Vol Keramik HT

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 408

BILL NO.

2 - STRUCTURE WORK

REKAP STR (1/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT RAB ENG & QS RAP SELISIH

2 STRUCTURAL WORKS
2.1.1 FONDATION & SOIL WORKS
A Foundation Work
Mobilization - Demobilization of m' 2720.00 2720.00 0.00
material and equipment/tool

Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 2720.00 2720.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
Pile Driving Analyzer Test ttk 4.00 4.00 0.00
Cut the Head of Pole size 40x40 ttk 68.00 68.00 0.00

B Earthwork (Provisional)
Soil quarrying with heavy m3 408.81 432.19 -23.39
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
manual soil quarrying m3 209.08 206.09 2.98
Soil Disposal m3 598.56 579.82 18.74
Anti-termite spray on soil before m2 809.50 785.86 23.64
construction
Dewatering System including OTHER BUILDING (GWT, STP, LS 1.00 1.00 0.00
pumps and other equipment. WASTE CONTAINER)

REKAP STR (2/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

2.1.2 Work of Bottom Structure


A Work of Pile Cap
backfill Sand, 100mm thick m3 6.32 6.36 -0.04
working floor, 50mm thick m3 3.16 3.65 -0.49
Ready Mix Concrete concrete K250 m3 59.19 54.95 4.24
Reinforcement Reinforcement BJTD-40 kg 5366.75 8041.49 -2674.74
formwork Formwork of Block m2 180.17 183.88 -3.71

B Work of Pit Lift


backfill Sand, 100mm thick m3 2.25 3.44 -1.19
working floor, 50mm thick m3 1.13 1.89 -0.76
Ready Mix Concrete concrete K250 m3 11.83 12.71 -0.88
Reinforcement Reinforcement BJTD-40 kg 1876.67 1711.82 164.85
formwork Formwork from multiplex 12mm m2 81.47 72.65 8.82

C Work of Tie Beam


backfill Sand, 300mm thick m3 49.90 44.59 5.31
working floor, 50mm thick m3 8.53 8.94 -0.41
Ready Mix Concrete concrete K250 m3 61.64 54.16 7.48
Reinforcement Reinforcement BJTD-40 kg 14478.83 13467.35 1011.48
formwork Formwork of Block m2 500.99 531.72 -30.73

D Work of Slab
backfill Sand, 300mm thick m3 197.32 244.80 -47.48
working floor, 50mm thick m3 34.54 40.78 -6.24
Ready Mix Concrete concrete K250 m3 143.01 134.43 8.58
Reinforcement Reinforcement BJTD-40 kg 13229.98 13167.13 62.85
formwork Formwork of Block m2 43.95 68.47 -24.52

E Work of Column
Ready Mix Concrete concrete K250 m3 20.18 19.27 0.91
Reinforcement Reinforcement BJTD-40 kg 5483.09 5266.80 216.29
formwork Formwork from multiplex 12mm m2 205.59 197.19 8.40

F Work of stair
Ready Mix Concrete concrete K250 m3 3.43 3.11 0.32
Reinforcement Reinforcement BJTD-40 kg 408.50 448.14 -39.64
formwork Formwork from multiplex 12mm m2 36.87 28.33 8.54

G Work of Concrete Wall (GWT)


Ready Mix Concrete concrete K300 m3 14.37 20.66 -6.29
Reinforcement Reinforcement BJTD-40 kg 1782.49 2317.64 -535.15
formwork Formwork from multiplex 12mm m2 121.23 105.38 15.85

H Water stop ex. Fosroc m1 65.24 33.05 32.19

2.1.3 Work of Top Structure

Work of Column
Ready Mix Concrete concrete K250 m3 39.06 41.70 -2.64
Reinforcement Reinforcement BJTD-40 kg 10629.52 11465.54 -836.02
formwork Formwork from multiplex 12mm m2 361.26 385.23 -23.97

Work of Beam
Ready Mix Concrete concrete K250 m3 114.99 112.94 2.05
Reinforcement Reinforcement BJTD-40 kg 20314.83 19775.16 539.67
formwork Formwork from multiplex 12mm m2 866.40 869.76 -3.36

Work of Slab
Ready Mix Concrete concrete K250 m3 145.71 156.79 -11.08
Reinforcement Reinforcement BJTD-40 kg 16815.30 18085.25 -1269.95
formwork Formwork from multiplex 12mm m2 1094.10 1175.19 -81.09

REKAP STR (3/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

Work of stair
Ready Mix Concrete concrete K250 m3 6.85 5.89 0.96
Reinforcement Reinforcement BJTD-40 kg 817.00 903.66 -86.66
formwork Formwork from multiplex 12mm m2 743.52 55.53 687.99

Work of Parapet Wall


Ready Mix Concrete Mutu Beton K-250 m3 5.11 2.92 2.19
Reinforcement Mutu Tulangan BJTD-40 kg 1877.47 193.33 1684.14
formwork Bekisting Multiplek 12 mm m2 68.11 39.00 29.11

REKAP STR (4/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

E Other Work

Waterproofing Integral Conplast WP 421 ex. Fosroc m3 147.06 153.85 -6.79

Lightweight steel frame 1.2 Truss AHU, Utility Building m2 426.75 426.75 0.00
Profil "S" 0.75mm

Cover roof Spandex depth 0.45 AHU, Utility Building m2 426.75 426.75 0.00
mm, includes nok, and
Insulations, and accessories :

Work of Insulation, includes AHU, Utility Building m2 426.75 426.75 0.00


other accessories:

Gutter on roof, depth 0.45 AHU, Utility Building m1 55.22 55.22 0.00
mm,includes frame plate strip
and other accessories :

Zincalume lisplank, include other m1 30.81 30.81 0.00


accessories

Partition Wiremesh M8 size AHU bh 1.00 1.00 0.00


(1199+791)x360 cm, complete
with door and other accessories,
include installation

1st Floor Canopy


WF 150x75x5x7, include 400 mm kg 465.50 402.85 62.65
steel voute
CNP 150x65x20x2.3 kg 546.29 528.72 17.57
Plate thickness 8 mm kg 36.93 31.65 5.28
Plate thickness 6 mm kg 39.79 36.27 3.52
Chemical anchor dia. 16 mm, 225 pcs 84.00 84.00 0.00
mm length
Grouting m3 0.01 0.01 0.00
Trekstang 12 mm kg 23.40 21.28 2.12
Bolt dia. 16 mm @ 4 pcs pcs 39.79 112.00 -72.21
Zincromate paint kg 1035.19 952.85 82.34

Floor hardener 3kg/m2 including STP m2 7.17 19.50 -12.33


trowel finish dan floor plate
reveals ex. Fosroc or equal
approved

2.3.5 CORRIDOR BUILDING STRUCTURE WORK

Structural Retrofitting Work

Steel Structure
CNP 150x65x20x2.3 kg 336.60 336.60 0.00
Plate thickness 8 mm kg 25.94 25.94 0.00
Chemical anchor dia. 16 mm, 200 mm length bh 163.20 163.20 0.00
Grouting thickness 3 mm Formwork of Block m3 0.00 0.00 0.00
Zincromate paint kg 362.54 362.54 0.00
Duco paint finish kg 362.54 362.54 0.00

REKAP STR (5/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT RAB ENG & QS RAP SELISIH

2 STRUCTURAL WORKS
2.1.1 FONDATION & SOIL WORKS
A Foundation Work
Mobilization - Demobilization of m' 2720.00 2720.00 0.00
material and equipment/tool

Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 2720.00 2720.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
Pile Driving Analyzer Test ttk 4.00 4.00 0.00
Cut the Head of Pole size 40x40 ttk 68.00 68.00 0.00

B Earthwork (Provisional)
Soil quarrying with heavy m3 408.81 432.19 -23.39
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
manual soil quarrying m3 209.08 206.09 2.98
Soil Disposal m3 598.56 579.82 18.74
Anti-termite spray on soil before m2 809.50 785.86 23.64
construction
Dewatering System including OTHER BUILDING (GWT, STP, LS 1.00 1.00 0.00
pumps and other equipment. WASTE CONTAINER)

2.1.2 Work of Bottom Structure


backfill Sand, 100mm thick m3 8.57 9.80 -1.23
backfill Sand, 300mm thick m3 247.22 289.39 -42.17
working floor, 50mm thick m3 47.35 55.26 -7.90
Ready Mix Concrete concrete K250 m3 299.27 278.63 20.64
Ready Mix Concrete (WALL) concrete K300 m3 14.37 20.66 -6.29
Reinforcement Reinforcement BJTD-40 kg 42626.31 44420.37 -1794.06
formwork Formwork of Block m2 725.11 784.07 -58.96
formwork Formwork from multiplex 12mm m2 445.16 403.55 41.61

Water stop ex. Fosroc m1 65.24 33.05 32.19

2.1.3 Work of Top Structure

Ready Mix Concrete concrete K250 m3 311.71 320.24 -8.53


Reinforcement Reinforcement BJTD-40 kg 50454.10 50422.94 31.16
formwork Formwork from multiplex 12mm m2 3133.39 2524.71 608.68

E Other Work

Waterproofing Integral Conplast WP 421 ex. Fosroc m3 147.06 153.85 -6.79

Lightweight steel frame 1.2 Truss AHU, Utility Building m2 426.75 426.75 0.00
Profil "S" 0.75mm

Cover roof Spandex depth 0.45 AHU, Utility Building m2 426.75 426.75 0.00
mm, includes nok, and
Insulations, and accessories :

Work of Insulation, includes AHU, Utility Building m2 426.75 426.75 0.00


other accessories:

Gutter on roof, depth 0.45 AHU, Utility Building m1 55.22 55.22 0.00
mm,includes frame plate strip
and other accessories :

Zincalume lisplank, include other m1 30.81 30.81 0.00


accessories

Partition Wiremesh M8 size AHU bh 1.00 1.00 0.00


(1199+791)x360 cm, complete
with door and other accessories,
include installation

1st Floor Canopy


WF 150x75x5x7, include 400 mm kg 465.50 402.85 62.65
steel voute
CNP 150x65x20x2.3 kg 546.29 528.72 17.57
Plate thickness 8 mm kg 36.93 31.65 5.28
Plate thickness 6 mm kg 39.79 36.27 3.52
Chemical anchor dia. 16 mm, 225 pcs 84.00 84.00 0.00
mm length
Grouting m3 0.01 0.01 0.00
Trekstang 12 mm kg 23.40 21.28 2.12
Bolt dia. 16 mm @ 4 pcs pcs 39.79 112.00 -72.21
Zincromate paint kg 1035.19 952.85 82.34

FIX (6/408)
Floor hardener 3kg/m2 including STP m2 7.17 19.50 -12.33
trowel finish dan floor plate
reveals ex. Fosroc or equal
approved

2.3.5 CORRIDOR BUILDING STRUCTURE WORK

Structural Retrofitting Work

Steel Structure
CNP 150x65x20x2.3 kg 336.60 336.60 0.00
Plate thickness 8 mm kg 25.94 25.94 0.00
Chemical anchor dia. 16 mm, 200 mm length bh 163.20 163.20 0.00
Grouting thickness 3 mm Formwork of Block m3 0.00 0.00 0.00
Zincromate paint kg 362.54 362.54 0.00
Duco paint finish kg 362.54 362.54 0.00

FIX (7/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT RAB ENG & QS RAP SELISIH

2 STRUCTURAL WORKS
2.1.1 FONDATION & SOIL WORKS
A Foundation Work
Mobilization - Demobilization of m' 2720.00 2720.00 0.00
material and equipment/tool

Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 2720.00 2720.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
Pile Driving Analyzer Test ttk 4.00 4.00 0.00
Cut the Head of Pole size 40x40 ttk 68.00 68.00 0.00

B Earthwork (Provisional)
Soil quarrying with heavy m3 408.81 432.19 -23.39
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
manual soil quarrying m3 209.08 206.09 2.98
Soil Disposal m3 598.56 579.82 18.74
Anti-termite spray on soil before m2 809.50 785.86 23.64
construction
Dewatering System including OTHER BUILDING (GWT, STP, LS 1.00 1.00 0.00
pumps and other equipment. WASTE CONTAINER)

2.1.2 Work of Bottom Structure


backfill Sand, 100mm thick m3 8.57 9.80 -1.23
backfill Sand, 300mm thick m3 247.22 289.39 -42.17
working floor, 50mm thick m3 47.35 55.26 -7.90
Ready Mix Concrete concrete K250 m3 610.99 598.87 12.12
Ready Mix Concrete (WALL) concrete K300 m3 14.37 20.66 -6.29
Reinforcement Reinforcement BJTD-40 kg 93080.41 94843.31 -1762.90
formwork Formwork of Block m2 725.11 784.07 -58.96
formwork Formwork from multiplex 12mm m2 3578.55 2928.26 650.29

Water stop ex. Fosroc m1 65.24 33.05 32.19


Waterproofing Integral Conplast WP 421 ex. Fosroc m3 147.06 153.85 -6.79

Lightweight steel frame 1.2 Truss AHU, Utility Building m2 426.75 426.75 0.00
Profil "S" 0.75mm

Cover roof Spandex depth 0.45 AHU, Utility Building m2 426.75 426.75 0.00
mm, includes nok, and
Insulations, and accessories :

Work of Insulation, includes AHU, Utility Building m2 426.75 426.75 0.00


other accessories:

Gutter on roof, depth 0.45 AHU, Utility Building m1 55.22 55.22 0.00
mm,includes frame plate strip
and other accessories :

Zincalume lisplank, include other m1 30.81 30.81 0.00


accessories

Partition Wiremesh M8 size AHU bh 1.00 1.00 0.00


(1199+791)x360 cm, complete
with door and other accessories,
include installation

1st Floor Canopy


WF 150x75x5x7, include 400 mm kg 465.50 402.85 62.65
steel voute
CNP 150x65x20x2.3 kg 546.29 528.72 17.57
Plate thickness 8 mm kg 36.93 31.65 5.28
Plate thickness 6 mm kg 39.79 36.27 3.52
Chemical anchor dia. 16 mm, 225 pcs 84.00 84.00 0.00
mm length
Grouting m3 0.01 0.01 0.00
Trekstang 12 mm kg 23.40 21.28 2.12
Bolt dia. 16 mm @ 4 pcs pcs 39.79 112.00 -72.21
Zincromate paint kg 1035.19 952.85 82.34

Floor hardener 3kg/m2 including STP m2 7.17 19.50 -12.33


trowel finish dan floor plate
reveals ex. Fosroc or equal
approved

2.3.5 CORRIDOR BUILDING STRUCTURE WORK

Structural Retrofitting Work

Steel Structure
CNP 150x65x20x2.3 kg 336.60 336.60 0.00

FIX (2) (8/408)


Plate thickness 8 mm kg 25.94 25.94 0.00
Chemical anchor dia. 16 mm, 200 mm length bh 163.20 163.20 0.00
Grouting thickness 3 mm Formwork of Block m3 0.00 0.00 0.00
Zincromate paint kg 362.54 362.54 0.00
Duco paint finish kg 362.54 362.54 0.00

FIX (2) (9/408)


No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
RAP R0 RAB ENG & QS

NO KODE RAP URAIAN PEKERJAAN SAT. QTY QTY QTY

1 P-000 PRELIMINAIRIES

P-000 Helm,Sepatu,Safety Belt Staff ls 1.00


P-000 Protokol kesehatan Covid-19 ls 1.00

P-100 Biaya Gaji,Lembur & Uang Makan Staff ( Staff Bulanan )


Managers
P-100 Site Management bln 10.00
P-100 Security ls 1.00
P-100 Tunjangan - Tunjangan Staf / THR ls 1.00
P-100 Maintenance of the works ( Defects period) ls 1.00

P-101 Gaji Harian


P-101 Harian K 3 / Gudang bln 8.00
P-101 Harian Surveyor bln 8.00

P-120 Pembelian Konsumsi Lembur Meeting


P-120 Pembelian Makanan / Minuman Lembur bln 8.00
P-120 Pembelian Makanan / Minuman Meeting bln 8.00

P-130 P 3 K, Biaya Pengobatan, Astek, Askes


P-130 Iuran Astek / Askes / BPJS ls 1.00

P-200 Transport, Tol, Parkir, BBm, Service Kendaraan


P-200 Ongkos Taxi, Angkutan Umum, Pick up ls 1.000.00
P-200 Biaya Tol, Parkir, BBM 8.000.00
P-200 Transportasi tukang org 100.00

P-210 Kebersihan Akhir ls 1.00

P-300 Testing Besi, Beton, Air & Tanah


P-300 Crusting Test Beton ( per 6 m3) bh 500.00
P-300 Test Tarik / Tekuk Besi ( Per 50.000 kg ) bh 48.00

P-400 Telepon, Voucher & Fax ls 1.00

P-410 Instalasi Listrik site office


P-410 Penyambungan Daya PLN ( biaya koordinasi)/sementara ls 1.00
P-410 Instalasi Listrik site office ls 1.00
P-410 Biaya Pemakaian Listrik & Abudemen bln 10.000.00

P-420 PAM & Pembelian Air Kerja ls 1.00

P-500 Upah Kuli Bongkar Muat Material ls 1.00


P-501 Tip Supir, Teknisi Cor Beton & Upah Kuli Turun material ls 1.00
P-510 Biaya Koordinasi Keamanan External ls 1.00
P-520 Gaji Keamanan Internal ls 1.00
P-530 Entertainment Owner,Direksi & MK ls 1.00

P-550 Insentif Konsultan


P-550 Insentif Konsultan (Bpk Teddy) ls 1.000.00
P-550 Insentif Konsultan Struktur (Bpk Rusli) ls 1.000.00
P-550 Insentif Konsultan Arsitektur (Bpk Evan) ls 1.000.00

P-800 Pembelian Inventaris


P-800 Printer A3 unit 1.00
P-800 Printer A4 unit 2.00
P-800 Komputer unit 4.00
P-800 UPS unit 2.00
P-800 AC unit 2.00
P-800 Pembelian inventaris lainnya ls 1.00
No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
RAP R0 RAB ENG & QS

NO KODE RAP URAIAN PEKERJAAN SAT. QTY QTY QTY

P-820 ATK, Keperluan Kantor,Peralatan Kantor & Foto Copy bln 10.00

P-830 Keperluan Dapur Direksi Keet, Kontrakan dll bln 10.00

P-920 Dokumen Tender, SoftAS Drawing dll


P-920 Dokumen Kontrak ls 1.00
P-920 Biaya Foto Copy Gambar ls 1.000.00
P-920 Biaya AS Drawing ls 1.000.00

P-930 Uang Jaminan (Insurance) dll


P-930 Advance payment guarantee ls 1.00
P-930 Performance guarantee ls 1.00
P-930 CAR & TPL ls 1.00
P-930 Deductible ls 1.00

Jumlah Preliminaries :

2 M-000 MATERIAL

M-000 Material Lainya


M-000 Plastic Concrete spacer m2 4,332.00
M-000 Kawat beton roll 138.00
M-000 Paku kg 412.00
M-000 Glasswool 24kg/m2 1.2mx30m roll 12.00
M-000 Roofmesh 2214 uk 1.8mx30m roll 8.00
M-000 Alumunium Foil uk 1.2mx50m roll 15.00
M-000 Mould oil ltr 80.00
M-000 Sikagrout 215 @25 kg/zak ex. Sika zak 70.00
M-000 Manhole 800x800 bh 2.00
M-000 Material Bantu Pengecoran ls 1.00
M-000 Material Bantu Pembesian ls 1.00
M-000 Material Bantu Sanitary ls 1.00
M-000 Material bantu lainnya ls 1.00

M-100 Baja ( WF, CNP, UNP, H Beam dll )


M-100 WF 150x75x5x7 kg 465.50 465.50 402.85
M-100 CNP 150x60x20x2.3 kg 876.29 882.89 865.32
M-100 Plate 8 mm kg 62.36 62.87 57.59
M-100 Plate 6 mm kg 39.79 39.79 36.27
M-100 Trekstang kg 23.40 23.40 21.28
M-100 Angkur Dia. 16 bh 244.00 247.20 247.20
M-100 Bolt dia. 16 bh 39.79 39.79 112.00
M-100 Ongkos Kirim ls 1.00

M-110 Material Besi

M-110 Besi beton BJTD 40 kg 95041.751.97 93080.41 94843.31


M-110 Ongkos Kirim Besi beton BJTD 40 kg 95041.751.97 93080.41 94843.31
M-110 Kolom praktis KP806 btg 1,124.00
M-110 Wiremesh M4 lbr 19.00
M-110 Wiremesh M8 lbr 9.00 1.00 1.00

M-210 Batako, hebel dan bata ringan

M-210 Bata Ringan 60x20x10 cm ex. Leicht Brick m3 319.00 307 276
M-210 Ongkos Kirim Bata Ringan 60x20x10 cm m3 319.00
M-210 Batako Trass 36x17x8cm bh 12,296.00

M-300 Bahan : pasir urug

M-300 Pasir urug m3 258.42


No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
RAP R0 RAB ENG & QS

NO KODE RAP URAIAN PEKERJAAN SAT. QTY QTY QTY

M-350 Pasir beton

M-350 Pasir Pasang m3 165.00

M-400 Bahan : Semen 3 roda @ 50 kg

M-400 Semen zak 1,200.00

M-420 Semen instan

M-420 Perekat bata ringan @40kg/sak ex. Broco zak 268.00


M-420 Plester Bata Ringan @40kg/sak ex. Broco zak 3,250.00
M-420 Acian Plester @40kg/sak ex. Broco zak 265.00
M-420 Skimcoat Beton @40kg/sak ex. Broco zak 31.00
M-420 Tile Adhesive @25kg/sak ex. Broco zak 421.00
M-420 Tile Grout@1kg/sak ex. Broco zak 498.00
M-420 Ongkos Kirim Mortar zak 4,400.00

M-500 Beton

M-500 Beton B0 m3 46.75 47.35 55.26


M-500 Beton K250 kg/m2 NFA m3 595.84 610.99 598.87
M-500 Beton K300 kg/m2 NFA m3 49.13 14.37 20.66
644.96 625.36 619.53
M-600 Plywood Polyfilm

M-600 Plywood 15 mm lbr 110.00


M-600 Plywood 12 mm lbr 516.00 601.07 491.85

M-650 Kayu kaso

M-650 Kayu 5/7cm m3 30.00


M-650 Kayu 6/12cm m3 22.00

M-700 Baja Ringan, Metal sheet


M-700 Rangka Baja Ringan m2 442.96 442.96 442.96
M-700 Atap Zincalume Kliplok System m2 442.96 442.96 442.96
M-700 Flashing metal m1 45.11 45.11 45.11
M-700 Talang Metal m1 58.99 58.99 58.99
M-700 Ongkos Kirim Material m2 442.96 442.96 442.96

M-800 Keramik, HT
M-800 HT 60x60 Granite texture ex. Frontino m2 49.13
M-800 HT uk. 60 x 60 cm Double Loading ex. Frontino m2 748.27
M-800 HT 60x60 cm Rustic Cementum ex. Frontino m2 123.61
M-800 Dinding CT 30x60 cm ex. Roman m2 356.47
M-800 Dinding CT 30x30 cm ex. Roman m2 188.48
M-800 Lantai CT 30x30 cm ex. Roman Gol B m2 182.70
M-800 Skirting Hospital HT 10x60 cm keping 727.00
M-800 Skirting Hospital HT 8x30 cm ex. Roman keping 31.00
M-800 Ongkos Cutter step nose keping 28.00
M-800 Ongkos Kirim Material HT & Keramik m2 1,693.02

M-820 Sanitairy
M-820 Closet type CW 421 J ex. Toto unit 8.00
M-820 Shower Spray TB 19 CSMCR ex. Toto unit 8.00
M-820 Lavatory LW897CJ + Faucet TX109LD ex. Toto unit 19.00
M-820 Floor Drain TX 1 EB ex. Toto unit 9.00
No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
RAP R0 RAB ENG & QS

NO KODE RAP URAIAN PEKERJAAN SAT. QTY QTY QTY

M-820 Robe Hook TS 118 WSB ex. Toto unit 8.00


M-820 Slop sink SK33 + Wall Faucet TX133AUN13C ex. Toto unit 3.00
M-820 Kran T 23 BQ13N ex. Toto unit 3.00
M-820 Paper holder TX 703 AESV1 ex. Toto unit 8.00
M-820 Kitchen Faucet TX603KM ex. Toto unit 8.00
M-820 Kitchen Sink double ex. Lokal unit 8.00
M-820 Roof Drain Ironmongeries ex. Antasan unit 9.00
M-820 Ongkos kirim sanitair ls 1.00
M-820 Resiko kehilangan & kerusakan ls 1.00

M-830 Cat
M-830 Cat zinchromate kg 1,390.62

M-840 Hardware Pintu Besi ex. Dekkson


M-840 D2 uk. 900x2150 unit 5.000.00
M-840 D2A uk. 1400x2150 unit 1.000.00
M-840 D2A-LD2 uk. 1400x2150 unit 3.000.00
M-840 D2A-LD4 uk. 1400x2150 unit 1.000.00
M-840 FDB uk. 1100x2150 unit 4.000.00
M-840 PB uk. 600x1000 unit 7.000.00
M-840 SD uk. 900x2150 unit 4.000.00
M-840 SD-LD2 uk. 900x2150 mm unit 1.000.00
M-840 SDB uk. 1100x2150 unit 1.000.00
M-840 SD1 uk. 1000x2150 unit 1.000.00
M-840 SD2 uk. 1600x2150 unit 2.000.00
M-840 SD5 uk. 1100x2150 unit 1.000.00
M-840 Door Louver DW4 uk. 1600x2150 + (1800+1160)x580 unit 2.000.00
M-840 Ongkos Kirim unit 33.000.00

M-850 Hardware Pintu Kayu ex. Dekkson


M-850 Daun Pintu Kayu D1A-DP uk. 1600x2150 (Facility Building) unit 2.000.00
M-850 Daun Pintu Kayu D4 uk. 900x2150 unit 2.000.00
M-850 Daun Pintu Kayu D4-A uk. 800x2150 mm unit 1.000.00
M-850 Daun Pintu Kayu D4-K uk. 900x2150 unit 2.000.00
M-850 Daun Pintu Kayu D4-DP uk. 900x2150 unit 2.000.00
M-850 Daun Pintu Kayu D5-K uk. 800x2150 unit 2.000.00
M-850 Daun Pintu Kayu D5A-K uk. 900x2150 unit 6.000.00
M-850 Daun Pintu Kayu 5B-K uk. 1000x2150 unit 1.000.00
M-850 Kusen + Daun Pintu D1A-DP uk. 1600x2150 (Main Building) unit 1.000.00
M-850 Kusen + Daun Pintu D4-K1 uk. 900x2150 unit 5.000.00
M-850 Kusen + Daun Pintu D4B uk. 900x2150 unit 1.000.00
M-850 Kusen + Daun Pintu D5A-K1 uk. 900x2150 unit 5.000.00
M-850 Kusen + Daun Pintu D2A-K uk. 1400x2150 unit 8.000.00
M-850 Ongkos Kirim unit 38.000.00

Jumlah Material :

3 S-000 SUBKON
S-100 STRUKTUR

S-101 Fondasi Tiang Pancang


S-101 Material Tiang Pancang 40x40; K-500, PC Strand 0.5" m1 2,720.00 2,720.00 2,720.00
S-101 Joint Plate, t= 8 mm ; angkur 4D13 ttk 204.00 204.00 204.00
S-101 Mobilisasi Tiang Pancang ls 1.00 1.00 1.00
S-101 Jasa Pancang (HSPD) 240 ton m1 2,720.00 2,720.00 2,720.00
S-101 Joint Tiang Pancang ttk 204.00 204.00 204.00
S-101 Handling Tiang Pancang m1 2,720.00 2,720.00 2,720.00
S-101 PDA test ttk 4.00 4.00 4.00
No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
RAP R0 RAB ENG & QS

NO KODE RAP URAIAN PEKERJAAN SAT. QTY QTY QTY

S-101 Mobilisasi & Demobilisasi Alat Pancang ls 1.00 1.00 1.00

S-104 Anti rayap


S-104 Subcon antirayap m2 793.625.69 809.498.21 785.859.34

S-106 Waterproofing
S-106 Waterproofing Integral ex. Fosroc m3 144.17 147.06 153.85
S-106 Water Stop ex. Fosroc m1 63.96 65.24 33.05
S-106 Waterproofing coating ex. Fosroc m2 233.31
S-106 Waterproofing membrane ex. Fosroc m2 227.78
S-106 Floor Hardener 3 kg m2 213.49 7.17 19.50
S-106 Floor Hardener 5 kg m2 11.72 TIDAK ADA

S-200 FINISHING /ARSITEKTUR

S-200 Subcont / Pekerjaan Lain-lain


S-200 Insulation Spray Polyurethene m2 181.33
S-200 Corner Guard bh 21.00
S-200 Wall guard m1 32.00
S-200 Signage Interior ls 1.00
S-200 Signage + Logo Façade ls 1.00
S-200 Canopy ACP ex. Seven m2 212.51
S-200 Cermin 600x900 unit 8.00

S-201 Sandwich Panel


S-200 Dinding Sandwich panel PIR 50 mm m2 178.08
S-200 Pekerjaan dinding timbal 2 mm m2 82.40
S-200 Ceiling Sandwich panel PIR 50 mm m2 96.19

S-202 Cat
S-202 Cat dinding antibacterial emulsion ex. Jotun Majestic TB care m2 4,128.94
S-202 Cat dinding acrylic emulsion ex. Jotun Majestic TB Care m2 1,076.07
S-202 Cat enamel ex. Majextic TB sheen m2 137.45
S-202 Cat weathershield emulsion ex. Jotun Jotashield antifade m2 2,039.27
S-202 Skirting oil paint 10 cm m1 60.02
S-202 Epoxy 500 Micron m2 124.42

S-203 Lead Shield wall


S-200 Lead Shield wall 2 mm Area Radiologi m2 152.60
S-200 Lead Shield wall 4 mm Area Radiologi m2 55.88
S-200 Lead Shield wall 2 mm Operation Room m2 82.40

S-206 Lantai Vynil


S-206 Lantai vinyl Somplan 360 ex. Tarkett m2 706.012.15
S-206 Lantai vinyl IQ Toro SC ex. Tarkett m2 84.402.00
S-206 Skirting PVC 15 cm vinyl ex. Tarkett m1 604.246.00
S-206 Self Leveling m2 578.140.28

S-208 Pintu Besi


S-208 Kusen D1A-DP uk. 1600x2150 (Facility Building) unit 2.000.00
S-208 Kusen D4 uk. 900x2150 unit 2.000.00
S-208 Kusen D4-A uk. 800x2150 mm unit 1.000.00
S-208 Kusen D4-K uk. 900x2150 unit 2.000.00
S-208 Kusen D4-DP uk. 900x2150 unit 2.000.00
S-208 Kusen D5-K uk. 800x2150 unit 2.000.00
S-208 Kusen D5A-K uk. 900x2150 unit 6.000.00
S-208 Kusen D5B-K uk. 1000x2150 unit 1.000.00
S-208 D2 uk. 900x2150 unit 5.000.00
S-208 D2A uk. 1400x2150 unit 1.000.00
S-208 D2A-LD2 uk. 1400x2150 unit 3.000.00
S-208 D2A-LD4 uk. 1400x2150 unit 1.000.00
S-208 FDB uk. 1100x2150 unit 4.000.00
No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
RAP R0 RAB ENG & QS

NO KODE RAP URAIAN PEKERJAAN SAT. QTY QTY QTY

S-208 PB uk. 600x1000 unit 7.000.00


S-208 SD uk. 900x2150 unit 4.000.00
S-208 SD-LD2 uk. 900x2150 mm unit 1.000.00
S-208 SDB uk. 1100x2150 unit 1.000.00
S-208 SD1 uk. 1000x2150 unit 1.000.00
S-208 SD2 uk. 1600x2150 unit 2.000.00
S-208 SD5 uk. 1100x2150 unit 1.000.00
S-208 Door Louver DW4 uk. 1600x2150 + (1800+1160)x580 unit 2.000.00
S-208 Louver BV2 uk. 1200x580 unit 6.000.00
S-208 Ongkos Kirim unit 39.000.00

S-209 Pintu Kayu


S-209 Daun Pintu Kayu D1A-DP uk. 1600x2150 (Facility Building) unit 2.000.00
S-209 Daun Pintu Kayu D4 uk. 900x2150 unit 2.000.00
S-209 Daun Pintu Kayu D4-A uk. 800x2150 mm unit 1.000.00
S-209 Daun Pintu Kayu D4-K uk. 900x2150 unit 2.000.00
S-209 Daun Pintu Kayu D4-DP uk. 900x2150 unit 2.000.00
S-209 Daun Pintu Kayu D5-K uk. 800x2150 unit 2.000.00
S-209 Daun Pintu Kayu D5A-K uk. 900x2150 unit 6.000.00
S-209 Daun Pintu Kayu 5B-K uk. 1000x2150 unit 1.000.00
S-209 Kusen + Daun Pintu D1A-DP uk. 1600x2150 (Main Building) unit 1.000.00
S-209 Kusen + Daun Pintu D4-K1 uk. 900x2150 unit 5.000.00
S-209 Kusen + Daun Pintu D4B uk. 900x2150 unit 1.000.00
S-209 Kusen + Daun Pintu D5A-K1 uk. 900x2150 unit 5.000.00
S-209 Kusen + Daun Pintu D2A-K uk. 1400x2150 unit 8.000.00
S-209 Ongkos Kirim unit 38.000.00

S-210 Pintu & Jendela Kaca Alumunium ex. Alexindo Finish Anodized
S-210 DW1 (3350 X 3000) unit 1.000.00
S-210 D6 (1000 X 2150) unit 1.000.00
S-210 SD4 (900 X 2150) unit 1.000.00
S-210 W1 (825 X 3000) unit 1.000.00
S-210 W1A (1800 X 3000) unit 2.000.00
S-210 W2 (3350 X 3000) unit 1.000.00
S-210 W2A (3350 X 3000) unit 1.000.00
S-210 W3 (900 X 1700) unit 3.000.00
S-210 W3A (600 X 1700) unit 4.000.00
S-210 W3A-1 (600 X 1700) unit 1.000.00
S-210 W3B (300 X 1700) unit 2.000.00
S-210 W4 (1800 X 1700) unit 4.000.00
S-210 W4A (1200 X 1700) unit 4.000.00
S-210 W4A-1 (1200 X 1700) unit 1.000.00
S-210 W4B (1500 X 1700) unit 2.000.00
S-210 W4C (1000 X 1700) unit 3.000.00
S-210 W4D (1200 X 1700) unit 2.000.00
S-210 W4E (2700 X 1700) unit 1.000.00
S-210 W4F (2050 X 1700) unit 1.000.00
S-210 W5 (800 X 1200) Radiologi (Jasa Pasang) unit 2.000.00
S-210 BV1 (750 X 400) unit 2.000.00
S-210 BV3 (2000 X 400) unit 1.000.00
S-210 BV4 (250 X 400) unit 2.000.00
S-210 BV5 (300 X 400) unit 4.000.00
S-210 DW5 (5700 X 3000) unit -
S-210 DW6 (3660 X 3000) unit 1.000.00
S-210 DW7 (2850 X 3000) unit -
S-210 DW2 (2560 X 2150) unit 1.000.00
S-210 DW3 (2050 X 2150) unit 2.000.00
S-210 D2B (900 X 2150) unit 3.000.00
S-210 W6 (1200 X 1200) unit 3.000.00
S-210 Ongkos Kirim ls 1.000.00

S-211 Pintu Hermatic


No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
RAP R0 RAB ENG & QS

NO KODE RAP URAIAN PEKERJAAN SAT. QTY QTY QTY

S-211 hermetic sliding 1600x2200 unit 1.000.00


S-211 hermetic sliding 1600x2200 + Timbal 2 mm unit 1.000.00
S-211 hermetic swing size 900x2200 unit 1.000.00
S-211 hermetic swing size 900x2200 + Timbal 2 mm unit 1.000.00
S-211 sliding size 1600x2200 (Transfer Room) unit 2.000.00
S-211 Ongkos Kirim unit 6.000.00

S-212 Partisi & Plafond


S-212 Dinding Gypsum 12 mm 1 Lapis m2 208.475.00
S-212 Plafond gypsumboard 9 mm + Manhole ex. Jayaboard m2 837.243.70
S-212 Plafond gypsumboard 9 mm WR + Manhole ex. Jayaboard m2 134.309.00
S-212 Plafong kalsiboard 6 mm ex. Kalsi m2 90.165.00
S-212 Shadowline m1 1296.718.00

S-213 Railling
S-213 Railling Tangga darurat m1 28.405.18
S-213 Hand Railling darurat m1 47.080.18

S-214 MEP
S-214 Plumbing ls 1.00 1.000.00 1.000.00
S-214 Mekanikal & Elektrikal ls 1.00 1.000.00 1.000.00
S-214 VAC ls 1.00 1.000.00 1.000.00
S-214 Lift ls 1.00 1.000.00 1.000.00

Jumlah Subcon :

4 U-000 UPAH
U000 UPAH LAINNYA
U-000 Upah Potong Kepala Pancang ttk 68.00
U-000 Upah pasang pasir urug m3 250.90
U-000 Upah Rangka Atap baja ringan m2 442.96
U-000 Upah Pasang Penutup Atap m2 442.96
U-000 Upah Pasang Flashing & Nok m1 45.11
U-000 Upah Pasang Talang Atap metal m1 58.99
U-000 Upah gelas Glasswool / Insulation m2 442.96
U-000 Dinding Wiremesh ruang genset + Material m2 9.36
U-000 Dinding Wiremesh ruang AHU + Material bh 71.64

U100 STRUKTUR
U-100 Upah Trowel m2 225.21

U-101 Galian Tanah manual m3 204.98


U-101 Buang tanah bekas galian m3 204.98

U-103 Upah pembesian kg 92,273.55


U-103 Upah Turun besi kg 92,273.55

U-104 Upah bekisting batako m2 716.65


U-104 Upah bekisting balok & Plat m2 1,922.05
U-104 Upah bekisting kolom m2 822.33
U-104 Upah bekisting tangga m2 765.09

U-105 Upah Lantai Kerja m3 45.39


U-105 Upah Pengecoran Pile cap & Tie Beam m3 259.82
U-105 Upah Pengecoran Kolom m3 88.76
U-105 Upah Pengecoran Balok & Plat m3 255.58
U-105 Upah Pengecoran Tangga m3 10.08
U-105 Upah Curring m3 659.64

U-200 FINISHING/ARSITEKTUR
No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
RAP R0 RAB ENG & QS

NO KODE RAP URAIAN PEKERJAAN SAT. QTY QTY QTY

U-201 Upah pasang dinding bata ringan m2 3,065.17


U-201 Upah Plesteran dinding dalam m2 3,542.23
U-201 Upah Acian dinding dalam m2 2,905.39
U-201 Upah Turun dan Langsir Material Bata Ringan m2 3,065.17
U-201 Langsir material plester dan Aci m2 6,447.62
U-201 Upah skimcoat, Expose m2 373.65
U-201 Upah Plesteran dinding Luar m2 1,025.12
U-201 Upah Acian dinding Luar m2 1,025.12
U-201 Langsir material Skimcoat m2 373.65
U-201 Upah Kolom Praktis m1 1,021.72

U-202 Upah pasang HT dinding include plesteran m2 46.14


U-202 Upah pasang HT Jamb Lift + include plesteran m1 13.60
U-202 Upah pasang HT lantai + screed m2 762.41
U-202 Upah pasang HT tangga + screed m2 56.25
U-202 Upah pasang Skiritng HT + Tali air included Cutter HT m1 436.22
U-202 Upah Lansir Material HT m2 864.80
U-202 Upah Lansir Mortar Perekat HT & Nut m2 864.80
U-202 Upah pasang Keramik dinding include plesteran m2 497.26
U-202 Upah pasang Keramik lantai + screed m2 170.74
U-202 Upah pasang Skiritng Keramik + Tali air included Cutter HT m1 9.25
U-202 Upah Lansir Material Keramik m2 668.00
U-202 Upah Lansir Mortar Perekat HT & Nut m2 668.00
U-202 Upah pasang Screed Vynil m2 790.41
U-202 Upah pasang Screed Proteksi WR m2 233.31
U-202 Upah pasang Screed Atap Included pasang Wiremesh m2 215.83
U-202 Upah pasang meja beton 600x1400 mm bh 5.00
U-202 Angkut Semen + Pasir m2 1,239.55

U-203 Upah pasang Closet Duduk unit 8.00


U-203 Upah pasang shower spray unit 8.00
U-203 Upah pasang Lavatory + Faucet unit 19.00
U-203 Upah pasang Floor Drain unit 9.00
U-203 Upah pasang Slop sink + Faucet unit 3.00
U-203 Upah pasang Kran unit 3.00
U-203 Upah pasang Papper holder unit 8.00
U-203 Upah pasang Robe Hook unit 8.00
U-203 Upah pasang Kitchen Faucet unit 8.00
U-203 Upah pasang Kitchen sink unit 8.00
U-203 Upah pasang Roof drain unit 9.00
U-203 Upah langsir Closet duduk unit 8.00
U-203 Upah langsir material sanitair unit 91.00

U-900 BAJA
U-900 Fabrikasi & Material bantu kg 1,467.34
U-900 Erection kg 1,467.34
U-900 Upah Pasang Angkur bh 244.00
U-900 Upah Pasang Mur Baut bh 39.79
U-900 Ongkos Kirim kg 1,467.34

Jumlah Upah :

5 A-000 ALAT

A-000 Sewa Alat


A-000 Alat Kerja lainnya ls 1.000.00
A-000 Transport ls 1.000.00

A-213 Mobile Crane


A-213 Mobile Crane shift 7.000.00

A-230 Sewa Excavator,


No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
RAP R0 RAB ENG & QS

NO KODE RAP URAIAN PEKERJAAN SAT. QTY QTY QTY

A-230 Sewa Excavator, Uang Makan, Lembur & Tip ls 1.00

A-250 Alat - Concrate Pump


A-250 Alat bantu Concrete Pump m3 525.49

A-500 Sewa schafolding


A-500 Scafolding struktur m2 2,687.15
A-500 Concrete form work m2 822.334.69
A-500 Tie rod m2 822.33
A-500 Scafolding Finishing (Interior & Façade) ls 1.00

A-600 BBM ( Bensin, Solar, Oli )


A-600 Bensin ltr 350.00
A-600 Solar ltr 350.00

A-800 Pembelian Alat Kerja lainnya


A-800 Pembelian alat bantu kerja ls 1.00

Jumlah Alat :

GRAND TOTAL
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY VOL
FORKON
3.00 EXISTING MAIN BUILDING RENOVATION ARCHITECTURAL WORK
3.1.1 INTERIOR WALLS AND WALL FINISHES

3.1.1.1 LIGHT BRICK, PLASTER, AND PARTITIONS WORK

A Light brick masonry t=100 mm ex. broco or m2 3065.17 2761.99


equal approved, with instant mortar as an
adhesive including practical concrete

Lead Shield wall from Pb t=2 mm covered m2 152.60 135.04


with metal frame type partition from 12 mm
gypsumboard ex Jayaboard or Equal
Approved with 0.55 mm frame, including
instalation, accessories, and others as
specified (WX1)

Lead Shield wall from Pb t=4 mm covered m2 55.88 56.92


with metal frame type partition from 12 mm
gypsumboard ex Jayaboard or Equal
Approved with 0.55 mm frame, including
instalation, accessories, and others as
specified (WX2)

Sandwich panel isolation wall cover type PIR m2 151.30 142.68


with 100 mm 50 mm thickness ex.
Zelltech/Alsun/Equal, including accessories
and others as specified (BD)&(BDX)

B 10mm thick min. cement render at Masonry m2 2905.386.90 2803.773.05


Wall with smooth finish including reveals to
receive paint finish (paint measured
separately)

C 10mm thick min. cement render at Masonry m2 636.841.25 649.671.25


Wall with smooth finish excluding reveals to
received tile finish (tile measured separately)

3.1.1.2 WALL FINISHES


A Homogenous tile 300x600 mm Class B on light m2 321.112.50 244.192.50
brick wall classification ex. frontino or Equal
Approved, including mortar bed and grouting
(HT3)

B Ceramic Tile 300x300 mm Class B on light m2 189.745.00 259.150.00


brick wall classification ex. Roman or Equal
Approved, including mortar bed and grouting
(CT3)

C Interior acrylic emulsion paint finish on light m2 3005.320.50 2811.385.50


brick wall and column anti-bacteria type
jotun majestic TB care ex. Jotun or Equal
Approved (PT3)

D Interior acrylic emulsion paint finish on light m2 858.106.03 555.491.63


brick wall and column type jotaplast ex. Jotun
or Equal Approved

E Interior enamel paint finish on 1.5 m light m2 137.452.50 137.452.50


brick wall ex. Majesric TB Sheen or Equal
Approved
F Coating waterproofing using Brushbond Grey gwt m2 98.856.00 98.856.00
ex Fosroc including Screed Protection,
accessories and flatten
G Interior acrylic emulsion paint finish on light gwt m2 26.260.00 26.260.00
brick wall and column type jotaplast ex. Jotun
or Equal Approved
H Exterior weathershield emulsion paint type gwt m2 286.372.00 286.372.00
jotashield antifade flex ex. Jotun or equal
approved
I Epoxy 500 micron wall ex. Propan or equal gwt m2 98.856.00 98.856.00
approved

3.1.2 FLOOR FINISHES

A Homogeneous tile 600x600 mm double m2 646.344.00 589.260.00


loading process type polish ex. frontino or
equal approved (HT1)
B Ceramic tile 300x300 mm anti slip ex. Roman m2 177.657.50 160.580.00
or equal approved (CT2)
C Vinyl flooring type roll homogenous anti m2 706.012.15 621.820.00
bacteria and fungal type Somplan 350 ex.
Tarkett or equal approved (VN)

D Skirting homogeneous tile 100X600 mm m' 436.222.00 498.820.00


including mortar bed, AM grouting, and
flatten ex. Roman or equal approved (HT2)

E Skirting PVC 150 mm height off white colour, m' 604.246.00 578.450.00
including fixing accessories and flatten ex.
Tarkett or equal approved (VP)

F Skirting oil paint 100 mm height ex. jotun, m' 60.022.50 46.760.00
including fixing accessories and flatten (PT2)

G Skirting ceramic tile 100X300 mm including m' 9.250.00 -


mortar bed, AM grouting, and flatten ex.
Roman or equal approved

REKAP ARS (19/408)


H Floor hardener 3kg/m2 including trowel finish UTILITY m2 84.381.00 -
dan floor plate reveals ex. Fosroc or equal
approved
I Floor hardener 5kg/m2 including trowel finish GWT m2 13.260.00 13.260.00
dan floor plate reveals ex. Fosroc or equal
approved
J Coating waterproofing using Brushbond Grey GWT m2 91.709.33 91.709.33
ex Fosroc, accessories and flatten
K Screed with wiremesh M4, groove line water GWT m2 21.590.00 21.590.00
slooping
L Epoxy 500 micron wall ex. Propan or equal GWT m2 70.119.33 70.119.33
approved
###
3.1.3 CEILING FINISHES ###
###
A Gypsum board ceiling 9 mm thick ex. m2 ###
Jayaboard or equal approved, with boral
metal system frame, including fixing
accessories, instalation and flatten (GB1)

Existing main building UGD, Surgery, Laboratory, pathology, blood m2


bank, Lobby & waiting area, Staff Amenity,
Consult Room, Medrec, Farmasi, Dental,
Pediatric, ENT, Orthopedi, InTerna Dept.,
Opthamology, Obsgyn

###
B Gypsum board ceiling water resistance 9 mm m2 ###
thick ex. Jayaboard or equal approved, with
boral metal system frame, including fixing
accessories, instalation and flatten (GB2)

Existing main building Toilet, Dirty Utility m2


###
C Interior acrylic emulsion paint finish on light m2 ###
brick wall and column anti-bacteria type
jotun majestic TB care ex. Jotun or Equal
Approved

Existing main building All ceiling areas below suspended ceiling m2


###
###
D Ceiling shadow line 10x10mm from gypsum m' ###
profile paint finish, fixing accessories and
flatten
Existing main building All areas installed with gypsum and gypsum m'
WR ceiling

REKAP ARS (20/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT

3.1.4 DOORS AND WINDOWS

3.1.4.1 WOODEN DOOR

A Door D1A-DP. Double leaf solid engineering pcs ###


wood door, steel door frame, HPL or melamic
finish; equipped with 6 mm clear glass ex.
Asahimas; Door protection finishing on the
bottom of the door, to 900mm AFFL on both
sides of the door; total size 1600x2150 mm
ex. jotun includes hardware, accessories, and
installation

Existing main building UGD pcs

B Door D4-K1. Single leaf solid engineering pcs ###


wood door and frame with HPL or melamic
finish; Kickplate finishing on the bottom of the
door, to 300mm AFFL on both sides of the
door;total size 900x2150 mm ex. jotun
includes hardware, accessories, and
installation

Existing main building Staff Amenity, Consult Room, Medrec, pcs


Farmasi

C Door D4B, Single leaf solid engineering wood pcs ###


door and frame with HPL or melamic finish;
total size 900x2150 mm ex. jotun includes
hardware, accessories, and installation

Existing main building Laboratory, Pathology, Blood Bank pcs

D Door D5A-K1. Single leaf solid engineering pcs ###


wood door and frame with HPL or melamic
finish; Kickplate finishing on the bottom of the
door, to 300mm AFFL on both sides of the
door; total size 900x2150 mm ex. jotun
includes hardware, accessories, and
installation

Existing main building Toilet, Dirty Utility pcs

E Door D2A-K. Single leaf solid engineering pcs ###


wood door and frame with HPL or melamic
finish; Kickplate finishing on the bottom of the
door, to 300mm AFFL on both sides of the
door; total size 1400x2150 mm ex. jotun
includes hardware, accessories, and
installation

Existing main building Surgery, Dental, ENT, Orthopedi, Pediatric, pcs


Interna Dept., Opthamology, Obsgyn

3.1.4.2 ALUMUNIUM DOORS AND GLASS

A Door window DW5, two-leaf double swing pcs


door alumunium frame, total size 5700x3000
mm ex. Alexindo or equal approved, equipped
with 12 mm clear glass ex. Asahimas, as
drawings and specification, including
hardware, accessories, and installation

Existing main building Lobby pcs

B Door window DW6, two-leaf double swing pcs ###


door alumunium frame, total size 3660x3000
mm ex. Alexindo or equal approved, equipped
with 12 mm clear glass ex. Asahimas, as
drawings and specification, including
hardware, accessories, and installation

Existing main building Lobby-Waiting Area pcs

REKAP ARS (21/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT

C Door window DW7, two-leaf double swing pcs


door alumunium frame, total size 2850x3000
mm ex. Alexindo or equal approved, equipped
with 12 mm clear glass ex. Asahimas, as
drawings and specification, including
hardware, accessories, and installation

Existing main building Waiting Area pcs

3.1.5 SANITARY FIXTURES

A Lavatory LW 897 CJ ex. Toto pcs


1st floor Staff Amenity, Consult, UGD, Laboratorium, pcs
Surgery, Dental, ENT, Pediatric, Interna
Dept, Opthamology, Obsgyn

C Toilet mirror frameless size 600x900 mm pcs


including backing panel mounted on
1st floor Staff Amenity, Consult, UGD pcs

D Sitting closet type CW 421 J ex. Toto pcs


1st floor Staff Amenity, Consult, UGD pcs

E Shower Spray TB 19 CSMCR ex. Toto pcs


1st floor Staff Amenity, Consult, UGD pcs

F Floor Drain TX 1 EB ex. Toto pcs


1st floor Staff Amenity, Consult, UGD pcs

G Robe Hook TS 118 WSB ex. Toto pcs


1st floor Staff Amenity, Consult, UGD pcs

G Paper holder TX 703 AESV1 ex. TOTO pcs


1st floor Staff Amenity, Consult, UGD pcs

K Slop sink SK33 + Wall Faucet TX133AUN13C pcs


ex. Toto

1st floor Dirty utility pcs

REKAP ARS (22/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

SUBTOTAL

#REF!

3.1.1 INTERIOR WALLS AND WALL FINISHES


3.1.1.1 LIGHT BRICK, PLASTER, AND PARTITIONS WORK Rp.
3.1.1.2 WALL FINISHES Rp.

3.1.2 FLOOR FINISHES

3.1.3 CEILING FINISHES

3.1.4 DOORS AND WINDOWS


3.1.4.1 WOODEN DOOR Rp.
3.1.4.2 ALUMUNIUM DOORS AND GLASS Rp.

3.1.5 SANITARY FIXTURES

REKAP ARS (23/408)


No. / Sandi Proyek :
Nama Proyek : RSAU dr. M. SOETOMO, PONTIANAK
ENG & QS
STR ARS
QTY GWT, STP,
QTY FACILITY QTY MAIN QTY FACILITY
NO KODE RAP URAIAN PEKERJAAN SAT. BUILDING QTY UTILITY CONTAINER, BUILDING BUILDING QTY UTILITY QTY GWT
WASTE

M-800 Keramik, HT
M-800 HT 60x60 Granite texture ex. Frontino m2 - - - 0.00 46 - -
M-800 HT uk. 60 x 60 cm Double Loading ex. Frontino m2 - - - 299.83 289 - -
M-800 HT 60x60 cm Rustic Cementum ex. Frontino m2 - - - 0.00 116 - -
M-800 Dinding CT 30x60 cm ex. Roman m2 - - - 0.00 67 - -
M-800 Dinding CT 30x30 cm ex. Roman m2 - - - 83.96 - 162 -
M-800 Lantai CT 30x30 cm ex. Roman Gol B m2 - - - 33.40 47 80 -
M-800 Skirting Hospital HT 10x60 cm keping - - - 181.08 650 - -
M-800 Skirting Hospital HT 8x30 cm ex. Roman keping - - - 0.00 - 42 -
M-800 Ongkos Cutter step nose keping - - - 0.00 33 - -
M-800 Ongkos Kirim Material HT & Keramik m2 - - - 428.06 605 243 -
RAB VOL FORKON (ENG & QS)

Vol. Vol. Vol. Vol. Vol. Volume Struktur Arsitek Volume


No. URAIAN SAT. Struktur Main Facility Utilty GWT Total Facility Utilty
GWT, STP, CONTAINER, WASTE
Main Facility Utilty GWT Total
Building Building Building Building Building Building Building Building Building Building Building

A STRUKTUR 0
Mob demob pancang m1 2,720.00 - - - - 2,720.00 2,080.00 280.00 360.00 - - - - 2,720.00
Pondasi pancang 40x40 m1 2,720.00 - - - - 2,720.00 2,080.00 280.00 360.00 - - - - 2,720.00
Pondasi pancang 25x25 m1 - - - - - - - - - - - - - -
PDA tes ttk 4.00 - - - - 4.00 1.00 1.00 2.00 - - - - 4.00
Potong kepala pancang 40x40 ttk 68.00 - - - - 68.00 52.00 7.00 9.00 - - - - 68.00
Potong kepala pancang 25x25 ttk - - - - - - - - - - - - - -

Galian Alat m3 408.81 - - - - 408.81 226.00 125.27 80.92 - - - - 432.19


Galian Manual m3 209.08 - - - - 209.08 132.41 54.36 19.32 - - - - 206.09
buangan tanah m3 598.56 - - - - 598.56 299.95 179.63 100.24 - - - - 579.82

anti rayap Safe 1 200 SL m2 809.50 - - - - 809.50 333.00 357.91 94.95 - - - - 785.86
Dewatering ls 1.00 - - - - 1.00 - - 1.00 - - - - 1.00

Urugan Pasir m3 255.91 - - - - 255.91 156.80 120.96 21.56 - - - - 299.32

Lantai Kerja 5 cm m3 46.29 - - - - 46.29 29.20 20.47 3.76 - - - - 53.43


Beton K250 (Pile Cup, Tie Beam) m3 238.26 - - - - 238.26 135.72 83.75 6.33 - - - - 225.80
Beton K250 (Kolom) m3 75.19 - - - - 75.19 73.10 2.56 - - - - - 75.66
Beton K250 (Plat, Balok) m3 255.08 - - - - 255.08 251.67 11.53 - - - - - 263.20
Beton K250 (Tangga) m3 10.28 - - - - 10.28 9.00 - - - - - - 9.00

Beton K300 (Pile Cup, Tie Beam) m3 26.76 - - - - 26.76 - - 18.89 - - - - 18.89
Beton K300 (Kolom, dinding) m3 15.35 - - - - 15.35 - - 21.60 - - - - 21.60
Beton K300 (Plat, Balok) m3 5.61 - - - - 5.61 - - 6.53 - - - - 6.53

Bekisting Batako m2 730.99 - - - - 730.99 448.08 241.98 99.77 - - - - 789.83


Bekisting Kolom & dinding m2 838.78 - - - - 838.78 640.01 40.95 120.38 - - - - 801.34
Bekisting Balok & Plat m2 1,960.50 - - - - 1,960.50 1,897.02 115.29 32.64 - - - - 2,044.95
Bekisting Tangga m2 780.40 - - - - 780.40 83.86 - - - - - - 83.86

Pembesian kg 93,196.28 - - - - 93,196.28 73,084.15 13,394.30 8,510.15 - - - - 94,988.60

WF 250x125x6x9 kg - - - - - - - - - - - - - -
WF 150x75x5x7 kg 465.50 - - - - 465.50 402.85 - - - - - - 402.85
WF 200x100x5.5x8 kg - - - - - - - - - - - - - -
CNP 150x60x20x2.3 kg 882.89 - - - - 882.89 528.72 - 336.60 - - - - 865.32
Plate 12 mm kg - - - - - - - - - - - - - -
Plate 10 mm kg - - - - - - - - - - - - - -
Plate 8 mm kg 62.87 - - - - 62.87 31.65 - 25.94 - - - - 57.59
Plate 6 mm kg 39.79 - - - - 39.79 36.27 - - - - - - 36.27
Ikatan Angin kg - - - - - - - - - - - - - -
Trekstang kg 23.40 - - - - 23.40 21.28 - - - - - - 21.28
Angkur Dia. 16 bh 247.20 - - - - 247.20 84.00 - 163.20 - - - - 247.20
Bolt dia. 16 bh 39.79 - - - - 39.79 112.00 - - - - - - 112.00
Bolt dia. 12 bh - - - - - - - - - - - - - -
Grouting baja m3 0.01 - - - - 0.01 0.01 - 0.00 - - - - 0.01
Grouting baja 20x25x0.25 bh - - - - - - - - - - - - - -
Cat Zincromate kg 1,397.73 - - - - 1,397.73 952.85 - 362.54 - - - - 1,315.39
Finishing Cat Duco ls 362.54 - - - - 362.54 - - 362.54 - - - - 362.54

Waterproofing Integral ex. Fosroc m2 147.06 - - - - 147.06 111.80 - 42.05 - - - - 153.85


Water Stop ex. Fosroc m1 65.24 - - - - 65.24 - - 33.05 - - - - 33.05

Baja Ringan m2 426.75 - - - 22.31 449.06 115.74 311.01 - - - - 22.31 449.06


Atap Zincalume m2 426.75 - - - 22.31 449.06 115.74 311.01 - - - - 22.31 449.06
Insulation m2 426.75 - - - 22.31 449.06 115.74 311.01 - - - - 22.31 449.06
Talang air m1 55.22 - - - 4.60 59.82 12.99 - - - - - 4.60 17.59
Lisplang m1 30.81 - - - 14.30 45.11 30.81 - - - - - 14.30 45.11

Dinding dalam bata ringan m2 - 158.68 2,529.48 350.76 26.26 3,065.17 - - - 148.99 2,284.67 302.07 26.26 2,761.99
Dinding Luar bata ringan m2 - - - - - - - - - - - - - -
Plester + Aci dinding dalam m2 - 144.08 2,162.66 546.13 52.52 2,905.39 - - - 144.08 2,162.66 444.52 52.52 2,803.77
Plester + Aci dinding luar m2 - - 1,025.12 - - 1,025.12 - - - - 1,025.12 - - 1,025.12
Plesteran dinding dalam m2 - 86.04 425.81 125.00 - 636.84 - - - 62.27 425.81 161.59 - 649.67
Plesteran dinding luar m2 - - - - - - - - - - - - - -

Dinding CT 30x60 cm ex. Roman m2 - 150.24 170.87 - - 321.11 - - - 73.32 170.87 - - 244.19
Dinding Jamb Lift HT 30x60 cm ex. Frontino m1 - - 13.60 - - 13.60 - - - - 13.60 - - 13.60
Dinding HT luar 60x60 Granite texture ex. Frontino m2 - - 46.14 - - 46.14 - - - - 46.14 - - 46.14
HT uk. 60 x 60 cm Double Loading ex. Frontino m2 - 308.16 338.18 - - 646.34 - - - 299.83 289.43 - - 589.26
Lantai HT 60x60 cm Rustic Cementum series type m2 - - 116.07 - - 116.07 - - - - 116.07 - - 116.07
NA60CM015 ex. Nara Ceramica
Lantai HT 30x60 cm ex. Frontino (Grove line + bevel) m2 - - 56.25 - - 56.25 - - - - 66.81 - - 66.81
Skirting HT 10x60 cm polish ex. Frontino m' - 120.73 315.49 - - 436.22 - - - 108.65 390.17 - - 498.82

Dinding CT 30x30 cm ex. Roman m2 - 51.15 - 125.00 - 176.15 - - - 83.96 - 161.59 - 245.55
Lantai CT 30x30 cm ex. Roman Gol B m2 - 32.44 44.55 100.67 - 177.66 - - - 33.40 47.10 80.08 - 160.58
Skirting CT 10x30 cm ex. Roman m' - - - 9.25 - 9.25 - - - - - 12.55 - 12.55

Partisi 1 lapis 12 mm + Timbal 2 mm m2 - - 152.60 - - 152.60 - - - - 135.04 - - 135.04


Partisi 1 lapis 12 mm + Timbal 4 mm m2 - - 55.88 - - 55.88 - - - - 56.92 - - 56.92

Sandwich panel PIR 100 mm m2 - - 151.30 - - 151.30 - - - - 142.68 - - 142.68


Sandwich panel PIR 100 mm + Timbal 2 mm m2 - - - - - - - - - - - - - -
Ceiling Sandwich Panel PIR 100 mm m2 - - 96.19 - - 96.19 - - - - 71.78 - - 71.78

Cat dinding antibacterial emulsion ex. Jotun Majestic TB care m2 - 1,378.33 2,750.61 - - 4,128.94 - - - 1,292.56 2,681.32 - - 3,973.88

Cat dinding acrylic emulsion ex. Jotun Majestic TB Care m2 - - 330.25 719.55 26.26 1,076.07 - - - - 333.09 401.14 26.26 760.49
Cat enamel ex. Majextic TB sheen m2 - - 137.45 - - 137.45 - - - - 137.45 - - 137.45
Cat weathershield emulsion ex. Jotun Jotashield antifade m2 - - 1,671.50 131.26 286.37 2,089.13 - - - - 1,671.50 162.59 286.37 2,120.46

Skirting oil paint 10 cm m' - - 60.02 - - 60.02 - - - - 46.76 - - 46.76


Epoxy 500 Micron m2 - - - - 168.98 168.98 - - - - - - 168.98 168.98

Trowel Finish + Floor Hardener 3 kg m2 7.17 - 122.08 84.38 - 213.63 - - 19.50 - 122.08 118.07 - 259.65
Trowel Finish + Floor Hardener 5 kg m2 - - - - 13.26 13.26 - - - - - - 13.26 13.26
Waterproofing coating ex. Fosroc + Screed Pretection m2 - - 59.64 - 190.57 250.21 - - - - 59.64 - 190.57 250.21
Waterproofing membrane with Profex Torchseal 3 PV ex m2 - - 227.78 - - 227.78 - - - - 227.78 - - 227.78
Fosroc
Screed with wiremesh M4 m2 - - 181.33 - 21.59 202.92 - - - - 181.33 - 21.59 202.92

Lantai vinyl Somplan 360 ex. Tarkett m2 - - 450.27 - - 450.27 - - - - 396.00 - - 396.00
Lantai vinyl IQ Toro SC ex. Tarkett m2 - - 84.40 - - 84.40 - - - - 71.78 - - 71.78
Skirting PVC 15 cm vinyl ex. Tarkett m' - 205.65 398.60 - - 604.25 - - - 225.46 352.99 - - 578.45
Lantai vinyl Somplan 360 ex. Tarkett (Renovasi Main Building) m2 - 255.74 - - - 255.74 - - - 225.82 - - - 225.82

Expose dak m2 - - 202.83 - 208.75 411.58 - - - - 203.73 - 208.75 412.48


Plafond gypsumboard 9 mm ex. Jayaboard m2 - 213.22 528.14 95.88 - 837.24 - - - 244.40 557.16 80.08 - 881.64
Plafond gypsumboard 9 mm WR ex. Jayaboard m2 - 32.44 101.87 - - 134.31 - - - 32.23 84.32 - - 116.55
Plafong kalsiboard 6 mm ex. Kalsi m2 - - 90.17 - - 90.17 - - - - 91.06 - - 91.06
Shadowline m' - 440.30 760.54 95.88 - 1,296.72 - - - 421.49 760.54 95.90 - 1,277.93
GRC CETAK m2 - - - - - - - - - - - - - -
ACP ex. Seven m2 - - 212.51 - - 212.51 - - - - 212.51 - - 212.51
Grill Alumunium m2 - - - - - - - - - - - - - -
Signage LS - - 1.00 - - 1.00 - - - - 1.00 - - 1.00

Railling Tangga m' - - 28.41 - - 28.41 - - - - 28.41 - - 28.41


Hand Railling m' - - 47.08 - - 47.08 - - - - 47.08 - - 47.08
Railing façade m' - - - - - - - - - - - - - -
Corner Guard pcs - - 21.00 - - 21.00 - - - - 21.00 - - 21.00
Wall guard m' - - 32.00 - - 32.00 - - - - 32.00 - - 32.00
Insulation Spray Polyurethene m2 - - 181.33 - - 181.33 - - - - 181.33 - - 181.33
meja beton 600x1400 mm fin CT 30x30 cm BH - - - 5.00 - 5.00 - - - - - 5.00 - 5.00
Dinding Wiremesh M8 BH - - - 1.00 - 1.00 - - - - - 1.00 - 1.00
Batu kali m3 - - - - - - - - - - - - - -
Manhole size 800x800 mm BH - - - - 2.00 2.00 - - - - - - 2.00 2.00
Manhole size 1000x1000 mm BH - - - - - - - - - - - - - -
Cat Walk 12 m BH - - - - - - - - - - - - - -
Cat ladder 3000 BH - - - - 2.00 2.00 - - - - - - 2.00 2.00
Blower Room LS - - - - - - - - - - - - - -
Dinding AHU Wiremesh M8 BH 1.00 - - - - 1.00 1.00 - - - - - - 1.00
Signage Interior ls - - 1.00 - - 1.00 - - - - 1.00 - - 1.00

FACILITY BUILDING 0 - - - - - - - - - - - - - -
D1A-DP uk. 1600x2150 (Facility Building) unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
D4 uk. 900x2150 unit - - 2.00 - - 2.00 - - - - 3.00 - - 3.00
D4-A uk. 800x2150 mm unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
D4-K uk. 900x2150 unit - - 2.00 - - 2.00 - - - - 3.00 - - 3.00
D4-DP uk. 900x2150 unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
D5-K uk. 800x2150 unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
D5A-K uk. 900x2150 unit - - 6.00 - - 6.00 - - - - 6.00 - - 6.00
D5B-K uk. 1000x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00

MAIN BUILDING 0 - - - - - - - - - - - - - -
D1A-DP uk. 1600x2150 (Main Building) unit - 1.00 - - - 1.00 - - - 1.00 - - - 1.00
D4-K1 uk. 900x2150 unit - 5.00 - - - 5.00 - - - 5.00 - - - 5.00
D4B uk. 900x2150 unit - 1.00 - - - 1.00 - - - 1.00 - - - 1.00
D5A-K1 uk. 900x2150 unit - 5.00 - - - 5.00 - - - 5.00 - - - 5.00
Door D2A-K uk. 1400x2150 unit - 8.00 - - - 8.00 - - - 8.00 - - - 8.00

FACILITY BUILDING 0 - - - - - - - - - - - - - -
D2 uk. 900x2150 unit - - 5.00 - - 5.00 - - - - 5.00 - - 5.00
D2A uk. 1400x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
D2A-LD2 uk. 1400x2150 unit - - 3.00 - - 3.00 - - - - 3.00 - - 3.00
D2A-LD4 uk. 1400x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
FDB uk. 1100x2150 unit - - 4.00 - - 4.00 - - - - 4.00 - - 4.00
PB uk. 600x1000 unit - - 7.00 - - 7.00 - - - - 7.00 - - 7.00
SD uk. 900x2150 unit - - 4.00 - - 4.00 - - - - 4.00 - - 4.00
SD-LD2 uk. 900x2150 mm unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
SDB uk. 1100x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
SD1 uk. 1000x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
SD2 uk. 1600x2150 unit - - 1.00 - 1.00 2.00 - - - - 1.00 - 1.00 2.00
SD5 uk. 1100x2150 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00

hermetic sliding 1600x2200 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00


hermetic sliding 1600x2200 + Timbal 2 mm unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
hermetic swing size 900x2200 unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
hermetic swing size 900x2200 + Timbal 2 mm unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
sliding size 1600x2200 (Transfer Room) unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00

UTILITY BUILDING 0 - - - - - - - - - - - - - -
Door Louver DW4 uk. 1600x2150 + (1800+1160)x580 unit - - - 2.00 - 2.00 - - - - - 2.00 - 2.00
Louver BV2 uk. 1200x580 unit - - - 6.00 - 6.00 - - - - - 6.00 - 6.00

FACILITY BUILDING 0 - - - - - - - - - - - - - -
DW1 (3350 X 3000) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
D6 (1000 X 2150) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
SD4 (900 X 2150) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00

W1 (825 X 3000) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00


W1A (1800 X 3000) unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
W2 (3350 X 3000) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
W2A (3350 X 3000) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
W3 (900 X 1700) unit - - 3.00 - - 3.00 - - - - 3.00 - - 3.00
W3A (600 X 1700) unit - - 4.00 - - 4.00 - - - - 4.00 - - 4.00
W3A-1 (600 X 1700) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
W3B (300 X 1700) unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
W4 (1800 X 1700) unit - - 4.00 - - 4.00 - - - - 4.00 - - 4.00
W4A (1200 X 1700) unit - - 4.00 - - 4.00 - - - - 4.00 - - 4.00
W4A-1 (1200 X 1700) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
W4B (1500 X 1700) unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
W4C (1000 X 1700) unit - - 3.00 - - 3.00 - - - - 3.00 - - 3.00
W4D (1200 X 1700) unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
W4E (2700 X 1700) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
W4F (2050 X 1700) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
W5 (800 X 1200) Radiologi (Jasa Pasang) unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
BV1 (750 X 400) unit - - 2.00 - - 2.00 - - - - 2.00 - - 2.00
BV3 (2000 X 400) unit - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
BV4 (250 X 400) unit - - 2.00 - - 2.00 - - - - 5.00 - - 5.00
BV5 (300 X 400) unit - - 4.00 - - 4.00 - - - - 4.00 - - 4.00

MAIN BUILDING 0 - - - - - - - - - - - - - -
DW5 (5700 X 3000) unit - - - - - - - - - - - - - -
DW6 (3660 X 3000) unit - 1.00 - - - 1.00 - - - 1.00 - - - 1.00
DW7 (2850 X 3000) unit - - - - - - - - - - - - - -

UTILITY BUILDING 0 - - - - - - - - - - - - - -
DW2 (2560 X 2150) unit - - - 1.00 - 1.00 - - - - - 1.00 - 1.00
DW3 (2050 X 2150) unit - - - 2.00 - 2.00 - - - - - 2.00 - 2.00
D2B (900 X 2150) unit - - - 3.00 - 3.00 - - - - - 3.00 - 3.00
W6 (1200 X 1200) unit - - - 3.00 - 3.00 - - - - - 3.00 - 3.00

Closet type CW 421 J ex. Toto pcs - 3.00 5.00 - - 8.00 - - - 3.00 5.00 - - 8.00
Shower Spray TB 19 CSMCR ex. Toto pcs - 3.00 5.00 - - 8.00 - - - 3.00 5.00 - - 8.00
Lavatory LW897CJ + Faucet TX109LD ex. Toto pcs - 11.00 8.00 - - 19.00 - - - 11.00 8.00 - - 19.00
Floor Drain TX 1 EB ex. Toto pcs - 3.00 6.00 - - 9.00 - - - 3.00 6.00 - - 9.00
Robe Hook TS 118 WSB ex. Toto pcs - 3.00 5.00 - - 8.00 - - - 3.00 5.00 - - 8.00
Slop sink SK33 + Wall Faucet TX133AUN13C ex. Toto pcs - 1.00 2.00 - - 3.00 - - - 1.00 2.00 - - 3.00
Kran T 23 BQ13N ex. Toto pcs - - 3.00 - - 3.00 - - - - 3.00 - - 3.00
Paper holder TX 703 AESV1 ex. Toto pcs - 3.00 5.00 - - 8.00 - - - 3.00 5.00 - - 8.00
Kitchen Faucet TX603KM ex. Toto pcs - - 3.00 5.00 - 8.00 - - - - 3.00 5.00 - 8.00
Scrub.sink pcs - - 1.00 - - 1.00 - - - - 1.00 - - 1.00
Kitchen Sink double ex. Lokal pcs - - 3.00 5.00 - 8.00 - - - - 3.00 5.00 - 8.00
Roof Drain Ironmongeries ex. Antasan pcs - - 9.00 - - 9.00 - - - - 9.00 - - 9.00
Cermin 600x900 pcs - 3.00 5.00 - - 8.00 - - - 3.00 5.00 - - 8.00
DAFTAR HARGA BAHAN

No MATERIAL

Beton fc' 10Mpa, Slump 12+2 (B0) FA 15%


Beton fc' 30Mpa, Slump 12+2 (B0) FA 15%
Beton fc' 35Mpa, Slump 12+2 (B0) FA 15%
Beton fc' 40Mpa, Slump 12+2 (B0) FA 15%
Beton fc' 45Mpa, Slump 12+2 (B0) FA 15%

Beton Raft

BETON READY MIX JAKARTA


1 Beton B-0 kg/m2 NFA
Beton K125 kg/m2 Fly Ash 15%
Beton K250 kg/m2 NFA
Beton K300 kg/m2 NFA
Beton K350 kg/m2 Fly Ash 15%

Beton B0 kg/m2 NFA


Beton B0 Fly Ash 10%
Beton B0 Fly Ash 15%
Beton FC'25 MPA NFA
Beton FC'25 MPA Fly Ash 10%
Beton FC'25 MPA Fly Ash 15%
Beton FC'30 MPA NFA
Beton FC'30 MPA Fly Ash 10%
Beton FC'30 MPA Fly Ash 15%
Beton FC'35 MPA NFA
Beton FC'35 MPA Fly Ash 10%
Beton FC'35 MPA Fly Ash 15%

BEKISTING
1 Plywood 6 mm
2 Plywood 9 mm
3 Plywood 12 mm
4 Plywood 15 mm
5 Kayu Kaso 6/6 -
6 Kayu 6/12 -
7 Kayu Kaso 5/7
8 Concrete form work
9 Paku
10 Plastic Concrete spacer
11 Mould oil
12 Tie Rod
13 Colbond
14 Bondek
15 Curing

Transport
1 Transport Besi Beton
2 Container 20' @ 21 ton uk 5.75 m x 2.35 m x 2.38 m
3 Container 40' @ 24 ton
4 ongkos kirim keramik
5 ongkos kirim sanitary kecil
5 ongkos kirim sanitary closet, washtafel, Urinal
5 ongkos kirim bata ringan
6 ongkos kirim mortar
7 ongkos kirim semen di lokal

BESI BETON DAN WIRE MESH


7 Wiremesh
8 Cakar Ayam & Dowel
8 Besi Beton BJTD 40
12 Besi Beton BJTP 25
9 Kawat beton
10 Kawat Duri
11 Kolom Praktis KP 806 Panjang 3m
HILTI
Rebar D13
Rebar D16
13 Wiremesh galvanized M3 façade uk 3x100x100
INSULLATION
12 Glasswool 32kg/m2 t = 2"
13 Glasswool 80kg/m2 t = 2"
14 Alumunium Foil Single sided 1.25 x 60 m
15 Alumunium Foil Double Sided 1.25 x 60
16 Roofmesh 5x5 t 2 mm uk 1.8mx30m
17 Sealant

PASANGAN DINDING DAN LANTAI


18 Pasir Urug by subkon
1 Pasir Urug
19 Pasir Putih
20 Pasir Pasang/Pasir Beton
21 Kerikil Split 1:2
22 Kerikil Split 2:3
23 Koral
24 Abu Batu
25 limestone
26 Batu Bata Lokal
27 Batako Trass 17x10x31
28 Batako Press 40x20x10
29 Batu Kali
30 Semen @ 50 kg
31 Semen @ 50 kg
32 Kawat Ayam 0.9 x 10m
33 Glass Block uk.19x19x9.5
34 Gurinda Mangkok
35 Plastik Cor
36 Glass block 20x20x8
37 Geotextile Non Woven Polifelt TS 20

Pagar BRC HD uk. 1750x2400


Tiang BRC HD uk. 1750

Pagar BRC T120-8 t=1200


Pintu ganda t=1200

Roster Semen (Type silang 3) uk. 20x20x10mm

BATA RINGAN
37 Bataringan ex. Super bata
Bataringan ex. Power Block
Bataringan ex. Grand Elephant
Bataringan ex. Mercusuar
Bata Ringan Ex. Thermoblock
Bata Ringan ex. Leicht Brick
READYMIX MORTAR
MORTAR UTAMA

1 Thinbed (Perekat Bata Ringan t : 3mm) @40kg


2 Plester Bt. Ringan t=10mm daya sebar 2-2.5m2 @50kg
3 Acian plesteran t=1.5mm daya sebar 20m2 @40kg
4 Mortar ex. UZIN Bond floor @ 50 KG - Tile Adhesive lantai
5 Tile Adhesive standart (HT, Dinding, Lantai) daya sebar 8m
6 Tile Adhesive Keramik area basah Ex. Powerbond
7 Mortar Tile grout@ KG - 1.9m2/kg/20x20-2.85m2/kg/30x30-
8 MU 408 CF daerah basah @ KG - 1.9m2/kg/20x20-2.85m2/k
8 Mortar ex. UZIN SC 100 @ 50 KG - Skimcoat - interior
Acian Bata Merah Ex. Drymix
9 Sikagroute - ex. sika

Perekat bata ringan @40kg/sak


Plester Bata Ringan @40kg/sak
Acian Plester @40kg/sak
Skimcoat Beton @40kg/sak
Tile Adhesive @25kg/sak
Tile Grout@1kg/sak

LAIN-LAIN
WF & H Beam
BENDING 400
BENDING 300
Hot dip galvanized

HB 400 X100x13x21
HB 350 X 350 X 12 X 19
HB 300x300x10x15
HB 200x200x8x12

1 WF 150X 75 X 5 X 7
2 WF 200 X 100 X 5.5 X 8
1 WF 250 X 125 X 6 X 9
2 WF 300 X 150 X 6.5 X 9
4 WF 350 X 175 X 7 X 11
3 WF 400 X 200 X 8 X 13
WF 450 X 200x11x7
1 WF 600x200x11x7

2 Steel column WF 200x100x5.5x8


2 Steel beam WF 150x75x5x7
3 Steel hollow 200x200x8
4 Steel hollow 100x100x3
5 Hollow beam 80x80x5 (HBC1). = Hollow 40x60
6 Steel hollow 50x100x 3mm
5 Pipa 4"
6 Pipa 5"
7 Pipa 6"
8 Pipa 8"
9 Pipa 10"
8 CNP 150x50x20x3.2
13 UNP 100x50x5
15 UNP 100x50x5
9 - L - 40X40X4
10 - L - 50x50x5
11 - L - 60X60X6
11 - L - 70X70x7
12 - L - 80x80x8
13 - L - 90x90x9
14 - L - 100x100x10
14 Plat baja tebal 1.2-18 mm (variatif)
15 32mm thick base plate
16 25mm thick base plate
17 20mm thick base plate
18 16mm thick base plate
19 14mm thick base plate
19 13mm thick base plate
20 12mm thick base plate
21 10mm thick base plate
22 8mm thick base plate
23 6mm thick base plate
24 4mm thick base plate
Siku galvanis uk.60x60x6

25 Plat 6 x 40 x 300
26 Steel Bar dia 22 mm
27 HTB ø 32 mm
28 HTB ø 25 mm
29 HTB ø 22 mm
30 HTB ø 19 mm
31 HTB ø 16 mm
31 HTB ø 13 mm
32 HTB ø 12 mm
33 Baut 10 mm
34 Braching ø 16 mm + Turn Buckle ø 19 mm
35 Braching ø 19 mm + Turn Buckle ø 19 mm
36 Trekstang ø 12 mm untuk atap
37 Trekstang Besi dia.13 mm pjg=1,3 m
35 Angkur bout ø 13 mm l 200 mm
36 Angkur bout ø 13 mm l 300 mm
37 Angkur bout ø 16 mm l 500 mm
38 Angkur bolt dia19 panjang 760 mm
39 Anchor bolt dia22 Panjang 880 mm
40 Angkur bout ø 25 mm, l = 880 mm
Anchor bolt M14 x 15 mm
Anchor M12
41 Longdrat M16, l = 850 mm
42 Steorofoam tebal 1 cm uk 1 m x 2 m
43 Pemasangan pipa dia 1.5"

Aluminium U 25.4x25.4x1.6

KANSTEEN ; PAVING BLOCK


43 Kansteen type DKI ex CI uk. 600x140x300
44 Car Stoper uk. 15x30x60
45 Paving Blok t = 8 cm Warna Abu-abu
46 Whell Stopper
47 Buis Beton Uk. 80x90x100x9 cm
48 Floordeck
49 Rosteer Semen Oblique
Batu Kerawangan (Roster sigilis bevel) 20x20x10cm

50 Paving type interlock ex. Interlock Karya Persada


55 Kansteen Type 1 Uk. 40x28x15
55 Kansteen Type 1 Uk. 30x20xmenerus/slipform
56 Kansteen Type 2 Uk. 15x30x40
56 Kansteen Type 2 Uk. 15x30x40
Pipa Drainase Dia 500 mm
Pipa Drainase Dia 1000 mm
U-Ditch 30x30x5
Tutup U-Ditch 30x60x9 HD

DRAINASE
U Dith 30x30 (p =1.2m)
U Dith 40x40 (p =1.2m)
Udith cover 300 Light Duty
Udith cover 400 Light Duty
Udith cover 300 Heavy Duty
Udith cover 400 Heavy Duty
Box culvert beban gandar 14.5T
BC 500x500x1000
BC 800x800x1000
Box culvert beban gandar 21T
BC 500x500x1000 Bina Marga
BC 800x800x1000 Bina Marga
RC Cover 125 mm(Heavy duty)
RC Sorround 190 mm (heavy duty)

KERAMIK DINDING
1 Keramik Dinding 20x30 ex. Platinum Bonza
1 Keramik Dinding 25x40 ex Platinum
1 Keramik Dinding 20x40 ex Roman Interloc dTravessa
2 Stepnosing granity uk 10 x 30
3 Stepnosing sand stone 100 x 200 G 224000

KERAMIK LANTAI
1 Keramik Dinding 30x30 ex. Roman Gol B
1 Keramik Lantai 20x20 ex. Platinum
1 Keramik Lantai 30x30 ex. Roman Gol B
1 Keramik Lantai 33x33 ex. Roman Gol B
1 Keramik Lantai 40x40 ex. Roman Gol B
1 Keramik Lantai 50x50 ex. Roman Gol B
1 Keramik Dinding 30x60 ex. Roman Gol D

1 Keramik Lantai 30x30 ex. Roman 30x30 vivaz bianco

1 PVC Corner beads uk. 2.5x2.4

HOMOGENOUSE TILE
1 HT uk. 30 x 60 cm polished type pearlwhite ex. Granito
2 HT uk. 30 x 60 cm polished type latte ex. Granito
3 HT uk. 60 x 60 cm polished type frostwhite ex. Granito
4 HT uk. 30 x 60 cm polished type frostwhite stepnosing ex. Gr
5 HT uk. 60 x 60 cm rustic type espresso ex. Granito
6 HT uk. 60 x 60 cm matt type summer ex. Granito
7 HT uk. 60 x 60 cm unpolish type cofee ex. Granito

1 HT uk. 30 x 60 cm polished type pearlwhite ex. Granito


2 HT uk. 30 x 60 cm polished type latte ex. Granito
3 HT uk. 60 x 60 cm Double Loading type Snow White FR60D1
4 Jasa Stepnosing HT uk. 30 x 60 cm
5 Jasa Cutting Size HT uk. 20 x 60 cm
6 Lantai HT 60x60 cm Rustic Cementum series type NA60CM0

Plint Keramik10x30
Plint Keramik10x50
Plint Keramik10x60
Plint Keramik10x80
Ambalan 400 mm
Ambalan 250 mm

Skirting steel black paint finish


MASS KERAMIK
Mass keramic mozaik uk. 9x9 (Pc. Rate 350.000,-)

WAIRU STONE
Wairu Stone type Paving uk. 35x17x4.5 Chacroal
Coating batu

BATU ALAM
MARMER
550x900 mm
550x1555 mm
550x1705 mm

Pemasangan Dinding Marmer Serpigiante (M1)


Pemasangan Dinding Marmer Laurent Black (M2)
Pemasangan Dinding Marmer Calacata (M3)

Pemasngan Lantai Marmer Serpigiante (M1)


Pemasangan Lantai Marmer Laurent Black (M2)
Pemasangan Lantai Marmer Calacata (M3)

Material Marmer lokal ujung pandang


Material Marmer Dark Emprador
Meja washtafel White Carara
Ambalan marmer Dark Emprador l 20 cm
Material tanggulan Granite t15 mm l 235 mm
Material Batu Cobalt Stone t 50 mm
Material Batu Andesit Flame 40x40x2
Material Batukoral sikat
Material Batu Andesit Bakar 30x60x5 Finish Polished
Material Batu Andesit Gutter 30 cm
Material Batu Candi Merah RTM 30x30xstd
Material Plint Marmer
Material Plint kolom - granite
Pekerjaan Granit Black Alam Gold meja washtafel
Wonosari stone
Slate Stone

Upah Pasang Batu andesit


Upah Pasang Batu andesit Topping+bevel+bullnose
Upah PasangBatu Candi Merah
Upah Pasang Mozaik
Upah Dan Material Coating Batu andesit @2x/ m2

Upah Pasang Marmer+polish


Upah pasang top table
Upah pasang Tangga step+plint
RTN Marmer
Cristalisasi
Upah Pasang ambalan

Upah screed lantai

SUBKON VINYL
Prelim subkon Vinyl
Gerfloor Vinyl Roll Homogenus Bakteri & fungal tebal 2mm termas
Leveling + polymer
Skirting pvc 80/100mm
Biaya pasang lantai Vinyl
Biaya pasang skirting

Vinyl type somplan 350 ex. Tarkett


Vinyl type IQ Granite ex. Tarkett (biasa)
Vinyl type IQ Toro SC ex. Tarkett

SANITARY
1 Closet duduk ex. Toto CW 660NJ/SW660J
1 Closet duduk ex. Toto type CW705ELNJ (tanpa TC365)
2 Eco washer ex. Toto type TCW 04 SF2
3 Closet Jongkok type CE6
3 Closet duduk ex. Toto type CW637J + Shower Spray THX20
4 Closet duduk ex. Toto type CW421J
4 Closet duduk ex. Toto type C51/T150NL
4 Eco Washer ex. Toto type TCW07S
4 Wastafel ex. Toto type LW103JT1 area toilet HCP
5 Lavatory ex. Toto type LW240CJ
6 Lavatory ex. TOTO LW521 V1 A
7 Lavatory ex. TOTO (LW7CJ)
8 Lavatory ex. TOTO (LW523NJ)
9 Lavatory ex. TOTO (LW536CJ)
10 Lavatory ex. TOTO (LV38V1)
11 Faucet type T205M ex. TOTO
12 Lavatory ex. TOTO (TX115LESBR)
13 Faucet type T205M ex. TOTO
9 Floor drain ex. TOTO (TX1BN).
10 Robe hook ex. TOTO (TS118WSB).
11 Robe hook ex. TOTO (TX704AEZV1).
11 Towel bar ex. TOTO (TX726AES).
12 Paper holder ex. TOTO (TX720ACRB)
13 Paper holder ex. TOTO (TX703AESV1).
14 Paper holder ex. TOTO (TX8).
13 Hand dryer ex. TOTO (TYC322WF).
14 Urinoir ex. TOTO (U57).
15 Urinoir ex. Toto type UW 930 J
16 Urinoir ex. Toto type UW 447 JT1
16 Partition Urinor A100
17 Shower ex. TOTO (A9A115XY)
18 valve Shower TX442SFN
19 Relling Showerex. TOTO (TX721AN)
20 Shower set ex. TOTO (TX445SESMBR)
21 Shower spray ex. TOTO (TB19CSMCR).
22 Shower spray ex. TOTO (THX20NB).
Shower spray ex. TOTO (THX20MCRB).
Shower TX432SD ex. TOTO
22 Kran TEN12ENF (HANDICAP)
23 Faucet TX101LB
24 Kran T23BQ13N
25 Kran TEN40AV800
24 Kran T205QN
25 Kran TX124LEC
25 Kran TX118LEL
26 Kran T23B13
27 Kran A807 S ex. Onda
27 Grab Bar5B
28 Grab Bar TX 3A3
28 Grab Bar TX10AES
29 Bathtubs exTOTO. (FBY1520PE).
30 Bathtubs exTOTO. (FB1700-70).
31 Bathtubs exTOTO. (PJY 1814 PWE).
32 Valve bathtub TX447SI
33 Valve Shower TX447SKBR
34 Kitchen zink single bowl ex. Royal SB 45
35 Kitchen zink double bowl ex. WASSER type SYLVIA1-2B0D-8
35 Kran kitchenzink T30AR13V7N
36 Kran kitchenzink Tx605KRS
37 Kran kitchenzink TX603KCS
36 Shower Room Door Handle ex. TOTO TX 10 B
37 Hand drayer TYC322M
38 Hand drayer TYC322W
38 Soap and Shampo Dispenser ex. TOTO TS125R
39 Soap and Shampo Dispenser ex. TOTO TS126AR
39 Soap holder ex, Toto TX2AV1B
39 Single Lever Shower Mixer ex. TOTO TX 404 SHNBR
Roof Drain Cast Iron dia 4 "
Mixer TX443 SEN

1 Urinal ex. KOHLER (Bardon K4978T-ET)


2 Lavatory ex. KOHLER (VERTISIL K5301)
3 Faucet ex. KOHLER (K-97345-4)
4 Closet ex. KOHLER (Caring K-3722)
5 Lavatory ex. KOHLER (K-8715t-1-0) Handicaped
6 Faucet ex. KOHLER (K-13460) handicaped
7 Grab Bar ex. KOHLER (K-10545-S) handicaped
8 Lavatory ex. KOHLER LINIA (k-2219T-0)
9 Faucet ex. KOHLER ALTEO (K-45800-4)
10 papper holder ex. KOHLER (K-18396T-S)

SANITARY RSAU PONTIANAK (TOTO)


Closet duduk tipe CW 421 J / SW 420 JP ex.Toto
Lavatory LW897CJ + Faucet TX109LD ex. Toto
Shower Spray TB 19 CSMCR ex. Toto
Robe Hook TS118WSB ex. Toto
Paper holder TX 703 AESV1
Kran T 23 BQ13N ex. Toto
Slop sink SK33 + Wall Faucet TX133AUN13C ex. Toto
Floor Drain TX1EB ex. Toto
Kitchen Faucet TX603KM ex. Toto
Kitchen Sink Double Blow Ex. Lokal

Integral Stain Steel Double Bowl Sink ex. Bolsena-KS4201-


MODENA

Integral Stain Steel Single Bowl Sink ex. Bolsena-KS3130-MODENA

Lansir Material
Upah langsir Closet Jongkok
Upah langsir Closet duduk
Upah langsir Lavatory
Upah langsir Shower set
Upah langsir Urinoir
Upah langsir Zinc 1 Bowl
Upah langsir Bathup
Upah langsir material sanitair

Material Banntu / sealant


Material bantu Closet Jongkok
Material bantu Closet duduk
Material bantu Lavatory
Material bantu Shower set
Material Bantu Urinoir
Material bantu Zinc 1 Bowl
Material bantu Bathup
Material bantu FD
Material bantu sanitair

UPAH PASANG
Upah pasang Closet Jongkok
Upah pasang Closet Duduk
Upah pasang Lavatory
Upah pasang Shower set
Upah pasang Urinoir
Upah pasang Kran
Upah pasang Jet washer/head shower
Upah pasang Eco Washer
Upah pasang Papper holder
Upah pasang Zinc 1 Bowl
Upah pasang Service Zinc
Upah pasang Soap Holder
Upah pasang Hand drayer
Upah pasang Rope Hook
Upah pasang Towel bar
Upah pasang Grap bar
Upah pasang Floor Drain
Upah pasang Bathup
Upah Pasang Sanitair

1 Pipa drain PVC AW ø2" + ijuk


2 Ijuk
3 Pipa PVC 2x4" type AW ex Wavin l = 100 cm
4 Pipa Sparing Kabel Data dibawah slab lantai PVC AW 2x3" e
5 Pipa Air hujan PVC type AW ex Wavin dia. 6"

Fitting
PVC AW 50 mm diameter
PVC AW 100 mm diameter
PVC AW 80 mm diameter
PVC AW 150 mm diameter

Material Bantu
PVC AW 50 mm diameter
PVC AW 100 mm diameter
PVC AW 80 mm diameter
PVC AW 150 mm diameter

ATAP METAL, FALSHING, TALANG


1 Atap Polycarbonate Type Twinlite uk. 11800x2100
subkon 1 Atap Metal Lebar 660 mm tebal 0.45 COLOUR
2 Cladding Lebar 750 mm
3 Union MP Deck
4 Nok
5 Flashing Union Lebar 914 mm
6 Flashing Union Lebar 450 mm
7 Flashing Union Lebar 300 mm
8 Talang Lebar 250 mm
9 Talang Lebar 1219 mm
10 Paku roofing
Insullation PU Foam Spray

DAFTAR HARGA UPAH

No UPAH

1 Galian Tanah Kedalaman < 1 m


2 Galian Tanah Kedalaman > 1 m
1 Galian Tanah Kedalaman < 1 m (dgn Subkon Gali)
2 Upah Urugan Tanah dr luar by subkon
3 Upah Urugan Tanah
4 Upah Pemadatan Tanah
5 Upah Pasir Urug tebal 10 cm
6 Upah urugan split
6 Upah Potong BOre pile dia 150 cm
7 Upah Potong BOre pile dia 40 cm
7 Upah Potong / Chipping Bore pile dia 120 cm
8 Upah Potong spun pile dia 300 mm
9 Upah Potong spun pile dia 350 mm
10 Upah Potong spun pile dia 600 mm
10 Upah Potong pancang uk. 35x35
11 Upah Potong pancang uk. 25x25
12 Upah Potong pancang uk. 20x20
13 Upah Potong pancang uk. 15x15
11 Upah Buang Potong BOre pile dia 150 cm
12 Upah Buang Sisa Chipping Bore pile dia 120 cm
13 Upah Buang Potong Spun pile dia 300 mm
14 Upah Buang Potong Spun pile dia 350 mm
15 Upah Buang Potong Spun pile dia 600 mm
15 Upah Buang pancang uk. 35x35
16 Upah Buang pancang uk. 25x25
17 Upah Buang pancang uk. 20x20
18 Upah Buang pancang uk. 15x15
16 Upah Buang Buang pancang 25x25

14 Upah Abu Batu tebal 5 cm


15 Upah Buang Tanah
Upah Buang Tanah ke luar lokasi
16 Upah Pondasi Batu Kali
17 Upah Pasang Aanstampeng
18 Upah Langsir Material Batu Kali
19 Tip Sopir Truk Mixer
20 Uang Jalan Banjar Beton
Uang Jalan Banjar Besi
Uang Jalan Banjar Kayu
Uang Jalan Banjar Bata Ringan
Uang Jalan Banjar MU
21 Upah Curring
22 Upah Cor Plat, Balok, pile cap
23 Upah Cor , Kolom dan Retaining Wall
24 Upah Cor , tangga
25 Upah Cor , tangga LT 15 - LT 32
26 Upah Cor Site Mix
27 Upah Gosok/Jidar
28 Upah Turun Besi
29 Upah Pembesian
30 Upah Handling Besi
30 Upah Pasang stek
31 Upah Pasang shear conector
31 Upah Pasang steorofoam
32 Upah Pasang plywood
33 Accessories

BEKISTING
29 Upah Angkutan Batako
30 Upah Bekisting Balok Praktis
31 Upah Bekisting batako u/ Pile Cap & Tie Beam
32 Upah Bekisting Multiplek u/ Pile Cap & Tie Beam
33 Upah Bekisting Kolom Praktis
30 Upah Bekisting Balok
31 Upah Bekisting Kolom
31 Upah pasang Bekisting Kolom Bulat
32 Upah Fabrikasi Bekisting Kolom Bulat
32 Upah Bekisting dinding
33 Upah Bekisting Plat
34 Upah Bekisting Tangga
35 Upah Bekisting Lisplank
36 Upah Bekisting sisi Plat
37 Upah Perapihan beton + Skimcoat

PEKERJAAN DINDING
38 Upah Pasang Bata ddg dalam
39 Upah Pasang Bata ddg luar
40 Upah Pasang Bata Merah
41 Upah lansir Material Pasangan Bata
42 Upah Bongkar hebel
43 Upah lansir Material Plester + Aci
44 Upah lansir Material semen +pasir
44 Upah Plester Beton
45 Upah Plesteran dinding dalam
46 Upah Acian dinding dalam
47 Upah Plesteran dinding Luar
48 Upah Acian dinding Luar
49 Upah Tali Air/benagan
50 Upah Perapihan
51 Upah Tanggulan
52 Upah Prostek
53 Upah Pembersihan
54 Upah Grouting
55 Upah Tali Air/benagan skirting
56 Upah meja
57 Upah bondek
58 Upah Kolom Praktis
59 Upah plester Aci Tanggulan
60 Upah Opening
61 Upah Lansir Material keramik
62 Upah Lansir Material HT
62 Upah lansir Mortar
62 Upah dinding Mozaik
63 Upah Skimcoat
64 Upah Pasang HT lantai
65 Upah Pasang Keramik lantai
65 Upah Pasang HT lantai 60-80
66 Upah Pasang Keramik lantai GWT
65 Upah Pasang HT dinding
66 Upah Pasang HT dinding 60-80
Upah Pasang keramik dinding
67 Upah Pasang keramik dinding GWT
68 Upah Pasang HT lantai tangga
67 Upah lantai Mozaik
68 Upah Trowel lantai
68 Upah Pasang plesteran tangga
65 Upah Pasang Step Nosing 10x20-10x30
66 Upah Meja wastafel ≤ 1000 mm
67 Upah Meja wastafel > 1000 mm
67 Upah Pasang Step Plin/Skirting keramik
Upah Pasang Step Plin/Skirting HT
68 Upah cutter plint
68 Upah Pasang Step border
68 Upah Pasang Step Plin/Skirting coakan 2x5 cm
Upah HT lantai 60x120
Upah HT dinding 60x120

PEKERJAAN EKSTERNAL
1 Perapihan Sambungan
2 Upah Pasang Sal U ditc
3 Upah Pasang Pipa
4 Upah Pasang PVC AW 50 mm diameter
5 Upah Pasang PVC AW 100 mm diameter
6 Upah Pasang PVC AW 80 mm diameter
Upah Pasang PVC AW 150 mm diameter
7 Upah Buis Beton Dia 80 cm H 2 m
8 Upah Pengisi Buis Beton Dia 80 cm H 2 m
Upah pembuatan manhole beton
Upah pasang tutup manhole
Upah pasang box culvert

BAJA
50 Fabrikasi WF < 50 T
Fabrikasi WF 50 T - 200 T
Fabrikasi WF > 200 T
51 Fabrikasi + Material Bantu pipa, Siku, Rangka Batang
52 Fabrikasi + Material Bantu Honeycomb
53 Shopdrawing
54 Erection
55 Cat zinchromate
56 Cat minyak pada baja
57 Pas angkur
58 Pas bracing
59 Pas trekstang
60 Pas trekstang
61 Pas baut
62 Pasang Chemical angkur
ongkos kirim baja

Atap Zincalume termasuk Nok


63 Upah Pasang Atap
64 Upah Pasang nok
65 Pasang lisplank
66 Pasang Flashing
67 Upah Tekuk
68 Upah Angkutan
No Alat

1 Schaffolding
2 Alat Trowel
3 Alat bantu psang Bondex
4 Alumunium U
5 Alat untuk bobok pancang
6 Upah Kupas P/A, + Pembersihan puing
7 Stamper
8 Vibro
8 Alat pasang Bondeck
9 Alat pasang Atap
10 Alat gurinda Mangkok
11 Alat Bobok Tiang Bor
12 Alat Concrate Pump
13 Alat Pengecoran Manual
14 Concrete Form Work
Mobil Crane
15 Mobile Crane kap.25 Ton (1 shift 7 Jam)

No Subcont

PEKERJAAN TANAH
1 Galian Tanah
2 Galian Tanah Manual
3 Urugan kembali bekas galian
4 Buang tanah bekas galian keluar lokasi
5 Pemadatan dan Perataan Tanah

SUBKON TANAH
Site clearing
Urugan tanah dari luar+pemadatan CBR min15%
agregate basecoarse CBR min 90% t=30cm

SUBKON DEWATERING
Dewatering paket 1 (tower 1&2)
Dewatering paket 2 (tower 3&4)
Dewatering paket 3 (tower 5&6)
Dewatering paket 4 (tower 7-10)
Dewatering paket 4 (tower 11)

SUBKON BEKISTING
1 Kolom
2 Balok
3 Plat
4 Tangga
5 Retaining Wall

PEKERJAAN PONDASI
PANCANG
Mobdemob alat pancang
Material Pancang uk. 35x35 p 10+10 m
Material Pancang uk. 25x25 p 10+10 m
Material Pancang uk. 20X20 p 10+10 m
Material Pancang uk. 15X15 p 6 m
Handling Pancang uk.35x35 p 10 m
Handling Pancang uk. 25x25 p 10 m
Handling Pancang uk. 20x20 p 10 m
Handling Pancang uk. 15x15 p 10 m
Jasa Pancang uk. 35x35 p 10+10m
Jasa Pancang uk. 25x25 p 10+10 m
Jasa Pancang uk. 20x20 p 10+10 m
Jasa Pancang uk. 15x15 p 6 m
Upah potong 35X35
Upah potong 25x25
Dolly 1 meter
Dolly 2 meter
Sambungan Plat 35x35
Sambungan Plat 25x25
Sambungan Plat. 20x20
Sambungan Plat. 15x15

Stand by alat

Test beban 170 T, tiang 35x35


Test beban 170 T, tiang 25x25
Biaya Test PDA
BORED PILE
1 Mobilisasi Dan Demobilisasi
2 Base crane+mesin bor
3 Service crane
4 Akomodasi dan transport lokal
5 Operational alat (plat, keselamatan kerj,Manajement site)
6 Keamanan
7 Buang lumpur
8 Jasa pengeboran dia 120 cm
9 Jasa fabrikasi dan instal rebar
10 Pengecoran dengan tremi
11 Test PDA
12 Tes Kentlage Uk.35x35 170T
13 Tes Kentlage Uk.25x25 170T
Pancang dia 60
Jasa pemancangan
Mobdemob

1 Static load test dg beban 100 ton counterweight mesin panca


2 Penggunaaan HSPD unt static Loading test
3 Test Lateral dengan beban 40 ton
4 PDA Test
5 Mob demob peralatan test

PRESTRESS

PC Strand dia 0.5", galvanized sheet, Groute CEBEX- 100

DINDING PRECAST
Dindig Precast t=10 cm

SHEET PILE type CSP W.350.1000 Kelas A


1 Material CSP W.350.1000 Kelas A
2 Mobilisasi Dan Demobilisasi Piling Rig + diesel hammer DD
3 Mobilisasi Dan Demobilisasi Service crane
4 Manejemen proyek
5 keamanan alat
6 Akomodasi dan transport
7 safety
8 asuransi tenaga kerja
9 Jasa Pancang sheet pile
10 handling dilokasi pancang

Excavator Type breaker


1 Excavator Type breaker @ 8 jam x 350000
2 Operator per shift
3 Solar @ 10 L / jam
4 Mobilisasi Dan Demobilisasi

Excavator Type PC75


1 Excavator Type PC75
2 Operator per shift
3 Solar @ 10 L / jam
4 Mobilisasi Dan Demobilisasi

5 keamanan alat
6 Akomodasi dan transport
7 safety
8 asuransi tenaga kerja

Dinding Panel
Bongkar Pagar Panel Precast, T = 2 m
Pemasangan pagar precast panel t = 2 m ( material lama )+
Pemasangan pagar precast panel t = 2 m + kolom ( material
Pemasangan kembali material kawat duri existing

DINDING SOLID WOOD PANEL


Dinding kayu nyatoh +kaca tempered
Dinding kayu nyatoh (rangka hollow 40/40,backing plywood)
Kaca tempered

ANTI RAYAP
Sipermetrine ex. Blockade 100EC
Imidakloprid ex. Lentra 200SL

ANTI RAYAP PONTIANAK


Premise 200 SL
Safe 1 200 SL
PERKERASAN JALAN

Aspal hotmix tebal 5 cm area Jalan


Sirtu tebal 10 cm
Sirtu tebal 30 cm
Batu pecah tebal 10 cm
Aspal siram + split tebal 10 cm
Lapisan Batu pecah tebal 20 cm
Lapisan Batu pasir tebal 3 cm
Pemasangan Turap Batu Kali
Pemasangan Paving Uk. 20x20x8
Pemasangan Paving motif altstadt

Waterproofing
1 Integral conplast WP421ex. Fosroc
2 Waterproofing coating brushbond flex ex. Fosroc
3 Waterproofing coating brushbond grey ex. Fosroc
4 Epoxy 1000micron Ex. Propan
5 Floor Hardener 3 kg Nitofloor Hardtop Natural ex. Fosroc
6 Floor Hardener 5 kg Nitofloor Hardtop Natural ex. Fosroc
7 Waterproofing membrane Profex Torchseal 3 PV ex. Fosroc
8 Waterstop with Supercasst SW 10 ex. Fosroc
9 water stop. PVC - 200 mm

Rangka Atap Baja Ringan Smart Truss

Chemical Angkur
1 Chemical Angkur dia 19 mm
2 Chemical Angkur dia. 22 mm

RAILING
1 Railing Tangga Utama
2 Railing tangga Gallery
Railing kaca tempered laminated 12mm clear H 1200mm
6
main silicon sealent
7 Handrell tangga baja
8 Penyekat tangga Baja
9 Handrell tangga gallery
10 Plat sheet t : 6mm buangan air hujan L 280x20mm
9 Relling Ramp
3 Corner guard L 50x50x5 p 1200
7 Corner guard L 60x60x6
10 Grill gutter400mm
4 Grill gutter300mm
5 Grill gutter200mm
10 Tutup Man Hole 1000x1000
11 Tangga MonyetGalvanized p 3000 GWT
12 Ornamen Mihrab 700x700 t 5 mm stainless
13 Pagar gerbang perforated
Car stopper dari pipa 4"
Car stopper dari pipa panjang 180 mm
Car stopper dari pipa panjang 391 mm
Car stopper dari pipa panjang 450 mm
Car stopper dari pipa panjang 503 mm
Car stopper dari pipa panjang 649 mm
Car stopper dari pipa panjang 785 mm

RAILLING JASUINDO
Railling BSP dia 38x2mm H=1200mm tiang dia 25mm jarak
1bh/trap (finish cat)
Hand Railling tangga BSP dia 38x2mm dan bracket finish
cat
Hand Railling tangga stainless hairline t=1.2mm dan bracket
Pintu gerbang lipat hollow 20x40 jarak 70mm konbinasi plat
strip H=2500 L=7150 Finish cat
Pagar Kawat Duri galvanis x5 lajur tiang siku 50x50x5
H=450
Kisi-kisi tangga jeruji besi hollow 40x40jarak lubang 40mm
dan dudukan plat strip 5x50 finish cat

TIMBER DECK

Pekerjaan pemasangan Kolom WPC


Pekerjaan pemasangan Lantai Timberdeck area tangga
(FF-10)
skirtingkayu

Atap sirap

PLAFOND
Plafon gypsum 9mm Ex. Jayaboard modul 60x60 rk.metal
furing
Plafon kalsiboard 6mm Ex. Jayaboard modul 60x60 rk.metal
furing
Shadowline
Partisi gypsum 12mm rangka metal stud 76

Plafond Gypsum 9 mm ex. Jayaboard/setara termasuk


3
rangka C tebal 0,35 mm
Plafond Gypsum 12 mm ex. Jayaboard/setara termasuk
4
rangka C tebal 0,35 mm
Plafond Gypsum 13 mm ex. Jayaboard/setara termasuk
rangka C tebal 0,35 mm
Plafond Gypsum WR 9 mm ex. Jayaboard/setara tebal
4
rangka Chollow 0,35 mm
Plafond Gypsum WR 12 mm ex. Jayaboard/setara tebal
5
rangka C hollow 0,35 mm
Plafond GRC 8mm tebal rangka C hollow 0,35 mm
Drop ceilling <=30cm
Drop ceilling <=40cm
Drop ceilling <=50cm
Curtainbox gypsum 9mm
6 Drop ceilling gypsum 12 mm h = 20 cm termasuk cove,
7 Drop celling uk H= 550mm
8 Drop celling uk H= 400mm
8 Drop celling uk H= 150mm
9 Drop celling uk H= 200mm
10 Drop celling uk H= 750mm
11 Plafond kalsiboard 6 mm mm ex. Jayaboard/setara
12 Shadow Line 10x10
11 Cove Plafond t 10 cm dari multiplek
12 Cove Plafond t 15 cm dari multiplek
13 Cove Plafond t 25 cm dari multiplek
13 Cove Plafond t 30 cm dari multiplek
13 Cove Plafond t 20 cm dari multiplek
14 Plafond clading aluminium l 100x2000 tebal 0,35 mm
15 Main Hole 60x60
16 PartisiGypsum 12 mm double layer
17 PartisiGypsum 9 mm 2muka (Stick on wall full bonding)
PartisiGypsum 9 mm 1muka (Stick on wall full bonding)
Dinding Multiplex lapis HPL Lobby Lift (HP1)
Dinding Multiplex lapis HPL + Rockwool (HP1)
Plafond lapis HPL Lobby Lift (HP1)
Plafond expanded metal type tile 60x60
Plafond expanded metal type linier
Plafond expanded metal type bevel
Cove Plafond t Office
Cove Plafond t Masjid

CAT
1 Cat dinding luar ex. Dulux profesional weathershield E1000
2 Cat dinding dalam Dulux Profesional A1000
3 Cat plafond luar ex. Dulux
4 Cat plafond dalam ex. Dulux Catylac
5 Cat Acrilyc easy clean / majestic sheen ex. Jotun
6 Cat Acrilyc enamel Dulux Profesional Solventbased M1000
7 Cat Texture
8 Cat Epoxy
9 Cat Garis Parkir
10 Cat Marka
11 Cat Arah Panah
12 Area Pejalan Kaki

CAT JAKARTA
Cat dinding interior emultion Ex. Jotun/Propan/Dulux
Cat plafon interior emultion Ex. Jotun/Propan/Dulux
Cat dinding enamel Ex. Jotun/Propan/Dulux
Cat dinding Weathershield Ex. Jotun/Propan/Dulux

SUBKON PLAFOND ----->>PONTIANAK


Plafon gypsum 9mm rangka furing 0.4
Plafon gypsum 9mm WR rangka furing 0.4
plafon kalsiboard 6mm rangka furing 0.4
Shadowline
prelim subkon plafon
Partisi Gypsum 12mm 1sisi

CAT PONTIANAK
Cat weathershield emulsion ex. Jotun Jotashield antifade
Cat dinding antibacterial emulsion ex. Jotun Majestic TB care
Cat dinding acrylic emulsion ex. Jotun Jotaplast
Cat plafon antibacterial emulsion ex. Jotun Majestic TB care
Cat plafon acrylic emulsion ex. Jotaplast
Cat enamel ex. Majextic TB sheen
INSULATION SPRAY PONTIANAK
Insulation spray polyurethene

Solid Surface
Top Table solid surface uk. 600x400mm
Cover Kolom Solid Surface

Acrilic paint ex. Mowilex termasuk perapihan


Acrilic paint ex. Dulux easy clean termasuk perapihan
Acrilic paint ex. Dulux pentalite 44808 / pure white termasuk
Dulux Wheathershield Pro Std

Carpet ex goodrich
Wallpapper

CUBICAL

Mobilisasi

Partisi cubical tempered glass 8mm


Pemasangan SpotCubicle
Partisi cubical tempered mm t 8 mm
Partisi cubical Phenolic

ALUMUNIUM

Kaca Pos Jaga tebal 10mm


Kaca Pos Jaga tebal 10mm
Skylight laminated clear 8+8
Skylight laminated clear 6+6

Pemasangan alumunium PVDF tipe A-2 (Red)

Pemasangan alumunium PVDF tipe A-15 (stainlesssteel


metalik)
Pemasangan alumunium PVDF tipe A-16 (dark grey)
Pemasangan alumunium PVDF tipe A-17 (dark grey)
Pemasangan alumunium PVDF tipe A-18 (magnesy)
Pemasangan alumunium PVDF tipe A-19 (dark grey)
Pemasangan alumunium PVDF tipe A-20 (Magnesy metalic)
Pemasangan alumunium PVDF tipe A-21 (Red)
Pemasangan alumunium PVDF tipe A-22 (Yellow)
Pemasangan alumunium PVDF tipe A-23 (green)
Pemasangan alumunium PVDF tipe A-24 (Blue)
Finishing kolom K 3 dari ACP "stainless steel metallic" dan

Windowstool ACP
Fire stop
Spandrel Kalsiboard L 70 cm

PINTU JENDELA ALUMINIUM


P1 Pintu Utama Frameless uk. 2400x2200mm
P9 Pintu alum+kaca clear 6mm uk.790x2200mm
P11 Frameless clear tempered 12mm uk. 810x2200mm
J1 Jendela alum + kaca stopsol 6mm
J2 Jendela alum +kaca stopsol 6mm
J5 Jendela alum sliding
BV1 Jendela alum+kaca stopsol

ACP ex. Seven rangka hollow


kaca cermin 5mm, uk. 60x100

ACP PONTIANAK
Suply & Install ACP to cloum clading
Suply & Install stainless steel hairlane to coloum skirting
Stainless steel railing post wide 70mmx20mm, 1150mm high,
tempered clear glass 12mm thick excluded (by other) with
including handrail dia. 40mm with hairline finish, to ramp area GF
to basement
Grill alumunium mounting 100x150 mm Hollow
height 2800 mm with 150 mm spacing

PINTU JENDELA WPC DAN UPVC


Kusen+daun pintu WPC 790x2200mm
Kusen+daun pintu WPC 890x2200mm
Kusen+daun pintu WPC 890x2200mm
Kusen+daun pintu UPVC 790x2200mm
Kusen+daun pintu UPVC 600x2000mm
Kusen+daun pintu UPVC 790x2000mm
Kusen+daun pintu WPC 1900x2200mm
Jendela Jungkit UPVC 1800x2200
Jendela kaca mati UPVC 5050x2200

PINTU BESI
Pintu besi uk. 1500x2200mm
Pintu besi uk. 790x2200mm
Pintu besi 890x2200mm
Pintu besi 890x2200mm
Pintu besi uk. 990x2200mm
Pintu besi uk. 990x2200mm
Pintu besi790x2200mm
Pintu besi790x2200mm

ROLLINGDOOR
RD1 Sanwamas HWS 1.2mm solid material
RD2 SanwamasLWS 0.5mm solid material
RD3 SanwamasLWS 0.5mm solid material
RD4 SanwamasLWS 0.5mm solid material

Screen frame; comprising aluminium plate with batik pattern, steel hollow frame in
Cover Kolom ACP

Pekerjaan Caping/lisplank Canopy Food Court, aluminium t


Aluminium grille with shorea wood finish; comprising aluminium hollow , steel fra
Baja canopy

CERMIN
Cermin Uk. 600x1900mm tebal 5mm bevel termasuk plywood
Cermin Uk. 600x1000mm tebal 5mm bevel termasuk plywood
Cermin Uk. 600x1400mm tebal 5mm bevel termasuk plywood
Cermin Uk. 600x1800mm tebal 5mm bevel termasuk plywood
Cermin uk. 1800x1200mm
Cermin uk. 1890x1200mm
Cermin uk. 1600x1200mm
Cermin uk. 3650x1200mm
Cermin uk. 1650x1200mm
Cermin uk. 2600x1200mm
Cermin Tebal 6 mm termasuk bevel + bingkai

LOUVRE ALUMINIUM & CANOPY


Type GR -2 uk. 700x500mm
Type GR -3 uk. 350x500mm
Type GR -4 uk. 600x500mm
Canopy ACP + Laminated Clear Glass 5+5
Skylight ACP+laminated clearglass 5+5 +Alum powder coat
Skylight 6.5x6.5 extrude aluminium+glass 10mm
Fasade Grill Aluminium hollow 100x150mm jarak 100mm

PAWLING
Handrell BR-1200 Ex. USA
Wall Guard -WG 6C
Corner Guard CG 20

RAILING BESI
Railing besi BSP Ø 38 H=900, jeruji Ø 25 jarak 140 fin cat
Handrail besi BSP Ø 38 x2 dan bracket
Corner guard L50.50.5
Railing balkon Hollow galvanis 50x50
Railling Besi Luar Hollow galvanis 30x60
Panel plat stainless steel t=1.2mm, backing triplex 5mm incl

Louvre Besi GR-1 (doble) uk.1.25x3.2 dan 2.25x3.2


Galvanis steel plate grating 300
Galvanis steel grating kotak (60x60)

CUBICAL
Cubikel rata-rata

3D PANEL
Dinding 3Dpanel

WPC - Flooring
Floor Decking WPC
Upah Pasang Floor Decking
WPC - Skirting
Skirting panel WPC
Material Bantu
Upah Pasang Skirting WPC

Cladding WPC
Cladding WPC
Material Bantu
Rangka Hollow Galvanized 20x40
Upah Pasang Clading

CONWOOD
Pergola Sky Lounge alt. 1 t= 1.4 cm x15 cm Deck 6"
Pergola Sky Lounge alt.2 t= 2.5 cm x 15 cm Deck 6 "
Dekoratif tiang Baja Sky Lounge uk. 20x1.4 cm Deck 8"
Ornamen D inding lift -1 uk. 5x1.6 cm Plank 2", jarak 5 cm
Ornamen dinding lift - 2 uk. 5x1.6 cm Plank 2", jarak 5 cm
Lantai Decking Conwood
Bangku Finish Conwood

SANDWICH PANEL
Dinding EPS 50mm
Ceilling EPS 75mm
Aluminium extrusion
Jasa Pasang EPS
Prelim subkon EPS
D1 Automatic sliding door 1400x2100
D2 Manual Single Swing 900x2100

ANALISA HARGA SA

No. Item

ANALISA

Mob Demom Tiang pancang 40x40, 25x25 & Alat


Mobilisasi Material Pancang
Mob-Demob Alat Pancang HSPD 240 Ton
Mob-Demob Mobile Crane
Mob-Demob Excavator

Pekerjaan Tiang pancang 40x40 kedalaman 40 m


Material
Material Pancang 40x40 kedalaman 40 m
Joint Standard
Alat
Jasa Pancang (HSPD) 240 ton
Joint Tiang Pancang
Handling Tiang Pancang
PDA test
Bobokan kepala Pancang

Pekerjaan Tiang pancang 25x25 kedalaman 24 m


Material
Material Pancang 40x40 kedalaman 40 m
Joint Standard
Alat
Jasa Pancang (HSPD) 240 ton
Joint Tiang Pancang
Handling Tiang Pancang
PDA test
Bobokan kepala Pancang

Galian Tanah Dengan Alat


Excavator Type ITACHI 210
Operator per shift
Solar @ 20 L / jam
Mobilisasi Dan Demobilisasi
Buang tanah bekas galian keluar lokasi
Alat Bantu

Galian Tanah Manual


Upah Galian Tanah
Alat Bantu
Buang tanah bekas galian keluar lokasi
Buang tanah bekas galian

Pasir urug t=10 cm


Pasir urug
Upah pasang pasir urug
Alat bantu

Batu Kali
Bahan : Batu Kali
Semen
Pasir beton
Angkutan/Langsir material batu kali
Upah pas. Batu kali

Beton lantai kerja MUTU B-0


Beton B-0 kg/m2 NFA
Concrete Pump
Upah Lantai Kerja
Alat Bantu

Pengecoran Beton K250 Pada Pit Lift, Pile Cap, Tie beam
Beton K250 kg/m2 NFA
Material bantu pek. Cor ( relat, stopcor, dekking, dll)
Tip Sopir Mixer
Upah Pengcoran Plat, Balok, Pile Cap
Upah Curring
Alat bantu (bucket, vibrator,talang, dll) (Masuk Prelim)
Alat - Concrate Pump

Pengecoran Beton K300 Pada Pit Lift, Pile Cap, Tie beam
Beton K300 kg/m2 NFA
Material bantu pek. Cor ( relat, stopcor, dekking, dll)
Tip Sopir Mixer
Upah Pengcoran Plat, Balok, Pile Cap
Upah Curring
Alat bantu (bucket, vibrator,talang, dll) (Masuk Prelim)
Alat - Concrate Pump

Pengecoran Beton K250 Pada Kolom & Dinding (Vertikal)


Beton K250 kg/m2 NFA
Material bantu pek. Cor ( relat, stopcor, dekking, dll)
Tip Sopir Mixer
Upah Pengcoran Kolom
Upah Curring
Alat bantu (bucket, vibrator,talang, dll) (Masuk Prelim)
Alat - Concrate Pump

Pengecoran Beton K300 Pada Kolom & Dinding (Vertikal)


Beton K300 kg/m2 NFA
Material bantu pek. Cor ( relat, stopcor, dekking, dll)
Tip Sopir Mixer
Upah Pengcoran Kolom
Upah Curring
Alat bantu (bucket, vibrator,talang, dll) (Masuk Prelim)
Alat - Concrate Pump

Pengecoran Beton K250 Pada Balok, Plat Lantai


Beton K250 kg/m2 NFA
Material bantu pek. Cor ( relat, stopcor, dekking, dll)
Tip Sopir Mixer
Upah Pengcoran Plat, Balok, Pile Cap
Upah Curring
Alat bantu (bucket, vibrator,talang, dll) (Masuk Prelim)
Alat - Concrate Pump

Pengecoran Beton K300 Pada Balok, Plat Lantai


Beton K300 kg/m2 NFA
Material bantu pek. Cor ( relat, stopcor, dekking, dll)
Tip Sopir Mixer
Upah Pengcoran Plat, Balok, Pile Cap
Upah Curring
Alat bantu (bucket, vibrator,talang, dll) (Masuk Prelim)
Alat - Concrate Pump

Pengecoran Beton K250 Pada Tangga, Parapet


Beton FC' 25 Fa 15%
Material bantu pek. Cor ( relat, stopcor, dekking, dll)
Tip Sopir Mixer
Upah Pengcoran Plat, Balok, Pile Cap
Upah Curring
Alat bantu (bucket, vibrator,talang, dll) Masuk Prelim
Alat - Concrate Pump
Pasangan Batako, Untuk Bekisting Pile Cap dan Tie Beam
Batako Trass 36x17x8cm
Semen
Pasir
Upah Angkutan Batako
Upah pas. Batako
Alat bantu

Bekisting Kolom
Bahan : Plywood 15 mm
Concrete form work
Support
Paku
Plastic Concrete spacer
Mould oil
Tie rod
Kayu kaso 5/7
Material Perapihan Beton
Upah Bekesting Kolom
Upah Perapihan Beton

Bekisting Plat lantai & Balok


Bahan : Plywood 12 mm
Scafolding
Kayu 6/12cm
Kayu 5/7cm
Plastic Concrete spacer
Mould oil
Paku
Material Perapihan Beton
Upah bekisting plat & Balok :
Upah Perapihan Beton
Bekisting Plat Ramp & Tangga
Bahan : Plywood 12 mm
Scafolding
Kayu 6/12cm
Kayu 5/7cm
Plastic Concrete spacer
Mould oil
Paku
Material Perapihan Beton
Upah bekisting Ramp & Tangga
Upah Perapihan Beton

Besi beton BJTD 40


Bahan : Besi beton BJTD 40
Kawat beton
Material bantu pek. Pembesian (cakar ayam, stek, support, p
Material transport & loading/unloading
Upah Turun besi
Upah pembesian
Alat bantu (bar cutter, bar bender)

Wiremesh Rata-rata
Bahan : Wiremesh rata-rata
Wastage& overLaps Wiremesh
Kawat beton
Ongkos Kirim wiremesh
Cakar ayam & dowel
Upah turun wire mesh
Upah gelar wiremesh
PEKERJAAN BAJA
WF 250 X 125 X 6 X 9
WF 250 X 125 X 6 X 9
Hot dip Galvanized
Fabrikasi & Material Pembantu
Shopdrawing
Ongkos Kirim
Erection
Cat zinchromate

WF 200 X 100 X 5.5 X 8


WF 200 X 100 X 5.5 X 8
Hot dip Galvanized
Fabrikasi & Material Pembantu Jakarta
Shopdrawing
Transport
Erection
Cat zinchromate

WF 150X 75 X 5 X 7
WF 150X 75 X 5 X 7
Hot dip Galvanized
Fabrikasi & Material Pembantu Jakarta
Shopdrawing
Transport
Erection
Cat zinchromate
7 CNP 150x50x20x3.2
CNP 150x50x20x3.2
Hot dip Galvanized
Fabrikasi & Material Pembantu
Shopdrawing
Ongkos Kirim
Erection
Cat zinchromate

12mm thick base plate


12mm thick base plate
Hot dip Galvanized
Fabrikasi & Material Pembantu Jakarta
Shopdrawing
Ongkos Kirim
Erection
Cat zinchromate

10mm thick base plate


10mm thick base plate
Hot dip Galvanized
Fabrikasi & Material Pembantu Jakarta
Shopdrawing
Ongkos Kirim
Erection
Cat zinchromate
### 8mm thick base plate
8mm thick base plate
Hot dip Galvanized
Fabrikasi & Material Pembantu Jakarta
Shopdrawing
Ongkos Kirim
Erection
Cat zinchromate

### 6mm thick base plate


6mm thick base plate
Hot dip Galvanized
Fabrikasi & Material Pembantu Jakarta
Shopdrawing
Ongkos Kirim
Erection
Cat zinchromate

1 Cat zinchromate
Cat zinchromate termasuk upah

Angkur dia 16 panjang 640 mm


Angkur bout ø 16 mm l 720 mm
Hot dip Galvanized
Upah Pasang
Ongkos Kirim
Trekstang ø 12 mm untuk atap
Trekstang ø 12 mm untuk atap
Hot dip Galvanized
Upah Pasang Trekstang
Cat zinchromate

Braching ø 16 mm + Turn Buckle ø 16 mm


Besi beton dia 16
Turn Buckle ø 16 mm
Hot dip Galvanized
Upah Pasang Braching
Ongkos Kirim turn buckle

3 HTB ø 16 mm
HTB ø 16 mm
Upah Pasang
Ongkos Kirim

4 HTB ø 12 mm
HTB ø 12 mm
Upah Pasang
Ongkos Kirim

Grouting Baja w sika groute


Sikagrout 215 ex. Sika (1 m3 = 1900 kg)
Upah Pasang
Alat bantu
Ongkos Kirim

INSULATION
Glasswoll
Alumunium Foil
Roofmesh 2214 uk 1.8mx30m
Upah gelar GLASSWOOL

TALANG
Plat zinkalume l=60 t=0.4 mm
Plat strip 3 cm
Upah Tekuk
Alat bantu
Upah pasang

Lisplang
Plat zinkalume l=30 t=0.4 mm
Alat bantu
Upah pasang
ARSITEKTUR

1 Kolom Praktis ( KP806)


Beton Site Mix
Bahan : Semen 3 roda @ 50 kg
Pasir beton
Split
Alat bantu
Bekisting
Multiplek 9 mm
kayu kaso 5/7
Kolom Praktis KP 806 Panjang 3m
Bor stek
Onkos Kirim besi kolom praktis
Upah kolom Praktis

2 Pasangan dinding batu bata ringan tb=10 cm dinding Dalam


Bata Ringan ex. Leicht Brick
Perekat Bata Ringan @40kg ex. Broco
Kolom praktis KP806
Corner bead
ongkos kirim mortar
ongkos kirim bata ringan
Upah Turun dan Langsir Material pas. Bata ringan
Upah pasang dinding bata ringan

3 Pasangan dinding batu bata ringan tb=10 cm dinding luar


Bata Ringan ex. Leicht Brick
Perekat Bata Ringan @40kg ex. Broco
Kolom praktis KP806
Corner bead
Sloof KP806
ongkos kirim mortar
ongkos kirim bata ringan
Upah Turun dan Langsir Material pas. Bata ringan
Upah pasang dinding bata ringan

Plester Readymix mortar pada dinding dalam tebal 10 mm plester


Plester @40kg ex. Broco
ongkos kirim mortar
Langsir material plester dan Aci
Upah Plesteran dinding dalam

Acian mortar dinding dalam tebal 2 mm


Acian @40kg ex. Broco
ongkos kirim mortar
Langsir material plester dan Aci
Tali Air
Upah Acian dinding dalam

Plester Readymix mortar pada dinding luar tebal 15 mm plester


Plester @40kg ex. Broco
ongkos kirim mortar
Langsir material plester dan Aci
Tali Air
Upah Plesteran dinding Luar
Acian mortar dinding luar tebal 3 mm
Acian @40kg ex. Broco
ongkos kirim mortar
Langsir material plester dan Aci
Tali Air
Upah Acian dinding Luar

Keramik Dinding HT 60x60 cm ex. Granito (Lobby HT)


HT uk. 30 x 60 cm polished type pearlwhite ex. Granito
Tile Adhesive Dinding @25kg
Plester bata Ringan @40kg ex. Broco
Tile Grout@1kg/sak
Semen
Pasir
Ongkos kirim HT/keramik
Ongkos kirim mortar
Upah langsir Material HT
Upah langsir Material mortar
Upah pasang HT dinding include plesteran

Keramik Dinding CT 30x60 cm ex. Roman


Keramik Dinding CT 30x60 cm ex. Roman
Tile Adhesive Dinding @25kg
Plester bata Ringan @40kg ex. Broco
Tile Grout@1kg/sak
Semen
Pasir
Ongkos kirim HT/keramik
Ongkos kirim mortar
Upah langsir Material HT
Upah langsir Material mortar
Upah pasang HT dinding include plesteran

Keramik Dinding CT 30x30 cm ex. Roman Gol B


Keramik Dinding 30x30 ex. Roman Gol B
Tile Adhesive Dinding @25kg
Plester bata Ringan @40kg ex. Broco
Tile Grout@1kg/sak
Semen
Pasir
Ongkos kirim HT/keramik
Ongkos kirim mortar
Upah langsir Material HT
Upah langsir Material mortar
Upah pasang HT dinding include plesteran

Dinding Jamb Lift HT 30x60 cm ex. Granito


Penebalan dinding bata ringan Jamb Lift
Plester penebalan dinding
Pasangan dinding HT 30*60

Keramik Lantai HT 60x60 cm Polish


HT uk. 60 x 60 cm Double Loading type Snow White FR60D121
Tile Adhesive Dinding @25kg
Plester bata Ringan @40kg ex. Broco
Tile Grout@1kg/sak
Semen
Pasir
Ongkos kirim HT/keramik
Ongkos kirim mortar
Upah langsir Material HT
Upah langsir Material mortar
Upah Screed Lantai
Upah pasang HT Lantai

Keramik Dinding HT uk. 60 x 60 cm unpolish type cofee ex. Granito


HT uk. 60 x 60 cm unpolish type cofee ex. Granito
Tile Adhesive Dinding @25kg
Plester bata Ringan @40kg ex. Broco
Tile Grout@1kg/sak
Semen
Pasir
Ongkos kirim HT/keramik
Ongkos kirim mortar
Upah langsir Material HT
Upah langsir Material mortar
Upah pasang HT dinding include plesteran

Keramik Lantai 30x30 ex. Roman Gol B


Keramik Lantai 30x30 ex. Roman Gol B
Tile Adhesive Dinding @25kg
Plester bata Ringan @40kg ex. Broco
Tile Grout@1kg/sak
Semen
Pasir
Ongkos kirim HT/keramik
Ongkos kirim mortar
Upah langsir Material HT
Upah langsir Material mortar
Upah Screed Lantai
Upah pasang HT Lantai

Pekerjaan HT plint/skirting uk. 100x600 mm


HT uk. 60 x 60 cm polished type frostwhite ex. Granito
Tile Adhesive Dinding @25kg
Plester bata Ringan @40kg ex. Broco
Tile Grout@1kg/sak
Semen
Pasir
Ongkos kirim HT/keramik
Ongkos kirim mortar
Upah langsir Material HT
Upah langsir Material mortar
Upah tali air
Upah cutter plint
Upah pasang keramik plint include plesteran

Pekerjaan CT plint/skirting uk. 100x300 mm


Keramik Lantai 30x30 ex. Roman Gol B
Tile Adhesive Dinding @25kg
Plester bata Ringan @40kg ex. Broco
Tile Grout@1kg/sak
Semen
Pasir
Ongkos kirim HT/keramik
Ongkos kirim mortar
Upah langsir Material HT
Upah langsir Material mortar
Upah tali air
Upah cutter plint
Upah pasang keramik plint include plesteran

Plint/Skirting oil/enamel paint ex. Jotun


Cat Acrilyc enamel ex. Jotun/propan
Tile Adhesive Dinding @25kg
Plester bata Ringan @40kg ex. Broco
Tile Grout@1kg/sak
Semen
Pasir
Ongkos kirim HT/keramik
Ongkos kirim mortar
Upah langsir Material HT
Upah langsir Material mortar
Upah tali air
Upah cutter plint

Keramik Lantai HT 60x60 cm Unpolish


Lantai HT 60x60 cm Rustic Cementum series type NA60CM015 ex.
Tile Adhesive Dinding @25kg
Plester bata Ringan @40kg ex. Broco
Tile Grout@1kg/sak
Semen
Pasir
Ongkos kirim HT/keramik
Ongkos kirim mortar
Upah langsir Material HT
Upah langsir Material mortar
Upah Screed Lantai
Upah pasang HT Lantai

Lantai HT 30x60 cm ex. Granito (Grove line + bevel)


HT uk. 60 x 60 cm Double Loading type Snow White FR60D121
Jasa Stepnosing HT uk. 30 x 60 cm
Jasa Cutting Size HT uk. 20 x 60 cm
Tile Adhesive Dinding @25kg
Plester bata Ringan @40kg ex. Broco
Tile Grout@1kg/sak
Semen
Pasir
Ongkos kirim HT/keramik
Ongkos kirim mortar
Upah langsir Material HT
Upah langsir Material mortar
Upah Screed Lantai
Upah pasang HT Lantai

Pelapis Dinding Lead Shield/ Pb/ timah hitam tebal 2mm


Partisi Dinding 1 lapis tebal 12 mm ex. Jaya board
Pekerjaan dinding timbal 2 mm
Mob demob pekerjaan Timbal

Pelapis Dinding Lead Shield/ Pb/ timah hitam tebal 4mm


Partisi Dinding 1 lapis tebal 12 mm ex. Jaya board
Pekerjaan dinding timbal 2 mm
Mob demob pekerjaan Timbal

Ceiling Sandwich panel PIR 50 mm


Ceilling PIR 50 mm
Aluminium extrusion
Jasa Pasang PIR
Mob demob pekerjaan Sandwich panel

Dinding Sandwich panel PIR 50 mm


Dinding PIR 50 mm
Aluminium extrusion
Suspension material & Cover Colum
Jasa Pasang EPS
Mob demob pekerjaan Sandwich panel

Dinding Sandwich panel PIR 50 mm + Timbal 2 mm


Dinding PIR 50 mm
Pekerjaan dinding timbal 2 mm
Mob demob pekerjaan Timbal
Aluminium extrusion
Suspension material & Cover Colum
Pasangan Bata Ringan
Plester + Aci
Cat Anti Bacterial
Jasa Pasang EPS
Mob demob pekerjaan Sandwich panel

Sandwich panel EPS 75 mm + Timbal 2 mm


Ceilling EPS 75mm
Aluminium extrusion
Jasa Pasang EPS
Mob demob pekerjaan Sandwich panel
Pekerjaan dinding timbal 2 mm
Mob demob pekerjaan Timbal

Waterproofing Coating + Screed Protection


Waterproofing coating brushbond grey ex. Fosroc
Semen
Pasir
Angkutan
Upah screed
Trowel Finish + Floor Hardener 3 kg
Floor Hardener 3 kg non metalik natural
Alat trowel
Upah trowel lantai

Trowel Finish + Floor Hardener 5 kg


Floor Hardener 3 kg non metalik natural
Alat trowel
Upah trowel lantai

Waterproofing membrane
Waterproofing membrane Profex Torchseal 3 PV ex. Fosroc

Screed 5 cm + wiremesh M4
Semen
Pasir
Wiremesh M4
Angkut Semen + Pasir
Upah Screed
Groove line / tali air 50 mm
Alat Bantu
Material Bantu
Upah Tali Air

Screed t=5 cm
Semen
Pasir
Angkutan
Upah screed + leveling

Lantai Vinyl type Somplan 350 ex. Tarkett


Material Vinyl
Adhesive + Coating
Self Leveling
Pasang lantai Vinyl
Prelim subkon
Mortar Screed 5 cm @50kg /sak ex. Uzin Screed
Upah Screed

Lantai Vinyl type Somplan 350 ex. Tarkett


Material Vinyl IQ Granite ex. Tarkett
Adhesive + Coating
Self Leveling
Pasang lantai Vinyl
Prelim subkon
Mortar Screed 5 cm @50kg /sak ex. Uzin Screed
Upah Screed

Lantai Vinyl type IQ Granite ex. Tarkett


Material Vinyl IQ Granite ex. Tarkett
Adhesive + Coating
Self Leveling
Pasang lantai Vinyl
Prelim subkon
Mortar Screed 5 cm @50kg /sak ex. Uzin Screed
Upah Screed

Vinyl type IQ Toro SC ex. Tarkett


Material Vinyl IQ Toro SC ex. Tarkett
Adhesive + Coating
Self Leveling
Pasang lantai Vinyl
Prelim subkon
Mortar Screed 5 cm @50kg /sak ex. Uzin Screed
Upah Screed

Lantai Vinyl type IQ Granite ex. Tarkett (Area Renovasi)


Material Vinyl IQ Granite ex. Tarkett
Adhesive + Coating
Self Leveling
Pasang lantai Vinyl
Prelim subkon
Mortar Screed 5 cm @50kg /sak ex. Uzin Screed
Upah Screed
Skirting PVC 15 cm vinyl ex. Tarkett
Material Vinyl IQ Granite ex. Tarkett
Cooper Tape
Wall capping
Coving Fillet
Biaya pasang skirting Vinyl
Biaya pasang Wall capping & Coving Fillet

Exposed Dak Beton


Skimcoat Beton @40kg/sak
Ongkos kirim mortar
Upah langsir Material mortar
Upah Exposed Dak Beton
Alat Bantu

Meja beton UK. 600x1400 Finish ct 30X30


Beton Site Mix
Besi
Bekisting
Upah Meja
Meja wastafel finish ct 30x30

Meja beton UK. 600x1400 Finish ct 30X30


Beton Site Mix
Besi
Bekisting
Upah Meja
Meja wastafel finish ct 30x30

Pagar Wiremesh
Wiremesh M8
Siku 50x50x5
Ongkos kirim
Material bantu
Cat Zincromate
Cat Duco
Pintu masuk uk. 1.6x2.4
Upah pemasangan (pabrikasi + pasang)

SANITARY RSAU Pontianak

Closet duduk tipe CW 421 J ex. Toto


Closet duduk tipe CW 421 J ex. Toto
Resiko kehilangan & kerusakan
ongkos kirim sanitary closet, washtafel, Urinal
Upah langsir Closet duduk
Acsesories Material Bantu
Upah pasang Closet Duduk

Shower Spray TB 19 CSMCR ex. Toto


Shower Spray TB 19 CSMCR ex. Toto
Resiko kehilangan & kerusakan
ongkos kirim sanitary kecil
Upah langsir material sanitair
Material bantu sanitair
Upah pasang Jet washer/head shower

Lavatory LW897CJ + Faucet TX109LD ex. Toto


Lavatory LK 897 CJ ex. Toto
Resiko kehilangan & kerusakan
ongkos kirim sanitary closet, washtafel, Urinal
Upah langsir Lavatory
Material bantu Lavatory
Upah pasang Lavatory

Tapset Sink TX 109 LD ex. Toto


Tapset Sink TX 109 LD ex. Toto
Resiko kehilangan & kerusakan
ongkos kirim sanitary kecil
Upah langsir material sanitair
Material bantu sanitair
Upah pasang Kran

Floor Drain TX1EB ex. Toto


Floor Drain TX1EB ex. Toto
Resiko kehilangan & kerusakan
ongkos kirim sanitary kecil
Upah langsir material sanitair
Material bantu FD
Upah pasang Floor Drain
Robe Hook TS118WSB ex. Toto
Robe Hook TS118WSB ex. Toto
Resiko kehilangan & kerusakan
ongkos kirim sanitary kecil
Upah langsir material sanitair
Material bantu sanitair
Upah pasang Robhook

Slop sink SK33 + Wall Faucet TX133AUN13C ex. Toto


Slop sink SK508 ex. Toto
Resiko kehilangan & kerusakan
ongkos kirim sanitary closet, washtafel, Urinal
Upah langsir Lavatory
Material bantu Lavatory
Upah pasang Lavatory

Kran Wudhu T23BQ13N


Kran Wudhu T23BQ13N
Resiko kehilangan & kerusakan
ongkos kirim sanitary kecil
Upah langsir material sanitair
Material bantu sanitair
Upah Pasang Sanitair kran

Paper holder TX 703 AESV1


Paper holder TX 703 AESV1
Resiko kehilangan & kerusakan
ongkos kirim sanitary kecil
Upah langsir material sanitair
Material bantu sanitair
Upah pasang Papper holder

Kitchen Faucet TX603KM ex. Toto


Kitchen Faucet TX603KM ex. Toto
Resiko kehilangan & kerusakan
ongkos kirim sanitary kecil
Upah langsir material sanitair
Material bantu sanitair
Upah Pasang Sanitair kran

Kitchen Sink Double Blow Ex. Lokal


Integral Stainless Steel double bowl sink ex. Bolsena type KS-42
Resiko kehilangan & kerusakan
ongkos kirim sanitary kecil
Upah langsir zink
Material bantu zink
Upah pasang zinc bowl

Roof Drain Ironmongeries ex. Antasan


Floor Drain TX1EB ex. Toto
Resiko kehilangan & kerusakan
ongkos kirim sanitary kecil
Upah langsir material sanitair
Material bantu FD
Upah pasang Floor Drain
ATAP Metal
Lysaght Klip Lock Optima 0,45 mm Zincalume
Nok Atap
ongkos kirim Material
Assesories & Material Bantu
Jasa Pasang Atap

RANGKA BAJA RINGAN


Kanal C 75 Tebal 0.75 mm TCT
ongkos kirim Material
Assesories & Material Bantu
Jasa Pasang Atap

Integral Stain Steel Double Bowl Sink ex. Bolsena-KS4201-MODENA


Integral Stain Steel Double Bowl Sink ex. Bolsena-KS4201-MODENA
Resiko kehilangan & kerusakan
ongkos kirim sanitary kecil
Upah langsir zink
Material bantu zink
Upah pasang zinc bowl

Integral Stain Steel Single Bowl Sink ex. Bolsena-KS3130-MODENA


Integral Stain Steel Single Bowl Sink ex. Bolsena-KS3130-MODENA
Resiko kehilangan & kerusakan
ongkos kirim sanitary kecil
Upah langsir zink
Material bantu zink
Upah pasang zinc bowl
SAT. HARGA HARGA Disc

SEBELUM DISC

m3 570,000 570,000
m3 750,000 750,000
m3 760,000 760,000
m3 770,000 770,000
m3 810,000 810,000

m3 830,000 830,000

m3 759,000 690,000 731,400 0%


m3 620,000 657,200 0%
m3 979,000 890,000 943,400 0%
m3 1,034,000 940,000 996,400 0%
m3 720,000 763,200 0%

m3 690,000 731,400 -
m3 665,000 694,300 10,000
m3 660,000 689,000 10,000
m3 780,000 816,200 10,000
m3 745,000 779,100 10,000
m3 760,000 805,600 -
m3 815,000 863,900 -
m3 770,000 805,600 10,000
m3 765,000 800,300 10,000
m3 835,000 874,500 10,000
m3 800,000 837,400 10,000
m3 795,000 832,100 10,000

lbr 45,000 60,800 0%


lbr 130,000 175,500 0%
lbr 210,000 283,500 0%
lbr 270,000 364,500 0%
m3 1,850,000 2,197,500 0%
m3 1,800,000 2,197,500 0%
m3 1,963,636 2,350,900 0%
m3 7,500 10,100 0%
kg 16,364 22,100 0%
m2 2,000 2,700 0%
ltr 26,500 35,800 0%
bh 6,500 8,800 0%
ltr 18,000 24,300 0%
m2 98,000 132,300 0%
ltr 4,000 5,400 0%

-
kg 600 600 800 0%
kontainer 10,000,000 13,500,000 0%
kontainer 14,700,000 19,845,000 0%
m2 21,315 28,800 0%
unit 10,000 13,500 0%
unit 238,095.24 321,400 0%
m3 10,403,000 396,441 535,200 0%
kg 10,800,000 514 690 0%
sak - - 0%

bisa sni -
kg 9,000 9,000 0%
m2 6,500 8,800 0%
kg 7,600 7,800 0%
Kg 8,100 8,100 0%
kg 14,600 19,700 0%
m1 5,000 6,800 0%
btg 34,100 34,100 40,900 0%

ttk 16,675 20,000 0%


ttk 34,500 41,400 0%
m2 1,673,000 46,472 62,700 0%
m2 75,000 101,300 0%
m2 95,000 128,300 0%
m2 8,000 10,800 0%
m2 15,000 20,300 0%
m2 25,000 33,800 0%
m' 15,000 20,300 0%

m3 250,000 337,500 0%
m3 95,000 128,300 0%
m3 185,000 244,800 0%
m3 95,000 123,300 0%
m3 420,000 567,000 0%
m3 195,000 263,300 0%
m3 400,000 540,000 0%
m3 250,000 337,500 0%
m3 190,000 256,500 0%
bh 650 1,000 0%
bh 1,700 1,900 0%
bh 7,550 10,200 0%
bh 250,000 337,500 0%
zak 64,000 86,400 0%
zak 69,000 93,200 0%
Roll 125,000 168,800 0%
bh 16,500 22,300 0%
bh 150,000 202,500 0%
m2 - - 0%
bh 30,000 40,500 0%
m2 20,000 27,000 0%

lbr 442,000 566,900 5%


bh 205,000 276,800 0%

lbr 1 664,000 896,400 0%


unit 1 1,800,000 2,430,000 0%

bh 13,000 17,600 0%

m3 500,000 595,000 0%
m3 530,000 636,000 0%
m3 560,000 672,000 0%
m3 500,000 600,000 0%
m3 550,000 660,000 0%
m3 LOCO 455,000 546,000 0%
1.100.00

Zak 45,000 54,000 0%


Zak 34,000 40,800 0%
Zak 45,000 54,000 0%
Zak 55,500 66,600 0%
Zak 60,500 72,600 0%
Zak 60,000 72,000 0%
kg 7,000 8,400 0%
kg 6,000 7,200 0%
Zak 71,500 85,800 0%
Zak 35,000 42,000
Zak 187,500 225,000 0%

zak LOCO 40,000 48,000 0%


zak LOCO 22,000 26,400 0%
zak LOCO 40,000 48,000 0%
zak LOCO 48,000 57,600 0%
zak LOCO 33,750 40,500 0%
zak LOCO 6,300 7,600 0%

1
kg 7,576 10,200 0.0%
kg 10,899 14,700 0.0%
kg 5,000 6,800 0.0%

kg 12,850 11,682 12,266 0.0%


kg 12,850 10,686 11,221 0.0%
kg 12,850 10,686 11,221 0.0%
kg 12,750 11,591 12,170 0.0%

kg 11,150 10,532 11,258 0.0%


kg 11,150 10,532 11,258 0.0%
kg 11,150 10,532 11,258 0.0%
kg 12,850 9,500 9,975 0.0%
kg 12,850 9,500 9,975 0.0%
kg 12,850 11,682 12,266 0.0%
kg 12,850 11,682 12,266 0.0%
kg 12,850 11,682 12,266 0.0%

kg 11,682 12,266 0%
kg 11,682 12,266 0%
kg 12,850 13,493 0%
kg 11,475 12,049 0%
kg 11,475 12,049 0%
kg 11,282 11,846 0%
btg 1,162,713 1,220,848 0%
btg 1,576,929 1,655,776 0%
btg 2,012,946 2,113,594 0%
kg 8,935 9,381 0%
kg 8,935 9,381 0%
kg 11,800 11,800 12,390 0%
kg 6,955 7,302 0%
kg 6,955 7,302 0%
kg 8,636 9,068 0%
kg 9,420 9,891 0%
kg 9,420 9,891 0%
kg 9,364 9,832 0%
kg 9,364 9,832 0%
kg 9,364 9,832 0%
kg 9,364 9,832 0%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 10,671 7.5%
kg 10,986 11,536 0.0%
kg 12,085 12,689 0.0%
kg 12,085 12,689 0.0%
kg 12,085 12,689 0.0%
kg 12,085 12,689 0.0%
btg 350,000 367,500 0%

kg 10,986 11,536 0%
bh 1,000,000 1,050,000 0%
bh 15,000 15,750 0%
bh 12,500 13,125 0%
bh 11,000 11,550 0%
bh 9,900 10,395 0%
bh 8,500 8,925 0%
bh 6,500 6,825 0%
bh 4,500 4,725 0%
bh 4,500 4,725 0%
kg 181,192 190,252 0%
kg 295,763 310,551 0%
bh 22,500 23,625 0%
bh 27,500 28,875 0%
bh 35,500 37,275 0%
bh 45,500 47,775 0%
bh 65,500 68,775 0%
bh 76,700 80,535 0%
bh 114,000 119,700 0%
bh 105,000 110,250 0%
bh 45,500 47,775 0%
bh 32,500 34,125 0%
bh 45,000 47,250 0%
lbr 8,500 8,925 0%
btg 250,000 262,500 0%

btg 65,000 87,800 0%

bh 53,000 60,400 5%
bh 37,000 42,200 5%
m2 91,000 103,700 5%
bh 70,000 79,800 5%
bh 580,000 696,000 0%
m2 - 0%
bh 12,000 13,700 5%
bh 10,000 12,000 0%

m2
m1 62,500 75,000 0%
m1 220,000 264,000 0%
m1 62,500 75,000 0%
m1 188,000 225,600 0%
bh 1,172,424 1,266,200 10%
bh 3,858,184 3,703,900 20%
bh 347,820 333,000 25%
bh 138,710 144,800 25%

unit 272,000 326,400 0%


unit 358,000 429,600 0%
unit 69,000 82,800 0%
unit 105,000 126,000 0%
unit 93,000 111,600 0%
unit 135,000 162,000 0%

unit 789,000 946,800 0%


unit 1,381,000 1,657,200 0%

unit 996,000 1,195,200 0%


unit 2,371,000 2,845,200 0%
unit 168,600 252,900 303,500 0%
unit 258,100 387,150 464,600 0%

m2 85,000 85,000 0%
m2 85,000 85,000 0%
m2 185,000 129,500 30%
m' 21,645 26,000 0%
m' 69,091 82,900 0%

m2 120,500 101,200 30%


m2 52,500 52,500 0%
m2 114,500 96,200 30%
m2 135,000 113,400 30%
m2 115,625 80,938 30%
m2 155,000 130,200 30%
m2 129,000 154,800 0%

m2 115,000 80,500 30%

btg 18,200 21,800 0%

m2 307,083 184,300 50%


m2 391,111 234,700 50%
m2 322,361 193,400 50%
keping 79,800 62,200 35%
m2 307,847 184,700 50%
m2 265,833 159,500 50%
m2 287,986 172,800 50%

m2 307,083 184,300 50%


m2 391,111 234,700 50%
m2 116,000 139,200 0%
keping 13,000 15,600 0%
keping 3,500 4,200 0%
m2 170,000 183,600 10%

m1 11,450 9,600 30%


m1 15,500 14,000 25%
m1 #REF! #REF! 25%
m1 #REF! #REF! 25%
m1 122,833 73,720 0%
m1 76,771 36,860 25%

m' 92,857 111,400 0%


m2 350,000 350,000 0%

m2 415,800 499,000
kg 206,800 248,200

UNIT 683,640 820,400 0%


UNIT 1,158,840 1,390,600 0%
UNIT 1,267,668 1,521,200 0%

Index 0%
m2 3,750,000 3,750,000 3,825,000 15%
m2 2,535,000 2,535,000 2,737,800 10%
m2 4,950,000 4,950,000 5,049,000 15%

m2 3,650,000 3,650,000 3,723,000 15%


m2 2,435,000 2,435,000 2,629,800 10%
m2 4,850,000 4,850,000 4,947,000 15%

m2 1,000,000 1,000,000 1,200,000 0%


m2 2,450,000 2,450,000 2,890,000 0%
m1 2,435,000 2,435,000 2,922,000 0%
m1 350,000 350,000 420,000 0%
m1 352,500 352,500 423,000 0%
m2 350,000 350,000 420,000 0%
m2 415,000 415,000 498,000 0%
m2 375,000 375,000 450,000 0%
m2 385,000 385,000 462,000 0%
m1 112,500 112,500 135,000 0%
m2 250,000 250,000 300,000 0%
m1 110,000 110,000 132,000 0%
m1 367,500 367,500 441,000 0%
m2 1,600,000 1,600,000 1,920,000 0%
m2 285,000 285,000 342,000 0%
m2 285,000 285,000 342,000 0%

m2 160,000 160,000 182,400 5%


m1 160,000 160,000 182,400 5%
m2 225,000 225,000 256,500 5%
m2 180,000 180,000 205,200 5%
m2 25,000 25,000 30,000 0%

m2 450,000 450,000 486,000 10%


m1 450,000 450,000 486,000 10%
m1 375,000 375,000 360,000 20%
m2 75,000 75,000 90,000 0%
m2 75,000 75,000 90,000 0%
m1 150,000 150,000 180,000 0%

m2 30,000 30,000 36,000 0%

Ls 18,400,000 51,831 62,200 0%


m2 320,000 384,000 0%
m2 80,000 96,000 0%
m' 60,000 72,000 0%
m2 85,000 102,000 0%
m' 20,000 24,000 0%

m2 225,000 270,000 0%
m2 252,000 302,400 0%
m2 430,435 516,500 0%

MATERIAL
BH 3,250,000 2,600,000 20%
BH 5,128,000 4,102,400 20%
BH 4,170,000 3,336,000 20%
BH 628,000 502,400 20%
BH 3,000,000 2,400,000 20%
BH 3,250,000 2,730,000 30%
BH 4,150,000 3,320,000 20%
BH 1,400,000 1,120,000 20%
BH 2,486,000 1,988,800 20%
BH 824,000 659,200 20%
BH 1,048,000 838,400 20%
BH 1,453,000 1,162,400 20%
BH 4,807,000 3,845,600 20%
BH 4,267,000 3,413,600 20%
BH 1,826,000 1,533,800 30%
BH 373,000 313,300 30%
BH 3,171,000 2,663,600 30%
BH 2,400,000 2,016,000 30%
BH 457,000 319,900 30%
BH 197,000 137,900 30%
BH 68,000 47,600 30%
BH 1,960,000 1,372,000 30%
BH 355,000 248,500 30%
BH 507,000 354,900 30%
BH 625,000 437,500 30%
BH 5,500,000 3,850,000 30%
BH 2,930,000 2,051,000 30%
BH 6,920,000 4,844,000 30%
BH 5,250,000 3,675,000 30%
BH 1,630,000 1,141,000 30%
BH 531,000 371,700 30%
BH 1,180,000 826,000 30%
BH 1,500,000 1,050,000 30%
BH 3,260,000 2,282,000 30%
BH 194,000 135,800 30%
BH 283,000 198,100 30%
BH 911,000 637,700 30%
BH 1,770,000 1,239,000 30%
BH 10,800,000 7,560,000 30%
BH 1,420,000 994,000 30%
BH 477,000 333,900 30%
BH 6,650,000 4,655,000 30%
BH 2,340,000 1,638,000 30%
BH 1,500,000 1,050,000 30%
BH 2,570,000 1,799,000 30%
BH 286,000 200,200 30%
BH 55,000 55,000 0%
BH 724,000 506,800 30%
BH 700,000 490,000 30%
BH 1,070,000 749,000 30%
BH 21,170,000 14,819,000 30%
BH 3,880,000 2,716,000 30%
BH 74,100,000 51,870,000 30%
BH 5,850,000 4,095,000 30%
BH 5,870,000 4,109,000 30%
BH 500,000 500,000 0%
BH 1,775,000 1,491,000 30%
BH 472,000 330,400 30%
BH 1,420,000 994,000 30%
BH 774,000 541,800 30%
BH 724,000 506,800 30%
BH 6,300,000 4,410,000 30%
BH 7,400,000 5,180,000 30%
BH 507,000 354,900 30%
BH 180,000 126,000 30%
BH 380,000 266,000 30%
BH 1,300,000 910,000 30%
Bh 350,000 315,000 10%
Bh 1,540,000 1,078,000 30%

BH 4,743,000 4,743,000 0%
BH 3,090,600 3,090,600 0%
BH - - 0%
BH 54,000,000 54,000,000 0%
BH - 0%
BH - 0%
BH - 0%
BH - 0%
BH - 0%
BH - 0%

bh 3,400,000 2,448,000 40%


bh 2,505,000 1,803,600 40%
bh 958,000 689,800 40%
bh 218,000 157,000 40%
bh 560,000 403,200 40%
bh 501,000 360,700 40%
bh 5,170,000 3,722,400 40%
bh 399,000 287,300 40%
bh 937,000 674,600 40%
bh 1,147,000 1,147,000 1,376,400 0%

bh 3,000,000 3,300,000 3,960,000 0%

bh 1,100,000 1,210,000 1,452,000 0%

bh 10,000 12,500 0%
bh 10,000 12,500 0%
bh 5,000 6,300 0%
bh 2,000 2,500 0%
bh 10,000 12,500 0%
bh 5,000 6,300 0%
bh 135,000 168,800 0%
bh 2,000 2,500 0%

135%
bh 20,000 27,000 0%
bh 25,000 33,800 0%
bh 20,000 27,000 0%
bh 15,000 20,300 0%
bh 15,000 20,300 0%
bh 25,000 33,800 0%
bh 25,000 33,800 0%
bh 25,000 33,800 0%
bh 7,500 10,100 0%

Index Upah Saniter 125%


bh 150,000 187,500 0%
bh 175,000 218,800 0%
bh 150,000 187,500 0%
bh 75,000 93,800 0%
bh 155,000 193,800 0%
bh 20,000 25,000 0%
bh 20,000 25,000 0%
bh 45,000 56,300 0%
bh 20,000 25,000 0%
bh 175,000 218,800 0%
bh 175,000 218,800 0%
bh 20,000 25,000 0%
bh 60,000 75,000 0%
bh 15,000 18,800 0%
bh 20,000 25,000 0%
bh 20,000 25,000 0%
bh 40,000 50,000 0%
bh 450,000 562,500 0%
bh 15,000 18,800 0%

m1 13,763 12,400 25%


m3 10,000 12,000 0%
m1 45,275 40,700 25%
m1 27,925 25,100 25%
m1 100,400 90,400 25%

m' 6,262 7,500 0%


m1 11,885 14,300 0%
m1 7,330 8,800 0%
m1 26,355 31,600 0%

m' 4,225 5,100 0%


m1 6,500 7,800 0%
m1 4,500 5,400 0%
m1 7,000 8,400 0%

m2 218,321 222,700 15%


m2 103,636 124,400 0%
m2 89,640 107,600 0%
m2 100,530 120,600 0%
m' 51,525 61,800 0%
m1 74,325 89,200 0%
m1 37,118 44,500 0%
m1 24,750 29,700 0%
m1 28,528 34,200 0%
m1 113,110 135,700 0%
bh 500 600 0%
m2 130,000 140,400 10%

R HARGA UPAH
RAB
SAT. HARGA HARGA Disc

SEBELUM DISC

m3 55,000 68,800 0%
m3 95,000 118,800 0%
m3 35,000 43,800 0%
m3 136,000 165,000 0%
m3 25,000 31,300 0%
m2 10,000 12,500 0%
m3 35,000 43,800 0%
m3 35,000 43,800 0%
ttk 200,000 250,000 0%
ttk 88,000 110,000 0%
ttk 50,000 62,500 0%
ttk 50,000 62,500 0%
ttk 65,000 81,300 0%
ttk 75,000 93,800 0%
ttk 65,000 81,300 0%
ttk 30,000 37,500 0%
ttk 50,000 62,500 0%
ttk 30,000 37,500 0%
ttk 65,000 81,300 0%
ttk 45,000 56,300 0%
ttk 30,000 37,500 0%
ttk 45,000 56,300 0%
ttk 35,000 43,800 0%
ttk 55,000 68,800 0%
ttk 25,000 31,300 0%
ttk 40,000 50,000 0%
ttk 15,000 18,800 0%
ttk 35,000 43,800 0%

m3 50,000 62,500 0%
m3 45,000 45,000 20%
m3 56,250 56,300 20%
m3 200,000 250,000 0%
m3 85,000 106,300 0%
m3 10,000 12,500 0%
m3 1,500 2,400 0%
m3 - 0%
m3 - - 0%
m3 - - 0%
m3 - - 0%
m3 - - 0%
m3 2,000 2,500 0%
m3 37,000 50,300 0%
m3 50,000 68,500 0%
m3 75,000 93,800 0%
m3 125,000 156,300 0%
m3 150,000 187,500 0%
m2 8,500 10,600 0%
kg 150 200 0%
kg 850 1,100 0%
kg - - 0%
ttk 1,500 1,900 0%
ttk 2,000 2,500 0%
m2 5,500 6,900 0%
m2 5,500 6,900 0%
m2 2,500 3,100 0%

-
m2 2,000 2,500 0%
m2 20,000 25,000 0%
m2 25,000 31,300 0%
m2 45,000 56,300 0%
m2 20,000 25,000 0%
m2 45,000 56,300 0%
m2 45,000 56,300 0%
m2 35,000 43,800 0%
m2 150,000 187,500 0%
m2 45,000 56,300 0%
m2 40,000 50,000 0%
m2 55,000 68,800 0%
m2 55,000 68,800 0%
m' 25,000 31,300 0%
m2 25,000 31,300 0%

index = 1.000.00 1.250.00


m2 23,000 27,000 33,800 0%
m2 35,000 35,000 43,800 0%
m2 40,000 40,000 50,000 0%
m2 2,000 2,000 2,500 0%
m2 2,500 2,500 3,100 0%
m2 1,500 1,500 1,900 0%
m2 1,500 1,500 1,900 0%
m2 25,000 25,000 31,300 0%
m2 20,000 20,000 25,000 0%
m2 16,000 16,000 20,000 0%
m2 25,000 25,000 31,300 0%
m2 17,000 17,000 21,300 0%
m' 7,500 7,500 9,400 0%
m' 15,000 15,000 18,800 0%
m' 25,000 25,000 31,300 0%
m' 3,500 3,500 4,400 0%
m' 2,000 2,000 2,500 0%
m1 10,000 10,000 12,500 0%
m1 7,500 7,500 9,400 0%
m5 60,000 60,000 75,000 0%
m4 30,000 30,000 37,500 0%
m3 19,000 19,000 23,800 0%
m2 10,000 10,000 12,500 0%
m1 12,500 12,500 15,600 0%
m0 2,000 2,000 2,500 0%
m1 2,500 2,500 3,100 0%
m2 1,000 1,000 1,300 0%
m2 60,000 60,000 75,000 0%
m2 20,000 20,000 25,000 0%
m2 40,000 40,000 50,000 0%
m2 30,000 30,000 37,500 0%
m2 35,000 35,000 43,800 0%
m2 50,000 50,000 62,500 0%
m2 48,000 48,000 60,000 0%
m2 35,000 35,000 43,800 0%
m2 38,000 38,000 47,500 0%
m2 55,000 55,000 68,800 0%
m2 50,000 50,000 62,500 0%
m2 75,000 75,000 93,800 0%
m2 15,000 15,000 18,800 0%
m2 35,000 35,000 43,800 0%
m1 15,000 15,000 18,800 0%
unit 100,000 100,000 125,000 0%
m1 150,000 150,000 187,500 0%
m1 20,000 20,000 25,000 0%
m1 25,000 25,000 31,300 0%
m1 10,500 10,500 13,100 0%
m1 25,000 25,000 31,300 0%
m1 10,000 10,000 12,500 0%
m2 68,000 68,000 85,000 0%
m2 75,000 75,000 93,800 0%

m1 15,000 15,000 20,300 0%


m1 25,000 25,000 33,800 0%
m1 25,000 25,000 33,800 0%
m1 9,100 9,100 12,300 0%
m1 14,400 14,400 19,400 0%
m1 14,400 14,400 19,400 0%
m1 14,400 14,400 19,400 0%
m1 20,000 20,000 27,000 0%
m1 20,000 20,000 27,000 0%
bh 400,000 720,000 972,000 0%
bh 40,000 60,000 81,000 0%
m' 50,000 67,500 0%

kg 4,000 4,000 5,900 0%


kg 2,750 2,750 4,200 0%
kg 2,500 2,500 3,900 0%
kg 2,400 2,400 3,700 0%
kg 3,600 3,600 5,400 0%
kg 50 50 150 0%
kg 2,500 2,500 3,400 0%
m2 800 800 1,100 0%
kg 1,000 1,000 1,400 0%
bh 7,500 7,500 10,100 0%
btg 25,000 25,000 33,800 0%
kg 1,500 1,500 2,500 0%
btg 5,000 5,000 7,300 0%
bh 3,250 3,250 4,900 0%
bh 8,000 8,000 10,800 0%
kg #REF! #REF! #REF! 0%

m2 35,000 35,000 47,300 0%


m' 5,000 5,000 6,800 0%
m' 10,000 10,000 13,500 0%
m' 5,000 5,000 6,800 0%
m' 1,500 1,500 2,000 0%
m' 2,500 2,500 3,400 0%
RAB
SAT. HARGA HARGA Disc

SEBELUM DISC SETELAH DISC

m2 17,000 23,000 0%
m2 7,500 10,100 0%
m2 3,000 4,100 0%
m' 5,000 6,800 0%
ttk 5,000 6,800 0%
m2 20,000 27,000 0%
m2 1,550 2,100 0%
m2 5,000 6,800 0%
m2 2,000 2,700 0%
m2 3,500 4,700 0%
m2 1,000 1,400 0%
ttk 2,500 3,400 0%
m3 45,000 60,800 0%
m3 25,000 33,800 0%
m2 19,000 25,700 0%

m2 4,750,000 6,412,500 0%

RAB
SAT. HARGA HARGA Disc

SEBELUM DISC SETELAH DISC

m3 35,000 47,300 0%
m3 95,000 128,300 0%
m3 25,000 33,800 0%
m3 17,500 23,600 0%
m3 10,000 13,500 0%

m2 6,000 8,100 0%
m3 136,000 183,600 0%
m3 370,000 499,500 0%
Ls 6 bln 777,400,000 1,049,490,000 0%
Ls 6 bln 777,400,000 1,049,490,000 0%
Ls 6 bln 777,400,000 1,049,490,000 0%
Ls 6 bln 1,357,200,000 1,832,220,000 0%
Ls 6 bln 395,700,000 534,195,000 0%

m2 145,000 195,800 0%
m2 145,000 195,800 0%
m2 145,000 195,800 0%
m2 145,000 195,800 0%
m2 145,000 195,800 0%

1
6,920.00 11,803
ls 60,000,000 81,675,000 0%
m1 265,000 393,580 0%
m1 152,000 225,720 0%
m1 115,000 170,830 0%
m1 115,000 170,830 0%
m1 12,000 17,820 0%
m1 10,000 14,850 0%
m1 5,000 7,480 0%
m1 5,000 7,480 0%
m1 65,000 96,580 0%
m1 45,000 66,880 0%
m1 40,000 52,030 0%
m1 40,000 52,030 0%
ttk 100,000 163,350 0%
ttk 75,000 96,580 0%
ttk 100,000 148,500 0%
ttk - 0%
ttk 590,000 876,150 0%
ttk 275,000 408,430 0%
ttk 225,000 334,180 0%
ttk 225,000 334,180 0%

ls 15,000,000 22,275,000 0%

ttk - 0%
ttk - 0%
ttk - 0%
ls 25,000,000 32,737,500 3%
ls 23,000,000 31,050,000 0%
ls 8,000,000 10,800,000 0%
ls 10,000,000 13,095,000 3%
ls 53,000,000 71,550,000 0%
ls 20,000,000 27,000,000 0%
m3 120,000 157,100 3%
m' 657,895 896,500 3%
kg 1,500 2,000 3%
m3 90,000 192,100 3%
ttk 8,000,000 10,800,000 0%
Ls 80,000,000 108,000,000 0%
Ls 60,000,000 81,000,000 0%
m1 657,800 888,000 0%
m1 200,000 270,000 0%
m1 100,000,000 135,000,000 0%

ttk - 0%
ttk - 0%
m1 - 0%
m1 - 0%
ls - 0%

m1 98,300 132,700 0%

m2 700,000 805,000 0%

m by other - 0%
ls 22,000,000 29,700,000 0%
ls exluded - 0%
ls 10,000,000 13,500,000 0%
ls by Mitra - 0%
ls 3,000,000 4,050,000 0%
ls 3,000,000 4,050,000 0%
ls 2,000,000 2,700,000 0%
m' 165,000,000 222,785,000 0%
m' 13,500,000 18,225,000 0%
Total pekerjaan 882 m1 265,310,000
harga per 1 m1 300,805

ls 2,800,000 3,780,000 0%
ls 300,000 405,000 0%
ls 768,000 1,036,800 0%
ls 3,000,000 4,050,000 0%

ls 1,400,000 1,890,000 0%
ls 250,000 337,500 0%
ls 768,000 1,036,800 0%
ls 3,000,000 4,050,000 0%

ls by Mitra - 0%
ls 6,000,000 8,100,000 0%
ls 5,000,000 6,750,000 0%
ls 2,000,000 2,700,000 0%

m' 98,500 127,700 4%


m' 227,500 294,800 4%
m' 437,500 567,000 4%
m' 50,000 58,320 4%

m2 1,377,180 1,859,200 0%
m2 1,440,000 1,944,000 0%
m2 840,000

m2 17,750 24,000 0%
m2 25,000 33,800 0%

m2 35,000 47,300 0%
m2 30,000 40,500 0%
m2 127,500 163,500 5%
m2 75,000 96,200 5%
m2 225,000 288,600 5%
m2 85,000 109,000 5%
m2 72,500 93,000 5%
m2 62,500 80,200 5%
m2 37,500 48,100 5%
m3 850,000 1,090,100 5%
m2 Upah 22,500 28,900 5%
m2 Upah 25,000 32,100 5%

m3 110,000 132,000 0%
m2 55,000 66,000 0%
m2 45,000 54,000 0%
m2 175,000 210,000 0%
m2 35,000 42,000 0%
m2 35,000 37,000 0%
m2 100,000 120,000 0%
m1 90,000 108,000 0%
m1 230,000 276,000 0%

m2 - - 0%
- -
8 54
ttk - - 0%
ttk - - 0%

INDEXT 1.000.00
m1 1,200,000 1,224,000 15%
m1 1,200,000 1,224,000 15%
m1 3,500,000 3,570,000 15%
m1 190,000 193,800 15%
m2 1,000,000 1,020,000 15%
m1 320,000 326,400 15%
m1 350,000 357,000 15%
m1 1,620,000 1,652,400 15%
unit - - 0%
m1 95,000 114,000 0%
m1 1,500,000 1,800,000 0%
m1 1,350,000 1,620,000 0%
m1 285,000 342,000 0%
unit 2,290,000 2,748,000 0%
unit 1,550,000 1,860,000 0%
unit 4,470,000 5,364,000 0%
Unit 83,500,000 100,200,000 0%
m1 535,000 642,000 0%
unit 1.800.00 963,000 924,500 20%
unit 3.910.00 2,091,850 2,008,200 20%
unit 4.500.00 2,407,500 2,311,200 20%
unit 5.030.00 2,691,050 2,583,400 20%
unit 6.490.00 3,472,150 3,333,300 20%
unit 7.850.00 4,199,750 4,031,800 20%

m' 550,000 726,000 0%

m' 220,000 290,400 0%

m' 275,000 363,000 0%

unit 20,000,000 26,400,000 0%

m' 250,000 330,000 0%

m2 1,250,000 1,650,000 0%

M2 1,500,000 1,800,000 0%
M2 1,750,000 2,100,000 0%
m1 114,750 137,700 0%

m2 350,000 420,000 0%

m2 116,000 150,800 0%

m2 140,000 182,000 0%
m' 18,000 23,400 0%
m2 198,000 257,400 0%

Index 30%
m2 120,000 144,000 0%

m2 102,000 122,400 0%

m2 135,000 176,850 0%

m2 135,000 162,000 0%

m2 125,000 150,000 0%
m2 168,000 220,000 0%
m' 40,000 48,000 0%
m' 50,000 60,000 0%
m' 60,000 72,000 0%
m' 130,000 156,000 0%
m1 - - 0%
m' 102,000 122,400 0%
m' 135,000 162,000 0%
m' 45,000 54,000 0%
m' 65,000 78,000 0%
m' 102,000 122,400 0%
m2 118,000 141,600 0%
m' 19,000 22,800 0%
m' 95,000 114,000 0%
m' 95,000 114,000 0%
m' 95,000 114,000 0%
m' 115,000 138,000 0%
m' 85,000 102,000 0%
m1 514,102 616,900 0%
unit 50,000 60,000 0%
m2 155,000 186,000 0%
m2 192,000 230,400 0%
m2 96,000 115,200
m2 250,000 300,000 0%
m2 310,000 372,000 0%
m2 155,000 186,000 0%
m2 800,000 960,000 0%
m2 700,000 917,000 0%
m2 1,300,000 1,560,000 0%
m' 110,000 132,000 0%
m' 170,000 204,000 0%

index 0%
m2 38,850 38,850 38,560 15%
m2 30,450 30,450 29,210 15%
m2 38,850 38,850 38,560 15%
m2 30,450 30,450 29,210 15%
bh 25,000 25,000 31,350 5%
m2 32,000 32,000 40,150 5%
m2 150,000 150,000 188,100 5%
m2 195,000 195,000 231,660 10%
m' 17,500 17,500 23,100 0%
m' 22,500 22,500 26,730 10%
m2 55,000 55,000 65,340 10%
m2 75,000 75,000 89,100 10%

m2 15,000 19,800 0%
m2 15,000 19,800 0%
m2 25,000 33,000 0%
m2 25,000 33,000 0%

m2 129,000 161,810 5%
m2 139,000 174,350 5%
m2 152,000 190,630 5%
m2 26,000 32,560 5%
m2 - - 0%
m2 157,000 188,400 0%

m2 33,000 43,560 0%
m2 36,000 47,520 0%
m2 28,200 37,180 0%
m2 36,000 47,520 0%
m2 28,200 37,180 0%
m2 33,500 44,220 0%
m2 200,000 264,000 0%

Dolar USD 14,163


bh 186 2,634,318 3,161,200 0%
m2 604 8,553,325 10,264,000 0%

m2 28,000 28,600 15%


m2 32,500 33,200 15%
m2 32,500 33,200 15%
m2 37,500 38,300 15%

m2 342,500 411,000 0%
m2 135,000 162,000 0%

119.00

Ls 262,500 265,000 20%

m2 2,792,890 3,351,500 0%
m2 55,000 66,000 0%
m2 2,848,000 3,418,000 0%
m2 1,900,000 2,166,000 5%

m2 600,000 684,000 5%
m2 600,000 684,000 5%
m2 1,650,000 1,881,000 5%
m2 1,150,000 1,380,000 0%

m2 - - 0%

m2 839,100 906,200 10%


m2 750,000 855,000 5%
m2 750,000 900,000 0%
m2 839,100 1,006,900 0%
m2 750,000 900,000 0%
m2 849,100 1,018,900 0%
m2 794,550 953,500 0%
m2 794,550 953,500 0%
m2 794,550 953,500 0%
m2 794,550 953,500 0%
m2 874,100 1,048,900 0%

m1 276,000 276,000 331,200 0%


m1 350,000 420,000 0%
m1 150,000 180,000 0%

Index harga pintu 1.100.00

bh 37,996,600 45,975,900 0%
bh 3,541,231 4,284,900 0%
bh 4,965,350 6,008,100 0%
bh 1,409,867 1,705,900 0%
bh 1,367,928 1,655,200 0%
bh 3,514,796 4,252,900 0%
bh 1,073,307 1,298,700 0%

m2 711,428 939,100 0%
unit 665,000 877,800 0%

2,538
m2 825,616 1,089,800 0%
m' 350,000 462,000 0%

m' 1,866,756 2,464,100 0%

m' 231,000
m2 2,156,000

bh 5,066,500 6,130,500 0%
bh 5,001,500 6,051,800 0%
bh 5,101,500 6,172,800 0%
bh 4,190,900 5,071,000 0%
bh 3,597,000 4,352,400 0%
bh 4,190,900 5,071,000 0%
bh 9,605,000 11,622,100 0%
bh 5,611,670 6,790,100 0%
bh 12,114,250 14,658,200 0%

bh 16,439,000 19,891,200 0%
bh 10,434,500 12,625,700 0%
bh 9,434,500 11,415,700 0%
bh 10,434,500 12,625,700 0%
bh 9,513,740 11,511,600 0%
bh 10,513,740 12,721,600 0%
bh 9,576,000 11,587,000 0%
bh 9,576,000 11,587,000 0%

bh 38,279,168 46,317,800 0%
bh 8,024,527 9,709,700 0%
bh 5,986,309 7,243,400 0%
bh 7,961,673 9,633,600 0%

m2 1,050,000 1,050,000 1,197,000 5%


m2 - - 5%

m1 - - 10%
m2 1,742,250 1,742,250 1,881,600 10%
m2 - - 10%

bh 1,293,000 1,551,600 0%
bh 717,000 860,400 0%
bh 1,006,000 1,207,200 0%
bh 1,229,000 1,474,800 0%
bh 2,279,000 2,734,800 0%
bh 2,379,000 2,854,800 0%
bh 2,040,000 2,448,000 0%
bh 4,490,000 5,388,000 0%
bh 2,100,000 2,520,000 0%
bh 3,235,000 3,882,000 0%
bh 1,320,000 1,504,800 5%

bh 650,000 780,000 0%
bh 400,000 480,000 0%
bh 578,000 693,600 0%
m2 2,824,000 3,388,800 0%
m2 2,824,000 3,388,800 0%
m2 2,060,000 2,472,000 0%
m2 2,788,000 3,345,600 0%

1.100.00
m' 952,000 1,047,200 1,382,300
m' 693,000 762,300 1,006,200
m' 651,000 716,100 945,300

m' 780,000 795,600 15%


m' 210,000 214,200 15%
bh 150,000 153,000 15%
m' 2,100,000 2,142,000 15%
m' 2,700,000 2,754,000 15%
m2 1,800,000 1,836,000 15%

bh 39,600,000 47,520,000 0%
m' 1,350,000 1,377,000 15%
m2 7,500,000 7,650,000 15%

bh 6,147,188 7,376,600 0%
0%
0%

m2 2,151,043 2,581,300 0%

m2 850,579 850,579 803,775 0


m2 150,000 150,000 180,000
-----------------------
harga per 1 m2 983,775
Jasa 10% 98,378
Harga + Jasa 1,082,153
Harga Dibulatkan 1,082,160

m1 57,931 57,931 54,705 0


m1 3,500 3,500 4,200
m1 35,000 35,000 42,000
-----------------------
harga per 1 m2 100,905
Jasa 10% 10,091
Harga + Jasa 110,996
Harga Dibulatkan 111,000

m2 386,207 386,207 364,980 0


m2 10,000 10,000 12,000
m2 75,000 75,000 90,000
m2 150,000 150,000 180,000
-----------------------
harga per 1 m2 646,980
Jasa 10% 64,698
Harga + Jasa 711,678
Harga Dibulatkan 711,680

m2 715,000 858,000 -
m2 1,050,000 1,260,000 -
m2 625,000 750,000 -
m2 660,000 792,000 -
m2 550,000 660,000 -
m2 650,000 780,000 -
m2 650,000 780,000 -

m2 430,000 516,000
m2 450,000 540,000
m2 165,000 198,000
m2 268 104,918 125,900
ls 268 410,448 492,500
bh 170,000,000 204,000,000
bh 22,000,000 26,400,000

ALISA HARGA SATUAN

Koef Sat Harga Sat Total

1.00 m1 342,500 342,500


1.00 m1 102,100 102,100
1.00 m1 2,700 2,700
1.00 m1 1,700 1,700

- - - - - - - - -
harga per 1 m1 449,000
Jasa 10% 44,900
Harga + Jasa 493,900
Harga Dibulatkan 493,900

1.00 m1 371,300 371,300


0.08 ttk 810,000 60,750
1.00 m1 216,000 216,000
0.08 ttk 202,500 15,188
1.00 m1 47,300 47,300
0.00 ls - -
1.00 m1 - -
- - - - - - - - -
harga per 1 m1 710,538
Jasa 10% 71,054
Harga + Jasa 781,591
Harga Dibulatkan 781,600

1.00 m1 168,800 168,800


0.08 ttk 337,500 28,125

1.00 m1 101,300 101,300


0.08 ttk 108,000 9,000
1.00 m1 33,800 33,800
0.00 ls - -
1.00 m1 - -
- - - - - - - - -
harga per 1 m1 341,025
Jasa 10% 34,103
Harga + Jasa 375,128
Harga Dibulatkan 375,200

0.00 hari 2,700,000 7,415


0.00 Shift 270,000 741
0.00 liter 1,836,000 5,042
0.00 ls 5,400,000 14,829
0.07 rit 607,500 40,500
1.00 ls 600 600
- - - - - - - - - - - - - - - - - -
Harga per 1 m3 46,085
Jasa 10% 4,609
Harga + Jasa 50,694
Harga Dibulatkan 50,700

1.00 m3 118,800 118,800


1.00 ls 3,800 3,800
- - - - - - - - - - - - - - - - - -
Harga per 1 m3 122,600
Jasa 10% 12,260
Harga + Jasa 134,860
Harga Dibulatkan 134,860

1.00 m3 63,300 63,300


- - - - - - - - - - - - - - - - - -
Harga per 1 m3 63,300
Jasa 10% 6,330
Harga + Jasa 69,630
Harga Dibulatkan 69,630

1.03 m3 128,300 132,149


1.00 m3 43,800 43,800
1.00 m3 1,800 1,800
- - - - - - - - - - - - - - - - - -
Harga per 1 m3 177,749
Jasa 10% 17,775
Harga + Jasa 195,524
Harga Dibulatkan 195,530
Harga per 1 m2 tebal 10 cm 19,553
Harga Dibulatkan 19,560

1.10 m3 337,500 371,250


2.24 sak 86,400 193,536
0.32 m3 123,300 39,456
1.00 m3 12,500 12,500
1.00 m3 250,000 250,000
- - - - - - - - - - - - - - - - - -
harga per 1 m3 866,742
Jasa 10% 86,674
Harga + Jasa 953,416
Harga Dibulatkan 953,420

1.030 m3 731,400 753,342


1.000 m3 - -
1.000 m3 50,300 50,300
1.000 m3 10,100 10,100
- - - - - - - - - - - - - - - - - -
Harga per 1 m3 813,742
Jasa 10% 81,374
Harga + Jasa 895,116
Harga Dibulatkan 895,120
Harga per 1 m2 tebal 5 cm 40,687
Harga Dibulatkan 40,690

Tie beam
1.05 m3 943,400 990,570
1.00 m3 4,953 4,953
1.00 m3 Included -
1.00 m3 58,300 58,300
1.00 m3 2,500 2,500
1.00 m3 - -
1.00 m3 67,500 67,500
- - - - - - - - - - - - - - - - - -
Harga 1 m3 1,123,823
Jasa 10% 112,382
Harga + Jasa 1,236,205
Harga Dibulatkan 1,236,210

Tie beam
1.05 m3 996,400 1,046,220
1.00 m3 5,231 5,231
1.00 m3 Included -
1.00 m3 58,300 58,300
1.00 m3 2,500 2,500
1.00 m3 - -
1.00 m3 67,500 67,500
- - - - - - - - - - - - - - - - - -
Harga 1 m3 1,179,751
Jasa 10% 117,975
Harga + Jasa 1,297,726
Harga Dibulatkan 1,297,730

(Vertikal)
1.05 m3 943,400 990,570
1.00 m3 9,906 9,906
1.00 m3 Included -
1.00 m3 83,500 83,500
1.00 m3 2,500 2,500
1.00 m3 - -
1.00 m3 67,500 67,500
- - - - - - - - - - - - - - - - - -
Harga 1 m3 1,153,976
Jasa 10% 115,398
Harga + Jasa 1,269,373
Harga Dibulatkan 1,269,380

(Vertikal)
1.05 m3 996,400 1,046,220
1.00 m3 10,462 10,462
1.00 m3 Included -
1.00 m3 83,500 83,500
1.00 m3 2,500 2,500
1.00 m3 - -
1.00 m3 67,500 67,500
- - - - - - - - - - - - - - - - - -
Harga 1 m3 1,210,182
Jasa 10% 121,018
Harga + Jasa 1,331,200
Harga Dibulatkan 1,331,210

1.05 m3 943,400 990,570


1.00 m3 4,953 4,953
1.00 m3 Included -
1.00 m3 60,300 60,300
1.00 m3 2,500 2,500
1.00 m3 - -
1.00 m3 67,500 67,500
- - - - - - - - - - - - - - - - - -
Harga 1 m3 1,125,823
Jasa 10% 112,582
Harga + Jasa 1,238,405
Harga Dibulatkan 1,238,410

1.05 m3 996,400 1,046,220


1.00 m3 5,231 5,231
1.00 m3 Included -
1.00 m3 60,300 60,300
1.00 m3 2,500 2,500
1.00 m3 - -
1.00 m3 67,500 67,500
- - - - - - - - - - - - - - - - - -
Harga 1 m3 1,181,751
Jasa 10% 118,175
Harga + Jasa 1,299,926
Harga Dibulatkan 1,299,930

1.05 m3 943,400 990,570


1.00 m3 4,953 4,953
1.00 m3 Included -
1.00 m3 108,800 108,800
1.00 m3 2,500 2,500
1.00 m3 - -
1.00 m3 67,500 67,500
- - - - - - - - - - - - - - - - - -
Harga 1 m3 1,174,323
Jasa 10% 117,432
Harga + Jasa 1,291,755
Harga Dibulatkan 1,291,760

Tie Beam
17.16 bh 1,900 32,598
0.21 sak 86,400 18,144
0.03 m3 123,300 3,699
1.00 m2 2,500 2,500
1.00 m2 51,300 51,300
1.00 m2 2,500 2,500
- - - - - - - - - - - - - - - - - -
Harga per 1 m2 110,741
Jasa 10% 11,074
Harga + Jasa 121,815
Harga Dibulatkan 121,820

2.5
0.13 lbr 364,500 48,979
1.00 m2 25,700 25,700
1.00 m2 23,000 23,000
0.25 kg 25,100 6,275
2.00 m2 2,700 5,400
0.03 ltr 35,800 895
1.00 bh 8,800 8,800
0.0084 m3 2,350,900 19,748
0.50 m2 1,554 777
1.00 m2 81,300 81,300
- m2 26,300 -
- - - - - - - - - - - - - - - - - -
Harga per 1 m2 220,873
Jasa 10% 22,087
Harga + Jasa 242,961
Harga Dibulatkan 242,970

1.5
0.22 lbr 283,500 63,491
1.00 m2 23,000 23,000
0.008 m3 2,197,500 17,580
0.008 m3 2,350,900 18,807
1.00 m2 2,700 2,700
0.02 ltr 35,800 788
0.25 kg 22,100 5,525
0.50 m2 1,554 777
1.00 m2 75,000 75,000
- m2 26,300 -
- - - - - - - - - - - - - - - - - -
Harga per 1 m2 207,668
Jasa 10% 20,767
Harga + Jasa 228,435
Harga Dibulatkan 228,440

3.0
0.11 lbr 283,500 31,745
1.00 m2 23,000 23,000
0.0090 m3 2,197,500 19,778
0.0100 m3 2,350,900 23,509
1.00 m2 2,700 2,700
0.02 ltr 35,800 788
0.25 kg 22,100 5,525
0.50 m2 1,554 777
1.00 m2 98,800 98,800
0.50 m2 26,300 13,150
- - - - - - - - - - - - - - - - - -
Harga per 1 m2 219,772
Jasa 10% 21,977
Harga + Jasa 241,749
Harga Dibulatkan 241,750

1.04 kg 7,800 8,112


0.03 kg 21,700 651
1.00 kg 180 180
1.00 kg 800 800
1.00 kg 200 200
1.00 kg 1,400 1,400
1.00 kg masuk prelim -
- - - - - - - - - - - - - - - - - -
harga per kg 11,343
Jasa 10% 1,134
Harga + Jasa 12,477
Harga Dibulatkan 12,480

1.000.00 kg 9,900 9,900


.150.00 kg 9,900 1,485
.003.00 kg 19,700 59
1.050.00 kg 200 210
1.000.00 kg 1,300 1,300
1.000.00 kg 250 250
1.000.00 kg 1,100 1,100
- - - - - - - - - - - - - - - - - -
harga per kg 14,304
Jasa 10% 1,430
Harga + Jasa 15,735
harga per kg dibulatkan 15,800
harga per m2 M-5 2 lapis 67,268
harga per m2 M-6 2 lapis 96,862
harga per m2 M-7 1 lapis 69,665
harga per m2 M-8 1 lapis 75,981
harga per m2 M-8 2 lapis 151,962
harga per m2 M-10 1 lapis 134,523
harga per Ton dibulatkan 15,800,000

1.030.00 kg 11,258 11,596


.000.00 kg 6,800 -
1.000.00 kg 5,900 5,900
1.000.00 kg 150 150
1.000.00 kg 800 800
1.000.00 kg 3,400 3,400
.000.00 kg 1,400 -
- - - - - - - - - - - - - - - - - -
harga per kg 21,846
Jasa 10% 2,185
Harga + Jasa 24,030
Harga Dibulatkan 24,040
Harga Dibulatkan dalam 1 Ton 24,040,000

1.030.00 kg 11,258 11,596


.000.00 kg 6,800 -
1.000.00 kg 5,900 5,900
1.000.00 kg 150 150
1.000.00 kg 800 800
1.000.00 kg 3,400 3,400
.000.00 kg 1,400 -
- - - - - - - - - - - - - - - - - -
harga per kg 21,846
Jasa 10% 2,185
Harga + Jasa 24,030
Harga Dibulatkan 24,040
Harga Dibulatkan dalam 1 Ton 24,040,000

1.030.00 kg 11,258 11,596


.000.00 kg 6,800 -
1.000.00 kg 5,900 5,900
1.000.00 kg 150 150
1.000.00 kg 800 800
1.000.00 kg 3,400 3,400
.000.00 kg 1,400 -
- - - - - - - - - - - - - - - - - -
harga per kg 21,846
Jasa 10% 2,185
Harga + Jasa 24,030
Harga Dibulatkan 24,040
Harga Dibulatkan dalam 1 Ton 24,040,000

1.030.00 kg 12,390 12,762


.000.00 kg 6,800 -
1.000.00 kg 5,900 5,900
1.000.00 kg 150 150
1.000.00 kg 800 800
1.000.00 kg 3,400 3,400
.000.00 kg 1,100 -
- - - - - - - - - - - - - - - - - -
harga per kg 23,012
Jasa 10% 2,301
Harga + Jasa 25,313
Harga Dibulatkan 25,320
Harga Dibulatkan dalam 1 Ton 25,320,000

1.050.00 kg 11,536 12,113


.000.00 kg 6,800 -
1.000.00 kg 4,200 4,200
1.000.00 kg 150 150
1.000.00 kg 800 800
1.000.00 kg 3,400 3,400
.000.00 kg 1,100 -
- - - - - - - - -
harga per kg 20,663
Jasa 10% 2,066
Harga + Jasa 22,729
Harga Dibulatkan 22,730
Harga Dibulatkan dalam 1 Ton 22,730,000

1.050.00 kg 12,689 13,323


.000.00 kg 6,800 -
1.000.00 kg 4,200 4,200
1.000.00 kg 150 150
1.000.00 kg 800 800
1.000.00 kg 3,400 3,400
.000.00 kg 1,100 -
- - - - - - - - -
harga per m2 21,873
Jasa 10% 2,187
Harga + Jasa 24,061
Harga Dibulatkan 24,070
Harga Dibulatkan dalam 1 Ton 24,070,000
1.050.00 kg 12,689 13,323
.000.00 kg 6,800 -
1.000.00 kg 4,200 4,200
1.000.00 kg 150 150
1.000.00 kg 800 800
1.000.00 kg 3,400 3,400
.000.00 kg 1,100 -
- - - - - - - - -
harga per m2 21,873
Jasa 10% 2,187
Harga + Jasa 24,061
Harga Dibulatkan 24,070
Harga Dibulatkan dalam 1 Ton 24,070,000

1.050.00 kg 12,689 13,323


.000.00 kg 6,800 -
1.000.00 kg 4,200 4,200
1.000.00 kg 150 150
1.000.00 kg 800 800
1.000.00 kg 3,400 3,400
.000.00 kg 1,100 -
- - - - - - - - -
harga per m2 21,873
Jasa 10% 2,187
Harga + Jasa 24,061
Harga Dibulatkan 24,070
Harga Dibulatkan dalam 1 Ton 24,070,000

1.00 Kg 1,050 1,050

- - - - - - - - - - - - - - - - - -
Harga per Kg 1,050
Jasa 10% 105
Harga + Jasa 1,155
Harga Dibulatkan 1,160

1.00 bh 98,775 98,775


1.000.00 bh 9,300 9,300
1.00 bh 6,800 6,800
1.00 bh 6,800 6,800
- - - - - - - - - - - - - - - - - -
harga per kg 121,675
Jasa 10% 12,168
Harga + Jasa 133,843
Harga Dibulatkan 133,850
1.05 kg 7,800 8,190
.000.00 kg 6,800 -
1.00 kg 2,500 2,500
1.000.00 kg 1,100 1,100
- - - - - - - - - - - - - - - - - -
harga per kg 11,790
Jasa 10% 1,179
Harga + Jasa 12,969
Harga Dibulatkan 12,970
Harga perkg 12,970

1.05 kg 7,800 8,190


0.11 bh 54,000 5,992
.000.00 bh 9,300 -
1.05 kg 2,500 2,625
1.00 kg 800 800
- - - - - - - - - - - - - - - - - -
harga per kg 17,607
Jasa 10% 1,761
Harga + Jasa 19,368
Harga Dibulatkan 19,370
Harga per kg 19,370

1.00 bh 11,425 11,425


1.00 bh 4,900 4,900
1.00 kg 700 700
- - - - - - - - - - - - - - - - - -
harga per bh 17,025
Jasa 10% 1,703
Harga + Jasa 18,728
Harga Dibulatkan 18,730

1.00 bh 11,425 11,425


1.00 bh 4,900 4,900
1.00 kg 700 700
- - - - - - - - - - - - - - - - - -
harga per bh 17,025
Jasa 10% 1,703
Harga + Jasa 18,728
Harga Dibulatkan 18,730

3.04 sak 265,000 805,600


1.00 m3 6,900 6,900
1.00 m3 3,100 3,100
3.04 sak 17,250 52,440
- - - - - - - - - - - - - - - - - -
harga per 1 m2 868,040
Jasa 10% 86,804
Harga + Jasa 954,844
Harga Dibulatkan 954,850
Harga 30*25 71,614
Harga 20*25 47,743

0.03 M2 924,800 25,689


0.03 M2 472,500 15,750
0.02 M2 580,500 10,750
1.00 M2 33,800 33,800
- - - - - - - - - - - - - - - - - -
harga per m2 85,989
Jasa 10% 8,599
Harga + Jasa 94,588
Harga Dibulatkan 94,590

1.05 m1 87,400 91,770


0.50 m1 83,300 41,650
1.00 m1 2,600 2,600
1.00 m1 3,500 3,500
1.00 m1 38,600 38,600
- - - - - - - - - - - - - - - - - -
harga per m2 178,120
Jasa 10% 17,812
Harga + Jasa 195,932
Harga Dibulatkan 195,940

1.05 m1 94,500 99,225


1.00 m1 3,500 3,500
1.00 m1 33,800 33,800
- - - - - - - - - - - - - - - - - -
harga per m2 136,525
Jasa 10% 13,653
Harga + Jasa 150,178
Harga Dibulatkan 150,180
2.77 kg/m1
0.01
0.060 zak 88,200 5,292
0.010 m3 123,300 1,233
0.010 m3 567,000 5,670
1.000 ls 1,220 1,220
10
0.01 lbr 175,500 2,438
0 m3 1,963,636 2,749
0.37 btg 40,900 14,997
2.00 ttk 2,700 5,400
1.00 m1 3,760 3,760
1.00 m' 23,800 23,800
- - - - - - - - - - -
harga per 1 m' 66,558
Jasa 10% -
Harga + Jasa 66,558
Harga Dibulatkan 66,560

0.104 m3 521,000 54,184


0.087 zak 48,000 4,195
0.780 m1 66,560 51,917
- m1 13,440 -
3.496 kg 690 2,412
0.104 m3 535,200 55,661
1.000 m2 1,300 1,300
1.000 m2 33,800 33,800
- - - - - - - - - - -
harga per 1 m2 203,469
Jasa 10% 20,347
Harga + Jasa 223,816
Harga Dibulatkan 223,820

0.105 m3 521,000 54,705


0.087 sak 48,000 4,195
0.780 m1 66,560 51,917
0.780 m1 13,440 10,483
0.350 m1 66,560 23,296
3.496 kg 690 2,412
0.105 m3 535,200 56,196
1.000 m2 8,500 8,500
1.000 m2 58,800 58,800
- - - - - - - - - - -
harga per 1 m2 270,504
Jasa 10% 27,050
Harga + Jasa 297,554
Harga Dibulatkan 297,560
0.71
0.48
mm plester
0.588 sak 24,900 14,647
23.53 kg 690 16,235
1.00 m2 1,300 1,300
1.00 m2 30,000 30,000
- - - - - - - - - - -
harga per 1 m2 62,182
Jasa 10% 6,218
Harga + Jasa 68,401
Harga Dibulatkan 68,500

0.067 sak 46,500 3,130


2.69 kg 690 1,858
1.00 m2 1,300 1,300
- m1 9,400 -
1.00 m2 22,000 22,000
- - - - - - - - - - -
harga per 1 m2 28,288
Jasa 10% 2,829
Harga + Jasa 31,116
Harga Dibulatkan 31,200

0.88 sak 23,400 20,647


35.29 kg 690 24,353
1.00 m2 1,300 1,300
0.60 m 9,400 -
1.00 m2 36,300 36,300
- - - - - - - - - - -
harga per 1 m2 82,600
Jasa 10% 8,260
Harga + Jasa 90,860
Harga Dibulatkan 90,860

0.067 sak 45,000 3,029


2.692 kg 690 1,858
0.07 m2 1,300 88
0.78 m1 9,400 7,332
1.00 m2 26,300 26,300
- - - - - - - - - - -
harga per 1 m2 38,606
Jasa 10% 3,861
Harga + Jasa 42,467
Harga Dibulatkan 42,470

1.07 m2 85,000 90,525


0.263 sak 40,500 10,631
0.42 sak 26,400 11,092
0.314 kg 7,600 2,389
- sak 93,200 -
- m3 123,300 -
1.07 m2 28,800 30,672
23.68 kg 690 16,342
1.00 m2 3,100 3,100
1.00 m2 1,300 1,300
1.00 m2 60,000 60,000
- - - - - - - - - - -
harga per 1 m2 226,051
Jasa 10% 22,605
Harga + Jasa 248,656
Harga Dibulatkan 248,660

1.07 m2 154,800 164,862


0.263 sak 40,500 10,631
0.42 sak 26,400 11,092
0.314 kg 7,600 2,389
- sak 93,200 -
- m3 123,300 -
1.07 m2 28,800 30,672
23.68 kg 690 16,342
1.00 m2 3,100 3,100
1.00 m2 1,300 1,300
1.00 m2 52,000 52,000
- - - - - - - - - - -
harga per 1 m2 292,388
Jasa 10% 29,239
Harga + Jasa 321,627
Harga Dibulatkan 321,630

1.07 m2 101,200 107,778


0.263 sak 40,500 10,631
0.42 sak 26,400 11,092
0.314 kg 7,600 2,389
- sak 93,200 -
- m3 123,300 -
1.07 m2 28,800 30,672
23.68 kg 690 16,342
1.00 m2 3,100 3,100
1.00 m2 1,300 1,300
1.00 m2 47,500 47,500
- - - - - - - - - - -
harga per 1 m2 230,804
Jasa 10% 23,080
Harga + Jasa 253,884
Harga Dibulatkan 253,900

0.49 m2 203,469 99,740


0.49 m2 62,182 30,482
0.49 m2 378,655 185,615
- - - - - - - - - - -
harga per 1 m1 315,836
Jasa 10% 31,584
Harga + Jasa 347,420
Harga Dibulatkan 347,420

1.07 m2 139,200 148,248


0.263 sak 40,500 10,631
- sak 26,400 -
0.314 kg 7,600 2,389
0.44 sak 93,200 41,008
0.06 m3 123,300 6,782
1.07 m2 28,800 30,672
6.88 kg 690 4,745
1.00 m2 3,100 3,100
1.00 m2 1,300 1,300
1.00 m2 22,500 22,500
1.00 m2 45,000 45,000
- - - - - - - - - - -
harga per 1 m2 316,374
Jasa 10% 31,637
Harga + Jasa 348,012
Harga Dibulatkan 348,100

ex. Granito
1.07 m2 172,800 184,032
0.314 sak 40,500 12,729
- sak 26,400 -
0.314 kg 7,600 2,389
0.44 sak 93,200 41,008
0.06 m3 123,300 6,782
1.07 m2 28,800 30,672
8.17 kg 690 5,638
1.00 m2 3,100 3,100
1.00 m2 1,300 1,300
1.00 m2 60,000 60,000
- - - - - - - - - - -
harga per 1 m2 347,649
Jasa 10% 34,765
Harga + Jasa 382,414
Harga Dibulatkan 382,500

1.07 m2 96,200 102,453


0.263 sak 40,500 10,631
- sak 26,400 -
0.314 kg 7,600 2,389
0.44 sak 93,200 41,008
0.06 m3 123,300 6,782
1.07 m2 28,800 30,672
6.88 kg 690 4,745
1.00 m2 3,100 3,100
1.00 m2 1,300 1,300
1.00 m2 22,500 22,500
1.00 m2 40,000 40,000
- - - - - - - - - - -
harga per 1 m2 265,579
Jasa 10% 26,558
Harga + Jasa 292,137
Harga Dibulatkan 292,200
0.11 m2 139,200 14,894
0.033 sak 40,500 1,337
0.06 sak 26,400 1,599
0.028 kg 7,600 210
- sak 93,200 -
- m3 123,300 -
0.10 m1 28,800 2,880
3.88 kg 690 2,678
0.10 m1 3,100 310
0.10 m1 1,300 130
1.00 m1 9,400 9,400
1.00 m1 13,100 13,100
1.00 m1 31,300 31,300
- - - - - - - - - - -
harga per 1 m2 77,838
Jasa 10% 7,784
Harga + Jasa 85,622
Harga Dibulatkan 85,700

0.11 m2 96,200 10,293


0.033 sak 40,500 1,337
0.06 sak 26,400 1,599
0.028 kg 7,600 210
- sak 93,200 -
- m3 123,300 -
0.10 m1 28,800 2,880
3.88 kg 690 2,678
0.10 m1 3,100 310
0.10 m1 1,300 130
1.00 m1 9,400 9,400
1.00 m1 13,100 13,100
1.00 m1 31,300 31,300
- - - - - - - - - - -
harga per 1 m2 73,237
Jasa 10% 7,324
Harga + Jasa 80,561
Harga Dibulatkan 80,570

0.11 m2 44,220 4,732


0.033 sak 26,400 871
0.06 sak 7,600 460
0.028 kg 93,200 2,575
- sak 123,300 -
- m3 28,800 -
0.10 m1 690 69
3.88 kg 3,100 12,033
0.10 m1 1,300 130
0.10 m1 9,400 940
1.00 m1 9,400 9,400
1.00 m1 13,100 13,100

- - - - - - - - - - -
harga per 1 m2 44,310
Jasa 10% 4,431
Harga + Jasa 48,741
Harga Dibulatkan 48,750

1.07 m2 183,600 195,534


0.263 sak 40,500 10,631
- sak 26,400 -
0.314 kg 7,600 2,389
0.44 sak 93,200 41,008
0.06 m3 123,300 6,782
1.07 m2 28,800 30,672
6.88 kg 690 4,745
1.00 m2 3,100 3,100
1.00 m2 1,300 1,300
1.00 m2 22,500 22,500
1.00 m2 45,000 45,000
- - - - - - - - - - -
harga per 1 m2 363,660
Jasa 10% 36,366
Harga + Jasa 400,026
Harga Dibulatkan 400,030

1.07 m2 139,200 148,944


2.50 Keping 15,600 39,000
2.50 Keping 4,200 10,500
0.263 sak 40,500 10,631
- sak 26,400 -
0.314 kg 7,600 2,389
0.44 sak 93,200 41,008
0.06 m3 123,300 6,782
2.50 m2 28,800 72,000
6.88 kg 690 4,745
1.00 m2 3,100 3,100
1.00 m2 1,300 1,300
1.00 m2 22,500 22,500
1.00 m2 62,500 62,500
- - - - - - - - - - -
harga per 1 m2 425,398
Jasa 10% 42,540
Harga + Jasa 467,938
Harga Dibulatkan 467,940
534,590

1.00 m2 188,400 188,400


1.00 m2 1,425,000 1,425,000
1.00 m2 161,200 161,200
- - - - - - - - - - -
harga per m2 1,774,600
Jasa 10 % 177,460
Total harga 1,952,060
Harga satuan 1,952,100

1.00 m2 188,400 188,400


1.00 m2 2,781,600 2,781,600
1.00 m2 161,200 161,200
- - - - - - - - - - -
harga per m2 3,131,200
Jasa 10 % 313,120
Total harga 3,444,320
Harga satuan 3,444,400

1.00 m2 735,800 735,800


1.00 m2 173,600 86,800
1.00 m2 249,800 249,800
1.00 m2 125,500 125,500
- - - - - - - - - - -
harga per m2 1,197,900
Jasa 10 % 119,790
Total harga 1,317,690
Harga satuan 1,317,700

1.00 m2 735,800 735,800


1.00 m2 173,600 86,800
1.00 m2 353,700 -
1.00 m2 236,300 236,300
1.00 m2 125,500 125,500
- - - - - - - - - - -
harga per m2 1,184,400
Jasa 10 % 118,440
Total harga 1,302,840
Harga satuan 1,302,900

1.00 m2 722,300 722,300


1.00 m2 1,500,000 1,500,000
1.00 m2 161,200 -
1.00 m2 173,600 86,800
1.00 m2 294,700 -
0.44 m2 203,469 88,894
0.44 m2 90,470 39,526
0.44 m2 33,600 14,680
1.00 m2 236,300 236,300
1.00 m2 125,500 125,500
- - - - - - - - - - -
harga per m2 2,813,999
Jasa 10 % 281,400
Total harga 3,095,399
Harga satuan 3,095,400

1.00 m2 735,800 735,800


1.00 m2 173,600 173,600
1.00 m2 249,800 249,800
1.00 m2 125,500 125,500
1.00 m2 1,650,000 1,650,000
1.00 m2 313,900 313,900
- - - - - - - - - - -
harga per m2 3,248,600
Jasa 10 % 324,860
Total harga 3,573,460
Harga satuan 3,573,500

1.00 M2 54,000 54,000


0.44 zak 93,200 41,008
0.06 m3 123,300 6,782
1.00 m2 1,900 1,900
1.00 m2 24,300 24,300

- - - - - - - - - - -
harga per m2 127,990
Jasa 10 % 12,799
Total harga 140,788
Harga satuan 140,800

1.03 m2 47,300 48,719


1.00 m2 18,800 18,800
1.00 m2 10,100 10,100
- - - - - - - - - - -
harga per m2 77,619
Jasa 10 % 7,762
Total harga 85,381
Harga satuan 85,400

1.03 m2 74,300 76,529


1.00 m2 18,800 18,800
1.00 m2 10,100 10,100
- - - - - - - - - - -
harga per m2 105,429
Jasa 10 % 10,543
Total harga 115,972
Harga satuan 116,000

1.00 M2 120,000 120,000

- - - - - - - - - - -
harga per m2 120,000
Jasa 10 % 12,000
Total harga 132,000
Harga satuan 132,000

0.49 sak 93,200 45,668


0.07 m3 123,300 8,631
0.09 lbr 216,000 19,048
1.00 m2 1,900 1,900
1.00 m2 36,000 36,000
- - - - - - - - - - -
harga per m2 111,247
Jasa 10 % 11,125
Total harga 122,371
Harga satuan 122,400

1.00 m2 3,100 3,100


1.00 kg 3,800 3,800
1.00 m1 9,400 9,400
- - - - - - - - - - -
harga per m1 16,300
Jasa 10 % 1,630
Total harga 17,930
Harga satuan 18,000

0.49 zak 93,200 45,668


0.07 m3 123,300 8,631
1.00 m2 1,900 1,900
1.00 m2 33,000 33,000
- - - - - - - - - - -
harga per m2 89,199
Jasa 10 % 8,920
Total harga 98,119
Harga satuan 98,200

1.00 m2 270,000 270,000


1.00 m2 54,000 54,000
1.00 m2 - -
1.00 m2 48,000 48,000
1.00 m2 62,200 62,200
2.20 sak - -
1.00 m2 - -
- - - - - - - - - - -
harga per m2 434,200
Jasa 10 % 43,420
Total harga 477,620
Harga satuan 477,700

1.00 m2 270,000 270,000


1.00 m2 54,000 54,000
1.00 m2 132,000 132,000
1.00 m2 48,000 48,000
1.00 m2 62,200 62,200
2.20 sak 28,800 63,360
1.00 m2 25,000 25,000
- - - - - - - - - - -
harga per m2 654,560
Jasa 10 % 65,456
Total harga 720,016
Harga satuan 720,100

1.00 m2 302,400 302,400


1.00 m2 54,000 54,000
1.00 m2 132,000 132,000
1.00 m2 48,000 48,000
1.00 m2 62,200 62,200
2.20 sak 28,800 63,360
1.00 m2 25,000 25,000
- - - - - - - - - - -
harga per m2 686,960
Jasa 10 % 68,696
Total harga 755,656
Harga satuan 755,700

1.00 m2 516,500 516,500


1.00 m2 54,000 54,000
1.00 m2 132,000 132,000
1.00 m2 48,000 48,000
1.00 m2 62,200 62,200
2.20 sak 28,800 63,360
1.00 m2 25,000 25,000
- - - - - - - - - - -
harga per m2 901,060
Jasa 10 % 90,106
Total harga 991,166
Harga satuan 991,200

1.00 m2 302,400 302,400


1.00 m2 54,000 54,000
1.00 m2 - -
1.00 m2 48,000 48,000
1.00 m2 62,200 62,200
2.20 sak - -
1.00 m2 - -
- - - - - - - - - - -
harga per m2 466,600
Jasa 10 % 46,660
Total harga 513,260
Harga satuan 513,300

0.15 m2 Included -
0.25 m1 114,000 28,166
1.00 m1 42,000 42,000
1.00 m1 42,000 42,000
0.15 m2 72,000 10,800
1.00 m1 36,000 36,000
- - - - - - - - - - -
harga per m1 158,966
Jasa 10 % 15,897
Total harga 174,862
Harga satuan 174,900

0.08 m2 57,600 4,725


3.28 kg 690 2,264
1.00 m2 1,300 1,300
1.00 m2 20,000 20,000
1.00 m2 2,500 2,500

- - - - - - - - - - -
harga per m2 30,789
Jasa 10 % 3,079
Total harga 33,868
Harga satuan 33,900

0.60 1.400
0.15 m3 943,400 141,510
15.00 kg 12,480 187,200
0.90 m2 228,440 205,596
1.50 m' 125,000 187,500
1.50 m2 253,900 380,850

- - - - - - - - - - -
harga per m2 1,102,656
Jasa 10 % 110,266
Total harga 1,212,922
Harga satuan 1,213,000

0.60 1.200
0.07 m3 943,400 67,925
7.20 kg 12,480 89,856
0.58 m2 228,440 131,581
1.20 m' 125,000 150,000
0.72 m2 253,900 182,808

- - - - - - - - - - -
harga per m2 622,170
Jasa 10 % 62,217
Total harga 684,387
Harga satuan 684,400

3.00 lbr 896,400 2,689,200


9.00 btg 249,800 2,248,200
1.00 ls 493,700 493,700
1.00 ls 148,100 148,100
389.49 kg 1,400 545,286
389.49 kg 3,000 1,168,470
1.00 bh 4,050,000 4,050,000
389.49 kg 7,400 2,882,226

- - - - - - - - - - -
harga per m2 14,225,182
Jasa 10 % 1,422,518
Total harga 15,647,700
Harga satuan 15,647,800

1.00 Unit 2,448,000 2,448,000


0.03 Unit 2,448,000 61,200
1.00 Unit 321,400 321,400
1.00 Unit 12,500 12,500
1.00 Unit 33,800 33,800
1.00 Unit 218,800 218,800
- - - - - - - - - - -
Harga per unit 3,095,700
Jasa 10% 309,570
Harga + Jasa 3,405,270
Harga Dibulatkan 3,405,300

1.00 Unit 689,800 689,800


0.03 Unit 689,800 20,694
1.00 Unit included -
1.00 Unit 2,500 2,500
1.00 Unit 10,100 10,100
1.00 Unit 18,800 18,800
- - - - - - - - - - -
Harga per m2 741,894
Jasa 10% 74,189
Harga + Jasa 816,083
Harga Dibulatkan 816,100

1.00 Unit 1,803,600 1,803,600


0.03 Unit 1,803,600 45,090
1.00 Unit 321,400 321,400
1.00 Unit 6,300 6,300
1.00 Unit 27,000 27,000
1.00 Unit 187,500 187,500
- - - - - - - - - - -
Harga per m2 2,390,890
Jasa 10% 239,089
Harga + Jasa 2,629,979
Harga Dibulatkan 2,630,000

1.00 Unit 674,600 674,600


0.03 Unit 674,600 20,238
1.00 Unit 13,500 13,500
1.00 Unit 2,500 2,500
1.00 Unit 10,100 10,100
1.00 Unit 25,000 25,000
- - - - - - - - - - -
Harga per m2 745,938
Jasa 10% 74,594
Harga + Jasa 820,532
Harga Dibulatkan 820,600

1.00 Unit 287,300 287,300


0.03 Unit 287,300 8,619
1.00 Unit 13,500 13,500
1.00 Unit 2,500 2,500
1.00 Unit 33,800 33,800
1.00 Unit 50,000 50,000
- - - - - - - - - - -
Harga per m2 395,719
Jasa 10% 39,572
Harga + Jasa 435,291
Harga Dibulatkan 435,300

1.00 Unit 157,000 157,000


0.03 Unit 157,000 4,710
1.00 Unit 13,500 13,500
1.00 Unit 2,500 2,500
1.00 Unit 33,800 33,800
1.00 Unit 18,800 18,800
- - - - - - - - - - -
Harga per m2 230,310
Jasa 10% 23,031
Harga + Jasa 253,341
Harga Dibulatkan 253,400

1.00 Unit 3,722,400 3,722,400


0.03 Unit 3,722,400 93,060
1.00 Unit 321,400 321,400
1.00 Unit 6,300 6,300
1.00 Unit 27,000 27,000
1.00 Unit 187,500 187,500
- - - - - - - - - - -
Harga per m2 4,357,660
Jasa 10% 435,766
Harga + Jasa 4,793,426
Harga Dibulatkan 4,793,500

1.00 Unit 360,700 360,700


0.03 Unit 360,700 10,821
5.00 Unit 13,500 67,500
1.00 Unit 2,500 2,500
1.00 Unit 10,100 10,100
1.00 Unit 25,000 25,000
- - - - - - - - - - -
Harga per m2 476,621
Jasa 10% 47,662
Harga + Jasa 524,283
Harga Dibulatkan 524,300

1.00 Unit 403,200 403,200


0.03 Unit 403,200 10,080
1.00 Unit 13,500 13,500
1.00 Unit 2,500 2,500
1.00 Unit 10,100 10,100
1.00 Unit 25,000 25,000
- - - - - - - - - - -
Harga per m2 464,380
Jasa 10% 46,438
Harga + Jasa 510,818
Harga Dibulatkan 510,900

1.00 Unit 674,600 674,600


0.03 Unit 674,600 20,238
5.00 Unit 13,500 67,500
1.00 Unit 2,500 2,500
1.00 Unit 10,100 10,100
1.00 Unit 25,000 25,000
- - - - - - - - - - -
Harga per m2 799,938
Jasa 10% 79,994
Harga + Jasa 879,932
Harga Dibulatkan 880,000

1.00 Unit 1,376,400 1,376,400


0.03 Unit 1,376,400 34,410
1.00 Unit 13,500 13,500
1.00 Unit 6,300 6,300
1.00 Unit 33,800 33,800
1.00 Unit 218,800 218,800
- - - - - - - - - - -
Harga per m2 1,683,210
Jasa 10% 168,321
Harga + Jasa 1,851,531
Harga Dibulatkan 1,851,600

1.00 Unit 312,000 312,000


0.03 Unit 312,000 9,360
1.00 Unit 13,500 13,500
1.00 Unit 2,500 2,500
1.00 Unit 33,800 33,800
1.00 Unit 50,000 50,000
- - - - - - - - - - -
Harga per m2 421,160
Jasa 10% 42,116
Harga + Jasa 463,276
Harga Dibulatkan 463,300
1.05 m2 132,000 138,600
0.07 m1 237,600 16,632
1.00 m2 40,000 40,000
1.00 m2 31,200 31,200
1.00 Unit 78,000 78,000
- - - - - - - - - - -
Harga per m2 304,432
Jasa 10% 30,443
Harga + Jasa 334,875
Harga Dibulatkan 334,900

1.05 m2 84,000 88,200


1.00 m2 20,000 20,000
1.00 m2 11,300 11,300
1.00 m2 48,000 48,000
- - - - - - - - - - -
Harga per m2 167,500
Jasa 10% 16,750
Harga + Jasa 184,250
Harga Dibulatkan 184,300

01-MODENA
1.00 Unit 3,960,000 3,960,000
0.03 Unit 3,960,000 99,000
1.00 Unit 13,500 13,500
1.00 Unit 6,300 6,300
1.00 Unit 33,800 33,800
1.00 Unit 218,800 218,800
- - - - - - - - - - -
Harga per m2 4,331,400
Jasa 10% 433,140
Harga + Jasa 4,764,540
Harga Dibulatkan 4,764,600

0-MODENA
1.00 Unit 1,452,000 1,452,000
0.03 Unit 1,452,000 36,300
1.00 Unit 13,500 13,500
1.00 Unit 6,300 6,300
1.00 Unit 33,800 33,800
1.00 Unit 218,800 218,800
- - - - - - - - - - -
Harga per m2 1,760,700
Jasa 10% 176,070
Harga + Jasa 1,936,770
Harga Dibulatkan 1,936,800
Indeks Harga Struktur 1.35
Indeks Harga Beton 1.06
Indeks Harga Besi 1.03
Indeks Harga Baja 1.05
Indeks Harga Arsitektur 1.20

Index harga upah 1.25


Rounded (2)
Nilai - ppn -
Jasa Kontraktor 10%
RAP NAMA
HARGA SUBKON/SUPLIER
MATERIAL UPAH
SETELAH DISC

570,000 PC Rate
750,000 PC Rate
760,000 PC Rate
770,000 PC Rate
810,000 PC Rate

830,000 PC Rate

690,000 Mega Jaya Mix


620,000
890,000 Mega Jaya Mix
940,000 Mega Jaya Mix
720,000

690,000 SIB
655,000 ADHIMIX
650,000 ADHIMIX
770,000 ADHIMIX
735,000 ADHIMIX
760,000 SIB
815,000 SIB
760,000 ADHIMIX
755,000 ADHIMIX
825,000 ADHIMIX
790,000 ADHIMIX
785,000 ADHIMIX

45,000
130,000 Pontianak
210,000
270,000
1,850,000
1,800,000 Pontianak
1,963,636 Pontianak
7,500
16,364
2,000
26,500
6,500
18,000
98,000
4,000

600
10,000,000
14,700,000
21,315
10,000 0
238,095 0
396,441
514
-

9,000
6,500
7,600
8,100
14,600
5,000
34,100

16,675 Hilti
34,500 Hilti
46,472 Sumber Makmur
75,000 Adeha
95,000 Adeha
8,000 Adeha
15,000 Adeha
25,000 Adeha
15,000

250,000 PT. Berkat putra


95,000
185,000
95,000
420,000
195,000
400,000
250,000
190,000
650
1,700
7,550
250,000
64,000
69,000 harga pontianak
125,000
16,500
150,000
-
30,000 #REF!
20,000 0

419,900 Duta Mesh


205,000

664,000 Google
1,800,000 Google

13,000 Omah Bata

500,000 Makmur Utama


530,000 Power Block
560,000 Grand Elephan Group
500,000
550,000 ALC
455,000 ex. Broco
45,000
34,000
45,000
55,500
60,500
60,000
7,000
6,000
71,500
35,000
187,500

40,000 ex. Broco


22,000 ex. Broco
40,000 ex. Broco
48,000 ex. Broco
33,750 ex. Broco
6,300 ex. Broco

Gracia
7,576 Gracia
10,899 Gracia
5,000 Gracia

11,682 GRACIA ABADI


10,686 GRACIA ABADI
10,686
11,591 GRACIA ABADI

10,532 GRACIA ABADI


10,532 GRACIA ABADI
10,532 GRACIA ABADI
9,500 GRACIA ABADI
9,500 GRACIA ABADI
11,682 GRACIA ABADI
11,682 GRACIA ABADI
11,682 GRACIA ABADI

11,682 0
11,682 GRACIA ABADI
12,850 Gracia
11,475 Gracia
11,475 Gracia
11,282 PT. Inti Sumber Bajasakti
1,162,713
1,576,929
2,012,946
8,935
8,935
11,800 Gracia
6,955 PT. Inti Sumber Bajasakti
6,955 PT. Inti Sumber Bajasakti
8,636 Gracia
514428% 514428% 9,420 Gracia
9,420 Gracia
9,364 Gracia
9,364 Gracia
9,364 Gracia
9,364 Gracia
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,162PT. Inti Sumber Bajasakti
10,986PT. Inti Sumber Bajasakti
12,085 PT. Inti Sumber Bajasakti
12,085PT. Inti Sumber Bajasakti
12,085PT. Inti Sumber Bajasakti
12,085PT. Inti Sumber Bajasakti
350,000 Google

10,986
1,000,000
15,000
12,500
11,000
9,900
8,500
6,500
4,500
4,500
181,192
295,763
22,500
27,500
35,500
45,500
65,500
76,700
114,000
105,000
45,500
32,500
45,000
8,500
250,000

65,000

50,350 Asiacon
35,150 Asiacon
86,450 Asiacon
66,500
580,000
-
11,400 Asiacon
10,000 Omah Bata

Interlock
62,500
220,000
62,500
188,000
1,055,182
3,086,547
260,865
104,033

272,000 Dusaspun
358,000 Dusaspun
69,000 Dusaspun
105,000 Dusaspun
93,000 Dusaspun
135,000 Dusaspun

789,000 Dusaspun
1,381,000 Dusaspun

996,000 Dusaspun
2,371,000 Dusaspun
252,900 harga panca
387,150 harga panca

85,000 Platinum
85,000 Platinum
129,500 Roman
21,645
69,091

84,350 Roman
52,500 Roman
80,150 Roman
94,500 Roman
80,938 Roman
108,500 Roman
129,000 Roman

80,500 Roman

18,200 Lemkra

153,542 Granito
195,556 Granito
161,181 Granito
51,870 Granito
153,924 Granito
132,917 Granito
143,993 Granito

153,542
195,556
116,000 NARACERAMICA
13,000 NARACERAMICA
3,500 NARACERAMICA
153,000

8,015
11,625
#REF!
#REF!
61,417
30,708

92,857 harga plint alluminium


350,000

415,800
206,800

Dika Karya Sejati Dika Karya Sejati 683,640 Dika karya sejati
Dika Karya Sejati Dika Karya Sejati 1,158,840
Dika Karya Sejati Dika Karya Sejati 1,267,668

3,187,500
2,281,500
4,207,500

3,102,500
2,191,500
4,122,500

1,000,000 Central alam


2,450,000 Central alam
2,435,000 Central alam
350,000 Central alam
352,500
350,000 Central alam
415,000 Central alam
375,000 Central alam
385,000 Central alam
112,500 Central alam
250,000 Central alam
110,000 Central alam
367,500 Central alam
1,600,000
285,000 0
285,000 0

152,000 Central alam


152,000 Central alam
213,750 Central alam
171,000 Central alam
25,000 Central alam

405,000 Central alam


405,000 Central alam
300,000 Central alam
75,000 Central alam
75,000 Central alam
150,000 Central alam

30,000 dari kak yulis

51,831
320,000 AQUALOC
80,000 AQUALOC
60,000 AQUALOC
85,000 AQUALOC
20,000 AQUALOC

225,000
252,000
430,435

2,600,000 Ex. TOTO


4,102,400 Ex. TOTO
3,336,000 Ex. TOTO
502,400 Ex. TOTO
2,400,000 Ex. TOTO
2,275,000 Ex. TOTO
3,320,000 Ex. TOTO
1,120,000 Ex. TOTO
1,988,800 Ex. TOTO
659,200 Ex. TOTO
838,400 Ex. TOTO
1,162,400 Ex. TOTO
3,845,600 Ex. TOTO
3,413,600 Ex. TOTO
1,278,200 Ex. TOTO
261,100 Ex. TOTO
2,219,700 Ex. TOTO
1,680,000 Ex. TOTO
319,900 Ex. TOTO
137,900 Ex. TOTO
47,600 Ex. TOTO
1,372,000 Ex. TOTO
248,500 Ex. TOTO
354,900 Ex. TOTO
437,500 Ex. TOTO
3,850,000 Ex. TOTO
2,051,000 Ex. TOTO
4,844,000 Ex. TOTO
3,675,000 Ex. TOTO
1,141,000 Ex. TOTO
371,700 Ex. TOTO
826,000 Ex. TOTO
1,050,000 Ex. TOTO
2,282,000 Ex. TOTO
135,800 Ex. TOTO
198,100 Ex. TOTO
637,700 Ex. TOTO
1,239,000 Ex. TOTO
7,560,000 Ex. TOTO
994,000 Ex. TOTO
333,900 Ex. TOTO
4,655,000 Ex. TOTO
1,638,000 Ex. TOTO
1,050,000 Ex. TOTO
1,799,000 Ex. TOTO
200,200 Ex. TOTO
55,000 Ex. ONDA
506,800 Ex. TOTO
490,000 Ex. TOTO
749,000 Ex. TOTO
14,819,000 Ex. TOTO
2,716,000 Ex. TOTO
51,870,000 Ex. TOTO
4,095,000 Ex. TOTO
4,109,000 Ex. TOTO
500,000 Ex. TOTO
1,242,500 Ex. TOTO
330,400 Ex. TOTO
994,000 Ex. TOTO
541,800 Ex. TOTO
506,800 Ex. TOTO
4,410,000 Ex. TOTO
5,180,000 Ex. TOTO
354,900 Ex. TOTO
126,000 Ex. TOTO
266,000 Ex. TOTO
910,000 Ex. TOTO
315,000
1,078,000 Ex. TOTO

4,743,000 Ex. KOHLER


3,090,600 Ex. KOHLER
- Ex. KOHLER
54,000,000 Ex. KOHLER
- Ex. KOHLER
- Ex. KOHLER
- Ex. KOHLER
- Ex. KOHLER
- Ex. KOHLER
- Ex. KOHLER

2,040,000
1,503,000
574,800
130,800
336,000
300,600
3,102,000
239,400
562,200
1,147,000

3,300,000

1,210,000

10,000
10,000
5,000
2,000
10,000
5,000
135,000
2,000

20,000
25,000
20,000
15,000
15,000
25,000
25,000
25,000
7,500

150,000
175,000
150,000
75,000
155,000
20,000
20,000
45,000
20,000
175,000
175,000
20,000
60,000
15,000
20,000
20,000
40,000
450,000
15,000

10,322
10,000
33,956
20,944
75,300

6,262
11,885
7,330
26,355

4,225
6,500
4,500
7,000

185,573
103,636
89,640
100,530
51,525
74,325
37,118
24,750
28,528
113,110
500
117,000

- 0.000
- 0.000
- -
RAP
HARGA

SETELAH DISC

55,000
95,000
35,000
136,000
25,000
10,000
35,000
35,000
200,000
88,000
50,000
50,000
65,000
75,000
65,000
30,000
50,000
30,000
65,000
45,000
30,000
45,000
35,000
55,000
25,000
40,000
15,000
35,000

50,000
36,000
45,000
200,000
85,000
10,000
1,500
-
-
-
-
-
2,000 3,250
37,000 54,500
50,000 67,500
75,000 92,500
125,000 142,500
150,000
8,500 16,500
150 150
850 898
-
1,500
2,000
5,500
5,500
2,500

2,000
20,000
25,000
45,000
20,000 0
45,000 62,500
45,000 62,500
35,000
150,000 0
45,000 62,500
40,000 57,500
55,000 72,500
55,000 72,500
25,000 42,500
25,000 25,000

27,000 44,500
35,000 52,500
40,000 57,500
2,000 5,500
2,500 6,000
1,500 5,000
1,500 5,000
25,000 28,500
20,000 27,000
16,000 19,500
25,000 43,333
17,000 26,500
7,500
15,000
25,000
3,500
2,000
10,000
7,500 11,000
60,000
30,000
19,000 36,500
10,000
12,500 30,833
2,000 5,500
2,500 6,000
1,000 4,500
60,000 77,500
20,000 37,500
40,000 57,500
30,000 47,500
35,000 52,500
50,000 67,500
48,000 65,500
35,000 52,500
38,000 55,500
55,000 72,500
50,000 67,500
75,000 92,500
15,000 32,500
35,000 52,500
15,000 32,500
100,000 117,500
150,000 167,500
20,000 37,500
25,000 42,500
10,500 28,000
25,000 42,500
10,000 27,500
68,000 85,500
75,000 92,500

15,000
25,000
25,000
9,100
14,400
14,400
14,400
20,000
20,000
720,000 harga panca
60,000 harga panca
50,000

4,000
2,750
2,500
2,400
3,600
100
2,500
800
1,000
7,500
25,000
1,500
5,000
3,250
8,000
#REF!

35,000
5,000
10,000
5,000
1,500
2,500
RAP
HARGA

SETELAH DISC

17,000
7,500
3,000
5,000
5,000
20,000
1,550
5,000
2,000
3,500
1,000
2,500
45,000 10,871
25,000
19,000

4,750,000

RAP NAMA
HARGA SUBKON

SETELAH DISC

35,000
95,000
25,000
17,500
10,000

6,000 Chandra Buana


136,000 Chandra Buana
370,000 Chandra Buana
777,400,000 Ghazindo
777,400,000 Ghazindo
777,400,000 Ghazindo
1,357,200,000 Ghazindo
395,700,000 Ghazindo

145,000 PT. Putra Saluyu


145,000 PT. Putra Saluyu
145,000 PT. Putra Saluyu
145,000 PT. Putra Saluyu
145,000 PT. Putra Saluyu

7,948
55,000,000 Wika Beton
265,000 Wika Beton
152,000 Wika Beton
115,000 Wika Beton
115,000 Wika Beton
12,000 0
10,000 0
5,000 0
5,000 0
65,000 PT. Caturpile
45,000 PT. Caturpile
35,000 PT. Caturpile
35,000 PT. Caturpile
110,000 PT. Caturpile
65,000 PT. Caturpile
100,000 PT. Caturpile
- 0
590,000 PT. Caturpile
275,000 PT. Caturpile
225,000 PT. Caturpile
225,000 PT. Caturpile

15,000,000 PT. Caturpile

-
-
-
24,250,000 Pakubumi
23,000,000 Pakubumi
8,000,000 Pakubumi
9,700,000 Pakubumi
53,000,000 Pakubumi
20,000,000 Pakubumi
116,400 Pakubumi
638,158 Pakubumi
1,455 Pakubumi
87,300 Pakubumi
8,000,000 PT. Caturpile
80,000,000 PT. Caturpile
60,000,000 PT. Caturpile
657,800
200,000
100,000,000

- PT. Caturpile
- PT. Caturpile
- PT. Caturpile
- PT. Caturpile
- PT. Caturpile

98,300

700,000 Gubah Mitra

-
22,000,000 tripondasi
- tripondasi
10,000,000 tripondasi
- tripondasi
3,000,000 tripondasi
3,000,000 tripondasi
2,000,000 tripondasi
165,000,000 tripondasi
13,500,000 tripondasi
196,500,000
222,789

2,800,000
300,000
768,000
3,000,000

1,400,000
250,000
768,000
3,000,000

-
6,000,000
5,000,000
2,000,000

94,560 Adicon Bangun Graha


218,400 Adicon Bangun Graha
420,000 Adicon Bangun Graha
48,000 Adicon Bangun Graha

1,377,180 Dayataka
1,440,000 Dayataka

17,750 Indofullin
25,000 Indofullin

35,000 Gucimas Pratama


30,000 Gucimas Pratama
121,125 PT. TALENTA
71,250 Arum
213,750 Arum
80,750 Arum
68,875 Arum
59,375 Arum
35,625 Arum
807,500 Arum
21,375 Arum
23,750 Arum

110,000 Triton
55,000 Triton
45,000 Triton
175,000 Triton
35,000 Triton
35,000 Triton
100,000 Triton
90,000 Triton
230,000 Triton

83.586.80
-
-

1,020,000 Fenindo
1,020,000 Fenindo
2,975,000 Fenindo
161,500 Fenindo
850,000 Fenindo
272,000 Fenindo
297,500 Fenindo
1,377,000 Fenindo
- Fenindo
95,000 Fenindo
1,500,000 Fenindo
1,350,000 Fenindo
285,000 Fenindo
2,290,000 Fenindo
1,550,000 Fenindo
4,470,000 Fenindo
83,500,000 Fenindo
535,000 Fenindo
770,400 Fenindo
1,673,480 Fenindo
1,926,000 Fenindo
2,152,840 Fenindo
2,777,720 Fenindo
3,359,800 Fenindo

550,000 Fenindo

220,000 Fenindo

275,000 sinar buana

20,000,000 Fenindo

250,000 Fenindo

1,250,000 Fenindo

1,500,000
1,750,000
114,750

350,000

116,000 Glory

140,000 Glory
18,000 Glory
198,000 Gipsindo

120,000 Menara Jaya

102,000 Menara Jaya

135,000 Menara Jaya

135,000 Menara Jaya

125,000 Menara Jaya


168,000 Menara Jaya
40,000 Menara Jaya
50,000 Menara Jaya
60,000 Menara Jaya
130,000 Menara Jaya
- Menara Jaya
102,000 Menara Jaya
135,000 Menara Jaya
45,000 Menara Jaya
65,000 Menara Jaya
102,000 Menara Jaya
118,000 Menara Jaya
19,000 Menara Jaya
95,000 Menara Jaya
95,000 Menara Jaya
95,000 Menara Jaya
115,000 Menara Jaya
85,000 Menara Jaya
514,102 Menara Jaya
50,000 Menara Jaya
155,000 Menara Jaya
192,000 Gipsindo
96,000 Gipsindo
250,000
310,000
155,000
800,000 Menara Jaya
700,000 Menara Jaya
1,300,000 Menara Jaya
110,000 Menara Jaya
170,000 Menara Jaya

33,023 Pentayasa
25,883 Pentayasa
33,023 Pentayasa
25,883 Pentayasa
23,750 Pentayasa
30,400 Pentayasa
142,500
175,500 KIS
17,500 PT. Sadaya Utama
20,250 PT. Sadaya Utama
49,500 PT. Sadaya Utama
67,500 PT. Sadaya Utama

15,000 NELSINDO
15,000 NELSINDO
25,000 NELSINDO
25,000 NELSINDO

122,550 Menara Jaya Persada


132,050 Menara Jaya Persada
144,400 Menara Jaya Persada
24,700 Menara Jaya Persada
-
157,000

33,000 PT. NELSINDO INTERNUSA


36,000 PT. NELSINDO INTERNUSA
28,200 PT. NELSINDO INTERNUSA
36,000 PT. NELSINDO INTERNUSA
28,200 PT. NELSINDO INTERNUSA
33,500 PT. NELSINDO INTERNUSA
200,000 Mutiara Rizky

2,634,318 Corianindo
8,553,325 Corianindo

23,800
27,625
27,625
31,875

342,500
135,000

262,500

2,792,890 Matrixtama
55,000 Matrixtama
2,848,000 Matrixtama
1,805,000 Matrixtama

570,000 Bintara
570,000 Bintara
1,567,500 Bintara
1,150,000 DIKA

- Bintara

755,190 Bintara
712,500 Bintara
750,000 Bintara
839,100 Bintara
750,000 Bintara
849,100 Bintara
794,550 Bintara
794,550 Bintara
794,550 Bintara
794,550 Bintara
874,100

276,000 Bintara
350,000 Bintara
150,000 Bintara

37,996,600 WINATATA
3,541,231 WINATATA
4,965,350 WINATATA
1,409,867 WINATATA
1,367,928 WINATATA
3,514,796 WINATATA
1,073,307 WINATATA

711,428 WINATATA
665,000 BINTARA

825,616 Ardatama
350,000 Ardatama

1,866,756 Ardatama

175,000 Tokopedia
1,633,333

5,066,500 Bangun Selaras


5,001,500 Bangun Selaras
5,101,500 Bangun Selaras
4,190,900 Bangun Selaras
3,597,000 Bangun Selaras
4,190,900 Bangun Selaras
9,605,000 Bangun Selaras
5,611,670 Bangun Selaras
12,114,250 Bangun Selaras

16,439,000 Super Teknik


10,434,500 Super Teknik
9,434,500 Super Teknik
10,434,500 Super Teknik
9,513,740 Super Teknik
10,513,740 Super Teknik
9,576,000 Super Teknik
9,576,000 Super Teknik

38,279,168 SANWAMAS
8,024,527 SANWAMAS
5,986,309 SANWAMAS
7,961,673 SANWAMAS

997,500 Bintara
- Bintara

- Bintara
1,568,025 Bintara
-

1,293,000 Bintara
717,000 Bintara
1,006,000 Bintara
1,229,000 Bintara
2,279,000 Bintara
2,379,000 Bintara
2,040,000 Bintara
4,490,000 Bintara
2,100,000 Bintara
3,235,000 Bintara
1,254,000

650,000 Bintara
400,000 Bintara
578,000 Bintara
2,824,000 Bintara
2,824,000 Bintara
2,060,000 Bintara
2,788,000 Bintara

1,047,200 PAWLING
762,300 PAWLING
716,100 PAWLING

663,000 Fenindo
178,500 Fenindo
127,500 Fenindo
1,785,000 Fenindo
2,295,000 Fenindo
1,530,000 Fenindo

39,600,000 Sinar Buana


1,147,500 Sinar Buana
6,375,000 Sinar Buana

6,147,188 Matrix
- Matrix
- Matrix

2,151,043 SIGMACO

1.050.00 637,935 669,831


1.000.00 150,000 150,000
------------------------------
819,831

Harga TIDAK Dibulatkan 819,831

1.050.00 43,448 45,621


1.000.00 3,500 3,500
1.000.00 35,000 35,000
------------------------------
84,121

Harga TIDAK Dibulatkan 84,121

1.050.00 289,655 304,138


1.000.00 10,000 10,000
1.000.00 75,000 75,000
1.000.00 150,000 150,000
------------------------------
539,138

Harga TIDAK Dibulatkan 539,138

715,000 0
1,050,000 0
625,000 0
660,000 0
550,000 0
650,000
650,000

430,000 IMO
450,000 IMO
165,000 IMO
104,918 IMO
410,448 IMO
170,000,000
22,000,000

Harga Sat
MATERIAL UPAH RAP Total

253,715 253,715
75,605 75,605
2,016 2,016
1,260 1,260

- - - - - - - - - - -
harga per 1 m1 332,596
Jasa 10% -
Harga + Jasa 332,596

275,000 275,000
600,000 45,000
160,000 160,000
150,000 11,250
35,000 35,000
- -
- -
- - - - - - - - - - -
harga per 1 m1 526,250
Jasa 10% -
Harga + Jasa 526,250

125,000 125,000
250,000 20,833

75,000 75,000
80,000 6,667
25,000 25,000
- -
- -
- - - - - - - - - - -
harga per 1 m1 252,500
Jasa 10% -
Harga + Jasa 252,500

2,000,000 5,492
200,000 549
1,360,000 3,735
4,000,000 10,985
450,000 30,000
415 415
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Harga per 1 m3 34,117.65

Harga TIDAK Dibulatkan 34,118

95,000 95,000
2,850 2,850
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Harga per 1 m3 97,850
Harga TIDAK Dibulatkan 97,850

50,620 50,620
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
50,620

Harga TIDAK Dibulatkan 50,620

95,000 97,850
35,000 35,000
1,329 1,329
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
134,179

Harga TIDAK Dibulatkan 134,179


13,418
Harga TIDAK Dibulatkan 13,418

250,000 275,000
64,000 143,360
95,000 30,400
10,000 10,000
200,000 200,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
658,760
Nilai - ppn 0

Harga TIDAK Dibulatkan 658,760

731,400 690,000 710,700


- - -
50,300 37,000 37,000
10,100 7,477 7,477
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
731,400 60,400 755,177
73,140 6,040 Nilai - ppn -
804,540 66,440
804,540 66,440 Harga TIDAK Dibulatkan 755,177
harga per m2 37,759

710,700
990,570 1.030.00 890,000 916,700
4,953 4,584 4,584
- Included 0
58,300 45,000 45,000
2,500 2,000 2,000
- - 0
67,500 50,000 50,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
990,570 133,253 1,018,284
99,057 13,325 Nilai - ppn 0
1,089,627 146,578
1,089,630 146,580 Harga TIDAK Dibulatkan 1,018,284

1,046,220 1.030.00 940,000 968,200


5,231 4,841 4,841
- Included 0
58,300 45,000 45,000
2,500 2,000 2,000
- - 0
67,500 50,000 50,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
1,046,220 133,531 1,070,041
104,622 13,353 Nilai - ppn 0
1,150,842 146,884
1,150,850 146,890 Harga TIDAK Dibulatkan 1,070,041

990,570 1.030.00 890,000 916,700


9,906 9,167 9,167
- Included 0
83,500 65,000 65,000
2,500 2,000 2,000
- - 0
67,500 50,000 50,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
990,570 163,406 1,042,867
99,057 16,341 Nilai - ppn 0
1,089,627 179,746
1,089,630 179,750 Harga TIDAK Dibulatkan 1,042,867

1,046,220 1.030.00 940,000 968,200


10,462 9,682 9,682
- Included 0
83,500 65,000 65,000
2,500 2,000 2,000
- - 0
67,500 50,000 50,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
1,046,220 163,962 1,094,882
104,622 16,396 Nilai - ppn 0
1,150,842 180,358
1,150,850 180,360 Harga TIDAK Dibulatkan 1,094,882

990,570 1.030.00 890,000 916,700


4,953 4,584 4,584
- Included 0
60,300 47,000 47,000
2,500 2,000 2,000
- - 0
67,500 50,000 50,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
990,570 135,253 1,020,284
99,057 13,525 Nilai - ppn 0
1,089,627 148,778
1,089,630 148,780 Harga TIDAK Dibulatkan 1,020,284

1,046,220 1.030.00 940,000 968,200


5,231 4,841 4,841
- Included 0
60,300 47,000 47,000
2,500 2,000 2,000
- - 0
67,500 50,000 50,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
1,046,220 135,531 1,072,041
104,622 13,553 Nilai - ppn 0
1,150,842 149,084
1,150,850 149,090 Harga TIDAK Dibulatkan 1,072,041

990,570 1.030.00 890,000 916,700


4,953 4,584 4,584
- Included 0
108,800 90,000 90,000
2,500 2,000 2,000
- - 0
67,500 50,000 50,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
990,570 183,753 1,063,284
99,057 18,375 Nilai - ppn 0
1,089,627 202,128
1,089,630 202,130 Harga TIDAK Dibulatkan 1,063,284

32,598 1,700 29,167


18,144 64,000 13,440
3,699 95,000 2,850
2,500 2,000 2,000
51,300 45,000 45,000
2,500 1,849 1,849
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
54,441 56,300 94,306
5,444 5,630 Nilai - ppn 0
59,885 61,930
59,890 61,930 Harga TIDAK Dibulatkan 94,306

2.500.00
48,979 .134.37 270,000 36,281
25,700 19,000 19,000
23,000 17,000 17,000
6,275 19,364 4,841
5,400 2,000 4,000
895 26,500 663
8,800 6,500 6,500
19,748 1,963,636 16,495
777 1,295 648
81,300 70,000 70,000
- 20,000 0
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
139,573 81,300 175,426
13,957 8,130 Nilai - ppn 0
153,531 89,430
153,540 89,430 Harga TIDAK Dibulatkan 175,426

1.500.00
.223.95 210,000 47,030
17,000 17,000
1,800,000 14,400
1,963,636 15,709
2,000 2,000
26,500 583
16,364 4,091
1,295 648
65,000 65,000
20,000 0
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
166,461
Nilai - ppn 0

Harga TIDAK Dibulatkan 166,461

3.000.00
.111.98 210,000 23,515
17,000 17,000
1,800,000 16,200
1,963,636 19,636
2,000 2,000
26,500 583
16,364 4,091
1,295 648
80,000 80,000
20,000 10,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
173,673
Nilai - ppn 0

Harga TIDAK Dibulatkan 173,673

1.030.00 7,600 7,828


16,600 498
100 100
600 600
150 150
1.000.00 1,150 1,150
masuk prelim 0
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
10,326
Nilai - ppn 0

Harga TIDAK Dibulatkan 10,326

9,900 9,000 9,000


1,485 9,000 1,350
59 14,600 44
210 75 79
1,300 987 987
250 200 200
1,100 850 850
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
11,444 2,860 12,510
1,144 286 Nilai - ppn 0
12,589 3,146
Harga TIDAK Dibulatkan 12,510
harga per m2 M-5 2 lapis 53,260
harga per m2 M-6 2 lapis 76,691
harga per m2 M-7 1 lapis 55,158
5,526 1,381 harga per m2 M-8 1 lapis 60,409
60,789 15,192 harga per m2 M-8 2 lapis 120,817
harga per m2 M-10 1 lapis 106,509
harga per Ton dibulatkan 12,509,750

11,596 10,532 10,848


- - 5,000 0
5,900 4,000 4,000
150 - 0
800 600 600
3,400 2,500 2,500
- 1,000 0
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
11,596 10,250 17,948
1,160 1,025 Nilai - ppn 0
12,755 11,275
12,760 11,280 Harga TIDAK Dibulatkan 17,948
Harga TIDAK Dibulatkan dalam 1 Ton 17,947,773

11,596 10,532 10,848


- - 5,000 0
5,900 4,000 4,000
150 - 0
800 600 600
3,400 2,500 2,500
- 1,000 0
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
11,596 10,250 17,948
1,160 1,025 Nilai - ppn 0
12,755 11,275
12,760 11,280 Harga TIDAK Dibulatkan 17,948
Harga TIDAK Dibulatkan dalam 1 Ton 17,947,773

11,596 10,532 10,848


- - 5,000 0
5,900 4,000 4,000
150 - 0
800 600 600
3,400 2,500 2,500
- 800 0
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
11,596 10,250 17,948
1,160 1,025 Nilai - ppn 0
12,755 11,275
12,760 11,280 Harga TIDAK Dibulatkan 17,948
Harga TIDAK Dibulatkan dalam 1 Ton 17,947,773

11,800 12,154
5,000 0
4,000 4,000
100 100
600 600
2,500 2,500
800 0
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
19,354
Nilai - ppn 0

Harga TIDAK Dibulatkan 19,354


Harga TIDAK Dibulatkan dalam 1 Ton 19,354,000

12,113 10,986 11,536


- 5,000 0
4,200 2,750 2,750
150 - 0
800 600 600
3,400 2,500 2,500
800 0
- - - - - - - - - - - - - - - - - -----------------------------------------------
12,913 7,750 17,386
1,291 775 Nilai - ppn 0
14,204 8,525
14,210 8,530 Harga TIDAK Dibulatkan 17,386
14,210,000 8,530,000 IDAK Dibulatkan dalam 1 Ton 17,385,682

13,323 1.050.00 12,085 12,689


- 5,000 0
4,200 2,750 2,750
150 - 0
800 600 600
3,400 2,500 2,500
800 0
- - - - - - - - - - - - - - - - - -----------------------------------------------
14,123 7,750 18,539
1,412 775 Nilai - ppn 0
15,536 8,525
15,540 8,530 Harga TIDAK Dibulatkan 18,539
15,540,000 8,530,000 IDAK Dibulatkan dalam 1 Ton 18,539,250
13,323 1.050.00 12,085 12,689
- 5,000 0
4,200 2,750 2,750
150 - 0
800 600 600
3,400 2,500 2,500
800 0
- - - - - - - - - - - - - - - - - -----------------------------------------------
14,123 7,750 18,539
1,412 775 Nilai - ppn 0
15,536 8,525
15,540 8,530 Harga TIDAK Dibulatkan 18,539
15,540,000 8,530,000 IDAK Dibulatkan dalam 1 Ton 18,539,250

13,323 1.050.00 12,085 12,689


- 5,000 0
4,200 2,750 2,750
150 - 0
800 600 600
3,400 2,500 2,500
800 0
- - - - - - - - - - - - - - - - - -----------------------------------------------
14,123 7,750 18,539
1,412 775 Nilai - ppn 0
15,536 8,525
15,540 8,530 Harga TIDAK Dibulatkan 18,539
15,540,000 8,530,000 IDAK Dibulatkan dalam 1 Ton 18,539,250

1,050 1,000 1,000

- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
1,050 - 1,000
105 - Nilai - ppn 0
1,155 -
1,160 - Harga TIDAK Dibulatkan 1,000

95,500 95,500
6,500 6,500
5,000 5,000
5,000 5,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
112,000
Nilai - ppn 0

Harga TIDAK Dibulatkan 112,000


7,600 7,980
5,000 0
1,500 1,500
800 800
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
10,280
Nilai - ppn 0

Harga TIDAK Dibulatkan 10,280


Harga TIDAK Dibulatkan 10,280

### 7,600 7,980


### 45,000 4,994
6,500 0
.442.48 1,500 1,575
600 600
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
15,149
Nilai - ppn 0

Harga TIDAK Dibulatkan 15,149


15,149

11,000 11,000
3,250 3,250
500 500
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
14,750
Nilai - ppn 0

Harga TIDAK Dibulatkan 14,750

11,000 11,000
3,250 3,250
500 500
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
14,750
Nilai - ppn 0

Harga TIDAK Dibulatkan 14,750

805,600 227,500 691,600


6,900 5,500 5,500
3,100 2,500 2,500
52,440 12,857 39,086
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
858,040 10,000 738,686
85,804 1,000 Nilai - ppn 0
943,844 11,000
943,850 11,000 Harga TIDAK Dibulatkan 738,686
70,789 825 Harga TIDAK Dibulatkan 55,401
5,309 550 Harga TIDAK Dibulatkan 36,934

685,000 19,028
350,000 11,667
430,000 7,963
25,000 25,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
63,657
Nilai - ppn 0

Harga TIDAK Dibulatkan 63,657

64,760 67,998
61,720 30,860
1,956 1,956
2,608 2,608
28,600 28,600
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
132,022
Nilai - ppn 0

Harga TIDAK Dibulatkan 132,022

70,000 73,500
2,608 2,608
25,000 25,000
- - - - - - - - - - - - - - - - - - - - - - -----------------------------------------------
101,108
Nilai - ppn 0

Harga TIDAK Dibulatkan 101,108


69,000 4,140
95,000 950
420,000 4,200
929 929

130,000 1,806
1,963,636 2,749
34,100 12,503
2,000 4,000
2,820 2,820
19,000 19,000
- - - - - - - - - - - - -
53,097
- -

Harga TIDAK Dibulatkan 53,097

455,000 47,320
40,000 3,496
53,097 41,416
11,200 -
514 1,798
396,441 41,230
2,000 2,000
27,000 27,000
- - - - - - - - - - - - -
164,259

Harga TIDAK Dibulatkan 164,259

455,000 47,775
40,000 3,496
53,097 41,416
11,200 8,736
53,097 18,584
514 1,798
396,441 41,626
8,000 8,000
45,000 45,000
- - - - - - - - - - - - -
216,431
- -

Harga TIDAK Dibulatkan 216,431

22,000 12,941
514 12,101
1,000 1,000
25,000 25,000
- - - - - - - - - - - - -
51,042
- -

Harga TIDAK Dibulatkan 51,042

40,000 2,692
514 1,385
1,000 1,000
7,500 -
18,000 18,000
- - - - - - - - - - - - -
23,077
- -

Harga TIDAK Dibulatkan 23,077

22,000 19,412
514 18,151
1,000 1,000
7,500 4,500
30,000 30,000
- - - - - - - - - - - - -
73,063
- -
Harga TIDAK Dibulatkan 73,063

40,000 2,692
514 1,385
1,000 67
7,500 5,850
20,000 20,000
- - - - - - - - - - - - -
29,994
- -

Harga TIDAK Dibulatkan 29,994

85,000 90,525
33,750 8,859
22,000 9,244
6,300 1,980
69,000 -
95,000 -
21,315 22,700
514 12,180
2,500 2,500
1,000 1,000
48,000 48,000
- - - - - - - - - - - - -
196,989
Nilai - ppn -

Harga TIDAK Dibulatkan 196,989

129,000 137,385
33,750 8,859
22,000 9,244
6,300 1,980
69,000 -
95,000 -
21,315 22,700
514 12,180
2,500 2,500
1,000 1,000
40,000 40,000
- - - - - - - - - - - - -
235,849
Nilai - ppn -

Harga TIDAK Dibulatkan 235,849

84,350 89,833
33,750 8,859
22,000 9,244
6,300 1,980
69,000 -
95,000 -
21,315 22,700
514 12,180
2,500 2,500
1,000 1,000
38,000 38,000
- - - - - - - - - - - - -
186,296
Nilai - ppn -

Harga TIDAK Dibulatkan 186,296

164,259 80,519
51,042 25,021
307,708 150,837
- - - - - - - - - - - - -
256,377
Nilai - ppn -

Harga TIDAK Dibulatkan 256,377

116,000 123,540
33,750 8,859
22,000 -
6,300 1,980
69,000 30,360
95,000 5,225
21,315 22,700
514 3,537
2,500 2,500
1,000 1,000
18,000 18,000
38,000 38,000
- - - - - - - - - - - - -
255,701
Nilai - ppn -

Harga TIDAK Dibulatkan 255,701

143,993 153,353
33,750 10,607
22,000 -
6,300 1,980
69,000 30,360
95,000 5,225
21,315 22,700
514 4,202
2,500 2,500
1,000 1,000
48,000 48,000
- - - - - - - - - - - - -
279,928
Nilai - ppn -

Harga TIDAK Dibulatkan 279,928

80,150 85,360
33,750 8,859
22,000 -
6,300 1,980
69,000 30,360
95,000 5,225
21,315 22,700
514 3,537
2,500 2,500
1,000 1,000
18,000 18,000
35,000 35,000
- - - - - - - - - - - - -
214,521
Nilai - ppn -

Harga TIDAK Dibulatkan 214,521


116,000 12,412
33,750 1,114
22,000 1,333
6,300 174
69,000 -
95,000 -
21,315 2,132
514 1,996
2,500 250
1,000 100
7,500 7,500
10,500 10,500
25,000 25,000
- - - - - - - - - - - - -
62,510
Nilai - ppn -

Harga TIDAK Dibulatkan 62,510

80,150 8,576
33,750 1,114
22,000 1,333
6,300 174
69,000 -
95,000 -
21,315 2,132
514 1,996
2,500 250
1,000 100
7,500 7,500
10,500 10,500
25,000 25,000
- - - - - - - - - - - - -
58,674
Nilai - ppn -

Harga TIDAK Dibulatkan 58,674

33,500 3,585
22,000 726
6,300 382
69,000 1,907
95,000 -
21,315 -
514 51
2,500 9,704
1,000 100
7,500 750
7,500 7,500
10,500 10,500

- - - - - - - - - - - - -
35,204
Nilai - ppn -

Harga TIDAK Dibulatkan 35,204

153,000 162,945
33,750 8,859
22,000 -
6,300 1,980
69,000 30,360
95,000 5,225
21,315 22,700
514 3,537
2,500 2,500
1,000 1,000
18,000 18,000
38,000 38,000
- - - - - - - - - - - - -
295,106
Nilai - ppn -

Harga TIDAK Dibulatkan 295,106

116,000 124,120
13,000 32,500
3,500 8,750
33,750 8,859
22,000 -
6,300 1,980
69,000 30,360
95,000 5,225
21,315 53,288
514 3,537
2,500 2,500
1,000 1,000
18,000 18,000
50,000 50,000
- - - - - - - - - - - - -
340,119
Nilai - ppn -

Harga TIDAK Dibulatkan 340,119


383,127

157,000 157,000
1,187,500 1,187,500
134,309 134,309
- - - - - - - - - - - - -
Harga per m2 1,478,809

Harga Tidak dibulatkan 1,478,809

157,000 157,000
2,318,000 2,318,000
134,309 134,309
- - - - - - - - - - - - -
Harga per m2 2,609,309

Harga Tidak dibulatkan 2,609,309

545,000 545,000
128,591 -
185,000 185,000
92,933 92,933
- - - - - - - - - - - - -
Harga per m2 822,933

Harga Tidak dibulatkan 822,933

545,000 545,000
128,591 -
261,987 -
175,000 175,000
92,933 92,933
- - - - - - - - - - - - -
Harga per m2 812,933

Harga Tidak dibulatkan 812,933

535,000 535,000
1,250,000 1,250,000
134,309 -
128,591 -
218,293 -
164,259 71,764
74,119 32,382
28,000 12,233
175,000 175,000
92,933 92,933
- - - - - - - - - - - - -
Harga per m2 2,169,312

Harga Tidak dibulatkan 2,169,312

545,000 545,000
128,591 128,591
185,000 185,000
92,933 92,933
1,375,000 1,375,000
261,597 261,597
- - - - - - - - - - - - -
Harga per m2 2,588,121

Harga Tidak dibulatkan 2,588,121

45,000 45,000
69,000 30,360
95,000 5,225
1,500 1,500
18,000 18,000

- - - - - - - - - - - - -
Harga per m2 100,085

Harga Tidak dibulatkan 100,085

35,000 36,050
15,000 15,000
7,500 7,500
- - - - - - - - - - - - -
Harga per m2 58,550

Harga Tidak dibulatkan 58,550

55,000 56,650
15,000 15,000
7,500 7,500
- - - - - - - - - - - - -
Harga per m2 79,150

Harga Tidak dibulatkan 79,150

100,000 100,000

- - - - - - - - - - - - -
Harga per m2 100,000

Harga Tidak dibulatkan 100,000

69,000 33,810
95,000 6,650
180,000 15,873
1,500 1,500
30,000 30,000
- - - - - - - - - - - - -
Harga per m2 87,833
Harga Tidak dibulatkan 87,833

2,500 2,500
3,000 3,000
7,500 7,500
- - - - - - - - - - - - -
Harga per m2 13,000

Harga Tidak dibulatkan 13,000

69,000 33,810
95,000 6,650
1,500 1,500
27,000 27,000
- - - - - - - - - - - - -
Harga per m2 68,960

Harga Tidak dibulatkan 68,960

225,000 225,000
45,000 45,000
- -
40,000 40,000
51,831 51,831
- -
- -
- - - - - - - - - - - - -
Harga per m2 361,831

Harga Tidak dibulatkan 361,831

225,000 225,000
45,000 45,000
110,000 110,000
40,000 40,000
51,831 51,831
24,000 52,800
20,000 20,000
- - - - - - - - - - - - -
Harga per m2 544,631

Harga Tidak dibulatkan 544,631

252,000 252,000
45,000 45,000
110,000 110,000
40,000 40,000
51,831 51,831
24,000 52,800
20,000 20,000
- - - - - - - - - - - - -
Harga per m2 571,631

Harga Tidak dibulatkan 571,631

430,435 430,435
45,000 45,000
110,000 110,000
40,000 40,000
51,831 51,831
24,000 52,800
20,000 20,000
- - - - - - - - - - - - -
Harga per m2 750,066

Harga Tidak dibulatkan 750,066

252,000 252,000
45,000 45,000
- -
40,000 40,000
51,831 51,831
- -
- -
- - - - - - - - - - - - -
Harga per m2 388,831
Harga Tidak dibulatkan 388,831

included -
95,000 23,471
35,000 35,000
35,000 35,000
60,000 9,000
30,000 30,000
- - - - - - - - - - - - -
Harga per m1 132,471

Harga Tidak dibulatkan 132,471

48,000 3,938
514 1,688
1,000 1,000
16,000 16,000
2,000 2,000

- - - - - - - - - - - - -
Harga per m2 24,625

Harga Tidak dibulatkan 24,625

890,000 133,500
10,326 154,890
166,461 149,815
100,000 150,000
186,296 279,445

- - - - - - - - - - - - -
Harga per m2 867,649

Harga Tidak dibulatkan 867,649

890,000 64,080
10,326 74,347
166,461 95,881
100,000 120,000
186,296 134,133

- - - - - - - - - - - - -
Harga per m2 488,442

Harga Tidak dibulatkan 488,442

664,000 1,992,000
185,000 1,665,000
365,700 365,700
109,710 109,710
1,000 389,490
2,200 856,878
3,000,000 3,000,000
5,500 2,142,195

- - - - - - - - - - - - -
Harga per m2 10,520,973

Harga Tidak dibulatkan 10,520,973

2,040,000 2,040,000
2,040,000 51,000
238,095 238,095
10,000 10,000
25,000 25,000
175,000 175,000
- - - - - - - - - - - - -
2,539,095
Nilai-ppn -

Harga TIDAK Dibulatkan 2,539,095

574,800 574,800
574,800 17,244
Inluded -
2,000 2,000
7,500 7,500
15,000 15,000
- - - - - - - - - - - - -
616,544
Nilai-ppn -

Harga TIDAK Dibulatkan 616,544

1,503,000 1,503,000
1,503,000 37,575
238,095 238,095
5,000 5,000
20,000 20,000
150,000 150,000
- - - - - - - - - - - - -
1,953,670
-

Harga TIDAK Dibulatkan 1,953,670

562,200 562,200
562,200 16,866
- -
2,000 2,000
7,500 7,500
20,000 20,000
- - - - - - - - - - - - -
608,566
-

Harga TIDAK Dibulatkan 608,566

239,400 239,400
239,400 7,182
- -
2,000 2,000
25,000 25,000
40,000 40,000
- - - - - - - - - - - - -
313,582
-
Harga TIDAK Dibulatkan 313,582

130,800 130,800
130,800 3,924
- -
2,000 2,000
25,000 25,000
15,000 15,000
- - - - - - - - - - - - -
176,724
-

Harga TIDAK Dibulatkan 176,724

3,102,000 3,102,000
3,102,000 77,550
238,095 238,095
5,000 5,000
20,000 20,000
150,000 150,000
- - - - - - - - - - - - -
3,592,645
-

Harga TIDAK Dibulatkan 3,592,645

300,600 300,600
300,600 9,018
- -
2,000 2,000
7,500 7,500
20,000 20,000
- - - - - - - - - - - - -
339,118
-

Harga TIDAK Dibulatkan 339,118

336,000 336,000
336,000 8,400
10,000 10,000
2,000 2,000
7,500 7,500
20,000 20,000
- - - - - - - - - - - - -
383,900
-

Harga TIDAK Dibulatkan 383,900

562,200 562,200
562,200 16,866
- -
2,000 2,000
7,500 7,500
20,000 20,000
- - - - - - - - - - - - -
608,566
-

Harga TIDAK Dibulatkan 608,566

1,147,000 1,147,000
1,147,000 28,675
10,000 10,000
5,000 5,000
25,000 25,000
175,000 175,000
- - - - - - - - - - - - -
1,390,675
-

Harga TIDAK Dibulatkan 1,390,675

260,000 260,000
260,000 7,800
- -
2,000 2,000
25,000 25,000
40,000 40,000
- - - - - - - - - - - - -
334,800
-

Harga TIDAK Dibulatkan 334,800


110,000 115,500
198,000 13,860
33,333 33,333
26,000 26,000
65,000 65,000
- - - - - - - - - - - - -
253,693
-

Harga TIDAK Dibulatkan 253,693

70,000 73,500
16,667 16,667
9,400 9,400
40,000 40,000
- - - - - - - - - - - - -
139,567
-

Harga TIDAK Dibulatkan 139,567

3,300,000 3,300,000
3,300,000 82,500
10,000 10,000
5,000 5,000
25,000 25,000
175,000 175,000
- - - - - - - - - - - - -
3,597,500
-

Harga TIDAK Dibulatkan 3,597,500

1,210,000 1,210,000
1,210,000 30,250
10,000 10,000
5,000 5,000
25,000 25,000
175,000 175,000
- - - - - - - - - - - - -
1,455,250
-

Harga TIDAK Dibulatkan 1,455,250


ber Bajasakti

ber Bajasakti
ber Bajasakti

er Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
ber Bajasakti
er Bajasakti
er Bajasakti
er Bajasakti
40,946,479 58,495
lt bs-lt10 lt 11-15 lt 16-20
2,000 2,500 3,000
37,000 42,000 47,000
50,000 55,000 60,000
75,000 80,000 85,000
125,000 130,000 135,000

8,500 10,500 12,500


150 150 150
850 865 880

45,000 50,000 55,000


45,000 50,000 55,000

45,000 50,000 55,000


40,000 45,000 50,000
55,000 60,000 65,000
55,000 60,000 65,000
25,000 30,000 35,000
25,000 25,000 25,000

27,000 32,000 37,000


35,000 40,000 45,000
40,000 45,000 50,000
2,000 3,000 4,000
2,500 3,500 4,500
1,500 2,500 3,500
1,500 2,500 3,500
25,000 26,000 27,000
20,000 22,000 24,000
16,000 17,000 18,000
25,000 30,000 35,000
17,000 20,000 23,000

7,500 8,500 9,500

19,000 24,000 29,000

12,500 17,500 22,500


2,000 3,000 4,000
2,500 3,500 4,500
1,000 2,000 3,000
60,000 65,000 70,000
20,000 25,000 30,000
40,000 45,000 50,000
30,000 35,000 40,000
35,000 40,000 45,000
50,000 55,000 60,000
48,000 53,000 58,000
35,000 40,000 45,000
38,000 43,000 48,000
55,000 60,000 65,000
50,000 55,000 60,000
75,000 80,000 85,000
15,000 20,000 25,000
35,000 40,000 45,000
15,000 20,000 25,000
100,000 105,000 110,000
150,000 155,000 160,000
20,000 25,000 30,000
25,000 30,000 35,000
10,500 15,500 20,500
25,000 30,000 35,000
10,000 15,000 20,000
68,000 73,000 78,000
75,000 80,000 85,000
168,154,082

3,868,000 58,020,000
2,418,000 43,524,000
6,286,000 101,544,000 39
6,000,000 49
13,950,000 13
121,494,000 36
42,000,000 315
163,494,000 452

24 juli 2020
24 juli 2020
28 april 2020
29 april 2020
30 april 2020

30 april 2020

30 april 2020
INTERNUSA
INTERNUSA
INTERNUSA
INTERNUSA
INTERNUSA
INTERNUSA
20,000 20,000
192,029 108,696
21,739 2,899
0 2,174
233,768 486,237,681 133,768

387,000 387,000
0
90,000 160,000
5,625 11,250
10,000 20,000
492,625 1,024,660,000 578,250

1,510,897,681

1,209,000 41,690
2,009,000 69,276
1,884,000 64,966
1,500,000 51,724

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

21,375 737

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------
6,864 Perekat Bata Ringan @40kg
daya sebar
Pemakaian 1 m2
Mortar Plester 40kg/sak
daya sebar Plester
Pemakaian 1 m2 ple

Mortar Acian 40kg/sak


daya sebar
Pemakaian 1 m2
Tile Adhesive Dinding @25kg/sak
daya sebar Plester
Pemakaian 1 m2 ple

Tile Adhesive Dinding @25kg/sak


daya sebar Plester
Pemakaian 1 m2 ple
153
56 20,494,832

7,505,168

700,000 69 178
200,003 82 90
150,002 96 268
444,461 247.5 20.64

1,494,466

585,000
120,510 268

175,000
92,933

973,442

153
56

3,846,518
Pemakaian 1 m2

Mortar Screed 50kg/sak


299,215
-
105,261 Pemakaian 1 m2
83,603
51,831
52,800
20,000

Mortar Screed 50kg/sak


299,215
-
105,261 Pemakaian 1 m2
83,603
51,831
52,800
20,000

Pemakaian 1 m2

Mortar Screed 50kg/sak

Pemakaian 1 m2
Skimcoat 40kg/sak
daya sebar Plester
Pemakaian 1 m2 ple
Holcim Merak motiv

780,000 615,000 655,000


citra seraya ongkir

66,000 3,750
66,000 3,750

pandu
20,000 -

SB CELKON
570,000 575,000
uzin MU
56,000 31,000
32,000 56,000
44,800 45,000
67,500 52,000
70,000 60,000
135,000 60,000
4,200 4,583
12,000
71,500

166,000

TOGO MESH

12,182

10,745
11,009
11,100
11,100
9,782
Cisangkan Hollywood MasterBlock

97,500
lt 21-25 lt 26-30 lt 20-35
3,500 4,000 4,500
57,000 67,000 77,000
70,000 80,000 90,000
95,000 105,000 115,000
145,000 155,000 165,000

17,500 22,500 27,500


150 150 150
905 930 955

65,000 75,000 85,000


65,000 75,000 85,000

65,000 75,000 85,000


60,000 70,000 80,000
75,000 85,000 95,000
75,000 85,000 95,000
45,000 55,000 65,000
25,000 25,000 25,000

47,000 57,000 67,000


55,000 65,000 75,000
60,000 70,000 80,000
6,000 8,000 10,000
6,500 8,500 10,500
5,500 7,500 9,500
5,500 7,500 9,500
29,000 31,000 33,000
28,000 32,000 36,000
20,000 22,000 24,000
45,000 55,000 70,000
28,000 33,000 38,000

11,500 13,500 15,500

39,000 49,000 59,000

32,500 42,500 57,500


6,000 8,000 10,000
6,500 8,500 10,500
5,000 7,000 9,000
80,000 90,000 100,000
40,000 50,000 60,000
60,000 70,000 80,000
50,000 60,000 70,000
55,000 65,000 75,000
70,000 80,000 90,000
68,000 78,000 88,000
55,000 65,000 75,000
58,000 68,000 78,000
75,000 85,000 95,000
70,000 80,000 90,000
95,000 105,000 115,000
35,000 45,000 55,000
55,000 65,000 75,000
35,000 45,000 55,000
120,000 130,000 140,000
170,000 180,000 190,000
40,000 50,000 60,000
45,000 55,000 65,000
30,500 40,500 50,500
45,000 55,000 65,000
30,000 40,000 50,000
88,000 98,000 108,000
95,000 105,000 115,000
PT. Berlian Djaya Konstruksi PT. Putra Saluyu
145,000 165,160
145,000 165,160
145,000 165,160
145,000 165,160
145,000 165,160

catur Rekaguna pakubumi pusaka abadi


35,000,000 60,000,000 137,000,000 110,000,000
320,000 265,000 339,250 307,000
185,000 160,000 193,775 182,000
320,000 270,000 339,250 307,000
320,000 270,000 339,250 307,000
- 12,000
- 10,000
- 5,000
- 5,000
75,000 65,000 90,000 95,000
75,000 45,000 80,000 60,000
75,000 40,000 80,000 60,000
75,000 40,000 80,000 60,000
100,000 170,000 100,000 85,000
75,000 100,000 80,000 50,000
100,000 170,000 220,000 110,000
200,000 85,000
600,000 590,000 140,000 775,000
250,000 275,000 80,000 425,000
75,000 225,000 80,000 60,000
75,000 225,000 80,000 60,000

15,000,000 12,500,000

80,000,000 250,000,000 55,000,000


80,000,000
8,000,000 20,000,000 8,000,000 8,500,000
0 8,812,320 224,804 Land streaping
0 11,015,400 224,804 bongkaran pagar batako
0 2,810,051 224,804
0 8,092,947 224,804
1 70,813,283 224,804
1 101,544,000 224,804
Fenindo Fenindo
1,200,000
1,200,000

3,500,000
190,000
1,000,000
320,000
350,000
1,100,000
-
1,500,000
1,350,000 800,000
1,040,000 700,000
2,290,000 2,000,000
1,550,000 2,000,000
8,940,000 10,000,000
83,500,000
535,000
963,000
2,091,850
2,407,500
2,691,050
3,472,150
4,199,750
MATRIKS SODIK

1,140,116 1,350,000

1,140,116 1,350,000
1,140,116 1,350,000

BINTARA DIKA BUMAN

955,000 600,000
955,000 600,000
2,432,250 1,650,000
2,115,000 1,450,000

849,100 839,100 1,000,000


760,000 750,000
760,000 750,000
849,100 839,100
760,000 750,000
849,100 849,100
804,550 794,550
804,550 794,550
804,550 794,550
804,550 794,550

600,000
350,000
150,000
SMNS KRISOON
715,000
1,050,000
625,000 533,040
550,000 544,393
550,000 544,393
551,617
278,237,681
1,202,760,000

1,480,997,681
15,000
40 kg 14.0
11.90 m2/zak
0.084 zak/m2 tebal 3 mm
50 kg 2.10
1.79 m2/zak
0.560 zak/m2 tebal 10 mm
0.840 zak/m2 tebal 15 mm
1.120 zak/m2 tebal 20 mm
0.420 zak/m2 tebal 5 mm

40 kg 13.0
10.40 m2/zak
0.096 zak/m2 tebal 3 mm
0.064 zak/m2 tebal 2 mm
0.032 zak/m2 tebal 1 mm
25 kg
4 m2/zak
0.250 zak/m2 tebal 3 mm

25 kg
4 m2/zak
0.250 zak/m2 tebal 3 mm
0.800 zak/m2 tebal 20 mm
1.200 zak/m2 tebal 30 mm
2.000 zak/m2 tebal 50 mm

50 kg

0.800 zak/m2 tebal 20 mm


1.200 zak/m2 tebal 30 mm
2.000 zak/m2 tebal 50 mm
50 kg

0.800 zak/m2 tebal 20 mm


1.200 zak/m2 tebal 30 mm
2.000 zak/m2 tebal 50 mm

0.800 zak/m2 tebal 20 mm


1.200 zak/m2 tebal 30 mm
2.000 zak/m2 tebal 50 mm

50 kg

0.800 zak/m2 tebal 20 mm


1.200 zak/m2 tebal 30 mm
2.000 zak/m2 tebal 50 mm
40 kg 16.000
12.80 m2/zak
0.078 zak/m2 tebal 1.5 mm
0.130 zak/m2 tebal 2.5 mm
Wika

270750
152000
115000
1.4019
aran pagar batako 1.7524
0.4470
1.2875
11.2652
16
ars M.B

Pasir beton Volume Koef Total


Dinding dalam bata ringan 116.21 0.01 1.16
HT uk. 60 x 60 cm Double Loading ex. 299.83 0.06 16.49
Lantai HT 60x60 cm Rustic Cementum - 0.06 -
Lantai HT 30x60 cm ex. Frontino (Grove - 0.06 -
Lantai CT 30x30 cm ex. Roman Gol B 33.40 0.06 1.84
Screed with wiremesh M4 - 0.07 -
Waterproofing coating ex. Fosroc + Sc - 0.06 -
Bekisting Batako - 0.03 -
Total 19
Pembulatan 19

Screed Lantai @40kg/sak ex. Broco Volume Koef Total


Lantai vinyl Somplan 360 ex. Tarkett - 2.20 -
Lantai vinyl IQ Toro SC ex. Tarkett - 2.20 -

Total -
Pembulatan -

Semen Volume Koef Total


Dinding dalam bata ringan 116.21 0.06 6.97
HT uk. 60 x 60 cm Double Loading ex. 299.83 0.44 131.93
Lantai HT 60x60 cm Rustic Cementum - 0.44 -
Lantai HT 30x60 cm ex. Frontino (Grove - 0.44 -
Lantai CT 30x30 cm ex. Roman Gol B 33.40 0.44 14.70
Screed with wiremesh M4 - 0.49 -
Waterproofing coating ex. Fosroc + Sc - 0.44 -
Bekisting Batako - 0.21 -
Total 154
Pembulatan 154

Plester Bata Ringan @40kg/sak ex. Broco Volume Koef Total


Plester + Aci dinding dalam 144.08 0.59 84.75
Plester + Aci dinding luar - 0.88 -
Plesteran dinding dalam 62.27 0.59 36.63
Dinding CT 30x60 cm ex. Roman 73.32 0.42 30.81
Dinding Jamb Lift HT 30x60 cm ex. Fro - 0.49 -
Dinding HT luar 60x60 Granite texture - 0.42 -
Dinding CT 30x30 cm ex. Roman 83.96 0.42 35.28
Skirting HT 10x60 cm polish ex. Fronti 108.65 0.06 6.58
Skirting CT 10x30 cm ex. Roman - 0.06 -

Total 194
Pembulatan 194

Acian Plester @40kg/sak ex. Broco Volume Koef Total


Plester + Aci dinding dalam 144.08 0.07 9.70
Plester + Aci dinding luar - 0.07 -

Total 10
Pembulatan 10

Skimcoat Beton @40kg/sak ex. Broco Volume Koef Total


Expose dak - 0.08 -

Total -
Pembulatan -

Tile Adhesive @25kg/sak ex. Broco Volume Koef Total


HT uk. 60 x 60 cm Double Loading ex. 299.83 0.26 78.71
Lantai HT 60x60 cm Rustic Cementum - 0.26 -
Lantai HT 30x60 cm ex. Frontino (Grove - 0.26 -
Lantai CT 30x30 cm ex. Roman Gol B 33.40 0.26 8.77
Dinding CT 30x60 cm ex. Roman 73.32 0.26 19.25
Dinding Jamb Lift HT 30x60 cm ex. Fro - 0.26 -
Dinding HT luar 60x60 Granite texture - 0.26 -
Dinding CT 30x30 cm ex. Roman 83.96 0.26 22.04
Skirting HT 10x60 cm polish ex. Fronti 108.65 0.03 3.59
Skirting CT 10x30 cm ex. Roman - 0.03 -

Total 132.34
Pembulatan 132.00

Tile Grout@1kg/sak ex. Broco Volume Koef Total


HT uk. 60 x 60 cm Double Loading ex. 299.83 0.31 94.23
Lantai HT 60x60 cm Rustic Cementum - 0.31 -
Lantai HT 30x60 cm ex. Frontino (Grove - 0.31 -
Lantai CT 30x30 cm ex. Roman Gol B 33.40 0.31 10.50
Dinding CT 30x60 cm ex. Roman 73.32 0.31 23.04
Dinding Jamb Lift HT 30x60 cm ex. Fro - 0.31 -
Dinding HT luar 60x60 Granite texture - 0.31 -
Dinding CT 30x30 cm ex. Roman 83.96 0.31 26.39
Skirting HT 10x60 cm polish ex. Fronti 108.65 0.028 3.00
Skirting CT 10x30 cm ex. Roman - 0.028 -

Total 157.16
Pembulatan 157.00
str FACILITY BUILDING

Pasir beton
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako

Koef. Semen Koef. Pasir Screed Lantai @40kg/sak ex. Broco


0.49 0 0.07 0 Lantai vinyl Somplan 360 ex. Ta
0.49 0 0.07 0 Lantai vinyl IQ Toro SC ex. Tark

Total - Total -
Pembulatan - Pembulatan -

Semen
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako

Plester Bata Ringan @40kg/sak ex. Broco


Plester + Aci dinding dalam
Plester + Aci dinding luar
Plesteran dinding dalam
Dinding CT 30x60 cm ex. Roma
Dinding Jamb Lift HT 30x60 cm
Dinding HT luar 60x60 Granite t
Dinding CT 30x30 cm ex. Roma
Skirting HT 10x60 cm polish ex.
Skirting CT 10x30 cm ex. Roma
Plywood 15 mm
Bekisting Kolom & dinding

Plywood 12 mm
Bekisting Balok & Plat
Bekisting Tangga

Kayu 5/7cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Kayu 6/12cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Plastic Concrete spacer


Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Kawat beton
Pembesian

Paku
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Glasswool 24kg/m2 1.2mx30m
Insulation

Roofmesh 2214 uk 1.8mx30m


Insulation

Alumunium Foil uk 1.2mx50m


Insulation

Mould oil
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Batako Trass 36x17x8cm


Bekisting Batako

Material Bantu Perbaikan beton


Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

str UTILITY BUILDING

Pasir beton
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako

Screed Lantai @40kg/sak ex. Broco


Lantai vinyl Somplan 360 ex. Ta
Lantai vinyl IQ Toro SC ex. Tark

Semen
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako

Plester Bata Ringan @40kg/sak ex. Broco


Plester + Aci dinding dalam
Plester + Aci dinding luar
Plesteran dinding dalam
Dinding CT 30x60 cm ex. Roma
Dinding Jamb Lift HT 30x60 cm
Dinding HT luar 60x60 Granite t
Dinding CT 30x30 cm ex. Roma
Skirting HT 10x60 cm polish ex.
Skirting CT 10x30 cm ex. Roma

Plywood 15 mm
Bekisting Kolom & dinding
Plywood 12 mm
Bekisting Balok & Plat
Bekisting Tangga

Kayu 5/7cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Kayu 6/12cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Plastic Concrete spacer


Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Kawat beton
Pembesian

Paku
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Glasswool 24kg/m2 1.2mx30m


Insulation
Roofmesh 2214 uk 1.8mx30m
Insulation

Alumunium Foil uk 1.2mx50m


Insulation

Mould oil
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Batako Trass 36x17x8cm


Bekisting Batako

Material Bantu Perbaikan beton


Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

str GWT,STP,WASTE, CONTAINER

Pasir beton
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako
Screed Lantai @40kg/sak ex. Broco
Lantai vinyl Somplan 360 ex. Ta
Lantai vinyl IQ Toro SC ex. Tark

Semen
Dinding dalam bata ringan
HT uk. 60 x 60 cm Double Loadi
Lantai HT 60x60 cm Rustic Ce
Lantai HT 30x60 cm ex. Frontino
Lantai CT 30x30 cm ex. Roman
Screed with wiremesh M4
Waterproofing coating ex. Fosr
Bekisting Batako

Plester Bata Ringan @40kg/sak ex. Broco


Plester + Aci dinding dalam
Plester + Aci dinding luar
Plesteran dinding dalam
Dinding CT 30x60 cm ex. Roma
Dinding Jamb Lift HT 30x60 cm
Dinding HT luar 60x60 Granite t
Dinding CT 30x30 cm ex. Roma
Skirting HT 10x60 cm polish ex.
Skirting CT 10x30 cm ex. Roma

Plywood 15 mm
Bekisting Kolom & dinding

Plywood 12 mm
Bekisting Balok & Plat
Bekisting Tangga
Kayu 5/7cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Kayu 6/12cm
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Plastic Concrete spacer


Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Kawat beton
Pembesian

Paku
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Glasswool 24kg/m2 1.2mx30m


Insulation

Roofmesh 2214 uk 1.8mx30m


Insulation

Alumunium Foil uk 1.2mx50m


Insulation

Mould oil
Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga

Batako Trass 36x17x8cm


Bekisting Batako

Material Bantu Perbaikan beton


Bekisting Kolom & dinding
Bekisting Balok & Plat
Bekisting Tangga
Volume Koef Total
- 0.01 -
- 0.06 -
- 0.06 -
- 0.06 -
- 0.06 -
- 0.07 -
- 0.06 -
448.08 0.03 13.44
Total 13
Pembulatan 13

Volume Koef Total Koef. Semen Koef. Pasir


- 2.20 - 0.49 0 0.07 0
- 2.20 - 0.49 0 0.07 0

Total - Total - Total -


Pembulatan - Pembulatan - Pembulatan -

Volume Koef Total


- 0.06 -
- 0.44 -
- 0.44 -
- 0.44 -
- 0.44 -
- 0.49 -
- 0.44 -
448.08 0.21 94.10
Total 94
Pembulatan 94

Volume Koef Total


- 0.59 -
- 0.88 -
- 0.59 -
- 0.42 -
- 0.49 -
- 0.42 -
- 0.42 -
- 0.06 -
- 0.06 -

Total -
Pembulatan -

Volume Koef Total


640.01 0.13 86.00

Total 86.00
Pembulatan 86.00

Volume Koef Total


1,897.02 0.22 424.85
83.86 0.11 9.39
Total 434.24
Pembulatan 434.00

Volume Koef Total


640.01 0.01 5.38
1,897.02 0.01 15.18
83.86 0.01 0.84
Total 21.39
Pembulatan 21.00

Volume Koef Total


640.01 - -
1,897.02 0.01 15.18
83.86 0.01 0.75
Total 15.93
Pembulatan 16.00

Volume Koef Total


640.01 2.00 1,280.02
1,897.02 1.00 1,897.02
83.86 1.00 83.86
Total 3,260.90
Pembulatan 3,261.00

Volume Koef Total


73,084.15 0.03 2,192.52
Total 2,192.52 kg
Total 109.63 Roll
Pembulatan 110.00

Volume Koef Total


640.01 0.25 160.00
1,897.02 0.01 15.18
83.86 0.25 20.97
Total 196.14
Pembulatan 196.00

Volume Koef Total


115.74 0.03 3.22
Total 3.22 Roll
Pembulatan 3.00

Volume Koef Total


115.74 0.02 2.14
Total 2.14 Roll
Pembulatan 2.00

Volume Koef Total


115.74 0.03 3.86
Total 3.86 Roll
Pembulatan 4.00

Volume Koef Total


640.01 0.03 16.00
1,897.02 0.02 41.73
83.86 0.02 1.84
Total 59.58
Pembulatan 60.00

Volume Koef Total


448.08 17.16 7,687.65 12,524.51
Total 7,687.65
Pembulatan 7,688.00

Volume Koef Total


640.01 0.50 320
1,897.02 0.50 949
83.86 0.50 42
Total 1,310
Total 52
Pembulatan 52

Volume Koef Total


- 0.01 -
- 0.06 -
- 0.06 -
- 0.06 -
- 0.06 -
- 0.07 -
- 0.06 -
241.98 0.03 7.26
Total 7
Pembulatan 7

Volume Koef Total Koef. Semen Koef. Pasir


- 2.20 - 0.49 0 0.07 0
- 2.20 - 0.49 0 0.07 0

Total - Total - Total -


Pembulatan - Pembulatan - Pembulatan -

Volume Koef Total


- 0.06 -
- 0.44 -
- 0.44 -
- 0.44 -
- 0.44 -
- 0.49 -
- 0.44 -
241.98 0.21 50.82
Total 51
Pembulatan 51

Volume Koef Total


- 0.59 -
- 0.88 -
- 0.59 -
- 0.42 -
- 0.49 -
- 0.42 -
- 0.42 -
- 0.06 -
- 0.06 -

Total -
Pembulatan -

Volume Koef Total


40.95 0.13 5.50

Total 5.50
Pembulatan 6.00
Volume Koef Total
115.29 0.22 25.82
- 0.11 -
Total 25.82
Pembulatan 26.00

Volume Koef Total


40.95 0.01 0.34
115.29 0.01 0.92
- 0.01 -
Total 1.27
Pembulatan 1.00

Volume Koef Total


40.95 - -
115.29 0.01 0.92
- 0.01 -
Total 0.92
Pembulatan 1.00

Volume Koef Total


40.95 2.00 81.90
115.29 1.00 115.29
- 1.00 -
Total 197.19
Pembulatan 197.00

Volume Koef Total


13,394.30 0.03 401.83
Total 401.83 kg
Total 20.09 Roll
Pembulatan 20.00

Volume Koef Total


40.95 0.25 10.24
115.29 0.01 0.92
- 0.25 -
Total 11.16
Pembulatan 11.00

Volume Koef Total


311.01 0.03 8.64
Total 8.64 Roll
Pembulatan 9.00
Volume Koef Total
311.01 0.02 5.76
Total 5.76 Roll
Pembulatan 6.00

Volume Koef Total


311.01 0.03 10.37
Total 10.37 Roll
Pembulatan 10.00

Volume Koef Total


40.95 0.03 1.02
115.29 0.02 2.54
- 0.02 -
Total 3.56
Pembulatan 4.00

Volume Koef Total


241.98 17.16 4,151.62 12,524.51
Total 4,151.62
Pembulatan 4,152.00

Volume Koef Total


40.95 0.50 20
115.29 0.50 58
- 0.50 -
Total 78
Total 3
Pembulatan 3

Volume Koef Total


- 0.01 -
- 0.06 -
- 0.06 -
- 0.06 -
- 0.06 -
- 0.07 -
- 0.06 -
99.77 0.03 2.99
Total 3
Pembulatan 3
Volume Koef Total Koef. Semen Koef. Pasir
- 2.20 - 0.49 0 0.07 0
- 2.20 - 0.49 0 0.07 0

Total - Total - Total -


Pembulatan - Pembulatan - Pembulatan -

Volume Koef Total


- 0.06 -
- 0.44 -
- 0.44 -
- 0.44 -
- 0.44 -
- 0.49 -
- 0.44 -
99.77 0.21 20.95
Total 21
Pembulatan 21

Volume Koef Total


- 0.59 -
- 0.88 -
- 0.59 -
- 0.42 -
- 0.49 -
- 0.42 -
- 0.42 -
- 0.06 -
- 0.06 -

Total -
Pembulatan -

Volume Koef Total


120.38 0.13 16.18

Total 16.18
Pembulatan 16.00

Volume Koef Total


32.64 0.22 7.31
- 0.11 -
Total 7.31
Pembulatan 7.00
Volume Koef Total
120.38 0.01 1.01
32.64 0.01 0.26
- 0.01 -
Total 1.27
Pembulatan 1.00

Volume Koef Total


120.38 - -
32.64 0.01 0.26
- 0.01 -
Total 0.26
Pembulatan -

Volume Koef Total


120.38 2.00 240.76
32.64 1.00 32.64
- 1.00 -
Total 273.40
Pembulatan 273.00

Volume Koef Total


8,510.15 0.03 255.30
Total 255.30 kg
Total 12.77 Roll
Pembulatan 13.00

Volume Koef Total


120.38 0.25 30.10
32.64 0.01 0.26
- 0.25 -
Total 30.36
Pembulatan 30.00

Volume Koef Total


- 0.03 -
Total - Roll
Pembulatan -

Volume Koef Total


- 0.02 -
Total - Roll
Pembulatan -

Volume Koef Total


- 0.03 -
Total - Roll
Pembulatan -

Volume Koef Total


120.38 0.03 3.01
32.64 0.02 0.72
- 0.02 -
Total 3.73
Pembulatan 4.00

Volume Koef Total


99.77 17.16 1,711.74 12,524.51
Total 1,711.74
Pembulatan 1,712.00

Volume Koef Total


120.38 0.50 60
32.64 0.50 16
- 0.50 -
Total 77
Total 3
Pembulatan 3
ARS FACILITY BUILDING

Pasir beton Volume Koef Total


Dinding da 1,782.04 0.01 17.82
HT uk. 60 x 289.43 0.06 15.92
Lantai HT 116.07 0.06 6.38
Lantai HT 3 66.81 0.06 3.67
Lantai CT 47.10 0.06 2.59
Screed wit 181.33 0.07 12.69
Waterproofi 59.64 0.06 3.28
Bekisting - 0.03 -
Total 62
Pembulatan 62

Screed Lantai @40kg/ Volume Koef Total Koef. Semen Koef. Pasir
Lantai viny 396.00 2.20 871.20 0.49 194.04 0.07
Lantai viny 71.78 2.20 157.92 0.49 35.1722 0.07

Total 1,029.12 Total 229.21 Total


Pembulatan 1,029.00 Pembulatan 229.00 Pembulatan

Semen Volume Koef Total


Dinding da 1,782.04 0.06 106.92
HT uk. 60 x 289.43 0.44 127.35
Lantai HT 116.07 0.44 51.07
Lantai HT 3 66.81 0.44 29.40
Lantai CT 47.10 0.44 20.72
Screed wit 181.33 0.49 88.85
Waterproofi 59.64 0.44 26.24
Bekisting - 0.21 -
Total 451
Pembulatan 451

Plester Bata Ringan Volume Koef Total


Plester + A 2,162.66 0.59 1,272.15
Plester + A 1,025.12 0.88 904.52
Plesteran 425.81 0.59 250.48
Dinding CT 170.87 0.42 71.80
Dinding Jam 13.60 0.49 6.67
Dinding HT 46.14 0.42 19.39
Dinding CT - 0.42 -
Skirting HT 390.17 0.06 23.64
Skirting C - 0.06 -

Total 2,549
Pembulatan 2,549

Acian Plester @40kg/ Volume Koef Total


Plester + A 2,162.66 0.07 145.56
Plester + A 1,025.12 0.07 69.00

Total 215
Pembulatan 215

Skimcoat Beton @40k Volume Koef Total


Expose dak 203.73 0.08 16.71

Total 17
Pembulatan 17

Tile Adhesive @25kg/ Volume Koef Total


HT uk. 60 x 289.43 0.26 75.98
Lantai HT 116.07 0.26 30.47
Lantai HT 3 66.81 0.26 17.54
Lantai CT 47.10 0.26 12.36
Dinding CT 170.87 0.26 44.85
Dinding Jam 13.60 0.26 3.57
Dinding HT 46.14 0.26 12.11
Dinding CT - 0.26 -
Skirting HT 390.17 0.03 12.88
Skirting C - 0.03 -

Total 209.76
Pembulatan 210.00

Tile Grout@1kg/sak e Volume Koef Total


HT uk. 60 x 289.43 0.31 90.96
Lantai HT 116.07 0.31 36.48
Lantai HT 3 66.81 0.31 21.00
Lantai CT 47.10 0.31 14.80
Dinding CT 170.87 0.31 53.70
Dinding Jam 13.60 0.31 4.27
Dinding HT 46.14 0.31 14.50
Dinding CT - 0.31 -
Skirting HT 390.17 0.028 10.78
Skirting C - 0.028 -

Total 246.50
Pembulatan 247.00
UTILITY

Pasir beton Volume Koef Total


Dinding da 235.61 0.01 2.36
HT uk. 60 x - 0.06 -
Lantai HT - 0.06 -
Lantai HT 3 - 0.06 -
Lantai CT 80.08 0.06 4.40
Screed wit - 0.07 -
Waterproofi - 0.06 -
Bekisting - 0.03 -
Total 7
Pembulatan 7

Koef. Pasir Screed Lantai @40kg/ Volume Koef Total Koef. Semen Koef. Pasir
27.72 Lantai viny - 2.20 - 0.49 0
5.0246 Lantai viny - 2.20 - 0.49 0

32.74 Total - Total -


33.00 Pembulatan - Pembulatan - Pembulatan

Semen Volume Koef Total


Dinding da 235.61 0.06 14.14
HT uk. 60 x - 0.44 -
Lantai HT - 0.44 -
Lantai HT 3 - 0.44 -
Lantai CT 80.08 0.44 35.24
Screed wit - 0.49 -
Waterproofi - 0.44 -
Bekisting - 0.21 -
Total 49
Pembulatan 49

Plester Bata Ringan Volume Koef Total


Plester + A 444.52 0.59 261.48
Plester + A - 0.88 -
Plesteran 161.59 0.59 95.05
Dinding CT - 0.42 -
Dinding Jam - 0.49 -
Dinding HT - 0.42 -
Dinding CT 161.59 0.42 67.89
Skirting HT - 0.06 -
Skirting C 12.55 0.06 0.76

Total 425
Pembulatan 425

Acian Plester @40kg/ Volume Koef Total


Plester + A 444.52 0.07 29.92
Plester + A - 0.07 -

Total 30
Pembulatan 30

Skimcoat Beton @40k Volume Koef Total


Expose dak - 0.08 -

Total -
Pembulatan -

Tile Adhesive @25kg/ Volume Koef Total


HT uk. 60 x - 0.26 -
Lantai HT - 0.26 -
Lantai HT 3 - 0.26 -
Lantai CT 80.08 0.26 21.02
Dinding CT - 0.26 -
Dinding Jam - 0.26 -
Dinding HT - 0.26 -
Dinding CT 161.59 0.26 42.42
Skirting HT - 0.03 -
Skirting C 12.55 0.03 0.41

Total 63.85
Pembulatan 64.00

Tile Grout@1kg/sak e Volume Koef Total


HT uk. 60 x - 0.31 -
Lantai HT - 0.31 -
Lantai HT 3 - 0.31 -
Lantai CT 80.08 0.31 25.17
Dinding CT - 0.31 -
Dinding Jam - 0.31 -
Dinding HT - 0.31 -
Dinding CT 161.59 0.31 50.79
Skirting HT - 0.028 -
Skirting C 12.55 0.028 0.35

Total 76.30
Pembulatan 76.00
GWT

Pasir beton Volume Koef Total


Dinding da 20.48 0.01 0.20
HT uk. 60 x - 0.06 -
Lantai HT - 0.06 -
Lantai HT 3 - 0.06 -
Lantai CT - 0.06 -
Screed wit 21.59 0.07 1.51
Waterproofi 190.57 0.06 10.48
Bekisting - 0.03 -
Total 12
Pembulatan 12

Koef. Pasir Screed Lantai @40kg/ Volume Koef Total Koef. Semen
0.07 0 Lantai viny - 2.20 - 0.49 0
0.07 0 Lantai viny - 2.20 - 0.49 0

Total - Total - Total -


Pembulatan - Pembulatan - Pembulatan -

Semen Volume Koef Total


Dinding da 20.48 0.06 1.23
HT uk. 60 x - 0.44 -
Lantai HT - 0.44 -
Lantai HT 3 - 0.44 -
Lantai CT - 0.44 -
Screed wit 21.59 0.49 10.58
Waterproofi 190.57 0.44 83.85
Bekisting - 0.21 -
Total 96
Pembulatan 96

Plester Bata Ringan Volume Koef Total


Plester + A 52.52 0.59 30.89
Plester + A - 0.88 -
Plesteran - 0.59 -
Dinding CT - 0.42 -
Dinding Jam - 0.49 -
Dinding HT - 0.42 -
Dinding CT - 0.42 -
Skirting HT - 0.06 -
Skirting C - 0.06 -

Total 31
Pembulatan 31

Acian Plester @40kg/ Volume Koef Total


Plester + A 52.52 0.07 3.54
Plester + A - 0.07 -

Total 4
Pembulatan 4

Skimcoat Beton @40k Volume Koef Total


Expose dak 208.75 0.08 17.12

Total 17
Pembulatan 17

Tile Adhesive @25kg/ Volume Koef Total


HT uk. 60 x - 0.26 -
Lantai HT - 0.26 -
Lantai HT 3 - 0.26 -
Lantai CT - 0.26 -
Dinding CT - 0.26 -
Dinding Jam - 0.26 -
Dinding HT - 0.26 -
Dinding CT - 0.26 -
Skirting HT - 0.03 -
Skirting C - 0.03 -

Total -
Pembulatan -

Tile Grout@1kg/sak e Volume Koef Total


HT uk. 60 x - 0.31 -
Lantai HT - 0.31 -
Lantai HT 3 - 0.31 -
Lantai CT - 0.31 -
Dinding CT - 0.31 -
Dinding Jam - 0.31 -
Dinding HT - 0.31 -
Dinding CT - 0.31 -
Skirting HT - 0.028 -
Skirting C - 0.028 -

Total -
Pembulatan -
Koef. Pasir
0.07 0
0.07 0

Total -
Pembulatan -
BILL NO. 2 - STRUCTURE WORK

2. STR (362/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY QTY SELISIH
FORKON

2 STRUCTURAL WORKS

2.1 FACILITY BUILDING (NEW


(BUILDING)
2.1.1 FONDATION & SOIL WORKS
A Foundation Work
Mobilization - Demobilization of m' 2080.00 2080.00 0.00
material and equipment/tool

Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 2080.00 2080.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
Facility Building m' 2080.00 2080.00 0.00
0.00
Pile Driving Analyzer Test ttk 1.00 1.00 0.00
Cut the Head of Pole size 40x40 ttk 52.00 52.00 0.00

B Earthwork (Provisional)
Soil quarrying with heavy m3 202.61 226.00 -23.39
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
Facility Building Ground Floor and pit lift m3 202.61 226.00 -23.39

manual soil quarrying m3 135.39 132.41 2.98


Facility Building Pile Cap & Tie Beam m3 116.07 110.25 5.82
b. Sewage Treatment Plant BuildingPile Cap & Tie Beam m3 4.44 6.32 -1.88
c. Ground Water Tank Building Pile Cap & Tie Beam m3 9.02 10.69 -1.67
d. waste Container Pile Cap & Tie Beam m3 5.86 5.15 0.71

Soil Disposal m3 318.69 299.95 18.74


Facility Building m3 318.69 299.95 18.74

Anti-termite spray on soil before m2 356.64 333.00 23.64


construction
Facility Building Ground Floor and pit lift m2 356.64 333.00 23.64

2. STR (363/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

2.1.2 Work of Bottom Structure


A Work of Pile Cap
backfill Sand, 100mm thick m3 4.94 5.00 -0.06
working floor, 50mm thick m3 2.47 2.97 -0.50
Ready Mix Concrete concrete K250 m3 46.85 42.86 3.99
Reinforcement Reinforcement BJTD-40 kg 4150.15 6550.00 -2399.85
formwork Formwork of Block m2 118.48 123.40 -4.92

B Work of Pit Lift


backfill Sand, 100mm thick m3 2.25 3.44 -1.19
working floor, 50mm thick m3 1.13 1.89 -0.76
Ready Mix Concrete concrete K250 m3 11.83 12.71 -0.88
Reinforcement Reinforcement BJTD-40 kg 1876.67 1711.82 164.85
formwork Formwork from multiplex 12mm m2 81.47 72.65 8.82

C Work of Tie Beam


backfill Sand, 300mm thick m3 25.54 20.93 4.61
working floor, 50mm thick m3 4.26 4.99 -0.73
Ready Mix Concrete concrete K250 m3 32.01 27.74 4.27
Reinforcement Reinforcement BJTD-40 kg 6820.26 6680.78 139.48
formwork Formwork of Block m2 266.98 306.82 -39.84

D Work of Slab
backfill Sand, 300mm thick m3 102.59 127.43 -24.84
working floor, 50mm thick m3 17.10 21.24 -4.14
Ready Mix Concrete concrete K250 m3 60.02 65.12 -5.10
Reinforcement Reinforcement BJTD-40 kg 5812.30 5960.33 -148.03
formwork Formwork of Block m2 17.98 17.86 0.12

E Work of Column
Ready Mix Concrete concrete K250 m3 16.64 15.77 0.87
Reinforcement Reinforcement BJTD-40 kg 4592.74 4373.31 219.43
formwork Formwork from multiplex 12mm m2 148.98 141.24 7.74

F Work of stair
Ready Mix Concrete concrete K250 m3 3.43 3.11 0.32
Reinforcement Reinforcement BJTD-40 kg 408.50 448.14 -39.64
formwork Formwork from multiplex 12mm m2 36.87 28.33 8.54

2.1.3 Work of Top Structure

A 2nd Floor
Work of Column
Ready Mix Concrete concrete K250 m3 15.61 15.77 -0.16
Reinforcement Reinforcement BJTD-40 kg 4390.85 4373.31 17.54
formwork Formwork from multiplex 12mm m2 139.81 141.24 -1.43

Work of Beam
Ready Mix Concrete concrete K250 m3 26.17 31.08 -4.91
Reinforcement Reinforcement BJTD-40 kg 4569.60 5834.77 -1265.17
formwork Formwork from multiplex 12mm m2 208.06 253.90 -45.84

Work of Slab
Ready Mix Concrete concrete K250 m3 41.13 40.08 1.05
Reinforcement Reinforcement BJTD-40 kg 4675.57 4559.78 115.79
formwork Formwork from multiplex 12mm m2 330.15 326.12 4.03

2. STR (364/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

A 2nd Floor
Work of stair
Ready Mix Concrete concrete K250 m3 3.43 2.44 0.99
Reinforcement Reinforcement BJTD-40 kg 408.50 448.82 -40.32
formwork Formwork from multiplex 12mm m2 36.87 22.17 14.70

B 3rd Floor
Work of Column
Ready Mix Concrete concrete K250 m3 15.61 17.92 -2.31
Reinforcement Reinforcement BJTD-40 kg 4160.54 4416.07 -255.53
formwork Formwork from multiplex 12mm m2 139.81 160.47 -20.66

Work of Beam
Ready Mix Concrete concrete K250 m3 24.46 28.60 -4.14
Reinforcement Reinforcement BJTD-40 kg 3901.36 4579.28 -677.92
formwork Formwork from multiplex 12mm m2 199.82 212.19 -12.37

Work of Slab
Ready Mix Concrete concrete K250 m3 40.54 40.12 0.42
Reinforcement Reinforcement BJTD-40 kg 4557.80 4581.99 -24.19
formwork Formwork from multiplex 12mm m2 330.15 323.66 6.49

Work of stair
Ready Mix Concrete concrete K250 m3 3.43 3.45 -0.02
Reinforcement Reinforcement BJTD-40 kg 408.50 454.84 -46.34
formwork Formwork from multiplex 12mm m2 706.65 33.36 673.29

C Roof Floor
Work of Column
Ready Mix Concrete concrete K250 m3 7.83 8.01 -0.18
Reinforcement Reinforcement BJTD-40 kg 2078.13 2676.16 -598.03
formwork Formwork from multiplex 12mm m2 81.64 83.52 -1.88

Work of Beam
Ready Mix Concrete concrete K250 m3 32.78 24.99 7.79
Reinforcement Reinforcement BJTD-40 kg 6873.28 4372.48 2500.80
formwork Formwork from multiplex 12mm m2 248.39 182.60 65.79

Work of Slab
Ready Mix Concrete concrete K250 m3 53.51 51.74 1.77
Reinforcement Reinforcement BJTD-40 kg 6499.00 6393.68 105.32
formwork Formwork from multiplex 12mm m2 346.36 339.19 7.17

Work of Parapet Wall


Ready Mix Concrete Mutu Beton K-250 m3 5.11 2.92 2.19
Reinforcement Mutu Tulangan BJTD-40 kg 1877.47 193.33 1684.14
formwork Bekisting Multiplek 12 mm m2 68.11 39.00 29.11

Other Work
Waterproofing Integral Conplast WP 421 ex. Fosroc m3 86.29 76.73 9.56

2. STR (365/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

D Top Roof Floor


Work of Beam
Ready Mix Concrete concrete K250 m3 10.81 13.51 -2.70
Reinforcement Reinforcement BJTD-40 kg 2108.35 2313.69 -205.34
formwork Formwork from multiplex 12mm m2 90.17 97.80 -7.63

Work of Slab
Ready Mix Concrete concrete K250 m3 7.32 21.55 -14.23
Reinforcement Reinforcement BJTD-40 kg 725.05 2161.57 -1436.52
formwork Formwork from multiplex 12mm m2 62.24 161.56 -99.32

E Other Work

Waterproofing Integral Conplast WP 421 ex. Fosroc m3 18.13 35.07 -16.94

Lightweight steel frame 1.2 Truss AHU m2 115.74 115.74 0.00


Profil "S" 0.75mm

Cover roof Spandex depth 0.45 AHU m2 115.74 115.74 0.00


mm, includes nok, and
Insulations, and accessories :

Work of Insulation, includes AHU m2 115.74 115.74 0.00


other accessories:

Gutter on roof, depth 0.45 AHU m1 12.99 12.99 0.00


mm,includes frame plate strip
and other accessories :

Zincalume lisplank, include other AHU m1 30.81 30.81 0.00


accessories

Partition Wiremesh M8 size AHU bh 1.00 1.00 0.00


(1199+791)x360 cm, complete
with door and other accessories,
include installation

1st Floor Canopy


WF 150x75x5x7, include 400 mm kg 465.50 402.85 62.65
steel voute
CNP 150x65x20x2.3 kg 546.29 528.72 17.57
Plate thickness 8 mm kg 36.93 31.65 5.28
Plate thickness 6 mm kg 39.79 36.27 3.52
Chemical anchor dia. 16 mm, 225 pcs 84.00 84.00 0.00
mm length
Grouting m3 0.01 0.01 0.00
Trekstang 12 mm kg 23.40 21.28 2.12
Bolt dia. 16 mm @ 4 pcs pcs 39.79 112.00 -72.21
Zincromate paint kg 1035.19 952.85 82.34

2. STR (366/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

2.2 UTILITY BUILDING

2.2.1 FONDATION & SOIL WORKS


A Foundation Work
Mobilization - Demobilization of m' 280.00 280.00 0.00
material and equipment/tool

Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 280.00 280.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
b. Utility Building m' 280.00 280.00 0.00

Pile Driving Analyzer Test ttk 1.00 1.00


Cut the Head of Pole size 40x40 ttk 7.00 7.00

B Earthwork (Provisional)
Soil quarrying with heavy m3 125.27 125.27 0.00
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
Utility Building Ground Floor m3 125.27 125.27 0.00

manual soil quarrying m3 54.36 54.36 0.00


Utility Building Pile Cap & Tie Beam m3 54.36 54.36 0.00

Soil Disposal m3 179.63 179.63 0.00


Utility Building m3 179.63 179.63 0.00

Anti-termite spray on soil before m2 357.91 357.91 0.00


construction
Utility Building Ground Floor m2 357.91 357.91 0.00

2.2.2 UTILITY BUILDING STRUCTURE WORK

2.2.2.1 Work of Bottom Structure

A Work of Pile Cap


backfill Sand, 100mm thick m3 0.91 0.90 0.01
working floor, 50mm thick m3 0.46 0.45 0.01
Ready Mix Concrete concrete K250 m3 8.23 8.06 0.17
Reinforcement Reinforcement BJTD-40 kg 811.07 994.33 -183.26
formwork Formwork of Block m2 41.13 40.32 0.81

B Work of Tie Beam


backfill Sand, 300mm thick m3 18.84 16.89 1.95
working floor, 50mm thick m3 3.14 2.82 0.32
Ready Mix Concrete concrete K250 m3 22.79 20.62 2.17
Reinforcement Reinforcement BJTD-40 kg 4678.43 4637.35 41.08
formwork Formwork of Block m2 182.29 166.43 15.86

C Work of Slab
backfill Sand, 300mm thick m3 88.53 103.17 -14.64
working floor, 50mm thick m3 14.76 17.20 -2.44
Ready Mix Concrete concrete K250 m3 61.51 55.07 6.44
Reinforcement Reinforcement BJTD-40 kg 5299.80 5222.11 77.69
formwork Formwork of Block m2 10.50 35.23 -24.73

D Work of Column
Ready Mix Concrete concrete K250 m3 2.56 2.56 0.00
Reinforcement Reinforcement BJTD-40 kg 530.01 543.38 -13.37
formwork Formwork from multiplex 12mm m2 41.00 40.95 0.05

2. STR (367/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

2.2.2.2 Work of Roof Structure

A Work of Ring Balk


Ready Mix Concrete concrete K250 m3 18.36 11.53 6.83
Reinforcement Reinforcement BJTD-40 kg 2293.21 1997.13 296.08
formwork Formwork from multiplex 12mm m2 112.20 115.29 -3.09

B Work of Roof Cover


Lightweight steel frame 1.2 Truss Utility Building m2 311.01 311.01 0.00
Profil "S" 0.75mm
Cover roof Spandex depth 0.45 Utility Building m2 311.01 311.01 0.00
mm, includes nok, and
accessories :
Work of Insulation, includes Utility Building m2 311.01 311.01 0.00
other accessories:

Gutter on roof, depth 0.45 Utility Building m1 42.23 42.23 0.00


mm,includes frame plate strip
and other accessories :

2. STR (368/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

2.3 OTHER BUILDING (GWT, STP, WASTE CONTAINER)

2.3.1 FONDATION & SOIL WORKS


A Foundation Work
Mobilization - Demobilization of m' 360.00 360.00 0.00
material and equipment/tool

Pole Pile Foundation, size Concrete K500, Hydraulic Static m' 360.00 360.00 0.00
400x400 mm, depth 40 m Pile Driver (HSPD) 240 Ton
a. Sewage Treatment Plant Building m' 120.00 120.00 0.00
b. Ground Water Tank Building m' 160.00 160.00 0.00
c. waste Container m' 80.00 80.00 0.00

Pile Driving Analyzer Test ttk 2.00 2.00 0.00


Cut the Head of Pole size 40x40 ttk 9.00 9.00 0.00

B Earthwork (Provisional)
Soil quarrying with heavy m3 80.92 80.92 0.00
equipment includes compaction
from the ground floor to the
elevation below the working
floor.
a. Sewage Treatment Plant BuildingGround Floor m3 48.10 48.10 0.00
b. Ground Water Tank Building Ground Floor m3 21.61 21.61 0.00
c. waste Container Ground Floor m3 11.20 11.20 0.00

manual soil quarrying m3 19.32 19.32 0.00


a. Sewage Treatment Plant BuildingPile Cap & Tie Beam m3 4.44 4.44 0.00
b. Ground Water Tank Building Pile Cap & Tie Beam m3 9.02 9.02 0.00
c. waste Container Pile Cap & Tie Beam m3 5.86 5.86 0.00

Soil Disposal m3 100.24 100.24 0.00


a. Sewage Treatment Plant Building m3 52.54 52.54 0.00
b. Ground Water Tank Building m3 30.64 30.64 0.00
c. waste Container m3 17.07 17.07 0.00

Anti-termite spray on soil before m2 94.95 94.95 0.00


construction
a. Sewage Treatment Plant BuildingGround Floor m2 39.78 39.78 0.00
b. Ground Water Tank Building Ground Floor m2 35.41 35.41 0.00
c. waste Container Ground Floor m2 19.76 19.76 0.00

Dewatering System including 2 months ls 1.00 1.00 0.00


pumps and other equipment.

2. STR (369/408)
2.3.2 SEWAGE TREATMENT PLANT (STP) STRUCTURE WORK

Work of Bottom Structure

Work of Pile Cap


backfill Sand, 100mm thick m3 0.20 0.20 0.00
working floor, 50mm thick m3 0.10 0.10 0.00
Ready Mix Concrete concrete K300 m3 1.76 1.73 0.03
Reinforcement Reinforcement BJTD-40 kg 173.80 213.07 -39.27
formwork Formwork of Block m2 8.81 8.64 0.17

Work of Tie Beam


backfill Sand, 300mm thick m3 0.65 2.28 -1.63
working floor, 50mm thick m3 0.32 0.38 -0.06
Ready Mix Concrete concrete K300 m3 1.43 1.17 0.26
Reinforcement Reinforcement BJTD-40 kg 918.22 725.28 192.94
formwork Formwork of Block m2 11.44 12.37 -0.93

Work of Slab
backfill Sand, 300mm thick m3 1.36 2.88 -1.52
working floor, 50mm thick m3 0.68 0.48 0.20
Ready Mix Concrete concrete K300 m3 7.17 4.87 2.30
Reinforcement Reinforcement BJTD-40 kg 555.81 582.70 -26.89
formwork Formwork of Block m2 5.23 5.13 0.10

Other Work
Waterproofing Integral conplast WP 421 ex. Fosroc m3 8.60 6.04 2.56

Floor hardener 3kg/m2 including m2 7.17 19.50 -12.33


trowel finish dan floor plate
reveals ex. Fosroc or equal
approved

2. STR (370/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

2.3.3 GROUND WATER TANK (GWT) & PUMP ROOM STRUCTURE WORK

A Work of Bottom Structure

Work of Pile Cap


backfill Sand, 100mm thick m3 0.26 0.26 0.00
working floor, 50mm thick m3 0.13 0.13 0.00
Ready Mix Concrete concrete K300 m3 2.35 2.30 0.05
Reinforcement Reinforcement BJTD-40 kg 231.73 284.09 -52.36
formwork Formwork of Block m2 11.75 11.52 0.23

Work of Concrete Wall


Ready Mix Concrete concrete K300 m3 14.37 20.66 -6.29
Reinforcement Reinforcement BJTD-40 kg 1782.49 2317.64 -535.15
formwork Formwork from multiplex 12mm m2 121.23 105.38 15.85

Work of Tie Beam


backfill Sand, 300mm thick m3 2.51 2.45 0.06
working floor, 50mm thick m3 0.42 0.41 0.01
Ready Mix Concrete concrete K300 m3 3.68 3.32 0.36
Reinforcement Reinforcement BJTD-40 kg 1333.59 838.88 494.71
formwork Formwork of Block m2 26.39 33.09 -6.70

Work of Slab
backfill Sand, 300mm thick m3 1.09 7.80 -6.71
working floor, 50mm thick m3 1.38 1.30 0.08
Ready Mix Concrete concrete K300 m3 10.36 5.50 4.86
Reinforcement Reinforcement BJTD-40 kg 998.88 814.27 184.61
formwork Formwork of Block m2 6.45 6.53 -0.08

Work of Column
Ready Mix Concrete concrete K300 m3 0.98 0.94 0.04
Reinforcement Reinforcement BJTD-40 kg 360.34 350.11 10.23
formwork Formwork from multiplex 12mm m2 15.61 15.00 0.61

Other Work
Water stop ex. Fosroc m1 65.24 33.05 32.19
Waterproofing Integral Conplast WP 421 ex. Fosroc m3 28.42 29 -1.06

B Work of Top Structure

Work of Beam
Ready Mix Concrete concrete K300 m3 2.40 3.23 -0.83
Reinforcement Reinforcement BJTD-40 kg 569.02 677.81 -108.79
formwork Formwork from multiplex 12mm m2 7.76 7.98 -0.22

Work of Slab
Ready Mix Concrete concrete K300 m3 3.22 3.30 -0.08
Reinforcement Reinforcement BJTD-40 kg 357.88 388.23 -30.35
formwork Formwork from multiplex 12mm m2 25.20 24.66 0.54

Other Work
Waterproofing Integral Conplast WP 421 ex. Fosroc m3 5.61 6.53 -0.92

2. STR (371/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

2.3.4 WASTE CONTAINER STRUCTURE WORK

Work of Bottom Structure

Work of Pile Cap


backfill Sand, 100mm thick m3 0.13 0.13 0.00
working floor, 50mm thick m3 0.07 0.06 0.01
Ready Mix Concrete concrete K250 m3 1.18 1.15 0.03
Reinforcement Reinforcement BJTD-40 kg 115.87 145.29 -29.42
formwork Formwork of Block m2 5.88 5.76 0.12

Work of Tie Beam


backfill Sand, 300mm thick m3 2.36 2.04 0.32
working floor, 50mm thick m3 0.39 0.34 0.05
Ready Mix Concrete concrete K250 m3 1.73 1.31 0.42
Reinforcement Reinforcement BJTD-40 kg 728.33 585.06 143.27
formwork Formwork of Block m2 13.88 13.01 0.87

Work of Slab
backfill Sand, 300mm thick m3 3.75 3.52 0.23
working floor, 50mm thick m3 0.62 0.56 0.06
Ready Mix Concrete concrete K250 m3 3.95 3.87 0.08
Reinforcement Reinforcement BJTD-40 kg 563.19 587.72 -24.53
formwork Formwork of Block m2 3.79 3.72 0.07

2.3.5 CORRIDOR BUILDING STRUCTURE WORK

Structural Retrofitting Work

Steel Structure
CNP 150x65x20x2.3 kg 336.60 336.60 0.00
Plate thickness 8 mm kg 25.94 25.94 0.00
Chemical anchor dia. 16 mm, 200 mm length bh 163.20 163.20 0.00
Grouting thickness 3 mm Formwork of Block m3 0.00 0.00 0.00
Zincromate paint kg 362.54 362.54 0.00
Duco paint finish kg 362.54 362.54 0.00

2. STR (372/408)
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

SUB PENJUMLAHAN

BILL NO. 2 - STRUCTURE WORK

2.1 FACILITY BUILDING (NEW (BUILDING)

2.1.1 FONDATION & SOIL WORKS Rp.


2.1.2 FACILITY STRUCTURE WORK Rp.

2.2 UTILITY BUILDING

2.1.1 FONDATION & SOIL WORKS Rp.


2.1.2 UTILITY BUILDING STRUCTURE WORK Rp.

2.3 OTHER BUILDING (GWT, STP, WASTE CONTAINER)

2.3.1 FONDATION & SOIL WORKS Rp.


2.3.2 SEWAGE TREATMENT PLANT (STP) STRUCTURE WORK Rp.
2.3.3 GROUND WATER TANK (GWT) & PUMP ROOM STRUCTURE WORK Rp.
2.3.4 WASTE CONTAINER STRUCTURE WORK Rp.
2.1.3 CORRIDOR BUILDING STRUCTURE WORK Rp.

2. STR (373/408)
BILL NO. 3.1 - EXISTING MAIN BUILDING RENOVATION ARCHITECTURAL WORK

3.1 ARS - MAIN BUILDING (374/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY VOL
FORKON

3.1.1 INTERIOR WALLS AND WALL FINISHES

3.1.1.1 LIGHT BRICK, PLASTER, AND PARTITIONS WORK

A Light brick masonry t=100 mm ex. broco or m2 158.677.00 148.990.00


equal approved, with instant mortar as an
adhesive including practical concrete
Existing main building Toilet, Surgery, UGD, Dirty Utility, Medrec 158.677.00

B 10mm thick min. cement render at Masonry m2 144.078.00 144.078.00


Wall with smooth finish including reveals to
receive paint finish (paint measured
separately)

Existing main building UGD, Surgery, Laboratory, pathology, m2 144.078.00


bloodbank, lobby & waiting area, Staff
Amenity, Consult Room, Medrec, Farmasi,
Dental, Pediatric, ENT, Orthopedi, Inerna
Dept., Opthamology, Obsgyn, Dental
Pediatric

C 10mm thick min. cement render at Masonry m2 86.035.00 62.270.00


Wall with smooth finish excluding reveals to
received tile finish (tile measured separately)

Existing main building Toilet, Dental, Pediatric m2 86.035.00

3.1.1.2 WALL FINISHES


A Homogenous tile 300x600 mm Class B on light m2 150.24 73.32
brick wall classification ex. frontino or Equal
Approved, including mortar bed and grouting
(HT3)

Existing main building Toilet m2 150.240.00

B Ceramic Tile 300x300 mm Class B on light m2 51.15 83.96


brick wall classification ex. Roman or Equal
Approved, including mortar bed and grouting
(CT3)

Existing main building Dental, Pediatric m2 51.150.00

C Interior acrylic emulsion paint finish on light m2 965.475.00 771.540.00


brick wall and column anti-bacteria type
jotun majestic TB care ex. Jotun or Equal
Approved (PT3)

Existing main building UGD, Surgery, Laboratory, pathology, m2 965.475.00


bloodbank, lobby & waiting area, Staff
Amenity, Consult Room, Medrec, Farmasi,
Dental, Pediatric, ENT, Orthopedi, Inerna
Dept., Opthamology, Obsgyn, Dental,
Pediatric

3.1.2 FLOOR FINISHES

A Homogeneous tile 600x600 mm double m2 308.160.50 299.830.00


loading process type polish ex. frontino or
equal approved (HT1)
Existing main building Lobby & waiting area m2 308.160.50

B Ceramic tile 300x300 mm anti slip ex. Roman m2 32.437.50 33.400.00


or equal approved (CT2)
Existing main building Toilet, Dirty Utility m2 32.437.50

3.1 ARS - MAIN BUILDING (375/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

C Vinyl flooring type roll homogenous anti m2 255.743.75 225.820.00


bacteria and fungal type Somplan 350 ex.
Tarkett or equal approved (VN)

Existing main building UGD, Surgery, Laboratory, pathology, m2 255.743.75


bloodbank, Staff amenity, Consult Room,
Medrec, Farmasi, Dental, Pediatric, ENT,
Orthopedi, Interna Dept, Opthamology,
Obsgyn

D Skirting homogeneous tile 100X600 mm m' 120.730.00 108.650.00


including mortar bed, AM grouting, and
flatten ex. Roman or equal approved (HT2)

Existing main building Lobby & waiting area, Staff Amenity, Consult m' 120.730.00
Room, Medrec, Farmasi, Dental, Pediatric,
ENT, Orthopedi, Inerna Dept., Opthamology,
Obsgyn

E Skirting PVC 150 mm height off white colour, m' 205.650.00 225.460.00
including fixing accessories and flatten ex.
Tarkett or equal approved (VP)

Existing main building UGD, Surgery, Laboratory, pathology, m' 205.650.00


bloodbank

3.1.3 CEILING FINISHES

A Gypsum board ceiling 9 mm thick ex. m2 213.222.70 244.400.00


Jayaboard or equal approved, with boral
metal system frame, including fixing
accessories, instalation and flatten (GB1)

Existing main building UGD, Surgery, Laboratory, pathology, blood m2 213.222.70


bank, Lobby & waiting area, Staff Amenity,
Consult Room, Medrec, Farmasi, Dental,
Pediatric, ENT, Orthopedi, InTerna Dept.,
Opthamology, Obsgyn

B Gypsum board ceiling water resistance 9 mm m2 32.437.50 32.230.00


thick ex. Jayaboard or equal approved, with
boral metal system frame, including fixing
accessories, instalation and flatten (GB2)

Existing main building Toilet, Dirty Utility m2 32.437.50

C Interior acrylic emulsion paint finish on light m2 412.853.00 521.020.00


brick wall and column anti-bacteria type
jotun majestic TB care ex. Jotun or Equal
Approved

Existing main building All ceiling areas below suspended ceiling m2 412.853.00

D Ceiling shadow line 10x10mm from gypsum m' 440.300.00 421.490.00


profile paint finish, fixing accessories and
flatten
Existing main building All areas installed with gypsum and gypsum m' 440.300.00
WR ceiling

3.1 ARS - MAIN BUILDING (376/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.1.4 DOORS AND WINDOWS

3.1.4.1 WOODEN DOOR

A Door D1A-DP. Double leaf solid engineering pcs 1.000.00 1.000.00


wood door, steel door frame, HPL or melamic
finish; equipped with 6 mm clear glass ex.
Asahimas; Door protection finishing on the
bottom of the door, to 900mm AFFL on both
sides of the door; total size 1600x2150 mm
ex. jotun includes hardware, accessories, and
installation

Existing main building UGD pcs 1.000.00 1.000.00

B Door D4-K1. Single leaf solid engineering pcs 5.000.00 5.000.00


wood door and frame with HPL or melamic
finish; Kickplate finishing on the bottom of the
door, to 300mm AFFL on both sides of the
door;total size 900x2150 mm ex. jotun
includes hardware, accessories, and
installation

Existing main building Staff Amenity, Consult Room, Medrec, pcs 5.000.00 5.000.00
Farmasi

C Door D4B, Single leaf solid engineering wood pcs 1.000.00 1.000.00
door and frame with HPL or melamic finish;
total size 900x2150 mm ex. jotun includes
hardware, accessories, and installation

Existing main building Laboratory, Pathology, Blood Bank pcs 1.000.00 1.000.00

D Door D5A-K1. Single leaf solid engineering pcs 5.000.00 5.000.00


wood door and frame with HPL or melamic
finish; Kickplate finishing on the bottom of the
door, to 300mm AFFL on both sides of the
door; total size 900x2150 mm ex. jotun
includes hardware, accessories, and
installation

Existing main building Toilet, Dirty Utility pcs 5.000.00 5.000.00

E Door D2A-K. Single leaf solid engineering pcs 8.000.00 8.000.00


wood door and frame with HPL or melamic
finish; Kickplate finishing on the bottom of the
door, to 300mm AFFL on both sides of the
door; total size 1400x2150 mm ex. jotun
includes hardware, accessories, and
installation

Existing main building Surgery, Dental, ENT, Orthopedi, Pediatric, pcs 8.000.00 8.000.00
Interna Dept., Opthamology, Obsgyn

3.1.4.2 ALUMUNIUM DOORS AND GLASS

A Door window DW5, two-leaf double swing pcs -


door alumunium frame, total size 5700x3000
mm ex. Alexindo or equal approved, equipped
with 12 mm clear glass ex. Asahimas, as
drawings and specification, including
hardware, accessories, and installation

Existing main building Lobby pcs -

B Door window DW6, two-leaf double swing pcs 1.000.00 1.000.00


door alumunium frame, total size 3660x3000
mm ex. Alexindo or equal approved, equipped
with 12 mm clear glass ex. Asahimas, as
drawings and specification, including
hardware, accessories, and installation

Existing main building Lobby-Waiting Area pcs 1.000.00 1.000.00

3.1 ARS - MAIN BUILDING (377/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

C Door window DW7, two-leaf double swing pcs - -


door alumunium frame, total size 2850x3000
mm ex. Alexindo or equal approved, equipped
with 12 mm clear glass ex. Asahimas, as
drawings and specification, including
hardware, accessories, and installation

Existing main building Waiting Area pcs - -

3.1.5 SANITARY FIXTURES

A Lavatory LW 897 CJ ex. Toto pcs 11.00 11.00

1st floor Staff Amenity, Consult, UGD, Laboratorium, pcs 11.00 11.00
Surgery, Dental, ENT, Pediatric, Interna
Dept, Opthamology, Obsgyn

C Toilet mirror frameless size 600x900 mm pcs 3.00 3.00


including backing panel mounted on
1st floor Staff Amenity, Consult, UGD pcs 3.00 3.00

D Sitting closet type CW 421 J ex. Toto pcs 3.00 3.00

1st floor Staff Amenity, Consult, UGD pcs 3.00 3.00

E Shower Spray TB 19 CSMCR ex. Toto pcs 3.00 3.00

1st floor Staff Amenity, Consult, UGD pcs 3.00 3.00

F Floor Drain TX 1 EB ex. Toto pcs 3.00 3.00

1st floor Staff Amenity, Consult, UGD pcs 3.00 3.00

G Robe Hook TS 118 WSB ex. Toto pcs 3.00 3.00

1st floor Staff Amenity, Consult, UGD pcs 3.00 3.00

G Paper holder TX 703 AESV1 ex. TOTO pcs 3.00 3.00

1st floor Staff Amenity, Consult, UGD pcs 3.00 3.00

K Slop sink SK33 + Wall Faucet TX133AUN13C pcs 1.00 1.00


ex. Toto

1st floor Dirty utility pcs 1.00 1.00

3.1 ARS - MAIN BUILDING (378/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

SUBTOTAL

BILL NO. 3.1 - EXISTING MAIN BUILDING RENOVATION ARCHITECTURAL WORK

3.1.1 INTERIOR WALLS AND WALL FINISHES


3.1.1.1 LIGHT BRICK, PLASTER, AND PARTITIONS WORK Rp.
3.1.1.2 WALL FINISHES Rp.

3.1.2 FLOOR FINISHES

3.1.3 CEILING FINISHES

3.1.4 DOORS AND WINDOWS


3.1.4.1 WOODEN DOOR Rp.
3.1.4.2 ALUMUNIUM DOORS AND GLASS Rp.

3.1.5 SANITARY FIXTURES

3.1 ARS - MAIN BUILDING (379/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK

BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (380/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 1

NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY VOL


FORKON

3.2.1 INTERIOR WALLS AND WALL FINISHES

3.2.1.1 LIGHT BRICK, PLASTER, AND PARTITIONS WORK

A Light brick masonry t=100 mm ex. broco or equal m2 2529.475.05 2284.670.00


###
approved, with instant mortar as an adhesive
including practical concrete (WL1)

1st floor m2 825.825.75 775.080.00


2nd floor m2 785.937.50 661.050.00
3rd floor m2 653.698.40 619.470.00
Roof floor m2 264.013.40 229.070.00

B Lead Shield wall from Pb t=2 mm covered with m2 152.595.00 135.040.00


###
metal frame type partition from 12 mm
gypsumboard ex Jayaboard or Equal Approved with
0.55 mm frame, including instalation, accessories,
and others as specified (WX1)

1st floor Digital Mammo, YSIO MAX, USG m2 152.595.00

C Lead Shield wall from Pb t=4 mm covered with m2 55.880.00 56.920.00


###
metal frame type partition from 12 mm
gypsumboard ex Jayaboard or Equal Approved with
0.55 mm frame, including instalation, accessories,
and others as specified (WX2)

1st floor CT SCAN m2 55.880.00

D Sandwich panel isolation wall cover type PIR with m2 151.300.00 142.680.00
###
100 mm 50 mm thickness ex. Zelltech/Alsun/Equal,
including accessories and others as specified (BD)

3rd floor OT 1 m2 68.900.00 68.900.00

E Sandwich panel isolation wall cover type PIR with ###


100 mm 50 mm thickness ex. Zelltech/Alsun/Equal,
including Lead Shield wall from Pb t=2 mm,
accessories and others as specified (BDX)

3rd floor OT 2 m2 82.400.00 73.780.00

F 10mm thick min. cement render at Masonry Wall m2 2162.655.05 2162.655.05


###
with smooth finish including reveals to receive paint
finish (paint measured separately)
1st floor m2 603.963.75
2nd floor m2 722.758.80
3rd floor m2 835.932.50
Roof m2 -

G 10mm thick min. cement render at Masonry Wall m2 425.811.25 425.811.25


###
with smooth finish excluding reveals to received tile
finish (tile measured separately)

1st floor Visitor Toilet, Staff Toilet, Ablution m2 307.131.25


2nd floor Toilet, DU, Technical Area m2 77.752.50
3rd floor Toilet & Changing Room m2 40.927.50

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (381/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 2

NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.2.1.2 WALL FINISHES


A Homogenous tile 300x600 mm Class B on light brick m2 170.872.50 170.872.50
###
wall classification ex. frontino or Equal Approved,
including mortar bed and grouting

1st floor Visitor & Staff Toilet, Ablution m2 75.362.50


2nd floor Technical Area, Toilet, DU m2 50.607.50
3rd floor Toilet m2 44.902.50

B Homogenous tile 300x600 mm Class B on light brick m1 13.600.00 13.600.00


###
wall classification ex. frontino or Equal Approved,
including mortar bed and grouting

1st floor Jamb Lift m1 13.600.00

C Interior acrylic emulsion paint finish on light brick m2 2039.845.50 2039.845.50


###
wall and column anti-bacteria type jotun majestic
TB care ex. Jotun or Equal Approved
1st floor m2 734.586.50
2nd floor m2 690.161.50
3rd floor m2 583.337.50
Roof m2 31.760.00

D Interior acrylic emulsion paint finish on light brick m2 208.171.63 208.171.63


###
wall and column type jotaplast ex. Jotun or Equal
Approved
1st floor Panel room m2 52.230.00
2nd floor - m1 -
3rd floor Travo Instalation m1 28.515.00
Roof LMR, AHU m2 127.426.63

E Interior enamel paint finish on 1.5 m light brick wall m2 137.452.50 137.452.50
###
ex. Majesric TB Sheen or Equal Approved
1st floor Stair m2 35.527.50
2nd floor Stair m1 33.675.00
3rd floor Stair m1 34.125.00
Roof Stair m2 34.125.00

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (382/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 3

NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.2.2 FLOOR FINISHES

3.2.2.1 FLOOR HARDENER AND WATERPROOFING

A Floor hardener 3kg/m2 including trowel finish dan m2 122.080.00 122.080.00


###
floor plate reveals ex. Fosroc or equal approved

1st floor Panel Room m2 9.910.00


Roof LMR m2 112.170.00

B Coating waterproofing using Brushbond ex Fosroc m2 59.640.00 59.640.00


###
including Screed Protection, accessories and flatten

1st floor Staff toilet, visitor toilet, ablution m2 29.140.00


2nd floor Toilet m2 19.920.00
3rd floor Toilet m2 10.580.00
Roof m2 18.470.00
C Membrane waterproofing using Profex Torchseal 3 m2 227.783.43 227.783.43
###
PV ex. Fosroc

Roof (provisional) Roof deck m2 41.665.00


Roof top AHU deck, LMR deck, and staircase deck m2 186.118.43

C Screed with wiremesh M4, groove line water m2 181.325.93 181.325.93


###
slooping

Roof (provisional) Roof deck m2 16.995.00


Roof top AHU deck, LMR deck, and staircase deck m2 164.330.93

###

3.2.2.2 FLOOR FINISHES


A Homogeneous tile 600x600 mm double loading m2 338.183.50 289.430.00
###
process type polish ex. frontino or equal approved
(HT1)

1st floor Lobby lift, Waiting Area, Reading, m2 186.090.00 179.170.00


Consult Room, Control Room, USG,
Storage, dirty utility
2nd floor Lobby lift, Family Waiting, Technical m2 92.906.00 71.030.00
Area, Dirty Material
3rd floor Lobby Lift, Family Waiting m2 59.187.50 39.230.00

B Homogeneous tile 300x600 mm double loading m2 56.254.50 66.810.00


###
process type polish, include groove line ex. frontino
or equal approved (HT3)

1st floor Staircase m2 18.751.50 22.270.00


2nd floor Staircase m2 18.751.50 22.270.00
3rd floor Staircase m2 18.751.50 22.270.00

C Homogeneous tile 600x600 mm type Unpolish ex. 1st Floor (Entrance) m2 116.07 116.07
###
frontino or equal approved

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (383/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 4

NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

D Ceramic tile 300x300 mm anti slip ex. Roman or m2 44.550.00 47.100.00


###
equal approved (CT2)
1st floor Visitor & Staff Toilet, Dirty Utility, m2 22.200.00 25.750.00
Ablution
2nd floor Toilet, DU m2 14.820.00 14.210.00
3rd floor Toilet and female toilet lobby m2 7.530.00 7.140.00

E Vinyl flooring type roll homogenous anti bacteria m2 450.268.40 396.000.00


###
and fungal type Somplan 350 ex. Tarkett or equal
approved, include 50 mm screed, with self leveling
floor (underlayment) ex. Uzin

1st floor CT-Scan, YSIO MAX, CH, Digital Mammo, m2 86.593.50 75.750.00
USG

2nd floor NICU, ICU / HU, CU, Sterile Material m2 192.817.40 179.650.00
Store, S.A.S, Instrument Preparation And
Packaging Area, Washing and
Decontamination, Dirty material

3rd floor Changing Room, Transfer Room, Steril m2 170.857.50 140.600.00


Stock, Pre Operation, Equipt storage,
Clean utility, Dirty Corridor, Post
Operation

F Vinyl flooring type roll homogenous anti bacteria m2 84.402.00 71.780.00


###
and fungal type IQ Toro ex. Tarkett or equal
approved, include 50 mm screed, with self leveling
floor (underlayment) ex. Uzin

3rd floor OT 1, OT 2 m2 84.402.00

###

3.2.2.3 SKIRTING AND NOSING

A Skirting homogeneous tile 100X600 mm including m' 315.492.00 390.170.00


###
mortar bed, AM grouting, and flatten ex. Roman or
equal approved (HT2)
1st floor Staircase, prayer room, USG, storage, m' 162.745.00 191.370.00
dirty utility
2nd floor Staircase, technical area, dirty material m' 92.372.00 112.470.00

3rd floor Staircase, female changing, male m' 60.375.00 86.330.00


changing, dirty corridor, travo
installation

B Skirting oil paint 100 mm height ex. jotun, including m' 60.022.50 46.760.00
###
fixing accessories and flatten (PT2)

1st floor Panel room m' 16.900.00 12.390.00


Roof LMR, AHU m' 43.122.50 34.370.00

C Skirting PVC 150 mm height off white colour, m' 398.596.00 352.990.00
###
including fixing accessories and flatten ex. Tarkett or
equal approved (VP)
1st floor CT-Scan, YSIO MAX, CH, Digital Mammo, m' 68.290.00 56.920.00
USG
2nd floor NICU, ICU / HU, CU, Sterile Material m' 132.676.00 92.530.00
Store, S.A.S, Instrument Preparation And
Packaging Area, Washing and
Decontamination, Dirty material

3rd floor Changing Room, Transfer Room, Steril m' 197.630.00 203.540.00
Stock, OT 1, OT2, Pre Operation, Equipt
storage, Clean utility, Dirty Corridor, Post
Operation

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (384/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 5

NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.2.3 CEILING FINISHES

3.2.3.1 SUSPENDED CEILING

A Extra tapping and sanding (skim coat) at exposed m2 202.829.00 203.730.00


###
concrete ceiling ex. Jotun or equal approved (EC)

1st floor Staircase m2 27.550.00 21.880.00


2nd floor Staircase m2 17.640.00 21.880.00
3rd floor Staircase m2 22.535.00 21.880.00
Roof LMR & Staircase m2 135.104.00 138.090.00

B Gypsum board ceiling 9 mm thick ex. Jayaboard or m2 528.141.00 557.160.00


###
equal approved, with boral metal system frame,
including fixing accessories, instalation and flatten
(GB1)

1st floor Lobby Lift, Prayer room, Waitting Area, m2 253.610.00 254.920.00
Reading, Consult, Control Room, Dirty
Utility, Digital MAMO, USG, CT Scan,
YSIO MAX, CH

2nd floor Lobby Lift, Family waiting, NICU, ICU, CU, m2 243.068.00 250.680.00
Dirty Material, Technical Area, Steril
Material, Washing and Decontamination,
Instrument preparation, Dirty Material

3rd floor m2 31.463.00 51.560.00

C Gypsum board ceiling water resistance 9 mm thick m2 101.871.50 84.320.00


###
ex. Jayaboard or equal approved, with boral metal
system frame, including fixing accessories,
instalation and flatten (GB2)

1st floor toilet staff, toilet visitor, Ablution, panel m2 21.140.00 25.750.00
room
2nd floor Toilet, DU, Technical Area m2 14.112.00 14.210.00
3rd floor Toilet, Lobby lift, Travo installation, m2 66.619.50 44.360.00
changing room,, clean utility, corridor
dirty

D Calsiboard ceiling 6 mm thick ex. Kalsi or equal m2 90.165.00 91.060.00


###
approved, with boral metal system frame, including
fixing accessories, instalation and flatten (CB1)

Pre and Post Operation room, equip m2 90.165.00 91.060.00


storage

E Ceiling sandwich panel type PIR with 100 mm 50 m2 96.190.84 71.780.00


###
mm thickness ex. Zelltech/Alsun/Equal, including
accessories and others as specified (SP1)

OT 1, OT 2 m2 96.190.84

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (385/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 5

NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.2.3.2 CEILING PAINT FINISHES

A Interior acrylic emulsion paint finish on light brick m2 710.761.50 641.470.00


###
wall and column anti-bacteria type jotun majestic
TB care ex. Jotun or Equal Approved
1st floor All ceiling areas below exposed and m2 292.390.00 280.660.00
suspended ceiling, except panel room
2nd floor All ceiling areas below exposed and m2 274.820.00 264.890.00
suspended ceiling
3rd floor All ceiling areas below exposed and m2 120.617.50 95.920.00
suspended ceiling
Roof Staircase m2 22.934.00

B Interior acrylic emulsion paint finish on light brick m2 122.080.00 124.920.00


###
wall and column type jotaplast ex. Jotun or Equal
Approved
1st floor Panel room m2 9.910.00 10.070.00
2nd floor m2 -
3rd floor m2 -
Roof LMR, AHU m2 112.170.00 114.850.00

###

3.2.3.3 SHADOW LINE

A Ceiling shadow line 10x10mm from gypsum profile m' 686.588.00 686.588.00
###
paint finish, fixing accessories and flatten
1st floor All areas installed with gypsum and m' 278.815.00
gypsum WR ceiling
2nd floor All areas installed with gypsum and m' 260.673.00
gypsum WR ceiling
3rd floor All areas installed with gypsum and m' 147.100.00
gypsum WR ceiling

B Ceiling shadow line 10x10mm from gypsum profile m' 73.950.00 73.950.00
###
paint finish, fixing accessories and flatten
3rd floor All areas installed with calsiboard ceiling m' 73.950.00

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (386/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 6

NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.2.4 DOORS AND WINDOWS

3.2.4.1 WOODEN DOOR

A Door D1A-DP. Double leaf solid engineering wood pcs 2.000.00 2.000.00
###
door, steel door frame, HPL or melamic finish;
equipped with 6 mm clear glass ex. Asahimas; Door
protection finishing on the bottom of the door, to
900mm AFFL on both sides of the door; total size
1600x2150 mm ex. jotun includes hardware,
accessories, and installation

1st floor Lobby Lift pcs 1.000.00 1.000.00


2nd floor Lobby Lift pcs 1.000.00 1.000.00

B Door D4, Single leaf solid engineering steel door, pcs 2.000.00 3.000.00
###
steel door frame with HPL or melamic finish; total
size 900x2150 mm ex. jotun includes hardware,
accessories, and installation

1st floor Reading pcs 1.000.00 1.000.00


2nd floor CU pcs 1.000.00 1.000.00
3rd floor Male Changing pcs 1.000.00 1.000.00

C Door D4-A, Single leaf solid engineering wood door, pcs 1.000.00 1.000.00
###
steel door frame with HPL or melamic finish; total
size 800x2150 mm ex. jotun includes hardware,
accessories, and installation

3rd floor Female Changing pcs 1.000.00 1.000.00

D Door D4-K. Single leaf solid engineering wood door, pcs 2.000.00 3.000.00
###
steel door frame with HPL or melamic finish;
Kickplate finishing on the bottom of the door, to
300mm AFFL on both sides of the door;total size
900x2150 mm ex. jotun includes hardware,
accessories, and installation

2nd floor Family Waiting pcs 1.000.00 1.000.00


3rd floor Equip Storage, Sterile Stock pcs 1.000.00 2.000.00

E Door D4-DP. Single leaf solid engineering wood pcs 2.000.00 2.000.00
###
door, steel door frame with HPL or melamic finish;
Door protection finishing on the bottom of the door,
to 900mm AFFL on both sides of the door;total size
900x2150 mm ex. jotun includes hardware,
accessories, and installation

2nd floor SAS pcs 1.000.00 1.000.00


3rd floor Dirty Corridor pcs 1.000.00 1.000.00

3.2 ARS -FACILITY BUILDING (387/408)


F Door D5-K. Single leaf solid engineering wood door, pcs 2.000.00 2.000.00
###
steel door frame with HPL or melamic finish;
Kickplate finishing on the bottom of the door, to
300mm AFFL on both sides of the door;total size
800x2150 mm ex. jotun includes hardware,
accessories, and installation

1st floor Staff Toilet pcs 1.000.00 1.000.00


3rd floor Female Toilet pcs 1.000.00 1.000.00

G Door D5A-K. Single leaf solid engineering wood pcs 6.000.00 6.000.00
###
door, steel door frame with HPL or melamic finish;
Kickplate finishing on the bottom of the door, to
300mm AFFL on both sides of the door; total size
900x2150 mm ex. jotun includes hardware,
accessories, and installation

1st floor Storage, Dirty Utility pcs 2.000.00 2.000.00


2nd floor Toilet, Technical area, DU pcs 3.000.00 3.000.00
3rd floor Male Toilet pcs 1.000.00 1.000.00

H Door D5B-K. Single leaf solid engineering wood pcs 1.000.00 1.000.00
###
door, steel door frame with HPL or melamic finish;
Kickplate finishing on the bottom of the door, to
300mm AFFL on both sides of the door; total size
1100x2150 mmex. jotun includes hardware,
accessories, and installation

1st floor Visitor Toilet pcs 1.000.00 1.000.00

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (388/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 8
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.2.4.2 STEEL DOOR

A Door D2, 40 mm thick one-leaf steel door, made of pcs 5.000.00 5.000.00
###
4x4 cm hollow steel frame and 70x150 mm channel
(C) type steel sill, total size 900x2150 mm duco
paint finish, equipped with 6 mm thick glass ex.
Asahimas, including hardware, accessories, and
installation

2nd floor NICU 3.000.00 3.000.00


3rd floor Male & Female Changing 2.000.00 2.000.00

B Door D2A, 40 mm thick two-leaf steel door, made of pcs 1.000.00 1.000.00
###
4x4 cm hollow steel frame and 70x150 mm channel
(C) type steel sill, total size 1400x2150 mm duco
paint finish, including hardware, accessories, and
installation

1st floor Consult pcs 1.000.00 1.000.00

C Door D2A-LD2, 40 mm thick two-leaf steel door, pcs 3.000.00 3.000.00


###
made of 4x4 cm hollow steel frame and 70x150 mm
channel (C) type steel sill, Door leaf cover with Pb
sheet 2 mm; total size 1400x2150 mm duco paint
finish, including hardware, accessories, and
installation

1st floor YSIO MAX, Digital Mammo, USG pcs 3.000.00 3.000.00

D Door D2A-LD4, 40 mm thick two-leaf steel door, pcs 1.000.00 1.000.00


###
made of 4x4 cm hollow steel frame and 70x150 mm
channel (C) type steel sill, Door leaf cover with Pb
sheet 4 mm; total size 1400x2150 mm duco paint
finish, including hardware, accessories, and
installation

1st floor Ct scan pcs 1.000.00 1.000.00

E Door FDB, 40 mm thick one-leaf steel door, made pcs 4.000.00 4.000.00
###
of 4x4 cm hollow steel frame and 70x150 mm
channel (C) type steel sill, total size 1100x2150 mm,
equipped with handle panic bar ex. Bostinco as
specified, including hardware, accessories, and
installation

1st floor Staircase pcs 1.000.00 1.000.00


2nd floor Staircase pcs 1.000.00 1.000.00
3rd floor Staircase pcs 1.000.00 1.000.00
Roof Staircase pcs 1.000.00 1.000.00

F Door PB, 40 mm thick one-leaf steel door, total size pcs 7.000.00 7.000.00
###
600x1000 mm, all as specified, including hardware,
accessories, and installation.
1st floor Staircase, Med Gas Shaft pcs 2.000.00 2.000.00
2nd floor Staircase, Med Gas Shaft pcs 2.000.00 2.000.00
3rd floor Staircase, Med Gas Shaft pcs 2.000.00 2.000.00
Roof Staircase pcs 1.000.00 1.000.00

3.2 ARS -FACILITY BUILDING (389/408)


G Door SD, 40 mm thick one-leaf steel door, total size pcs 4.000.00 4.000.00
###
900x2150 mm, all as specified, including hardware,
accessories, and installation.
1st floor Panel Room pcs 2.000.00 2.000.00
2nd floor SAS pcs 1.000.00 1.000.00
3rd floor Travo Isolation pcs 1.000.00 1.000.00

H Door SD-LD2, 40 mm thick one-leaf steel door, total pcs 1.000.00 1.000.00
###
size 900x2150 mm, all as specified, including
hardware, accessories, and installation.

1st floor Ysio max pcs 1.000.00 1.000.00

I Door SDB, 40 mm thick one-leaf steel door, total pcs 1.000.00 1.000.00
###
size 1100x2150 mm, all as specified, including
hardware, accessories, and installation.

2nd floor Dirty Material 1.000.00 1.000.00

J Door SD1, 40 mm thick one-leaf steel door, total pcs 1.000.00 1.000.00
###
size 1000x2150 mm, all as specified, including
hardware, accessories, and installation.

Roof floor Lift Machine Room pcs 1.000.00

K Door SD2, 40 mm thick two-leaf steel door, made of pcs 1.000.00 1.000.00
###
4x4 cm hollow steel frame and 70x150 mm channel
(C) type steel sill, total size 1600x2150 mm duco
paint finish, including hardware, accessories, and
installation

Roof floor AHU Room pcs 1.000.00 1.000.00

L Door SD5, 40 mm thick, single leaf sliding door, total pcs 1.000.00 1.000.00
###
size 1100x2150 mm, duco paint finish, equipped
with 6 mm thick glass ex. Asahimas including
hardware, accessories, and installation.

2nd floor Dirty Material pcs 1.000.00 1.000.00

M Operation room automatic sliding door (hermetic Operation room on 3rd floor pcs 1.000.00 1.000.00
###
sliding size 1600x2200 mm) according to standards,
including accessories and installation

N Operation room automatic sliding door + Lead Operation room on 3rd floor pcs 1.000.00 1.000.00
###
Shield wall from Pb t=2 mm (hermetic sliding size
1600x2200 mm) according to standards, including,
accessories and installation

O Operation room manual swing door (hermetic swing Operation room on 3rd floor pcs 1.000.00 1.000.00
###
size 900x2200) according to standards, including
accessories and installation

P Operation room manual swing door + Lead Shield Operation room on 3rd floor pcs 1.000.00 1.000.00
###
wall from Pb t=2 mm (manual swing size 900x2200)
according to standards, including accessories and
installation

Q Transfer room interlocking system sliding door Transfer room on 3rd floor pcs 2.000.00 2.000.00
###
(sliding size 1600x2200 mm) according to standards,
including accessories and installation

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (390/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 8
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.2.4.3 ALUMUNIUM DOORS AND GLASS

A Door SD4, one-leaf door alumunium frame, total pcs 1.000.00 1.000.00
###
size 900x2150 mm ex. Alexindo or equal approved,
as drawings and specification, including hardware,
accessories, and installation

2nd floor SAS

B Door D6, one-leaf double swing door alumunium pcs 1.000.00 1.000.00
###
frame, total size 1000x2150 mm ex. alexindo or
equal approved, equipped with 12 mm clear glass
ex. Asahimas, as drawings and specification,
including hardware, accessories, and installation

1st floor Prayer Room

C Door window DW1, two-leaf double swing door pcs 1.000.00 1.000.00
###
alumunium frame, total size 3350x3000 mm ex.
alexindo or equal approved, equipped with 12 mm
clear glass ex. Asahimas, as drawings and
specification, including hardware, accessories, and
installation

1st floor Lobby Lift Fasade

D Window W1, awning glass window alumunium pcs 1.000.00 1.000.00


###
frame, total size 825x3000 mm ex. alexindo or equal
approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

1st floor Fasade NS pcs 1.000.00

E Window W1A, awning glass window alumunium pcs 2.000.00 2.000.00


###
frame, total size 1800x3000 mm ex. alexindo or
equal approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

1st floor Fasade Reading, Consult pcs 2.000.00 2.000.00

F Window W2, fixed glass window alumunium frame, pcs 1.000.00 1.000.00
###
total size3350x3000 mm ex. alexindo or equal
approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

2nd floor Fasade lobby lift pcs 1.000.00 1.000.00

G Window W2A, fixed glass window alumunium pcs 1.000.00 1.000.00


###
frame, total size 3350x1000+2523x1000 mm ex.
alexindo or equal approved, equipped with 6 mm
clear glass ex. Asahimas, as drawings and
specification, including hardware, accessories, and
installation

3rd floor Fasade lobby lift pcs 1.000.00 1.000.00

3.2 ARS -FACILITY BUILDING (391/408)


H Window W3, fixed glass window alumunium frame, pcs 3.000.00 3.000.00
###
total size 900x1700 mm ex. alexindo or equal
approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

2nd floor Fasade NICU and Washing pcs 2.000.00 2.000.00


Decontamination
3rd floor Fasade Dirty Corridor pcs 1.000.00 2.000.00

I Window W3A, fixed glass window alumunium pcs 4.000.00 4.000.00


###
frame, total size 800x1700 mm ex. alexindo or equal
approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

2nd floor Fasade Famili waiting, dirty material, pcs 3.000.00 3.000.00
Washing Decontamination
3rd floor Fasade Dirty Corridor pcs 1.000.00 1.000.00

J Window W3A-1, fixed glass window alumunium pcs 1.000.00 1.000.00


###
frame, total size 800x1700 mm ex. alexindo or equal
approved, equipped with 6 mm clear glass with
sunblast sticker ex. Asahimas, as drawings and
specification, including hardware, accessories, and
installation

3rd floor Male Changing Room pcs 1.000.00 1.000.00

K Window W3B, fixed glass window alumunium pcs 2.000.00 2.000.00


###
frame, total size 300x1700 mm ex. alexindo or equal
approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

2nd floor Fasade Washing Decontamination pcs 1.000.00 1.000.00

3rd floor Fasade Travo Isolation pcs 1.000.00 1.000.00

L Window W4, fixed glass window alumunium frame, pcs 4.000.00 4.000.00
###
total size 1800x1700 mm ex. alexindo or equal
approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

2nd floor Fasade ICU pcs 2.000.00 2.000.00


3rd floor Fasade sterile stock and Pre Op pcs 2.000.00 2.000.00

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (392/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 9
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

M Window W4A, fixed glass window alumunium pcs 4.000.00 4.000.00


###
frame, total size 1200x1700 mm ex. alexindo or
equal approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

2nd floor Fasade ICU and dirty material pcs 2.000.00 2.000.00
3rd floor Fasade Coridor dirty and linen pcs 2.000.00 2.000.00

N Window W4A-1, fixed glass window alumunium pcs 1.000.00 1.000.00


###
frame, total size 1200x1700 mm ex. alexindo or
equal approved, equipped with 6 mm clear glass
with sunblast sticker ex. Asahimas, as drawings and
specification, including hardware, accessories, and
installation

3rd floor Fasade Female changing room pcs 1.000.00 1.000.00

O Window W4B, fixed glass window alumunium pcs 2.000.00 2.000.00


###
frame, total size 1500x1700 mm ex. alexindo or
equal approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

2nd floor Fasade ICU pcs 1.000.00 1.000.00


3rd floor Fasade equip storage pcs 1.000.00 1.000.00

P Window W4C, fixed glass window alumunium pcs 3.000.00 3.000.00


###
frame, total size 1000x1700 mm ex. alexindo or
equal approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

1st floor Fasade back view pcs 1.000.00 1.000.00


2nd floor Fasade back view pcs 1.000.00 1.000.00
3rd floor Fasade back view pcs 1.000.00 1.000.00

Q Window W4D, fixed glass window alumunium pcs 2.000.00 2.000.00


###
frame, total size 1200x1700 mm ex. alexindo or
equal approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

2nd floor Fasade dirty material pcs 1.000.00 1.000.00


3rd floor Fasade coridor dirty pcs 1.000.00 1.000.00

R Window W4E, fixed glass window alumunium pcs 1.000.00 1.000.00


###
frame, total size 2700x1700 mm ex. alexindo or
equal approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

2nd floor Fasade ICU pcs 1.000.00 1.000.00

3.2 ARS -FACILITY BUILDING (393/408)


S Window W4F, fixed glass window alumunium pcs 1.000.00 1.000.00
###
frame, total size 2050x1700 mm ex. alexindo or
equal approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

3rd floor Fasade Clean Utility pcs 1.000.00 1.000.00

T Window W5, window alumunium frame, total size pcs 2.000.00 2.000.00
###
1200x800 mm ex. alexindo or equal approved,
equipped with 8 mm anti radiation clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

1st floor Y Sio Max, CT-Scan 2.000.00 2.000.00

U Window BV1, hopper aluminium glass window pcs 2.000.00 2.000.00


###
alumunium frame, total size 750x400 mm ex.
alexindo or equal approved, equipped with 6 mm
clear glass ex. Asahimas, as drawings and
specification, including hardware, accessories, and
installation

1st floor Visitor & Staff Toilet Reading

V Window BV3, aluminium glass window alumunium pcs 1.000.00 1.000.00


###
frame, total size 2000x400 mm ex. alexindo or equal
approved, equipped with 6 mm clear glass ex.
Asahimas, as drawings and specification, including
hardware, accessories, and installation

1st floor Stairs pcs 1.000.00 1.000.00

W Louver BV4, fixed aluminium grill, total size 250x250 pcs 2.000.00 5.000.00
###
mm ex. alexindo or equal approved, as drawings
and specification, including hardware, accessories,
and installation

1st floor Reading, Lobby lift pcs 2.000.00 3.000.00


2nd floor Lobby Lift pcs 1.000.00 1.000.00
3rd floor Lobby Lift pcs 1.000.00 1.000.00

X Louver BV5, fixed aluminium grill, total size 300x300 pcs 4.000.00 4.000.00
###
mm ex. alexindo or equal approved, as drawings
and specification, including hardware, accessories,
and installation

2nd floor NICU, ICU pcs 2.000.00 2.000.00


3rd floor Female Changing, Clean Utility pcs 2.000.00 2.000.00

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (394/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 10
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.2.5 SANITARY FIXTURES

A Lavatory LW897CJ + Faucet TX109LD ex. Toto pcs 8.00 8.00


###
1st floor Staff toilet, Visitor Toilet pcs 2.00 2.00
2nd floor Toilet, SAS pcs 4.00 4.00
3rd floor Toilet pcs 2.00 2.00

B Toilet mirror frameless size 600x900 mm including pcs 5.00 5.00


###
backing panel mounted on
1st floor Staff toilet, Visitor Toilet pcs 2.00 2.00
2nd floor Toilet, SAS pcs 1.00 1.00
3rd floor Toilet pcs 2.00 2.00

C Sitting closet type CW 421 J ex. Toto pcs 5.00 5.00


###
1st floor Staff toilet, Visitor Toilet pcs 2.00 2.00
2nd floor Toilet pcs 1.00 1.00
3rd floor Toilet pcs 2.00 2.00

D Shower Spray TB 19 CSMCR ex. Toto pcs 5.00 5.00


###
1st floor Staff toilet, Visitor Toilet pcs 2.00 2.00
2nd floor Toilet pcs 1.00 1.00
3rd floor Toilet pcs 2.00 2.00

E Floor Drain TX 1 EB ex. Toto pcs 6.00 6.00


###
1st floor Staff toilet, Visitor Toilet, Ablution pcs 3.00 3.00
2nd floor Toilet pcs 1.00 1.00
3rd floor Toilet pcs 2.00 2.00

F Robe Hook TS 118 WSB ex. Toto pcs 5.00 5.00


###
1st floor Staff toilet, Visitor Toilet pcs 2.00 2.00
2nd floor Toilet pcs 1.00 1.00
3rd floor Toilet pcs 2.00 2.00

G Paper holder TX 703 AESV1 ex. TOTO pcs 5.00 5.00


###
1st floor Staff toilet, Visitor Toilet pcs 2.00 2.00
2nd floor Toilet pcs 1.00 1.00
3rd floor Toilet pcs 2.00 2.00

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (395/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 11
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

H Scrub Sink 1200x600 mm (Provosional) Type Hanging, t = 2mm pcs 1.00 By Other
1.00
3rd floor OT pcs 1.00 1.00

I Integral Stainless Steel double bowl sink ex. Lokal pcs 3.00 3.00
###

1st floor Dirty Utility pcs 1.00 1.00


2nd floor DU pcs 1.00 1.00
3rd floor Clean Utility pcs 1.00 1.00

H kitchen Faucet TX 603 KM ex. Toto pcs 3.00 3.00


###
J 1st floor Dirty Utility pcs 1.00 1.00
2nd floor DU pcs 1.00 1.00
3rd floor Clean Utility pcs 1.00 1.00

K Slop sink SK33 + Wall Faucet TX133AUN13C ex. Toto pcs 2.00 2.00
###

1st floor Dirty utility pcs 1.00 1.00


2nd floor DU pcs 1.00 1.00

L Tapset Sink T 23 BQ13N ex. Toto pcs 3.00 3.00


###
1st floor Ablution/wudhu area pcs 3.00 3.00

M Roof Drain Ironmongeries ex. Antasan pcs 9.00 9.00


###
Roof floor Roof Floor pcs 9.00 9.00

###

3.2.6 EXTERIOR WALL AND FAÇADE

3.2.6.1 PLASTER AND GRC PRECAST WORK

A 10mm thick min. cement render at Masonry Wall m2 1025.120.00 1025.120.00


###
with smooth finish excluding reveals to received tile
finish and behind GRC precast (measured
separately)

Back view (A) Façade Wall m2 -


Right View (B) Façade Wall m2 438.660.00
Left view (C) Façade Wall m2 235.160.00
Front View (D) Façade Wall m2 351.300.00

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (396/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 12

NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.2.6.2 WALL FINISHES

A Exterior wall cover with 4 mm Alumunium m2 212.51 212.51


###
Composite Panel (ACP) ex. Seven or equal approved

White ACP 1st floor canopy m2 212.510.00 212.510.00

B Exterior weathershield emulsion paint type m2 1671.500.00 1671.500.00


###
jotashield antifade flex ex. Jotun or equal approved

Exterior paint Façade Wall m2 1343.590.00 1343.590.00


LMR, Stairwell, AHU, parapet m2 327.910.00 327.910.00

C Exterior wall cover with Homogenous Tile (Granite m2 46.140.00 46.140.00


###
Texture) 600x600 mm ex. Frontino or equal
approved
Back view (A) Façade Wall m2 - -
Right View (B) Façade Wall m2 - -
Left view (C) Façade Wall m2 17.160.00 17.160.00
Front View (D) Façade Wall m2 28.980.00 28.980.00

D Signage Work : Logos and letters, on the Façade ls 1.000.00 1.000.00


###
included Assesories

###

3.2.7 OTHER ARCHITECTURAL WORKS

3.2.7.1 RAILING

A Steel railing h=900 mm comprising 1"3 dia. Steel Staircase m' 28.41 28.41
###
pipe finish zincromated + paint colour to be
selection

B Steel handrailing comprising 2" dia. Steel pipe finish Staircase m' 47.08 47.08
###
zincromated + paint colour to be selection

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (397/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 13

NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.2.7.2 OTHERS

A Apply insullation spray polyurethane foam to m2 181.325.93 181.325.93


###
concrete roof
3rd floor Below slab of the upper floor m2 16.995.00 16.995.00
Roof Below slab of the upper floor m2 164.330.93 164.330.93

B Corner guard (CG) installation from alumunium pcs 21.00 21.00


###
height=900mm ex. Pawling

C Wall guard (WG) installation on the wall from WG m' 32.00 32.00
###
6C product ex. Pawlin g or equal approved

D Signage Work Interior Works ls 1.00 1.00


###

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (398/408)


BILL OF QUANTITY
BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK
PAGE : 14

NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

SUBTOTAL

BILL NO. 3.2 - FACILITY BUILDING ARCHITECTURAL WORK

3.2.1 INTERIOR WALLS AND WALL FINISHES ###


3.2.1.1 LIGHT BRICK, PLASTER, AND PARTITIONS WORK Rp.
3.2.1.2 WALL FINISHES Rp.

3.2.2 FLOOR FINISHES ###


3.2.2.1 FLOOR HARDENER AND WATERPROOFING Rp.
3.2.2.2 FLOOR FINISHES Rp.
3.2.2.3 SKIRTING AND NOSING Rp.

3.2.3 CEILING FINISHES ###


3.2.3.1 SUSPENDED CEILING Rp.
3.2.3.2 CEILING PAINT FINISHES Rp.
3.2.3.3 SHADOW LINE Rp.

3.2.4 DOORS AND WINDOWS ###


3.2.4.1 WOODEN DOOR Rp.
3.2.4.2 STEEL DOOR Rp.
3.2.4.3 ALUMUNIUM DOORS AND GLASS Rp.

3.2.5 SANITARY FIXTURES ###

3.2.6 EXTERIOR WALL AND FAÇADE ###


3.2.6.1 PLASTER AND GRC PRECAST WORK Rp.
3.2.6.2 WALL FINISHES Rp.

3.2.7 OTHER ARCHITECTURAL WORKS ###


3.2.7.1 RAILING Rp.
3.2.7.2 OTHERS Rp.

###

PROJECT: RUMAH SAKIT ANGKATAN UDARA dr. M. SUTOMO, PONTIANAK

3.2 ARS -FACILITY BUILDING (399/408)


#REF!

3.3 ARS - UTILITY (400/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY VOL
FORKON

3.3.1 WALLS AND WALL FINISHES

3.3.1.1 LIGHT BRICK, AND PLASTER


A Light brick masonry t=100 mm ex. broco or m2 350.759.50 302.070.00
equal approved, with instant mortar as an
adhesive including practical concrete
Utility building Maintenance office, Kitchen, Laundry, m2 350.759.50
Vacum, Medical Gas, Travo

B 10mm thick min. cement render at Masonry m2 546.133.85 444.520.00


Wall with smooth finish including reveals to
receive paint finish (paint measured
separately)

Utility building Maintenance office, Kitchen, Laundry, m2 414.873.35 281.930.00


Vacum, Medical Gas, Travo

Utility building Exterior wall m2 131.260.50 162.590.00

C 10mm thick min. cement render at Masonry m2 124.995.00 161.590.00


Wall with smooth finish excluding reveals to
received tile finish (tile measured separately)

Utility building Kitchen and Laundry m2 124.995.00

3.3.1.2 WALL FINISHES


A Ceramic tile 300x300 mm on light brick wall m2 124.995.00 161.590.00
classification ex. Roman or Equal Approved,
including mortar bed and grouting

Utility building Kitchen and Laundry m2 124.995.00

B Interior acrylic emulsion paint finish on light m2 623.674.40 321.060.00


brick wall and column type jotaplast ex. Jotun
or Equal Approved
Utility building Maintenance office, Kitchen, Laundry, m2 623.674.40
Vacum, Medical Gas, Travo

B Exterior weathershield emulsion paint type m2 131.260.50 162.590.00


jotashield antifade flex ex. Jotun or equal
approved
Utility building External wall m2 131.260.50

3.3.2 FLOOR FINISHES

3.3.2.1 FLOOR HARDENER AND WATERPROOFING


A Floor hardener 3kg/m2 including trowel finish m2 84.381.00 118.070.00
dan floor plate reveals ex. Fosroc or equal
approved
Utility building Genset, Trafo, Medical Gas, Vacum m2 84.381.00

3.3.2.2 FLOOR FINISHES


A Ceramic tile 300x300 mm ex. Roman or equal m2 100.670.00 80.080.00
approved
Utility building Kitchen, Maintenance office, Laundry m2 100.670.00
room

B Skirting ceramic tile 100X300 mm including m' 9.250.00 12.550.00


mortar bed, AM grouting, and flatten ex.
Roman or equal approved

Utility building Maintenance office m' 9.250.00

3.3 ARS - UTILITY (401/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

3.3.3 CEILING FINISHES

A Gypsum board ceiling 9 mm thick ex. m2 95.880.00 80.080.00


Jayaboard or equal approved, with boral
metal system frame, including fixing
accessories, instalation and flatten

Utility building Kitchen, laundry room, Maintenance m2 95.880.00


office

B Interior acrylic emulsion paint finish on light m2 95.880.00 80.080.00


brick wall and column type jotaplast ex. Jotun
or Equal Approved
Utility building All ceiling areas below suspended ceiling m2 95.880.00

C Ceiling shadow line 10x10mm from gypsum m' 95.880.00 95.900.00


profile paint finish, fixing accessories and
flatten
Utility building All ceiling areas below suspended ceiling m' 95.880.00

3.3.4 DOORS AND WINDOWS

3.3.4.1 STEEL DOOR AND LOUVER

A Door Louver DW4, 40 mm thick two-leaf steel pcs 2.000.00 2.000.00


door, made of 4x4 cm hollow steel frame and
70x150 mm channel (C) type steel sill, total
size 1600x2150 mm for door and
(1800+1160)x580 mm for louver, including
hardware, accessories, and installation

Utility building Vacum and Travo Room pcs 2.000.00 2.000.00

B Louver BV2, steel louver window, total size pcs 6.000.00 6.000.00
1200x580 mm, all as specified, including
hardware, accessories, and installation.

1st floor Vacum, Med Gas, Travo Room pcs 6.000.00 6.000.00

3.3.4.2 ALUMUNIUM DOORS AND GLASS

A Door D2B, one-leaf single swing door pcs 3.000.00 3.000.00


alumunium frame, total size 900x2150 mm
ex. Alexindo or equal approved, equipped
with 8 mm clear glass ex. Asahimas, as
drawings and specification, including
hardware, accessories, and installation

Utility building Kitchen, Maintenance Office, Medgas pcs 3.000.00 3.000.00

B Door window DW2, two-leaf single swing pcs 1.000.00 1.000.00


door alumunium frame, total size 1400x2150
mm for door and 1200x1200 mm for window
ex. Alexindo or equal approved, equipped
with 6 mm clear glass ex. Asahimas, as
drawings and specification, including
hardware, accessories, and installation

Utility building Kitchen pcs 1.000.00 1.000.00

C Door window DW3, one-leaf single swing pcs 2.000.00 2.000.00


door alumunium frame, total size 900x2150
mm for door and 1200x1200 mm for window
ex. Alexindo or equal approved, equipped
with 6 mm clear glass ex. Asahimas, as
drawings and specification, including
hardware, accessories, and installation

Utility building Laundry pcs 2.000.00 2.000.00

3.3 ARS - UTILITY (402/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

D Window W6, fix aluminium glass window pcs 3.000.00 3.000.00


alumunium frame, total size 1200x1200 mm
ex. Alexindo or equal approved, equipped
with 6 mm clear glass ex. Asahimas, as
drawings and specification, including
hardware, accessories, and installation

Utility building Kitchen and Maintenance Office pcs 3.000.00 3.000.00

3.3.5 SANITARY FIXTURES

A Integral Stainless Steel double bowl sink ex. pcs 5.00 5.00
Lokal
Utility building Laundry, Kitchen pcs 5.00 5.00

B kitchen Faucet TX 603 KM ex. Toto pcs 5.00 5.00


Utility building Kitchen pcs 5.00 5.00

3.3.6 OTHERS

A Concrete sink size 600x1400 mm with 100 Kitchen pcs 5.00 5.00
mm thickness, HT finish 600x600 mm ex.
frontino

B Dinding Partition Wiremesh M8 ukuran R. Genset bh 1.00 1.00


900x360 cm, lengkap dengan Pintu dan
Kelengkapan lainnya terpasang

3.3 ARS - UTILITY (403/408)


NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY

SUBTOTAL

#REF!

3.3.1 WALLS AND WALL FINISHES


3.3.1.1 LIGHT BRICK, AND PLASTER Rp.
3.3.1.2 WALL FINISHES Rp.

3.3.2 FLOOR FINISHES


3.3.2.1 FLOOR HARDENER AND WATERPROOFING Rp.
3.3.2.2 FLOOR FINISHES Rp.

3.3.3 CEILING FINISHES

3.3.4 DOORS AND WINDOWS


3.3.4.1 STEEL DOOR AND LOUVER Rp.
3.3.4.2 ALUMUNIUM DOORS AND GLASS Rp.

3.3.5 SANITARY FIXTURES

3.3.6 OTHERS

3.3 ARS - UTILITY (404/408)


BILL NO. 3.5 - GROUND WATER TANK (GWT) & PUMP ROOM ARCHITECTURAL WORK
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY QTY

3.5.1 INTERIOR WALLS AND WALL FINISHES

3.5.1.1 LIGHT BRICK, PLASTER, AND PARTITIONS WORK

A Light brick masonry t=100 mm ex. broco or m2 26.260.00 26.260.00


equal approved, with instant mortar as an
adhesive including practical concrete
Pump Room m2 26.260.00 26.260.00

B 10mm thick min. cement render at Masonry m2 52.520.00 52.520.00


Wall with smooth finish including reveals to
receive paint finish (paint measured
separately)

Pump Room Interior Brick Walls m2 26.260.00 26.260.00


Pump Room Exterior Brick Walls m2 26.260.00 26.260.00

C Prepare and apply skim coat plaster at m2 161.256.00 161.256.00


Concrete Walls & Columns with smooth finish
to receive wall finish (measured separately)

elv -1.30 m GWT m2 98.856.00 98.856.00


GWT elv +0.00 m Exterior Concrete Walls m2 62.400.00 62.400.00

3.5.1.2 WALL FINISHES AND WATERPROOFING

A Coating waterproofing using Brushbond Grey m2 98.856.00 98.856.00


ex Fosroc including Screed Protection,
accessories and flatten
GWT elv -1.30 m Interior Concrete Walls m2 98.856.00 98.856.00

B Interior acrylic emulsion paint finish on light m2 26.260.00 26.260.00


brick wall and column type jotaplast ex. Jotun
or Equal Approved
Pump Room m2 26.260.00 26.260.00

C Exterior weathershield emulsion paint type m2 286.372.00 286.372.00


jotashield antifade flex ex. Jotun or equal
approved
GWT Exterior Concrete Walls m2 62.400.00 62.400.00
Pum Room Exterior Brick Walls m2 26.260.00 26.260.00

D Epoxy 500 micron wall ex. Propan or equal m2 98.856.00 98.856.00


approved
GWT Interior Concrete Walls m2 98.856.00 98.856.00

3.5.2 FLOOR FINISHES

A Floor hardener 5kg/m2 including trowel finish m2 13.260.00 13.260.00


dan floor plate reveals ex. Fosroc or equal
approved
elv +0.00 m Pump Room m2 13.260.00 13.260.00

B Coating waterproofing using Brushbond Grey m2 91.709.33 91.709.33


ex Fosroc, accessories and flatten

elv -1.30 m Interior Slab m2 22.625.58 22.625.58


Exposed Concrete Ceiling m2 47.493.75 47.493.75
elv +3.20 m Exterior Slab m2 21.590.00 21.590.00
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY QTY

C Screed with wiremesh M4, groove line water m2 21.590.00 21.590.00


slooping
elv +3.20 m Exterior Slab m2 21.590.00 21.590.00

D Epoxy 500 micron wall ex. Propan or equal m2 70.119.33 70.119.33


approved
elv -1.30 m Interior Slab m2 22.625.58 22.625.58
Exposed Concrete Ceiling m2 47.493.75 47.493.75

3.5.3 CEILING FINISHES

Expose dak Extra tapping and sanding (skim coat) at m2 47.493.75 47.493.75
exposed concrete ceiling ex. ICI, Propan or
equal approved
GWT m2 47.493.75 47.493.75

3.5.4 STEEL DOORS

SD2 uk. 1600x2150 Door SD2, 40 mm thick two-leaf steel door, pcs 1.000.00 1.000.00
made of 4x4 cm hollow steel frame and
70x150 mm channel (C) type steel sill, total
size 1600x2150 mm duco paint finish,
including hardware, accessories, and
installation

Pump Room pcs 1.000.00 1.000.00

3.5.5 OTHER ARCHITECTURAL WORKS

Baja Ringan Lightweight steel frame 1.2 Truss Profil "S" Pump Room m2 22.310.00 22.310.00
0.75mm

Atap Zincalume Cover roof Spandex depth 0.45 mm, includes Pump Room m2 22.310.00 22.310.00
nok, and Insulations, and accessories :

Insulation Work of Insulation, includes other accessories: Pump Room m2 22.310.00 22.310.00

Gutter on roof, depth 0.45 mm,includes frame Pump Room m1 4.600.00 4.600.00
plate strip and other accessories :

Lisplang Zincalume lisplank, include other accessories Pump Room m1 14.300.00 14.300.00

Manhole size 800x8 Manhole size 800x800 mm, all as drawing and GWT pcs 2.000.00 2.000.00
specified, icluding installation.

Cat ladder 3000 Cat ladder 3000 mm height, made of d25 mm GWT pcs 2.000.00 2.000.00
S/S bar,all as drawing and specified, icluding
installation.
NO. JOB DESCRIPTION ADDITIONAL INFORMATION UNIT QTY QTY

SUBTOTAL

BILL NO. 3.5 - GROUND WATER TANK (GWT) & PUMP ROOM ARCHITECTURAL WORK

3.5.1 INTERIOR WALLS AND WALL FINISHES

3.5.1.1 LIGHT BRICK, PLASTER, AND PARTITIONS WORK Rp. Rp.


3.4.1.2 WALL FINISHES Rp. Rp.

3.5.2 FLOOR FINISHES

3.5.3 CEILING FINISHES

3.5.4 STEEL DOORS

3.5.5 OTHER ARCHITECTURAL WORKS

You might also like