ex. Toto type UW 930 J
16 Urinoir ex. Toto type UW 447 JT1
16 Partition Urinor A100
17 Shower ex. TOTO (A9A115XY)
18 valve Shower TX442SFN
19 Relling Showerex. TOTO (TX721AN)
20 Shower set ex. TOTO (TX445SESMBR)
21 Shower spray ex. TOTO (TB19CSMCR).
22 Shower spray ex. TOTO (THX20NB).
Shower spray ex. TOTO (THX20MCRB).
Shower TX432SD ex. TOTO
22 Kran TEN12ENF (HANDICAP)
23 Faucet TX101LB
24 Kran T23BQ13N
25 Kran TEN40AV800
24 Kran T205QN
25 Kran TX124LEC
25 Kran TX118LEL
26 Kran T23B13
27 Kran A807 S ex. Onda
27 Grab Bar5B
28 Grab Bar TX 3A3
28 Grab Bar TX10AES
29 Bathtubs exTOTO. (FBY1520PE).
30 Bathtubs exTOTO. (FB1700-70).
31 Bathtubs exTOTO. (PJY 1814 PWE).
32 Valve bathtub TX447SI
33 Valve Shower TX447SKBR
34 Kitchen zink single bowl ex. Royal SB 45
35 Kitchen zink double bowl ex. WASSER type SYLVIA1-2B0D-8
35 Kran kitchenzink T30AR13V7N
36 Kran kitchenzink Tx605KRS
37 Kran kitchenzink TX603KCS
36 Shower Room Door Handle ex. TOTO TX 10 B
37 Hand drayer TYC322M
38 Hand drayer TYC322W
38 Soap and Shampo Dispenser ex. TOTO TS125R
39 Soap and Shampo Dispenser ex. TOTO TS126AR
39 Soap holder ex, Toto TX2AV1B
39 Single Lever Shower Mixer ex. TOTO TX 404 SHNBR
Roof Drain Cast Iron dia 4 "
Mixer TX443 SEN
Lansir Material
Upah langsir Closet Jongkok
Upah langsir Closet duduk
Upah langsir Lavatory
Upah langsir Shower set
Upah langsir Urinoir
Upah langsir Zinc 1 Bowl
Upah langsir Bathup
Upah langsir material sanitair
UPAH PASANG
Upah pasang Closet Jongkok
Upah pasang Closet Duduk
Upah pasang Lavatory
Upah pasang Shower set
Upah pasang Urinoir
Upah pasang Kran
Upah pasang Jet washer/head shower
Upah pasang Eco Washer
Upah pasang Papper holder
Upah pasang Zinc 1 Bowl
Upah pasang Service Zinc
Upah pasang Soap Holder
Upah pasang Hand drayer
Upah pasang Rope Hook
Upah pasang Towel bar
Upah pasang Grap bar
Upah pasang Floor Drain
Upah pasang Bathup
Upah Pasang Sanitair
Fitting
PVC AW 50 mm diameter
PVC AW 100 mm diameter
PVC AW 80 mm diameter
PVC AW 150 mm diameter
Material Bantu
PVC AW 50 mm diameter
PVC AW 100 mm diameter
PVC AW 80 mm diameter
PVC AW 150 mm diameter
No UPAH
BEKISTING
29 Upah Angkutan Batako
30 Upah Bekisting Balok Praktis
31 Upah Bekisting batako u/ Pile Cap & Tie Beam
32 Upah Bekisting Multiplek u/ Pile Cap & Tie Beam
33 Upah Bekisting Kolom Praktis
30 Upah Bekisting Balok
31 Upah Bekisting Kolom
31 Upah pasang Bekisting Kolom Bulat
32 Upah Fabrikasi Bekisting Kolom Bulat
32 Upah Bekisting dinding
33 Upah Bekisting Plat
34 Upah Bekisting Tangga
35 Upah Bekisting Lisplank
36 Upah Bekisting sisi Plat
37 Upah Perapihan beton + Skimcoat
PEKERJAAN DINDING
38 Upah Pasang Bata ddg dalam
39 Upah Pasang Bata ddg luar
40 Upah Pasang Bata Merah
41 Upah lansir Material Pasangan Bata
42 Upah Bongkar hebel
43 Upah lansir Material Plester + Aci
44 Upah lansir Material semen +pasir
44 Upah Plester Beton
45 Upah Plesteran dinding dalam
46 Upah Acian dinding dalam
47 Upah Plesteran dinding Luar
48 Upah Acian dinding Luar
49 Upah Tali Air/benagan
50 Upah Perapihan
51 Upah Tanggulan
52 Upah Prostek
53 Upah Pembersihan
54 Upah Grouting
55 Upah Tali Air/benagan skirting
56 Upah meja
57 Upah bondek
58 Upah Kolom Praktis
59 Upah plester Aci Tanggulan
60 Upah Opening
61 Upah Lansir Material keramik
62 Upah Lansir Material HT
62 Upah lansir Mortar
62 Upah dinding Mozaik
63 Upah Skimcoat
64 Upah Pasang HT lantai
65 Upah Pasang Keramik lantai
65 Upah Pasang HT lantai 60-80
66 Upah Pasang Keramik lantai GWT
65 Upah Pasang HT dinding
66 Upah Pasang HT dinding 60-80
Upah Pasang keramik dinding
67 Upah Pasang keramik dinding GWT
68 Upah Pasang HT lantai tangga
67 Upah lantai Mozaik
68 Upah Trowel lantai
68 Upah Pasang plesteran tangga
65 Upah Pasang Step Nosing 10x20-10x30
66 Upah Meja wastafel ≤ 1000 mm
67 Upah Meja wastafel > 1000 mm
67 Upah Pasang Step Plin/Skirting keramik
Upah Pasang Step Plin/Skirting HT
68 Upah cutter plint
68 Upah Pasang Step border
68 Upah Pasang Step Plin/Skirting coakan 2x5 cm
Upah HT lantai 60x120
Upah HT dinding 60x120
PEKERJAAN EKSTERNAL
1 Perapihan Sambungan
2 Upah Pasang Sal U ditc
3 Upah Pasang Pipa
4 Upah Pasang PVC AW 50 mm diameter
5 Upah Pasang PVC AW 100 mm diameter
6 Upah Pasang PVC AW 80 mm diameter
Upah Pasang PVC AW 150 mm diameter
7 Upah Buis Beton Dia 80 cm H 2 m
8 Upah Pengisi Buis Beton Dia 80 cm H 2 m
Upah pembuatan manhole beton
Upah pasang tutup manhole
Upah pasang box culvert
BAJA
50 Fabrikasi WF < 50 T
Fabrikasi WF 50 T - 200 T
Fabrikasi WF > 200 T
51 Fabrikasi + Material Bantu pipa, Siku, Rangka Batang
52 Fabrikasi + Material Bantu Honeycomb
53 Shopdrawing
54 Erection
55 Cat zinchromate
56 Cat minyak pada baja
57 Pas angkur
58 Pas bracing
59 Pas trekstang
60 Pas trekstang
61 Pas baut
62 Pasang Chemical angkur
ongkos kirim baja
1 Schaffolding
2 Alat Trowel
3 Alat bantu psang Bondex
4 Alumunium U
5 Alat untuk bobok pancang
6 Upah Kupas P/A, + Pembersihan puing
7 Stamper
8 Vibro
8 Alat pasang Bondeck
9 Alat pasang Atap
10 Alat gurinda Mangkok
11 Alat Bobok Tiang Bor
12 Alat Concrate Pump
13 Alat Pengecoran Manual
14 Concrete Form Work
Mobil Crane
15 Mobile Crane kap.25 Ton (1 shift 7 Jam)
No Subcont
PEKERJAAN TANAH
1 Galian Tanah
2 Galian Tanah Manual
3 Urugan kembali bekas galian
4 Buang tanah bekas galian keluar lokasi
5 Pemadatan dan Perataan Tanah
SUBKON TANAH
Site clearing
Urugan tanah dari luar+pemadatan CBR min15%
agregate basecoarse CBR min 90% t=30cm
SUBKON DEWATERING
Dewatering paket 1 (tower 1&2)
Dewatering paket 2 (tower 3&4)
Dewatering paket 3 (tower 5&6)
Dewatering paket 4 (tower 7-10)
Dewatering paket 4 (tower 11)
SUBKON BEKISTING
1 Kolom
2 Balok
3 Plat
4 Tangga
5 Retaining Wall
PEKERJAAN PONDASI
PANCANG
Mobdemob alat pancang
Material Pancang uk. 35x35 p 10+10 m
Material Pancang uk. 25x25 p 10+10 m
Material Pancang uk. 20X20 p 10+10 m
Material Pancang uk. 15X15 p 6 m
Handling Pancang uk.35x35 p 10 m
Handling Pancang uk. 25x25 p 10 m
Handling Pancang uk. 20x20 p 10 m
Handling Pancang uk. 15x15 p 10 m
Jasa Pancang uk. 35x35 p 10+10m
Jasa Pancang uk. 25x25 p 10+10 m
Jasa Pancang uk. 20x20 p 10+10 m
Jasa Pancang uk. 15x15 p 6 m
Upah potong 35X35
Upah potong 25x25
Dolly 1 meter
Dolly 2 meter
Sambungan Plat 35x35
Sambungan Plat 25x25
Sambungan Plat. 20x20
Sambungan Plat. 15x15
Stand by alat
PRESTRESS
DINDING PRECAST
Dindig Precast t=10 cm
5 keamanan alat
6 Akomodasi dan transport
7 safety
8 asuransi tenaga kerja
Dinding Panel
Bongkar Pagar Panel Precast, T = 2 m
Pemasangan pagar precast panel t = 2 m ( material lama )+
Pemasangan pagar precast panel t = 2 m + kolom ( material
Pemasangan kembali material kawat duri existing
ANTI RAYAP
Sipermetrine ex. Blockade 100EC
Imidakloprid ex. Lentra 200SL
Waterproofing
1 Integral conplast WP421ex. Fosroc
2 Waterproofing coating brushbond flex ex. Fosroc
3 Waterproofing coating brushbond grey ex. Fosroc
4 Epoxy 1000micron Ex. Propan
5 Floor Hardener 3 kg Nitofloor Hardtop Natural ex. Fosroc
6 Floor Hardener 5 kg Nitofloor Hardtop Natural ex. Fosroc
7 Waterproofing membrane Profex Torchseal 3 PV ex. Fosroc
8 Waterstop with Supercasst SW 10 ex. Fosroc
9 water stop. PVC - 200 mm
Chemical Angkur
1 Chemical Angkur dia 19 mm
2 Chemical Angkur dia. 22 mm
RAILING
1 Railing Tangga Utama
2 Railing tangga Gallery
Railing kaca tempered laminated 12mm clear H 1200mm
6
main silicon sealent
7 Handrell tangga baja
8 Penyekat tangga Baja
9 Handrell tangga gallery
10 Plat sheet t : 6mm buangan air hujan L 280x20mm
9 Relling Ramp
3 Corner guard L 50x50x5 p 1200
7 Corner guard L 60x60x6
10 Grill gutter400mm
4 Grill gutter300mm
5 Grill gutter200mm
10 Tutup Man Hole 1000x1000
11 Tangga MonyetGalvanized p 3000 GWT
12 Ornamen Mihrab 700x700 t 5 mm stainless
13 Pagar gerbang perforated
Car stopper dari pipa 4"
Car stopper dari pipa panjang 180 mm
Car stopper dari pipa panjang 391 mm
Car stopper dari pipa panjang 450 mm
Car stopper dari pipa panjang 503 mm
Car stopper dari pipa panjang 649 mm
Car stopper dari pipa panjang 785 mm
RAILLING JASUINDO
Railling BSP dia 38x2mm H=1200mm tiang dia 25mm jarak
1bh/trap (finish cat)
Hand Railling tangga BSP dia 38x2mm dan bracket finish
cat
Hand Railling tangga stainless hairline t=1.2mm dan bracket
Pintu gerbang lipat hollow 20x40 jarak 70mm konbinasi plat
strip H=2500 L=7150 Finish cat
Pagar Kawat Duri galvanis x5 lajur tiang siku 50x50x5
H=450
Kisi-kisi tangga jeruji besi hollow 40x40jarak lubang 40mm
dan dudukan plat strip 5x50 finish cat
TIMBER DECK
Atap sirap
PLAFOND
Plafon gypsum 9mm Ex. Jayaboard modul 60x60 rk.metal
furing
Plafon kalsiboard 6mm Ex. Jayaboard modul 60x60 rk.metal
furing
Shadowline
Partisi gypsum 12mm rangka metal stud 76
CAT
1 Cat dinding luar ex. Dulux profesional weathershield E1000
2 Cat dinding dalam Dulux Profesional A1000
3 Cat plafond luar ex. Dulux
4 Cat plafond dalam ex. Dulux Catylac
5 Cat Acrilyc easy clean / majestic sheen ex. Jotun
6 Cat Acrilyc enamel Dulux Profesional Solventbased M1000
7 Cat Texture
8 Cat Epoxy
9 Cat Garis Parkir
10 Cat Marka
11 Cat Arah Panah
12 Area Pejalan Kaki
CAT JAKARTA
Cat dinding interior emultion Ex. Jotun/Propan/Dulux
Cat plafon interior emultion Ex. Jotun/Propan/Dulux
Cat dinding enamel Ex. Jotun/Propan/Dulux
Cat dinding Weathershield Ex. Jotun/Propan/Dulux
CAT PONTIANAK
Cat weathershield emulsion ex. Jotun Jotashield antifade
Cat dinding antibacterial emulsion ex. Jotun Majestic TB care
Cat dinding acrylic emulsion ex. Jotun Jotaplast
Cat plafon antibacterial emulsion ex. Jotun Majestic TB care
Cat plafon acrylic emulsion ex. Jotaplast
Cat enamel ex. Majextic TB sheen
INSULATION SPRAY PONTIANAK
Insulation spray polyurethene
Solid Surface
Top Table solid surface uk. 600x400mm
Cover Kolom Solid Surface
Carpet ex goodrich
Wallpapper
CUBICAL
Mobilisasi
ALUMUNIUM
Windowstool ACP
Fire stop
Spandrel Kalsiboard L 70 cm
ACP PONTIANAK
Suply & Install ACP to cloum clading
Suply & Install stainless steel hairlane to coloum skirting
Stainless steel railing post wide 70mmx20mm, 1150mm high,
tempered clear glass 12mm thick excluded (by other) with
including handrail dia. 40mm with hairline finish, to ramp area GF
to basement
Grill alumunium mounting 100x150 mm Hollow
height 2800 mm with 150 mm spacing
PINTU BESI
Pintu besi uk. 1500x2200mm
Pintu besi uk. 790x2200mm
Pintu besi 890x2200mm
Pintu besi 890x2200mm
Pintu besi uk. 990x2200mm
Pintu besi uk. 990x2200mm
Pintu besi790x2200mm
Pintu besi790x2200mm
ROLLINGDOOR
RD1 Sanwamas HWS 1.2mm solid material
RD2 SanwamasLWS 0.5mm solid material
RD3 SanwamasLWS 0.5mm solid material
RD4 SanwamasLWS 0.5mm solid material
Screen frame; comprising aluminium plate with batik pattern, steel hollow frame in
Cover Kolom ACP
CERMIN
Cermin Uk. 600x1900mm tebal 5mm bevel termasuk plywood
Cermin Uk. 600x1000mm tebal 5mm bevel termasuk plywood
Cermin Uk. 600x1400mm tebal 5mm bevel termasuk plywood
Cermin Uk. 600x1800mm tebal 5mm bevel termasuk plywood
Cermin uk. 1800x1200mm
Cermin uk. 1890x1200mm
Cermin uk. 1600x1200mm
Cermin uk. 3650x1200mm
Cermin uk. 1650x1200mm
Cermin uk. 2600x1200mm
Cermin Tebal 6 mm termasuk bevel + bingkai
PAWLING
Handrell BR-1200 Ex. USA
Wall Guard -WG 6C
Corner Guard CG 20
RAILING BESI
Railing besi BSP Ø 38 H=900, jeruji Ø 25 jarak 140 fin cat
Handrail besi BSP Ø 38 x2 dan bracket
Corner guard L50.50.5
Railing balkon Hollow galvanis 50x50
Railling Besi Luar Hollow galvanis 30x60
Panel plat stainless steel t=1.2mm, backing triplex 5mm incl
CUBICAL
Cubikel rata-rata
3D PANEL
Dinding 3Dpanel
WPC - Flooring
Floor Decking WPC
Upah Pasang Floor Decking
WPC - Skirting
Skirting panel WPC
Material Bantu
Upah Pasang Skirting WPC
Cladding WPC
Cladding WPC
Material Bantu
Rangka Hollow Galvanized 20x40
Upah Pasang Clading
CONWOOD
Pergola Sky Lounge alt. 1 t= 1.4 cm x15 cm Deck 6"
Pergola Sky Lounge alt.2 t= 2.5 cm x 15 cm Deck 6 "
Dekoratif tiang Baja Sky Lounge uk. 20x1.4 cm Deck 8"
Ornamen D inding lift -1 uk. 5x1.6 cm Plank 2", jarak 5 cm
Ornamen dinding lift - 2 uk. 5x1.6 cm Plank 2", jarak 5 cm
Lantai Decking Conwood
Bangku Finish Conwood
SANDWICH PANEL
Dinding EPS 50mm
Ceilling EPS 75mm
Aluminium extrusion
Jasa Pasang EPS
Prelim subkon EPS
D1 Automatic sliding door 1400x2100
D2 Manual Single Swing 900x2100
ANALISA HARGA SA
No. Item
ANALISA
Batu Kali
Bahan : Batu Kali
Semen
Pasir beton
Angkutan/Langsir material batu kali
Upah pas. Batu kali
Pengecoran Beton K250 Pada Pit Lift, Pile Cap, Tie beam
Beton K250 kg/m2 NFA
Material bantu pek. Cor ( relat, stopcor, dekking, dll)
Tip Sopir Mixer
Upah Pengcoran Plat, Balok, Pile Cap
Upah Curring
Alat bantu (bucket, vibrator,talang, dll) (Masuk Prelim)
Alat - Concrate Pump
Pengecoran Beton K300 Pada Pit Lift, Pile Cap, Tie beam
Beton K300 kg/m2 NFA
Material bantu pek. Cor ( relat, stopcor, dekking, dll)
Tip Sopir Mixer
Upah Pengcoran Plat, Balok, Pile Cap
Upah Curring
Alat bantu (bucket, vibrator,talang, dll) (Masuk Prelim)
Alat - Concrate Pump
Bekisting Kolom
Bahan : Plywood 15 mm
Concrete form work
Support
Paku
Plastic Concrete spacer
Mould oil
Tie rod
Kayu kaso 5/7
Material Perapihan Beton
Upah Bekesting Kolom
Upah Perapihan Beton
Wiremesh Rata-rata
Bahan : Wiremesh rata-rata
Wastage& overLaps Wiremesh
Kawat beton
Ongkos Kirim wiremesh
Cakar ayam & dowel
Upah turun wire mesh
Upah gelar wiremesh
PEKERJAAN BAJA
WF 250 X 125 X 6 X 9
WF 250 X 125 X 6 X 9
Hot dip Galvanized
Fabrikasi & Material Pembantu
Shopdrawing
Ongkos Kirim
Erection
Cat zinchromate
WF 150X 75 X 5 X 7
WF 150X 75 X 5 X 7
Hot dip Galvanized
Fabrikasi & Material Pembantu Jakarta
Shopdrawing
Transport
Erection
Cat zinchromate
7 CNP 150x50x20x3.2
CNP 150x50x20x3.2
Hot dip Galvanized
Fabrikasi & Material Pembantu
Shopdrawing
Ongkos Kirim
Erection
Cat zinchromate
1 Cat zinchromate
Cat zinchromate termasuk upah
3 HTB ø 16 mm
HTB ø 16 mm
Upah Pasang
Ongkos Kirim
4 HTB ø 12 mm
HTB ø 12 mm
Upah Pasang
Ongkos Kirim
INSULATION
Glasswoll
Alumunium Foil
Roofmesh 2214 uk 1.8mx30m
Upah gelar GLASSWOOL
TALANG
Plat zinkalume l=60 t=0.4 mm
Plat strip 3 cm
Upah Tekuk
Alat bantu
Upah pasang
Lisplang
Plat zinkalume l=30 t=0.4 mm
Alat bantu
Upah pasang
ARSITEKTUR
Waterproofing membrane
Waterproofing membrane Profex Torchseal 3 PV ex. Fosroc
Screed 5 cm + wiremesh M4
Semen
Pasir
Wiremesh M4
Angkut Semen + Pasir
Upah Screed
Groove line / tali air 50 mm
Alat Bantu
Material Bantu
Upah Tali Air
Screed t=5 cm
Semen
Pasir
Angkutan
Upah screed + leveling
Pagar Wiremesh
Wiremesh M8
Siku 50x50x5
Ongkos kirim
Material bantu
Cat Zincromate
Cat Duco
Pintu masuk uk. 1.6x2.4
Upah pemasangan (pabrikasi + pasang)
SEBELUM DISC
m3 570,000 570,000
m3 750,000 750,000
m3 760,000 760,000
m3 770,000 770,000
m3 810,000 810,000
m3 830,000 830,000
m3 690,000 731,400 -
m3 665,000 694,300 10,000
m3 660,000 689,000 10,000
m3 780,000 816,200 10,000
m3 745,000 779,100 10,000
m3 760,000 805,600 -
m3 815,000 863,900 -
m3 770,000 805,600 10,000
m3 765,000 800,300 10,000
m3 835,000 874,500 10,000
m3 800,000 837,400 10,000
m3 795,000 832,100 10,000
-
kg 600 600 800 0%
kontainer 10,000,000 13,500,000 0%
kontainer 14,700,000 19,845,000 0%
m2 21,315 28,800 0%
unit 10,000 13,500 0%
unit 238,095.24 321,400 0%
m3 10,403,000 396,441 535,200 0%
kg 10,800,000 514 690 0%
sak - - 0%
bisa sni -
kg 9,000 9,000 0%
m2 6,500 8,800 0%
kg 7,600 7,800 0%
Kg 8,100 8,100 0%
kg 14,600 19,700 0%
m1 5,000 6,800 0%
btg 34,100 34,100 40,900 0%
m3 250,000 337,500 0%
m3 95,000 128,300 0%
m3 185,000 244,800 0%
m3 95,000 123,300 0%
m3 420,000 567,000 0%
m3 195,000 263,300 0%
m3 400,000 540,000 0%
m3 250,000 337,500 0%
m3 190,000 256,500 0%
bh 650 1,000 0%
bh 1,700 1,900 0%
bh 7,550 10,200 0%
bh 250,000 337,500 0%
zak 64,000 86,400 0%
zak 69,000 93,200 0%
Roll 125,000 168,800 0%
bh 16,500 22,300 0%
bh 150,000 202,500 0%
m2 - - 0%
bh 30,000 40,500 0%
m2 20,000 27,000 0%
bh 13,000 17,600 0%
m3 500,000 595,000 0%
m3 530,000 636,000 0%
m3 560,000 672,000 0%
m3 500,000 600,000 0%
m3 550,000 660,000 0%
m3 LOCO 455,000 546,000 0%
1.100.00
1
kg 7,576 10,200 0.0%
kg 10,899 14,700 0.0%
kg 5,000 6,800 0.0%
kg 11,682 12,266 0%
kg 11,682 12,266 0%
kg 12,850 13,493 0%
kg 11,475 12,049 0%
kg 11,475 12,049 0%
kg 11,282 11,846 0%
btg 1,162,713 1,220,848 0%
btg 1,576,929 1,655,776 0%
btg 2,012,946 2,113,594 0%
kg 8,935 9,381 0%
kg 8,935 9,381 0%
kg 11,800 11,800 12,390 0%
kg 6,955 7,302 0%
kg 6,955 7,302 0%
kg 8,636 9,068 0%
kg 9,420 9,891 0%
kg 9,420 9,891 0%
kg 9,364 9,832 0%
kg 9,364 9,832 0%
kg 9,364 9,832 0%
kg 9,364 9,832 0%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 11,536 0.0%
kg 12,085 12,689 0.0%
kg 12,085 12,689 0.0%
kg 12,085 12,689 0.0%
kg 12,085 12,689 0.0%
btg 350,000 367,500 0%
kg 10,986 11,536 0%
bh 1,000,000 1,050,000 0%
bh 15,000 15,750 0%
bh 12,500 13,125 0%
bh 11,000 11,550 0%
bh 9,900 10,395 0%
bh 8,500 8,925 0%
bh 6,500 6,825 0%
bh 4,500 4,725 0%
bh 4,500 4,725 0%
kg 181,192 190,252 0%
kg 295,763 310,551 0%
bh 22,500 23,625 0%
bh 27,500 28,875 0%
bh 35,500 37,275 0%
bh 45,500 47,775 0%
bh 65,500 68,775 0%
bh 76,700 80,535 0%
bh 114,000 119,700 0%
bh 105,000 110,250 0%
bh 45,500 47,775 0%
bh 32,500 34,125 0%
bh 45,000 47,250 0%
lbr 8,500 8,925 0%
btg 250,000 262,500 0%
bh 53,000 60,400 5%
bh 37,000 42,200 5%
m2 91,000 103,700 5%
bh 70,000 79,800 5%
bh 580,000 696,000 0%
m2 - 0%
bh 12,000 13,700 5%
bh 10,000 12,000 0%
m2
m1 62,500 75,000 0%
m1 220,000 264,000 0%
m1 62,500 75,000 0%
m1 188,000 225,600 0%
bh 1,172,424 1,266,200 10%
bh 3,858,184 3,703,900 20%
bh 347,820 333,000 25%
bh 138,710 144,800 25%
m2 85,000 85,000 0%
m2 85,000 85,000 0%
m2 185,000 129,500 30%
m' 21,645 26,000 0%
m' 69,091 82,900 0%
m2 415,800 499,000
kg 206,800 248,200
Index 0%
m2 3,750,000 3,750,000 3,825,000 15%
m2 2,535,000 2,535,000 2,737,800 10%
m2 4,950,000 4,950,000 5,049,000 15%
m2 225,000 270,000 0%
m2 252,000 302,400 0%
m2 430,435 516,500 0%
MATERIAL
BH 3,250,000 2,600,000 20%
BH 5,128,000 4,102,400 20%
BH 4,170,000 3,336,000 20%
BH 628,000 502,400 20%
BH 3,000,000 2,400,000 20%
BH 3,250,000 2,730,000 30%
BH 4,150,000 3,320,000 20%
BH 1,400,000 1,120,000 20%
BH 2,486,000 1,988,800 20%
BH 824,000 659,200 20%
BH 1,048,000 838,400 20%
BH 1,453,000 1,162,400 20%
BH 4,807,000 3,845,600 20%
BH 4,267,000 3,413,600 20%
BH 1,826,000 1,533,800 30%
BH 373,000 313,300 30%
BH 3,171,000 2,663,600 30%
BH 2,400,000 2,016,000 30%
BH 457,000 319,900 30%
BH 197,000 137,900 30%
BH 68,000 47,600 30%
BH 1,960,000 1,372,000 30%
BH 355,000 248,500 30%
BH 507,000 354,900 30%
BH 625,000 437,500 30%
BH 5,500,000 3,850,000 30%
BH 2,930,000 2,051,000 30%
BH 6,920,000 4,844,000 30%
BH 5,250,000 3,675,000 30%
BH 1,630,000 1,141,000 30%
BH 531,000 371,700 30%
BH 1,180,000 826,000 30%
BH 1,500,000 1,050,000 30%
BH 3,260,000 2,282,000 30%
BH 194,000 135,800 30%
BH 283,000 198,100 30%
BH 911,000 637,700 30%
BH 1,770,000 1,239,000 30%
BH 10,800,000 7,560,000 30%
BH 1,420,000 994,000 30%
BH 477,000 333,900 30%
BH 6,650,000 4,655,000 30%
BH 2,340,000 1,638,000 30%
BH 1,500,000 1,050,000 30%
BH 2,570,000 1,799,000 30%
BH 286,000 200,200 30%
BH 55,000 55,000 0%
BH 724,000 506,800 30%
BH 700,000 490,000 30%
BH 1,070,000 749,000 30%
BH 21,170,000 14,819,000 30%
BH 3,880,000 2,716,000 30%
BH 74,100,000 51,870,000 30%
BH 5,850,000 4,095,000 30%
BH 5,870,000 4,109,000 30%
BH 500,000 500,000 0%
BH 1,775,000 1,491,000 30%
BH 472,000 330,400 30%
BH 1,420,000 994,000 30%
BH 774,000 541,800 30%
BH 724,000 506,800 30%
BH 6,300,000 4,410,000 30%
BH 7,400,000 5,180,000 30%
BH 507,000 354,900 30%
BH 180,000 126,000 30%
BH 380,000 266,000 30%
BH 1,300,000 910,000 30%
Bh 350,000 315,000 10%
Bh 1,540,000 1,078,000 30%
BH 4,743,000 4,743,000 0%
BH 3,090,600 3,090,600 0%
BH - - 0%
BH 54,000,000 54,000,000 0%
BH - 0%
BH - 0%
BH - 0%
BH - 0%
BH - 0%
BH - 0%
bh 10,000 12,500 0%
bh 10,000 12,500 0%
bh 5,000 6,300 0%
bh 2,000 2,500 0%
bh 10,000 12,500 0%
bh 5,000 6,300 0%
bh 135,000 168,800 0%
bh 2,000 2,500 0%
135%
bh 20,000 27,000 0%
bh 25,000 33,800 0%
bh 20,000 27,000 0%
bh 15,000 20,300 0%
bh 15,000 20,300 0%
bh 25,000 33,800 0%
bh 25,000 33,800 0%
bh 25,000 33,800 0%
bh 7,500 10,100 0%
R HARGA UPAH
RAB
SAT. HARGA HARGA Disc
SEBELUM DISC
m3 55,000 68,800 0%
m3 95,000 118,800 0%
m3 35,000 43,800 0%
m3 136,000 165,000 0%
m3 25,000 31,300 0%
m2 10,000 12,500 0%
m3 35,000 43,800 0%
m3 35,000 43,800 0%
ttk 200,000 250,000 0%
ttk 88,000 110,000 0%
ttk 50,000 62,500 0%
ttk 50,000 62,500 0%
ttk 65,000 81,300 0%
ttk 75,000 93,800 0%
ttk 65,000 81,300 0%
ttk 30,000 37,500 0%
ttk 50,000 62,500 0%
ttk 30,000 37,500 0%
ttk 65,000 81,300 0%
ttk 45,000 56,300 0%
ttk 30,000 37,500 0%
ttk 45,000 56,300 0%
ttk 35,000 43,800 0%
ttk 55,000 68,800 0%
ttk 25,000 31,300 0%
ttk 40,000 50,000 0%
ttk 15,000 18,800 0%
ttk 35,000 43,800 0%
m3 50,000 62,500 0%
m3 45,000 45,000 20%
m3 56,250 56,300 20%
m3 200,000 250,000 0%
m3 85,000 106,300 0%
m3 10,000 12,500 0%
m3 1,500 2,400 0%
m3 - 0%
m3 - - 0%
m3 - - 0%
m3 - - 0%
m3 - - 0%
m3 2,000 2,500 0%
m3 37,000 50,300 0%
m3 50,000 68,500 0%
m3 75,000 93,800 0%
m3 125,000 156,300 0%
m3 150,000 187,500 0%
m2 8,500 10,600 0%
kg 150 200 0%
kg 850 1,100 0%
kg - - 0%
ttk 1,500 1,900 0%
ttk 2,000 2,500 0%
m2 5,500 6,900 0%
m2 5,500 6,900 0%
m2 2,500 3,100 0%
-
m2 2,000 2,500 0%
m2 20,000 25,000 0%
m2 25,000 31,300 0%
m2 45,000 56,300 0%
m2 20,000 25,000 0%
m2 45,000 56,300 0%
m2 45,000 56,300 0%
m2 35,000 43,800 0%
m2 150,000 187,500 0%
m2 45,000 56,300 0%
m2 40,000 50,000 0%
m2 55,000 68,800 0%
m2 55,000 68,800 0%
m' 25,000 31,300 0%
m2 25,000 31,300 0%
m2 17,000 23,000 0%
m2 7,500 10,100 0%
m2 3,000 4,100 0%
m' 5,000 6,800 0%
ttk 5,000 6,800 0%
m2 20,000 27,000 0%
m2 1,550 2,100 0%
m2 5,000 6,800 0%
m2 2,000 2,700 0%
m2 3,500 4,700 0%
m2 1,000 1,400 0%
ttk 2,500 3,400 0%
m3 45,000 60,800 0%
m3 25,000 33,800 0%
m2 19,000 25,700 0%
m2 4,750,000 6,412,500 0%
RAB
SAT. HARGA HARGA Disc
m3 35,000 47,300 0%
m3 95,000 128,300 0%
m3 25,000 33,800 0%
m3 17,500 23,600 0%
m3 10,000 13,500 0%
m2 6,000 8,100 0%
m3 136,000 183,600 0%
m3 370,000 499,500 0%
Ls 6 bln 777,400,000 1,049,490,000 0%
Ls 6 bln 777,400,000 1,049,490,000 0%
Ls 6 bln 777,400,000 1,049,490,000 0%
Ls 6 bln 1,357,200,000 1,832,220,000 0%
Ls 6 bln 395,700,000 534,195,000 0%
m2 145,000 195,800 0%
m2 145,000 195,800 0%
m2 145,000 195,800 0%
m2 145,000 195,800 0%
m2 145,000 195,800 0%
1
6,920.00 11,803
ls 60,000,000 81,675,000 0%
m1 265,000 393,580 0%
m1 152,000 225,720 0%
m1 115,000 170,830 0%
m1 115,000 170,830 0%
m1 12,000 17,820 0%
m1 10,000 14,850 0%
m1 5,000 7,480 0%
m1 5,000 7,480 0%
m1 65,000 96,580 0%
m1 45,000 66,880 0%
m1 40,000 52,030 0%
m1 40,000 52,030 0%
ttk 100,000 163,350 0%
ttk 75,000 96,580 0%
ttk 100,000 148,500 0%
ttk - 0%
ttk 590,000 876,150 0%
ttk 275,000 408,430 0%
ttk 225,000 334,180 0%
ttk 225,000 334,180 0%
ls 15,000,000 22,275,000 0%
ttk - 0%
ttk - 0%
ttk - 0%
ls 25,000,000 32,737,500 3%
ls 23,000,000 31,050,000 0%
ls 8,000,000 10,800,000 0%
ls 10,000,000 13,095,000 3%
ls 53,000,000 71,550,000 0%
ls 20,000,000 27,000,000 0%
m3 120,000 157,100 3%
m' 657,895 896,500 3%
kg 1,500 2,000 3%
m3 90,000 192,100 3%
ttk 8,000,000 10,800,000 0%
Ls 80,000,000 108,000,000 0%
Ls 60,000,000 81,000,000 0%
m1 657,800 888,000 0%
m1 200,000 270,000 0%
m1 100,000,000 135,000,000 0%
ttk - 0%
ttk - 0%
m1 - 0%
m1 - 0%
ls - 0%
m1 98,300 132,700 0%
m2 700,000 805,000 0%
m by other - 0%
ls 22,000,000 29,700,000 0%
ls exluded - 0%
ls 10,000,000 13,500,000 0%
ls by Mitra - 0%
ls 3,000,000 4,050,000 0%
ls 3,000,000 4,050,000 0%
ls 2,000,000 2,700,000 0%
m' 165,000,000 222,785,000 0%
m' 13,500,000 18,225,000 0%
Total pekerjaan 882 m1 265,310,000
harga per 1 m1 300,805
ls 2,800,000 3,780,000 0%
ls 300,000 405,000 0%
ls 768,000 1,036,800 0%
ls 3,000,000 4,050,000 0%
ls 1,400,000 1,890,000 0%
ls 250,000 337,500 0%
ls 768,000 1,036,800 0%
ls 3,000,000 4,050,000 0%
ls by Mitra - 0%
ls 6,000,000 8,100,000 0%
ls 5,000,000 6,750,000 0%
ls 2,000,000 2,700,000 0%
m2 1,377,180 1,859,200 0%
m2 1,440,000 1,944,000 0%
m2 840,000
m2 17,750 24,000 0%
m2 25,000 33,800 0%
m2 35,000 47,300 0%
m2 30,000 40,500 0%
m2 127,500 163,500 5%
m2 75,000 96,200 5%
m2 225,000 288,600 5%
m2 85,000 109,000 5%
m2 72,500 93,000 5%
m2 62,500 80,200 5%
m2 37,500 48,100 5%
m3 850,000 1,090,100 5%
m2 Upah 22,500 28,900 5%
m2 Upah 25,000 32,100 5%
m3 110,000 132,000 0%
m2 55,000 66,000 0%
m2 45,000 54,000 0%
m2 175,000 210,000 0%
m2 35,000 42,000 0%
m2 35,000 37,000 0%
m2 100,000 120,000 0%
m1 90,000 108,000 0%
m1 230,000 276,000 0%
m2 - - 0%
- -
8 54
ttk - - 0%
ttk - - 0%
INDEXT 1.000.00
m1 1,200,000 1,224,000 15%
m1 1,200,000 1,224,000 15%
m1 3,500,000 3,570,000 15%
m1 190,000 193,800 15%
m2 1,000,000 1,020,000 15%
m1 320,000 326,400 15%
m1 350,000 357,000 15%
m1 1,620,000 1,652,400 15%
unit - - 0%
m1 95,000 114,000 0%
m1 1,500,000 1,800,000 0%
m1 1,350,000 1,620,000 0%
m1 285,000 342,000 0%
unit 2,290,000 2,748,000 0%
unit 1,550,000 1,860,000 0%
unit 4,470,000 5,364,000 0%
Unit 83,500,000 100,200,000 0%
m1 535,000 642,000 0%
unit 1.800.00 963,000 924,500 20%
unit 3.910.00 2,091,850 2,008,200 20%
unit 4.500.00 2,407,500 2,311,200 20%
unit 5.030.00 2,691,050 2,583,400 20%
unit 6.490.00 3,472,150 3,333,300 20%
unit 7.850.00 4,199,750 4,031,800 20%
m2 1,250,000 1,650,000 0%
M2 1,500,000 1,800,000 0%
M2 1,750,000 2,100,000 0%
m1 114,750 137,700 0%
m2 350,000 420,000 0%
m2 116,000 150,800 0%
m2 140,000 182,000 0%
m' 18,000 23,400 0%
m2 198,000 257,400 0%
Index 30%
m2 120,000 144,000 0%
m2 102,000 122,400 0%
m2 135,000 176,850 0%
m2 135,000 162,000 0%
m2 125,000 150,000 0%
m2 168,000 220,000 0%
m' 40,000 48,000 0%
m' 50,000 60,000 0%
m' 60,000 72,000 0%
m' 130,000 156,000 0%
m1 - - 0%
m' 102,000 122,400 0%
m' 135,000 162,000 0%
m' 45,000 54,000 0%
m' 65,000 78,000 0%
m' 102,000 122,400 0%
m2 118,000 141,600 0%
m' 19,000 22,800 0%
m' 95,000 114,000 0%
m' 95,000 114,000 0%
m' 95,000 114,000 0%
m' 115,000 138,000 0%
m' 85,000 102,000 0%
m1 514,102 616,900 0%
unit 50,000 60,000 0%
m2 155,000 186,000 0%
m2 192,000 230,400 0%
m2 96,000 115,200
m2 250,000 300,000 0%
m2 310,000 372,000 0%
m2 155,000 186,000 0%
m2 800,000 960,000 0%
m2 700,000 917,000 0%
m2 1,300,000 1,560,000 0%
m' 110,000 132,000 0%
m' 170,000 204,000 0%
index 0%
m2 38,850 38,850 38,560 15%
m2 30,450 30,450 29,210 15%
m2 38,850 38,850 38,560 15%
m2 30,450 30,450 29,210 15%
bh 25,000 25,000 31,350 5%
m2 32,000 32,000 40,150 5%
m2 150,000 150,000 188,100 5%
m2 195,000 195,000 231,660 10%
m' 17,500 17,500 23,100 0%
m' 22,500 22,500 26,730 10%
m2 55,000 55,000 65,340 10%
m2 75,000 75,000 89,100 10%
m2 15,000 19,800 0%
m2 15,000 19,800 0%
m2 25,000 33,000 0%
m2 25,000 33,000 0%
m2 129,000 161,810 5%
m2 139,000 174,350 5%
m2 152,000 190,630 5%
m2 26,000 32,560 5%
m2 - - 0%
m2 157,000 188,400 0%
m2 33,000 43,560 0%
m2 36,000 47,520 0%
m2 28,200 37,180 0%
m2 36,000 47,520 0%
m2 28,200 37,180 0%
m2 33,500 44,220 0%
m2 200,000 264,000 0%
m2 342,500 411,000 0%
m2 135,000 162,000 0%
119.00
m2 2,792,890 3,351,500 0%
m2 55,000 66,000 0%
m2 2,848,000 3,418,000 0%
m2 1,900,000 2,166,000 5%
m2 600,000 684,000 5%
m2 600,000 684,000 5%
m2 1,650,000 1,881,000 5%
m2 1,150,000 1,380,000 0%
m2 - - 0%
bh 37,996,600 45,975,900 0%
bh 3,541,231 4,284,900 0%
bh 4,965,350 6,008,100 0%
bh 1,409,867 1,705,900 0%
bh 1,367,928 1,655,200 0%
bh 3,514,796 4,252,900 0%
bh 1,073,307 1,298,700 0%
m2 711,428 939,100 0%
unit 665,000 877,800 0%
2,538
m2 825,616 1,089,800 0%
m' 350,000 462,000 0%
m' 231,000
m2 2,156,000
bh 5,066,500 6,130,500 0%
bh 5,001,500 6,051,800 0%
bh 5,101,500 6,172,800 0%
bh 4,190,900 5,071,000 0%
bh 3,597,000 4,352,400 0%
bh 4,190,900 5,071,000 0%
bh 9,605,000 11,622,100 0%
bh 5,611,670 6,790,100 0%
bh 12,114,250 14,658,200 0%
bh 16,439,000 19,891,200 0%
bh 10,434,500 12,625,700 0%
bh 9,434,500 11,415,700 0%
bh 10,434,500 12,625,700 0%
bh 9,513,740 11,511,600 0%
bh 10,513,740 12,721,600 0%
bh 9,576,000 11,587,000 0%
bh 9,576,000 11,587,000 0%
bh 38,279,168 46,317,800 0%
bh 8,024,527 9,709,700 0%
bh 5,986,309 7,243,400 0%
bh 7,961,673 9,633,600 0%
m1 - - 10%
m2 1,742,250 1,742,250 1,881,600 10%
m2 - - 10%
bh 1,293,000 1,551,600 0%
bh 717,000 860,400 0%
bh 1,006,000 1,207,200 0%
bh 1,229,000 1,474,800 0%
bh 2,279,000 2,734,800 0%
bh 2,379,000 2,854,800 0%
bh 2,040,000 2,448,000 0%
bh 4,490,000 5,388,000 0%
bh 2,100,000 2,520,000 0%
bh 3,235,000 3,882,000 0%
bh 1,320,000 1,504,800 5%
bh 650,000 780,000 0%
bh 400,000 480,000 0%
bh 578,000 693,600 0%
m2 2,824,000 3,388,800 0%
m2 2,824,000 3,388,800 0%
m2 2,060,000 2,472,000 0%
m2 2,788,000 3,345,600 0%
1.100.00
m' 952,000 1,047,200 1,382,300
m' 693,000 762,300 1,006,200
m' 651,000 716,100 945,300
bh 39,600,000 47,520,000 0%
m' 1,350,000 1,377,000 15%
m2 7,500,000 7,650,000 15%
bh 6,147,188 7,376,600 0%
0%
0%
m2 2,151,043 2,581,300 0%
m2 715,000 858,000 -
m2 1,050,000 1,260,000 -
m2 625,000 750,000 -
m2 660,000 792,000 -
m2 550,000 660,000 -
m2 650,000 780,000 -
m2 650,000 780,000 -
m2 430,000 516,000
m2 450,000 540,000
m2 165,000 198,000
m2 268 104,918 125,900
ls 268 410,448 492,500
bh 170,000,000 204,000,000
bh 22,000,000 26,400,000
- - - - - - - - -
harga per 1 m1 449,000
Jasa 10% 44,900
Harga + Jasa 493,900
Harga Dibulatkan 493,900
Tie beam
1.05 m3 943,400 990,570
1.00 m3 4,953 4,953
1.00 m3 Included -
1.00 m3 58,300 58,300
1.00 m3 2,500 2,500
1.00 m3 - -
1.00 m3 67,500 67,500
- - - - - - - - - - - - - - - - - -
Harga 1 m3 1,123,823
Jasa 10% 112,382
Harga + Jasa 1,236,205
Harga Dibulatkan 1,236,210
Tie beam
1.05 m3 996,400 1,046,220
1.00 m3 5,231 5,231
1.00 m3 Included -
1.00 m3 58,300 58,300
1.00 m3 2,500 2,500
1.00 m3 - -
1.00 m3 67,500 67,500
- - - - - - - - - - - - - - - - - -
Harga 1 m3 1,179,751
Jasa 10% 117,975
Harga + Jasa 1,297,726
Harga Dibulatkan 1,297,730
(Vertikal)
1.05 m3 943,400 990,570
1.00 m3 9,906 9,906
1.00 m3 Included -
1.00 m3 83,500 83,500
1.00 m3 2,500 2,500
1.00 m3 - -
1.00 m3 67,500 67,500
- - - - - - - - - - - - - - - - - -
Harga 1 m3 1,153,976
Jasa 10% 115,398
Harga + Jasa 1,269,373
Harga Dibulatkan 1,269,380
(Vertikal)
1.05 m3 996,400 1,046,220
1.00 m3 10,462 10,462
1.00 m3 Included -
1.00 m3 83,500 83,500
1.00 m3 2,500 2,500
1.00 m3 - -
1.00 m3 67,500 67,500
- - - - - - - - - - - - - - - - - -
Harga 1 m3 1,210,182
Jasa 10% 121,018
Harga + Jasa 1,331,200
Harga Dibulatkan 1,331,210
Tie Beam
17.16 bh 1,900 32,598
0.21 sak 86,400 18,144
0.03 m3 123,300 3,699
1.00 m2 2,500 2,500
1.00 m2 51,300 51,300
1.00 m2 2,500 2,500
- - - - - - - - - - - - - - - - - -
Harga per 1 m2 110,741
Jasa 10% 11,074
Harga + Jasa 121,815
Harga Dibulatkan 121,820
2.5
0.13 lbr 364,500 48,979
1.00 m2 25,700 25,700
1.00 m2 23,000 23,000
0.25 kg 25,100 6,275
2.00 m2 2,700 5,400
0.03 ltr 35,800 895
1.00 bh 8,800 8,800
0.0084 m3 2,350,900 19,748
0.50 m2 1,554 777
1.00 m2 81,300 81,300
- m2 26,300 -
- - - - - - - - - - - - - - - - - -
Harga per 1 m2 220,873
Jasa 10% 22,087
Harga + Jasa 242,961
Harga Dibulatkan 242,970
1.5
0.22 lbr 283,500 63,491
1.00 m2 23,000 23,000
0.008 m3 2,197,500 17,580
0.008 m3 2,350,900 18,807
1.00 m2 2,700 2,700
0.02 ltr 35,800 788
0.25 kg 22,100 5,525
0.50 m2 1,554 777
1.00 m2 75,000 75,000
- m2 26,300 -
- - - - - - - - - - - - - - - - - -
Harga per 1 m2 207,668
Jasa 10% 20,767
Harga + Jasa 228,435
Harga Dibulatkan 228,440
3.0
0.11 lbr 283,500 31,745
1.00 m2 23,000 23,000
0.0090 m3 2,197,500 19,778
0.0100 m3 2,350,900 23,509
1.00 m2 2,700 2,700
0.02 ltr 35,800 788
0.25 kg 22,100 5,525
0.50 m2 1,554 777
1.00 m2 98,800 98,800
0.50 m2 26,300 13,150
- - - - - - - - - - - - - - - - - -
Harga per 1 m2 219,772
Jasa 10% 21,977
Harga + Jasa 241,749
Harga Dibulatkan 241,750
- - - - - - - - - - - - - - - - - -
Harga per Kg 1,050
Jasa 10% 105
Harga + Jasa 1,155
Harga Dibulatkan 1,160
ex. Granito
1.07 m2 172,800 184,032
0.314 sak 40,500 12,729
- sak 26,400 -
0.314 kg 7,600 2,389
0.44 sak 93,200 41,008
0.06 m3 123,300 6,782
1.07 m2 28,800 30,672
8.17 kg 690 5,638
1.00 m2 3,100 3,100
1.00 m2 1,300 1,300
1.00 m2 60,000 60,000
- - - - - - - - - - -
harga per 1 m2 347,649
Jasa 10% 34,765
Harga + Jasa 382,414
Harga Dibulatkan 382,500
- - - - - - - - - - -
harga per 1 m2 44,310
Jasa 10% 4,431
Harga + Jasa 48,741
Harga Dibulatkan 48,750
- - - - - - - - - - -
harga per m2 127,990
Jasa 10 % 12,799
Total harga 140,788
Harga satuan 140,800
- - - - - - - - - - -
harga per m2 120,000
Jasa 10 % 12,000
Total harga 132,000
Harga satuan 132,000
0.15 m2 Included -
0.25 m1 114,000 28,166
1.00 m1 42,000 42,000
1.00 m1 42,000 42,000
0.15 m2 72,000 10,800
1.00 m1 36,000 36,000
- - - - - - - - - - -
harga per m1 158,966
Jasa 10 % 15,897
Total harga 174,862
Harga satuan 174,900
- - - - - - - - - - -
harga per m2 30,789
Jasa 10 % 3,079
Total harga 33,868
Harga satuan 33,900
0.60 1.400
0.15 m3 943,400 141,510
15.00 kg 12,480 187,200
0.90 m2 228,440 205,596
1.50 m' 125,000 187,500
1.50 m2 253,900 380,850
- - - - - - - - - - -
harga per m2 1,102,656
Jasa 10 % 110,266
Total harga 1,212,922
Harga satuan 1,213,000
0.60 1.200
0.07 m3 943,400 67,925
7.20 kg 12,480 89,856
0.58 m2 228,440 131,581
1.20 m' 125,000 150,000
0.72 m2 253,900 182,808
- - - - - - - - - - -
harga per m2 622,170
Jasa 10 % 62,217
Total harga 684,387
Harga satuan 684,400
- - - - - - - - - - -
harga per m2 14,225,182
Jasa 10 % 1,422,518
Total harga 15,647,700
Harga satuan 15,647,800
01-MODENA
1.00 Unit 3,960,000 3,960,000
0.03 Unit 3,960,000 99,000
1.00 Unit 13,500 13,500
1.00 Unit 6,300 6,300
1.00 Unit 33,800 33,800
1.00 Unit 218,800 218,800
- - - - - - - - - - -
Harga per m2 4,331,400
Jasa 10% 433,140
Harga + Jasa 4,764,540
Harga Dibulatkan 4,764,600
0-MODENA
1.00 Unit 1,452,000 1,452,000
0.03 Unit 1,452,000 36,300
1.00 Unit 13,500 13,500
1.00 Unit 6,300 6,300
1.00 Unit 33,800 33,800
1.00 Unit 218,800 218,800
- - - - - - - - - - -
Harga per m2 1,760,700
Jasa 10% 176,070
Harga + Jasa 1,936,770
Harga Dibulatkan 1,936,800
Indeks Harga Struktur 1.35
Indeks Harga Beton 1.06
Indeks Harga Besi 1.03
Indeks Harga Baja 1.05
Indeks Harga Arsitektur 1.20
570,000 PC Rate
750,000 PC Rate
760,000 PC Rate
770,000 PC Rate
810,000 PC Rate
830,000 PC Rate
690,000 SIB
655,000 ADHIMIX
650,000 ADHIMIX
770,000 ADHIMIX
735,000 ADHIMIX
760,000 SIB
815,000 SIB
760,000 ADHIMIX
755,000 ADHIMIX
825,000 ADHIMIX
790,000 ADHIMIX
785,000 ADHIMIX
45,000
130,000 Pontianak
210,000
270,000
1,850,000
1,800,000 Pontianak
1,963,636 Pontianak
7,500
16,364
2,000
26,500
6,500
18,000
98,000
4,000
600
10,000,000
14,700,000
21,315
10,000 0
238,095 0
396,441
514
-
9,000
6,500
7,600
8,100
14,600
5,000
34,100
16,675 Hilti
34,500 Hilti
46,472 Sumber Makmur
75,000 Adeha
95,000 Adeha
8,000 Adeha
15,000 Adeha
25,000 Adeha
15,000
664,000 Google
1,800,000 Google
Gracia
7,576 Gracia
10,899 Gracia
5,000 Gracia
11,682 0
11,682 GRACIA ABADI
12,850 Gracia
11,475 Gracia
11,475 Gracia
11,282 PT. Inti Sumber Bajasakti
1,162,713
1,576,929
2,012,946
8,935
8,935
11,800 Gracia
6,955 PT. Inti Sumber Bajasakti
6,955 PT. Inti Sumber Bajasakti
8,636 Gracia
514428% 514428% 9,420 Gracia
9,420 Gracia
9,364 Gracia
9,364 Gracia
9,364 Gracia
9,364 Gracia
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,986PT. Inti Sumber Bajasakti
12,085 PT. Inti Sumber Bajasakti
12,085PT. Inti Sumber Bajasakti
12,085PT. Inti Sumber Bajasakti
12,085PT. Inti Sumber Bajasakti
350,000 Google
10,986
1,000,000
15,000
12,500
11,000
9,900
8,500
6,500
4,500
4,500
181,192
295,763
22,500
27,500
35,500
45,500
65,500
76,700
114,000
105,000
45,500
32,500
45,000
8,500
250,000
65,000
50,350 Asiacon
35,150 Asiacon
86,450 Asiacon
66,500
580,000
-
11,400 Asiacon
10,000 Omah Bata
Interlock
62,500
220,000
62,500
188,000
1,055,182
3,086,547
260,865
104,033
272,000 Dusaspun
358,000 Dusaspun
69,000 Dusaspun
105,000 Dusaspun
93,000 Dusaspun
135,000 Dusaspun
789,000 Dusaspun
1,381,000 Dusaspun
996,000 Dusaspun
2,371,000 Dusaspun
252,900 harga panca
387,150 harga panca
85,000 Platinum
85,000 Platinum
129,500 Roman
21,645
69,091
84,350 Roman
52,500 Roman
80,150 Roman
94,500 Roman
80,938 Roman
108,500 Roman
129,000 Roman
80,500 Roman
18,200 Lemkra
153,542 Granito
195,556 Granito
161,181 Granito
51,870 Granito
153,924 Granito
132,917 Granito
143,993 Granito
153,542
195,556
116,000 NARACERAMICA
13,000 NARACERAMICA
3,500 NARACERAMICA
153,000
8,015
11,625
#REF!
#REF!
61,417
30,708
415,800
206,800
Dika Karya Sejati Dika Karya Sejati 683,640 Dika karya sejati
Dika Karya Sejati Dika Karya Sejati 1,158,840
Dika Karya Sejati Dika Karya Sejati 1,267,668
3,187,500
2,281,500
4,207,500
3,102,500
2,191,500
4,122,500
51,831
320,000 AQUALOC
80,000 AQUALOC
60,000 AQUALOC
85,000 AQUALOC
20,000 AQUALOC
225,000
252,000
430,435
2,040,000
1,503,000
574,800
130,800
336,000
300,600
3,102,000
239,400
562,200
1,147,000
3,300,000
1,210,000
10,000
10,000
5,000
2,000
10,000
5,000
135,000
2,000
20,000
25,000
20,000
15,000
15,000
25,000
25,000
25,000
7,500
150,000
175,000
150,000
75,000
155,000
20,000
20,000
45,000
20,000
175,000
175,000
20,000
60,000
15,000
20,000
20,000
40,000
450,000
15,000
10,322
10,000
33,956
20,944
75,300
6,262
11,885
7,330
26,355
4,225
6,500
4,500
7,000
185,573
103,636
89,640
100,530
51,525
74,325
37,118
24,750
28,528
113,110
500
117,000
- 0.000
- 0.000
- -
RAP
HARGA
SETELAH DISC
55,000
95,000
35,000
136,000
25,000
10,000
35,000
35,000
200,000
88,000
50,000
50,000
65,000
75,000
65,000
30,000
50,000
30,000
65,000
45,000
30,000
45,000
35,000
55,000
25,000
40,000
15,000
35,000
50,000
36,000
45,000
200,000
85,000
10,000
1,500
-
-
-
-
-
2,000 3,250
37,000 54,500
50,000 67,500
75,000 92,500
125,000 142,500
150,000
8,500 16,500
150 150
850 898
-
1,500
2,000
5,500
5,500
2,500
2,000
20,000
25,000
45,000
20,000 0
45,000 62,500
45,000 62,500
35,000
150,000 0
45,000 62,500
40,000 57,500
55,000 72,500
55,000 72,500
25,000 42,500
25,000 25,000
27,000 44,500
35,000 52,500
40,000 57,500
2,000 5,500
2,500 6,000
1,500 5,000
1,500 5,000
25,000 28,500
20,000 27,000
16,000 19,500
25,000 43,333
17,000 26,500
7,500
15,000
25,000
3,500
2,000
10,000
7,500 11,000
60,000
30,000
19,000 36,500
10,000
12,500 30,833
2,000 5,500
2,500 6,000
1,000 4,500
60,000 77,500
20,000 37,500
40,000 57,500
30,000 47,500
35,000 52,500
50,000 67,500
48,000 65,500
35,000 52,500
38,000 55,500
55,000 72,500
50,000 67,500
75,000 92,500
15,000 32,500
35,000 52,500
15,000 32,500
100,000 117,500
150,000 167,500
20,000 37,500
25,000 42,500
10,500 28,000
25,000 42,500
10,000 27,500
68,000 85,500
75,000 92,500
15,000
25,000
25,000
9,100
14,400
14,400
14,400
20,000
20,000
720,000 harga panca
60,000 harga panca
50,000
4,000
2,750
2,500
2,400
3,600
100
2,500
800
1,000
7,500
25,000
1,500
5,000
3,250
8,000
#REF!
35,000
5,000
10,000
5,000
1,500
2,500
RAP
HARGA
SETELAH DISC
17,000
7,500
3,000
5,000
5,000
20,000
1,550
5,000
2,000
3,500
1,000
2,500
45,000 10,871
25,000
19,000
4,750,000
RAP NAMA
HARGA SUBKON
SETELAH DISC
35,000
95,000
25,000
17,500
10,000
7,948
55,000,000 Wika Beton
265,000 Wika Beton
152,000 Wika Beton
115,000 Wika Beton
115,000 Wika Beton
12,000 0
10,000 0
5,000 0
5,000 0
65,000 PT. Caturpile
45,000 PT. Caturpile
35,000 PT. Caturpile
35,000 PT. Caturpile
110,000 PT. Caturpile
65,000 PT. Caturpile
100,000 PT. Caturpile
- 0
590,000 PT. Caturpile
275,000 PT. Caturpile
225,000 PT. Caturpile
225,000 PT. Caturpile
-
-
-
24,250,000 Pakubumi
23,000,000 Pakubumi
8,000,000 Pakubumi
9,700,000 Pakubumi
53,000,000 Pakubumi
20,000,000 Pakubumi
116,400 Pakubumi
638,158 Pakubumi
1,455 Pakubumi
87,300 Pakubumi
8,000,000 PT. Caturpile
80,000,000 PT. Caturpile
60,000,000 PT. Caturpile
657,800
200,000
100,000,000
- PT. Caturpile
- PT. Caturpile
- PT. Caturpile
- PT. Caturpile
- PT. Caturpile
98,300
-
22,000,000 tripondasi
- tripondasi
10,000,000 tripondasi
- tripondasi
3,000,000 tripondasi
3,000,000 tripondasi
2,000,000 tripondasi
165,000,000 tripondasi
13,500,000 tripondasi
196,500,000
222,789
2,800,000
300,000
768,000
3,000,000
1,400,000
250,000
768,000
3,000,000
-
6,000,000
5,000,000
2,000,000
1,377,180 Dayataka
1,440,000 Dayataka
17,750 Indofullin
25,000 Indofullin
110,000 Triton
55,000 Triton
45,000 Triton
175,000 Triton
35,000 Triton
35,000 Triton
100,000 Triton
90,000 Triton
230,000 Triton
83.586.80
-
-
1,020,000 Fenindo
1,020,000 Fenindo
2,975,000 Fenindo
161,500 Fenindo
850,000 Fenindo
272,000 Fenindo
297,500 Fenindo
1,377,000 Fenindo
- Fenindo
95,000 Fenindo
1,500,000 Fenindo
1,350,000 Fenindo
285,000 Fenindo
2,290,000 Fenindo
1,550,000 Fenindo
4,470,000 Fenindo
83,500,000 Fenindo
535,000 Fenindo
770,400 Fenindo
1,673,480 Fenindo
1,926,000 Fenindo
2,152,840 Fenindo
2,777,720 Fenindo
3,359,800 Fenindo
550,000 Fenindo
220,000 Fenindo
20,000,000 Fenindo
250,000 Fenindo
1,250,000 Fenindo
1,500,000
1,750,000
114,750
350,000
116,000 Glory
140,000 Glory
18,000 Glory
198,000 Gipsindo
33,023 Pentayasa
25,883 Pentayasa
33,023 Pentayasa
25,883 Pentayasa
23,750 Pentayasa
30,400 Pentayasa
142,500
175,500 KIS
17,500 PT. Sadaya Utama
20,250 PT. Sadaya Utama
49,500 PT. Sadaya Utama
67,500 PT. Sadaya Utama
15,000 NELSINDO
15,000 NELSINDO
25,000 NELSINDO
25,000 NELSINDO
2,634,318 Corianindo
8,553,325 Corianindo
23,800
27,625
27,625
31,875
342,500
135,000
262,500
2,792,890 Matrixtama
55,000 Matrixtama
2,848,000 Matrixtama
1,805,000 Matrixtama
570,000 Bintara
570,000 Bintara
1,567,500 Bintara
1,150,000 DIKA
- Bintara
755,190 Bintara
712,500 Bintara
750,000 Bintara
839,100 Bintara
750,000 Bintara
849,100 Bintara
794,550 Bintara
794,550 Bintara
794,550 Bintara
794,550 Bintara
874,100
276,000 Bintara
350,000 Bintara
150,000 Bintara
37,996,600 WINATATA
3,541,231 WINATATA
4,965,350 WINATATA
1,409,867 WINATATA
1,367,928 WINATATA
3,514,796 WINATATA
1,073,307 WINATATA
711,428 WINATATA
665,000 BINTARA
825,616 Ardatama
350,000 Ardatama
1,866,756 Ardatama
175,000 Tokopedia
1,633,333
38,279,168 SANWAMAS
8,024,527 SANWAMAS
5,986,309 SANWAMAS
7,961,673 SANWAMAS
997,500 Bintara
- Bintara
- Bintara
1,568,025 Bintara
-
1,293,000 Bintara
717,000 Bintara
1,006,000 Bintara
1,229,000 Bintara
2,279,000 Bintara
2,379,000 Bintara
2,040,000 Bintara
4,490,000 Bintara
2,100,000 Bintara
3,235,000 Bintara
1,254,000
650,000 Bintara
400,000 Bintara
578,000 Bintara
2,824,000 Bintara
2,824,000 Bintara
2,060,000 Bintara
2,788,000 Bintara
1,047,200 PAWLING
762,300 PAWLING
716,100 PAWLING
663,000 Fenindo
178,500 Fenindo
127,500 Fenindo
1,785,000 Fenindo
2,295,000 Fenindo
1,530,000 Fenindo
6,147,188 Matrix
- Matrix
- Matrix
2,151,043 SIGMACO
715,000 0
1,050,000 0
625,000 0
660,000 0
550,000 0
650,000
650,000
430,000 IMO
450,000 IMO
165,000 IMO
104,918 IMO
410,448 IMO
170,000,000
22,000,000
Harga Sat
MATERIAL UPAH RAP Total
253,715 253,715
75,605 75,605
2,016 2,016
1,260 1,260
- - - - - - - - - - -
harga per 1 m1 332,596
Jasa 10% -
Harga + Jasa 332,596
275,000 275,000
600,000 45,000
160,000 160,000
150,000 11,250
35,000 35,000
- -
- -
- - - - - - - - - - -
harga per 1 m1 526,250
Jasa 10% -
Harga + Jasa 526,250
125,000 125,000
250,000 20,833
75,000 75,000
80,000 6,667
25,000 25,000
- -
- -
- - - - - - - - - - -
harga per 1 m1 252,500
Jasa 10% -
Harga + Jasa 252,500
2,000,000 5,492
200,000 549
1,360,000 3,735
4,000,000 10,985
450,000 30,000
415 415
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Harga per 1 m3 34,117.65
95,000 95,000
2,850 2,850
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Harga per 1 m3 97,850
Harga TIDAK Dibulatkan 97,850
50,620 50,620
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
50,620
95,000 97,850
35,000 35,000
1,329 1,329
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
134,179
250,000 275,000
64,000 143,360
95,000 30,400
10,000 10,000
200,000 200,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
658,760
Nilai - ppn 0
710,700
990,570 1.030.00 890,000 916,700
4,953 4,584 4,584
- Included 0
58,300 45,000 45,000
2,500 2,000 2,000
- - 0
67,500 50,000 50,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
990,570 133,253 1,018,284
99,057 13,325 Nilai - ppn 0
1,089,627 146,578
1,089,630 146,580 Harga TIDAK Dibulatkan 1,018,284
2.500.00
48,979 .134.37 270,000 36,281
25,700 19,000 19,000
23,000 17,000 17,000
6,275 19,364 4,841
5,400 2,000 4,000
895 26,500 663
8,800 6,500 6,500
19,748 1,963,636 16,495
777 1,295 648
81,300 70,000 70,000
- 20,000 0
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
139,573 81,300 175,426
13,957 8,130 Nilai - ppn 0
153,531 89,430
153,540 89,430 Harga TIDAK Dibulatkan 175,426
1.500.00
.223.95 210,000 47,030
17,000 17,000
1,800,000 14,400
1,963,636 15,709
2,000 2,000
26,500 583
16,364 4,091
1,295 648
65,000 65,000
20,000 0
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
166,461
Nilai - ppn 0
3.000.00
.111.98 210,000 23,515
17,000 17,000
1,800,000 16,200
1,963,636 19,636
2,000 2,000
26,500 583
16,364 4,091
1,295 648
80,000 80,000
20,000 10,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
173,673
Nilai - ppn 0
11,800 12,154
5,000 0
4,000 4,000
100 100
600 600
2,500 2,500
800 0
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
19,354
Nilai - ppn 0
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
1,050 - 1,000
105 - Nilai - ppn 0
1,155 -
1,160 - Harga TIDAK Dibulatkan 1,000
95,500 95,500
6,500 6,500
5,000 5,000
5,000 5,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
112,000
Nilai - ppn 0
11,000 11,000
3,250 3,250
500 500
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
14,750
Nilai - ppn 0
11,000 11,000
3,250 3,250
500 500
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
14,750
Nilai - ppn 0
685,000 19,028
350,000 11,667
430,000 7,963
25,000 25,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
63,657
Nilai - ppn 0
64,760 67,998
61,720 30,860
1,956 1,956
2,608 2,608
28,600 28,600
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
132,022
Nilai - ppn 0
70,000 73,500
2,608 2,608
25,000 25,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
101,108
Nilai - ppn 0
130,000 1,806
1,963,636 2,749
34,100 12,503
2,000 4,000
2,820 2,820
19,000 19,000
- - - - - - - - - - - - -
53,097
- -
455,000 47,320
40,000 3,496
53,097 41,416
11,200 -
514 1,798
396,441 41,230
2,000 2,000
27,000 27,000
- - - - - - - - - - - - -
164,259
455,000 47,775
40,000 3,496
53,097 41,416
11,200 8,736
53,097 18,584
514 1,798
396,441 41,626
8,000 8,000
45,000 45,000
- - - - - - - - - - - - -
216,431
- -
22,000 12,941
514 12,101
1,000 1,000
25,000 25,000
- - - - - - - - - - - - -
51,042
- -
40,000 2,692
514 1,385
1,000 1,000
7,500 -
18,000 18,000
- - - - - - - - - - - - -
23,077
- -
22,000 19,412
514 18,151
1,000 1,000
7,500 4,500
30,000 30,000
- - - - - - - - - - - - -
73,063
- -
Harga TIDAK Dibulatkan 73,063
40,000 2,692
514 1,385
1,000 67
7,500 5,850
20,000 20,000
- - - - - - - - - - - - -
29,994
- -
85,000 90,525
33,750 8,859
22,000 9,244
6,300 1,980
69,000 -
95,000 -
21,315 22,700
514 12,180
2,500 2,500
1,000 1,000
48,000 48,000
- - - - - - - - - - - - -
196,989
Nilai - ppn -
129,000 137,385
33,750 8,859
22,000 9,244
6,300 1,980
69,000 -
95,000 -
21,315 22,700
514 12,180
2,500 2,500
1,000 1,000
40,000 40,000
- - - - - - - - - - - - -
235,849
Nilai - ppn -
84,350 89,833
33,750 8,859
22,000 9,244
6,300 1,980
69,000 -
95,000 -
21,315 22,700
514 12,180
2,500 2,500
1,000 1,000
38,000 38,000
- - - - - - - - - - - - -
186,296
Nilai - ppn -
164,259 80,519
51,042 25,021
307,708 150,837
- - - - - - - - - - - - -
256,377
Nilai - ppn -
116,000 123,540
33,750 8,859
22,000 -
6,300 1,980
69,000 30,360
95,000 5,225
21,315 22,700
514 3,537
2,500 2,500
1,000 1,000
18,000 18,000
38,000 38,000
- - - - - - - - - - - - -
255,701
Nilai - ppn -
143,993 153,353
33,750 10,607
22,000 -
6,300 1,980
69,000 30,360
95,000 5,225
21,315 22,700
514 4,202
2,500 2,500
1,000 1,000
48,000 48,000
- - - - - - - - - - - - -
279,928
Nilai - ppn -
80,150 85,360
33,750 8,859
22,000 -
6,300 1,980
69,000 30,360
95,000 5,225
21,315 22,700
514 3,537
2,500 2,500
1,000 1,000
18,000 18,000
35,000 35,000
- - - - - - - - - - - - -
214,521
Nilai - ppn -
80,150 8,576
33,750 1,114
22,000 1,333
6,300 174
69,000 -
95,000 -
21,315 2,132
514 1,996
2,500 250
1,000 100
7,500 7,500
10,500 10,500
25,000 25,000
- - - - - - - - - - - - -
58,674
Nilai - ppn -
33,500 3,585
22,000 726
6,300 382
69,000 1,907
95,000 -
21,315 -
514 51
2,500 9,704
1,000 100
7,500 750
7,500 7,500
10,500 10,500
- - - - - - - - - - - - -
35,204
Nilai - ppn -
153,000 162,945
33,750 8,859
22,000 -
6,300 1,980
69,000 30,360
95,000 5,225
21,315 22,700
514 3,537
2,500 2,500
1,000 1,000
18,000 18,000
38,000 38,000
- - - - - - - - - - - - -
295,106
Nilai - ppn -
116,000 124,120
13,000 32,500
3,500 8,750
33,750 8,859
22,000 -
6,300 1,980
69,000 30,360
95,000 5,225
21,315 53,288
514 3,537
2,500 2,500
1,000 1,000
18,000 18,000
50,000 50,000
- - - - - - - - - - - - -
340,119
Nilai - ppn -
157,000 157,000
1,187,500 1,187,500
134,309 134,309
- - - - - - - - - - - - -
Harga per m2 1,478,809
157,000 157,000
2,318,000 2,318,000
134,309 134,309
- - - - - - - - - - - - -
Harga per m2 2,609,309
545,000 545,000
128,591 -
185,000 185,000
92,933 92,933
- - - - - - - - - - - - -
Harga per m2 822,933
545,000 545,000
128,591 -
261,987 -
175,000 175,000
92,933 92,933
- - - - - - - - - - - - -
Harga per m2 812,933
535,000 535,000
1,250,000 1,250,000
134,309 -
128,591 -
218,293 -
164,259 71,764
74,119 32,382
28,000 12,233
175,000 175,000
92,933 92,933
- - - - - - - - - - - - -
Harga per m2 2,169,312
545,000 545,000
128,591 128,591
185,000 185,000
92,933 92,933
1,375,000 1,375,000
261,597 261,597
- - - - - - - - - - - - -
Harga per m2 2,588,121
45,000 45,000
69,000 30,360
95,000 5,225
1,500 1,500
18,000 18,000
- - - - - - - - - - - - -
Harga per m2 100,085
35,000 36,050
15,000 15,000
7,500 7,500
- - - - - - - - - - - - -
Harga per m2 58,550
55,000 56,650
15,000 15,000
7,500 7,500
- - - - - - - - - - - - -
Harga per m2 79,150
100,000 100,000
- - - - - - - - - - - - -
Harga per m2 100,000
69,000 33,810
95,000 6,650
180,000 15,873
1,500 1,500
30,000 30,000
- - - - - - - - - - - - -
Harga per m2 87,833
Harga Tidak dibulatkan 87,833
2,500 2,500
3,000 3,000
7,500 7,500
- - - - - - - - - - - - -
Harga per m2 13,000
69,000 33,810
95,000 6,650
1,500 1,500
27,000 27,000
- - - - - - - - - - - - -
Harga per m2 68,960
225,000 225,000
45,000 45,000
- -
40,000 40,000
51,831 51,831
- -
- -
- - - - - - - - - - - - -
Harga per m2 361,831
225,000 225,000
45,000 45,000
110,000 110,000
40,000 40,000
51,831 51,831
24,000 52,800
20,000 20,000
- - - - - - - - - - - - -
Harga per m2 544,631
252,000 252,000
45,000 45,000
110,000 110,000
40,000 40,000
51,831 51,831
24,000 52,800
20,000 20,000
- - - - - - - - - - - - -
Harga per m2 571,631
430,435 430,435
45,000 45,000
110,000 110,000
40,000 40,000
51,831 51,831
24,000 52,800
20,000 20,000
- - - - - - - - - - - - -
Harga per m2 750,066
252,000 252,000
45,000 45,000
- -
40,000 40,000
51,831 51,831
- -
- -
- - - - - - - - - - - - -
Harga per m2 388,831
Harga Tidak dibulatkan 388,831
included -
95,000 23,471
35,000 35,000
35,000 35,000
60,000 9,000
30,000 30,000
- - - - - - - - - - - - -
Harga per m1 132,471
48,000 3,938
514 1,688
1,000 1,000
16,000 16,000
2,000 2,000
- - - - - - - - - - - - -
Harga per m2 24,625
890,000 133,500
10,326 154,890
166,461 149,815
100,000 150,000
186,296 279,445
- - - - - - - - - - - - -
Harga per m2 867,649
890,000 64,080
10,326 74,347
166,461 95,881
100,000 120,000
186,296 134,133
- - - - - - - - - - - - -
Harga per m2 488,442
664,000 1,992,000
185,000 1,665,000
365,700 365,700
109,710 109,710
1,000 389,490
2,200 856,878
3,000,000 3,000,000
5,500 2,142,195
- - - - - - - - - - - - -
Harga per m2 10,520,973
2,040,000 2,040,000
2,040,000 51,000
238,095 238,095
10,000 10,000
25,000 25,000
175,000 175,000
- - - - - - - - - - - - -
2,539,095
Nilai-ppn -
574,800 574,800
574,800 17,244
Inluded -
2,000 2,000
7,500 7,500
15,000 15,000
- - - - - - - - - - - - -
616,544
Nilai-ppn -
1,503,000 1,503,000
1,503,000 37,575
238,095 238,095
5,000 5,000
20,000 20,000
150,000 150,000
- - - - - - - - - - - - -
1,953,670
-
562,200 562,200
562,200 16,866
- -
2,000 2,000
7,500 7,500
20,000 20,000
- - - - - - - - - - - - -
608,566
-
239,400 239,400
239,400 7,182
- -
2,000 2,000
25,000 25,000
40,000 40,000
- - - - - - - - - - - - -
313,582
-
Harga TIDAK Dibulatkan 313,582
130,800 130,800
130,800 3,924
- -
2,000 2,000
25,000 25,000
15,000 15,000
- - - - - - - - - - - - -
176,724
-
3,102,000 3,102,000
3,102,000 77,550
238,095 238,095
5,000 5,000
20,000 20,000
150,000 150,000
- - - - - - - - - - - - -
3,592,645
-
300,600 300,600
300,600 9,018
- -
2,000 2,000
7,500 7,500
20,000 20,000
- - - - - - - - - - - - -
339,118
-
336,000 336,000
336,000 8,400
10,000 10,000
2,000 2,000
7,500 7,500
20,000 20,000
- - - - - - - - - - - - -
383,900
-
562,200 562,200
562,200 16,866
- -
2,000 2,000
7,500 7,500
20,000 20,000
- - - - - - - - - - - - -
608,566
-
1,147,000 1,147,000
1,147,000 28,675
10,000 10,000
5,000 5,000
25,000 25,000
175,000 175,000
- - - - - - - - - - - - -
1,390,675
-
260,000 260,000
260,000 7,800
- -
2,000 2,000
25,000 25,000
40,000 40,000
- - - - - - - - - - - - -
334,800
-
70,000 73,500
16,667 16,667
9,400 9,400
40,000 40,000
- - - - - - - - - - - - -
139,567
-
3,300,000 3,300,000
3,300,000 82,500
10,000 10,000
5,000 5,000
25,000 25,000
175,000 175,000
- - - - - - - - - - - - -
3,597,500
-
1,210,000 1,210,000
1,210,000 30,250
10,000 10,000
5,000 5,000
25,000 25,000
175,000 175,000
- - - - - - - - - - - - -
1,455,250
-
ber Bajasakti
ber Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
ber Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
40,946,479 58,495
lt bs-lt10 lt 11-15 lt 16-20
2,000 2,500 3,000
37,000 42,000 47,000
50,000 55,000 60,000
75,000 80,000 85,000
125,000 130,000 135,000
3,868,000 58,020,000
2,418,000 43,524,000
6,286,000 101,544,000 39
6,000,000 49
13,950,000 13
121,494,000 36
42,000,000 315
163,494,000 452
24 juli 2020
24 juli 2020
28 april 2020
29 april 2020
30 april 2020
30 april 2020
30 april 2020
INTERNUSA
INTERNUSA
INTERNUSA
INTERNUSA
INTERNUSA
INTERNUSA
20,000 20,000
192,029 108,696
21,739 2,899
0 2,174
233,768 486,237,681 133,768
387,000 387,000
0
90,000 160,000
5,625 11,250
10,000 20,000
492,625 1,024,660,000 578,250
1,510,897,681
1,209,000 41,690
2,009,000 69,276
1,884,000 64,966
1,500,000 51,724
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
21,375 737
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------
6,864 Perekat Bata Ringan @40kg
daya sebar
Pemakaian 1 m2
Mortar Plester 40kg/sak
daya sebar Plester
Pemakaian 1 m2 ple
7,505,168
700,000 69 178
200,003 82 90
150,002 96 268
444,461 247.5 20.64
1,494,466
585,000
120,510 268
175,000
92,933
973,442
153
56
3,846,518
Pemakaian 1 m2
Pemakaian 1 m2
Pemakaian 1 m2
Skimcoat 40kg/sak
daya sebar Plester
Pemakaian 1 m2 ple
Holcim Merak motiv
66,000 3,750
66,000 3,750
pandu
20,000 -
SB CELKON
570,000 575,000
uzin MU
56,000 31,000
32,000 56,000
44,800 45,000
67,500 52,000
70,000 60,000
135,000 60,000
4,200 4,583
12,000
71,500
166,000
TOGO MESH
12,182
10,745
11,009
11,100
11,100
9,782
Cisangkan Hollywood MasterBlock
97,500
lt 21-25 lt 26-30 lt 20-35
3,500 4,000 4,500
57,000 67,000 77,000
70,000 80,000 90,000
95,000 105,000 115,000
145,000 155,000 165,000
15,000,000 12,500,000
3,500,000
190,000
1,000,000
320,000
350,000
1,100,000
-
1,500,000
1,350,000 800,000
1,040,000 700,000
2,290,000 2,000,000
1,550,000 2,000,000
8,940,000 10,000,000
83,500,000
535,000
963,000
2,091,850
2,407,500
2,691,050
3,472,150
4,199,750
MATRIKS SODIK
1,140,116 1,350,000
1,140,116 1,350,000
1,140,116 1,350,000
955,000 600,000
955,000 600,000
2,432,250 1,650,000
2,115,000 1,450,000
600,000
350,000
150,000
SMNS KRISOON
715,000
1,050,000
625,000 533,040
550,000 544,393
550,000 544,393
551,617
278,237,681
1,202,760,000
1,480,997,681
15,000
40 kg 14.0
11.90 m2/zak
0.084 zak/m2 tebal 3 mm
50 kg 2.10
1.79 m2/zak
0.560 zak/m2 tebal 10 mm
0.840 zak/m2 tebal 15 mm
1.120 zak/m2 tebal 20 mm
0.420 zak/m2 tebal 5 mm
40 kg 13.0
10.40 m2/zak
0.096 zak/m2 tebal 3 mm
0.064 zak/m2 tebal 2 mm
0.032 zak/m2 tebal 1 mm
25 kg
4 m2/zak
0.250 zak/m2 tebal 3 mm
25 kg
4 m2/zak
0.250 zak/m2 tebal 3 mm
0.800 zak/m2 tebal 20 mm
1.200 zak/m2 tebal 30 mm
2.000 zak/m2 tebal 50 mm
50 kg
50 kg
270750
152000
115000
1.4019
aran pagar batako 1.7524
0.4470
1.2875
11.2652
16
ars M.B
Total -
Pembulatan -
Total 194
Pembulatan 194
Total 10
Pembulatan 10
Total -
Pembulatan -
Total 132.34
Pembulatan 132.00
Total 157.16
Pembulatan 157.00
str FACILITY BUILDING
Pasir beton
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako
Total - Total -
Pembulatan - Pembulatan -
Semen
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako
Plywood 12 mm
Bekisting Balok & Plat
Bekisting Tangga
Kayu 5/7cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Kayu 6/12cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Kawat beton
Pembesian
Paku
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Glasswool 24kg/m2 1.2mx30m
Insulation
Mould oil
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Pasir beton
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako
Semen
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako
Plywood 15 mm
Bekisting Kolom & dinding
Plywood 12 mm
Bekisting Balok & Plat
Bekisting Tangga
Kayu 5/7cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Kayu 6/12cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Kawat beton
Pembesian
Paku
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Mould oil
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Pasir beton
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako
Screed Lantai @40kg/sak ex. Broco
Lantai vinyl Somplan 360 ex. Ta
Lantai vinyl IQ Toro SC ex. Tark
Semen
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako
Plywood 15 mm
Bekisting Kolom & dinding
Plywood 12 mm
Bekisting Balok & Plat
Bekisting Tangga
Kayu 5/7cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Kayu 6/12cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Kawat beton
Pembesian
Paku
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Mould oil
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Total -
Pembulatan -
Total 86.00
Pembulatan 86.00
Total -
Pembulatan -
Total 5.50
Pembulatan 6.00
Volume Koef Total
115.29 0.22 25.82
- 0.11 -
Total 25.82
Pembulatan 26.00
Total -
Pembulatan -
Total 16.18
Pembulatan 16.00
Screed Lantai @40kg/ Volume Koef Total Koef. Semen Koef. Pasir
Lantai viny 396.00 2.20 871.20 0.49 194.04 0.07
Lantai viny 71.78 2.20 157.92 0.49 35.1722 0.07
Total 2,549
Pembulatan 2,549
Total 215
Pembulatan 215
Total 17
Pembulatan 17
Total 209.76
Pembulatan 210.00
Total 246.50
Pembulatan 247.00
UTILITY
Koef. Pasir Screed Lantai @40kg/ Volume Koef Total Koef. Semen Koef. Pasir
27.72 Lantai viny - 2.20 - 0.49 0
5.0246 Lantai viny - 2.20 - 0.49 0
Total 425
Pembulatan 425
Total 30
Pembulatan 30
Total -
Pembulatan -
Total 63.85
Pembulatan 64.00
Total 76.30
Pembulatan 76.00
GWT
Koef. Pasir Screed Lantai @40kg/ Volume Koef Total Koef. Semen
0.07 0 Lantai viny - 2.20 - 0.49 0
0.07 0 Lantai viny - 2.20 - 0.49 0
Total 31
Pembulatan 31
Total 4
Pembulatan 4
Total 17
Pembulatan 17
Total -
Pembulatan -
Total -
Pembulatan -
Koef. Pasir
0.07 0
0.07 0
Total -
Pembulatan -
BILL NO. 2 - STRUCTURE WORK
2. STR (362/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY QTY SELISIH
FORKON
2 STRUCTURAL WORKS
Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 2080.00 2080.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
Facility Building m' 2080.00 2080.00 0.00
0.00
Pile Driving Analyzer Test ttk 1.00 1.00 0.00
Cut the Head of Pole size 40x40 ttk 52.00 52.00 0.00
B Earthwork (Provisional)
Soil quarrying with heavy m3 202.61 226.00 -23.39
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
Facility Building Ground Floor and pit lift m3 202.61 226.00 -23.39
2. STR (363/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY
D Work of Slab
backfill Sand, 300mm thick m3 102.59 127.43 -24.84
working floor, 50mm thick m3 17.10 21.24 -4.14
Ready Mix Concrete concrete K250 m3 60.02 65.12 -5.10
Reinforcement Reinforcement BJTD-40 kg 5812.30 5960.33 -148.03
formwork Formwork of Block m2 17.98 17.86 0.12
E Work of Column
Ready Mix Concrete concrete K250 m3 16.64 15.77 0.87
Reinforcement Reinforcement BJTD-40 kg 4592.74 4373.31 219.43
formwork Formwork from multiplex 12mm m2 148.98 141.24 7.74
F Work of stair
Ready Mix Concrete concrete K250 m3 3.43 3.11 0.32
Reinforcement Reinforcement BJTD-40 kg 408.50 448.14 -39.64
formwork Formwork from multiplex 12mm m2 36.87 28.33 8.54
A 2nd Floor
Work of Column
Ready Mix Concrete concrete K250 m3 15.61 15.77 -0.16
Reinforcement Reinforcement BJTD-40 kg 4390.85 4373.31 17.54
formwork Formwork from multiplex 12mm m2 139.81 141.24 -1.43
Work of Beam
Ready Mix Concrete concrete K250 m3 26.17 31.08 -4.91
Reinforcement Reinforcement BJTD-40 kg 4569.60 5834.77 -1265.17
formwork Formwork from multiplex 12mm m2 208.06 253.90 -45.84
Work of Slab
Ready Mix Concrete concrete K250 m3 41.13 40.08 1.05
Reinforcement Reinforcement BJTD-40 kg 4675.57 4559.78 115.79
formwork Formwork from multiplex 12mm m2 330.15 326.12 4.03
2. STR (364/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY
A 2nd Floor
Work of stair
Ready Mix Concrete concrete K250 m3 3.43 2.44 0.99
Reinforcement Reinforcement BJTD-40 kg 408.50 448.82 -40.32
formwork Formwork from multiplex 12mm m2 36.87 22.17 14.70
B 3rd Floor
Work of Column
Ready Mix Concrete concrete K250 m3 15.61 17.92 -2.31
Reinforcement Reinforcement BJTD-40 kg 4160.54 4416.07 -255.53
formwork Formwork from multiplex 12mm m2 139.81 160.47 -20.66
Work of Beam
Ready Mix Concrete concrete K250 m3 24.46 28.60 -4.14
Reinforcement Reinforcement BJTD-40 kg 3901.36 4579.28 -677.92
formwork Formwork from multiplex 12mm m2 199.82 212.19 -12.37
Work of Slab
Ready Mix Concrete concrete K250 m3 40.54 40.12 0.42
Reinforcement Reinforcement BJTD-40 kg 4557.80 4581.99 -24.19
formwork Formwork from multiplex 12mm m2 330.15 323.66 6.49
Work of stair
Ready Mix Concrete concrete K250 m3 3.43 3.45 -0.02
Reinforcement Reinforcement BJTD-40 kg 408.50 454.84 -46.34
formwork Formwork from multiplex 12mm m2 706.65 33.36 673.29
C Roof Floor
Work of Column
Ready Mix Concrete concrete K250 m3 7.83 8.01 -0.18
Reinforcement Reinforcement BJTD-40 kg 2078.13 2676.16 -598.03
formwork Formwork from multiplex 12mm m2 81.64 83.52 -1.88
Work of Beam
Ready Mix Concrete concrete K250 m3 32.78 24.99 7.79
Reinforcement Reinforcement BJTD-40 kg 6873.28 4372.48 2500.80
formwork Formwork from multiplex 12mm m2 248.39 182.60 65.79
Work of Slab
Ready Mix Concrete concrete K250 m3 53.51 51.74 1.77
Reinforcement Reinforcement BJTD-40 kg 6499.00 6393.68 105.32
formwork Formwork from multiplex 12mm m2 346.36 339.19 7.17
Other Work
Waterproofing Integral Conplast WP 421 ex. Fosroc m3 86.29 76.73 9.56
2. STR (365/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY
Work of Slab
Ready Mix Concrete concrete K250 m3 7.32 21.55 -14.23
Reinforcement Reinforcement BJTD-40 kg 725.05 2161.57 -1436.52
formwork Formwork from multiplex 12mm m2 62.24 161.56 -99.32
E Other Work
2. STR (366/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY
Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 280.00 280.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
b. Utility Building m' 280.00 280.00 0.00
B Earthwork (Provisional)
Soil quarrying with heavy m3 125.27 125.27 0.00
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
Utility Building Ground Floor m3 125.27 125.27 0.00
C Work of Slab
backfill Sand, 300mm thick m3 88.53 103.17 -14.64
working floor, 50mm thick m3 14.76 17.20 -2.44
Ready Mix Concrete concrete K250 m3 61.51 55.07 6.44
Reinforcement Reinforcement BJTD-40 kg 5299.80 5222.11 77.69
formwork Formwork of Block m2 10.50 35.23 -24.73
D Work of Column
Ready Mix Concrete concrete K250 m3 2.56 2.56 0.00
Reinforcement Reinforcement BJTD-40 kg 530.01 543.38 -13.37
formwork Formwork from multiplex 12mm m2 41.00 40.95 0.05
2. STR (367/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY
2. STR (368/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY
Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 360.00 360.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
a. Sewage Treatment Plant Building m' 120.00 120.00 0.00
b. Ground Water Tank Building m' 160.00 160.00 0.00
c. waste Container m' 80.00 80.00 0.00
B Earthwork (Provisional)
Soil quarrying with heavy m3 80.92 80.92 0.00
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
a. Sewage Treatment Plant BuildingGround Floor m3 48.10 48.10 0.00
b. Ground Water Tank Building Ground Floor m3 21.61 21.61 0.00
c. waste Container Ground Floor m3 11.20 11.20 0.00
2. STR (369/408)
2.3.2 SEWAGE TREATMENT PLANT (STP) STRUCTURE WORK
Work of Slab
backfill Sand, 300mm thick m3 1.36 2.88 -1.52
working floor, 50mm thick m3 0.68 0.48 0.20
Ready Mix Concrete concrete K300 m3 7.17 4.87 2.30
Reinforcement Reinforcement BJTD-40 kg 555.81 582.70 -26.89
formwork Formwork of Block m2 5.23 5.13 0.10
Other Work
Waterproofing Integral conplast WP 421 ex. Fosroc m3 8.60 6.04 2.56
2. STR (370/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY
2.3.3 GROUND WATER TANK (GWT) & PUMP ROOM STRUCTURE WORK
Work of Slab
backfill Sand, 300mm thick m3 1.09 7.80 -6.71
working floor, 50mm thick m3 1.38 1.30 0.08
Ready Mix Concrete concrete K300 m3 10.36 5.50 4.86
Reinforcement Reinforcement BJTD-40 kg 998.88 814.27 184.61
formwork Formwork of Block m2 6.45 6.53 -0.08
Work of Column
Ready Mix Concrete concrete K300 m3 0.98 0.94 0.04
Reinforcement Reinforcement BJTD-40 kg 360.34 350.11 10.23
formwork Formwork from multiplex 12mm m2 15.61 15.00 0.61
Other Work
Water stop ex. Fosroc m1 65.24 33.05 32.19
Waterproofing Integral Conplast WP 421 ex. Fosroc m3 28.42 29 -1.06
Work of Beam
Ready Mix Concrete concrete K300 m3 2.40 3.23 -0.83
Reinforcement Reinforcement BJTD-40 kg 569.02 677.81 -108.79
formwork Formwork from multiplex 12mm m2 7.76 7.98 -0.22
Work of Slab
Ready Mix Concrete concrete K300 m3 3.22 3.30 -0.08
Reinforcement Reinforcement BJTD-40 kg 357.88 388.23 -30.35
formwork Formwork from multiplex 12mm m2 25.20 24.66 0.54
Other Work
Waterproofing Integral Conplast WP 421 ex. Fosroc m3 5.61 6.53 -0.92
2. STR (371/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY
Work of Slab
backfill Sand, 300mm thick m3 3.75 3.52 0.23
working floor, 50mm thick m3 0.62 0.56 0.06
Ready Mix Concrete concrete K250 m3 3.95 3.87 0.08
Reinforcement Reinforcement BJTD-40 kg 563.19 587.72 -24.53
formwork Formwork of Block m2 3.79 3.72 0.07
Steel Structure
CNP 150x65x20x2.3 kg 336.60 336.60 0.00
Plate thickness 8 mm kg 25.94 25.94 0.00
Chemical anchor dia. 16 mm, 200 mm length bh 163.20 163.20 0.00
Grouting thickness 3 mm Formwork of Block m3 0.00 0.00 0.00
Zincromate paint kg 362.54 362.54 0.00
Duco paint finish kg 362.54 362.54 0.00
2. STR (372/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY
SUB PENJUMLAHAN
2. STR (373/408)
BILL NO. 3.1 - EXISTING MAIN BUILDING RENOVATION ARCHITECTURAL WORK
Existing main building Lobby & waiting area, Staff Amenity, Consult m' 120.730.00
Room, Medrec, Farmasi, Dental, Pediatric,
ENT, Orthopedi, Inerna Dept., Opthamology,
Obsgyn
E Skirting PVC 150 mm height off white colour, m' 205.650.00 225.460.00
including fixing accessories and flatten ex.
Tarkett or equal approved (VP)
Existing main building All ceiling areas below suspended ceiling m2 412.853.00
Existing main building Staff Amenity, Consult Room, Medrec, pcs 5.000.00 5.000.00
Farmasi
C Door D4B, Single leaf solid engineering wood pcs 1.000.00 1.000.00
door and frame with HPL or melamic finish;
total size 900x2150 mm ex. jotun includes
hardware, accessories, and installation
Existing main building Laboratory, Pathology, Blood Bank pcs 1.000.00 1.000.00
Existing main building Surgery, Dental, ENT, Orthopedi, Pediatric, pcs 8.000.00 8.000.00
Interna Dept., Opthamology, Obsgyn
1st floor Staff Amenity, Consult, UGD, Laboratorium, pcs 11.00 11.00
Surgery, Dental, ENT, Pediatric, Interna
Dept, Opthamology, Obsgyn
SUBTOTAL
D Sandwich panel isolation wall cover type PIR with m2 151.300.00 142.680.00
###
100 mm 50 mm thickness ex. Zelltech/Alsun/Equal,
including accessories and others as specified (BD)
###
E Interior enamel paint finish on 1.5 m light brick wall m2 137.452.50 137.452.50
###
ex. Majesric TB Sheen or Equal Approved
1st floor Stair m2 35.527.50
2nd floor Stair m1 33.675.00
3rd floor Stair m1 34.125.00
Roof Stair m2 34.125.00
###
###
C Homogeneous tile 600x600 mm type Unpolish ex. 1st Floor (Entrance) m2 116.07 116.07
###
frontino or equal approved
1st floor CT-Scan, YSIO MAX, CH, Digital Mammo, m2 86.593.50 75.750.00
USG
2nd floor NICU, ICU / HU, CU, Sterile Material m2 192.817.40 179.650.00
Store, S.A.S, Instrument Preparation And
Packaging Area, Washing and
Decontamination, Dirty material
###
B Skirting oil paint 100 mm height ex. jotun, including m' 60.022.50 46.760.00
###
fixing accessories and flatten (PT2)
C Skirting PVC 150 mm height off white colour, m' 398.596.00 352.990.00
###
including fixing accessories and flatten ex. Tarkett or
equal approved (VP)
1st floor CT-Scan, YSIO MAX, CH, Digital Mammo, m' 68.290.00 56.920.00
USG
2nd floor NICU, ICU / HU, CU, Sterile Material m' 132.676.00 92.530.00
Store, S.A.S, Instrument Preparation And
Packaging Area, Washing and
Decontamination, Dirty material
3rd floor Changing Room, Transfer Room, Steril m' 197.630.00 203.540.00
Stock, OT 1, OT2, Pre Operation, Equipt
storage, Clean utility, Dirty Corridor, Post
Operation
###
1st floor Lobby Lift, Prayer room, Waitting Area, m2 253.610.00 254.920.00
Reading, Consult, Control Room, Dirty
Utility, Digital MAMO, USG, CT Scan,
YSIO MAX, CH
2nd floor Lobby Lift, Family waiting, NICU, ICU, CU, m2 243.068.00 250.680.00
Dirty Material, Technical Area, Steril
Material, Washing and Decontamination,
Instrument preparation, Dirty Material
1st floor toilet staff, toilet visitor, Ablution, panel m2 21.140.00 25.750.00
room
2nd floor Toilet, DU, Technical Area m2 14.112.00 14.210.00
3rd floor Toilet, Lobby lift, Travo installation, m2 66.619.50 44.360.00
changing room,, clean utility, corridor
dirty
OT 1, OT 2 m2 96.190.84
###
###
A Ceiling shadow line 10x10mm from gypsum profile m' 686.588.00 686.588.00
###
paint finish, fixing accessories and flatten
1st floor All areas installed with gypsum and m' 278.815.00
gypsum WR ceiling
2nd floor All areas installed with gypsum and m' 260.673.00
gypsum WR ceiling
3rd floor All areas installed with gypsum and m' 147.100.00
gypsum WR ceiling
B Ceiling shadow line 10x10mm from gypsum profile m' 73.950.00 73.950.00
###
paint finish, fixing accessories and flatten
3rd floor All areas installed with calsiboard ceiling m' 73.950.00
###
A Door D1A-DP. Double leaf solid engineering wood pcs 2.000.00 2.000.00
###
door, steel door frame, HPL or melamic finish;
equipped with 6 mm clear glass ex. Asahimas; Door
protection finishing on the bottom of the door, to
900mm AFFL on both sides of the door; total size
1600x2150 mm ex. jotun includes hardware,
accessories, and installation
B Door D4, Single leaf solid engineering steel door, pcs 2.000.00 3.000.00
###
steel door frame with HPL or melamic finish; total
size 900x2150 mm ex. jotun includes hardware,
accessories, and installation
C Door D4-A, Single leaf solid engineering wood door, pcs 1.000.00 1.000.00
###
steel door frame with HPL or melamic finish; total
size 800x2150 mm ex. jotun includes hardware,
accessories, and installation
D Door D4-K. Single leaf solid engineering wood door, pcs 2.000.00 3.000.00
###
steel door frame with HPL or melamic finish;
Kickplate finishing on the bottom of the door, to
300mm AFFL on both sides of the door;total size
900x2150 mm ex. jotun includes hardware,
accessories, and installation
E Door D4-DP. Single leaf solid engineering wood pcs 2.000.00 2.000.00
###
door, steel door frame with HPL or melamic finish;
Door protection finishing on the bottom of the door,
to 900mm AFFL on both sides of the door;total size
900x2150 mm ex. jotun includes hardware,
accessories, and installation
G Door D5A-K. Single leaf solid engineering wood pcs 6.000.00 6.000.00
###
door, steel door frame with HPL or melamic finish;
Kickplate finishing on the bottom of the door, to
300mm AFFL on both sides of the door; total size
900x2150 mm ex. jotun includes hardware,
accessories, and installation
H Door D5B-K. Single leaf solid engineering wood pcs 1.000.00 1.000.00
###
door, steel door frame with HPL or melamic finish;
Kickplate finishing on the bottom of the door, to
300mm AFFL on both sides of the door; total size
1100x2150 mmex. jotun includes hardware,
accessories, and installation
###
A Door D2, 40 mm thick one-leaf steel door, made of pcs 5.000.00 5.000.00
###
4x4 cm hollow steel frame and 70x150 mm channel
(C) type steel sill, total size 900x2150 mm duco
paint finish, equipped with 6 mm thick glass ex.
Asahimas, including hardware, accessories, and
installation
B Door D2A, 40 mm thick two-leaf steel door, made of pcs 1.000.00 1.000.00
###
4x4 cm hollow steel frame and 70x150 mm channel
(C) type steel sill, total size 1400x2150 mm duco
paint finish, including hardware, accessories, and
installation
1st floor YSIO MAX, Digital Mammo, USG pcs 3.000.00 3.000.00
E Door FDB, 40 mm thick one-leaf steel door, made pcs 4.000.00 4.000.00
###
of 4x4 cm hollow steel frame and 70x150 mm
channel (C) type steel sill, total size 1100x2150 mm,
equipped with handle panic bar ex. Bostinco as
specified, including hardware, accessories, and
installation
F Door PB, 40 mm thick one-leaf steel door, total size pcs 7.000.00 7.000.00
###
600x1000 mm, all as specified, including hardware,
accessories, and installation.
1st floor Staircase, Med Gas Shaft pcs 2.000.00 2.000.00
2nd floor Staircase, Med Gas Shaft pcs 2.000.00 2.000.00
3rd floor Staircase, Med Gas Shaft pcs 2.000.00 2.000.00
Roof Staircase pcs 1.000.00 1.000.00
H Door SD-LD2, 40 mm thick one-leaf steel door, total pcs 1.000.00 1.000.00
###
size 900x2150 mm, all as specified, including
hardware, accessories, and installation.
I Door SDB, 40 mm thick one-leaf steel door, total pcs 1.000.00 1.000.00
###
size 1100x2150 mm, all as specified, including
hardware, accessories, and installation.
J Door SD1, 40 mm thick one-leaf steel door, total pcs 1.000.00 1.000.00
###
size 1000x2150 mm, all as specified, including
hardware, accessories, and installation.
K Door SD2, 40 mm thick two-leaf steel door, made of pcs 1.000.00 1.000.00
###
4x4 cm hollow steel frame and 70x150 mm channel
(C) type steel sill, total size 1600x2150 mm duco
paint finish, including hardware, accessories, and
installation
L Door SD5, 40 mm thick, single leaf sliding door, total pcs 1.000.00 1.000.00
###
size 1100x2150 mm, duco paint finish, equipped
with 6 mm thick glass ex. Asahimas including
hardware, accessories, and installation.
M Operation room automatic sliding door (hermetic Operation room on 3rd floor pcs 1.000.00 1.000.00
###
sliding size 1600x2200 mm) according to standards,
including accessories and installation
N Operation room automatic sliding door + Lead Operation room on 3rd floor pcs 1.000.00 1.000.00
###
Shield wall from Pb t=2 mm (hermetic sliding size
1600x2200 mm) according to standards, including,
accessories and installation
O Operation room manual swing door (hermetic swing Operation room on 3rd floor pcs 1.000.00 1.000.00
###
size 900x2200) according to standards, including
accessories and installation
P Operation room manual swing door + Lead Shield Operation room on 3rd floor pcs 1.000.00 1.000.00
###
wall from Pb t=2 mm (manual swing size 900x2200)
according to standards, including accessories and
installation
Q Transfer room interlocking system sliding door Transfer room on 3rd floor pcs 2.000.00 2.000.00
###
(sliding size 1600x2200 mm) according to standards,
including accessories and installation
###
A Door SD4, one-leaf door alumunium frame, total pcs 1.000.00 1.000.00
###
size 900x2150 mm ex. Alexindo or equal approved,
as drawings and specification, including hardware,
accessories, and installation
B Door D6, one-leaf double swing door alumunium pcs 1.000.00 1.000.00
###
frame, total size 1000x2150 mm ex. alexindo or
equal approved, equipped with 12 mm clear glass
ex. Asahimas, as drawings and specification,
including hardware, accessories, and installation
C Door window DW1, two-leaf double swing door pcs 1.000.00 1.000.00
###
alumunium frame, total size 3350x3000 mm ex.
alexindo or equal approved, equipped with 12 mm
clear glass ex. Asahimas, as drawings and
specification, including hardware, accessories, and
installation
F Window W2, fixed glass window alumunium frame, pcs 1.000.00 1.000.00
###
total size3350x3000 mm ex. alexindo or equal
approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation
2nd floor Fasade Famili waiting, dirty material, pcs 3.000.00 3.000.00
Washing Decontamination
3rd floor Fasade Dirty Corridor pcs 1.000.00 1.000.00
L Window W4, fixed glass window alumunium frame, pcs 4.000.00 4.000.00
###
total size 1800x1700 mm ex. alexindo or equal
approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation
2nd floor Fasade ICU and dirty material pcs 2.000.00 2.000.00
3rd floor Fasade Coridor dirty and linen pcs 2.000.00 2.000.00
T Window W5, window alumunium frame, total size pcs 2.000.00 2.000.00
###
1200x800 mm ex. alexindo or equal approved,
equipped with 8 mm anti radiation clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation
W Louver BV4, fixed aluminium grill, total size 250x250 pcs 2.000.00 5.000.00
###
mm ex. alexindo or equal approved, as drawings
and specification, including hardware, accessories,
and installation
X Louver BV5, fixed aluminium grill, total size 300x300 pcs 4.000.00 4.000.00
###
mm ex. alexindo or equal approved, as drawings
and specification, including hardware, accessories,
and installation
###
H Scrub Sink 1200x600 mm (Provosional) Type Hanging, t = 2mm pcs 1.00 By Other
1.00
3rd floor OT pcs 1.00 1.00
I Integral Stainless Steel double bowl sink ex. Lokal pcs 3.00 3.00
###
K Slop sink SK33 + Wall Faucet TX133AUN13C ex. Toto pcs 2.00 2.00
###
###
###
###
3.2.7.1 RAILING
A Steel railing h=900 mm comprising 1"3 dia. Steel Staircase m' 28.41 28.41
###
pipe finish zincromated + paint colour to be
selection
B Steel handrailing comprising 2" dia. Steel pipe finish Staircase m' 47.08 47.08
###
zincromated + paint colour to be selection
###
3.2.7.2 OTHERS
C Wall guard (WG) installation on the wall from WG m' 32.00 32.00
###
6C product ex. Pawlin g or equal approved
###
SUBTOTAL
###
B Louver BV2, steel louver window, total size pcs 6.000.00 6.000.00
1200x580 mm, all as specified, including
hardware, accessories, and installation.
1st floor Vacum, Med Gas, Travo Room pcs 6.000.00 6.000.00
A Integral Stainless Steel double bowl sink ex. pcs 5.00 5.00
Lokal
Utility building Laundry, Kitchen pcs 5.00 5.00
3.3.6 OTHERS
A Concrete sink size 600x1400 mm with 100 Kitchen pcs 5.00 5.00
mm thickness, HT finish 600x600 mm ex.
frontino
SUBTOTAL
#REF!
3.3.6 OTHERS
Expose dak Extra tapping and sanding (skim coat) at m2 47.493.75 47.493.75
exposed concrete ceiling ex. ICI, Propan or
equal approved
GWT m2 47.493.75 47.493.75
SD2 uk. 1600x2150 Door SD2, 40 mm thick two-leaf steel door, pcs 1.000.00 1.000.00
made of 4x4 cm hollow steel frame and
70x150 mm channel (C) type steel sill, total
size 1600x2150 mm duco paint finish,
including hardware, accessories, and
installation
Baja Ringan Lightweight steel frame 1.2 Truss Profil "S" Pump Room m2 22.310.00 22.310.00
0.75mm
Atap Zincalume Cover roof Spandex depth 0.45 mm, includes Pump Room m2 22.310.00 22.310.00
nok, and Insulations, and accessories :
Insulation Work of Insulation, includes other accessories: Pump Room m2 22.310.00 22.310.00
Gutter on roof, depth 0.45 mm,includes frame Pump Room m1 4.600.00 4.600.00
plate strip and other accessories :
Lisplang Zincalume lisplank, include other accessories Pump Room m1 14.300.00 14.300.00
Manhole size 800x8 Manhole size 800x800 mm, all as drawing and GWT pcs 2.000.00 2.000.00
specified, icluding installation.
Cat ladder 3000 Cat ladder 3000 mm height, made of d25 mm GWT pcs 2.000.00 2.000.00
S/S bar,all as drawing and specified, icluding
installation.
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY QTY
SUBTOTAL
BILL NO. 3.5 - GROUND WATER TANK (GWT) & PUMP ROOM ARCHITECTURAL WORK