Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PLANT NORTH

GEOGRAPHIC
N

NORTH
22.377° FOUNDATION CONCRETE QUANTITY
PREVALING
SUMMER WIND
S/W MATERIAL TOTAL QUANTITY [Cu. M]
270° 90° FOUNDATION CONCRETE 20.05

PREVALING
WINTER WIND
S/E
180°
GROUTING QUANTITY
MATERIAL TOTAL QUANTITY [Cu. M]
GROUT 0.03
F/W DETAIL OF FNJ002
(SCALE: 1 : 25)
NOTES
(17-L-101A-V-101A /17-L-101A-V-101B) DETAILS OF ABJ002 SECTION 6 FOUNDATIONS TYPE SCHEDULE 1) ALL DIMENSIONS ARE IN MILLIMETERS, ELEVATIONS & CO-ORDINATES ARE IN METERS.
(17-L-101B-V-101A/17-L-101B-V-101B) (SCALE: 1 : 25) (SCALE: 1 : 25) - ITEM TAG F/W TYPE R/F TYPE 2) EL.100.000 = +22.00m ABOVE AVERAGE BALTIC SEA LEVEL IS REFERRED TO THE H.P.P (High Point Paving)
1710-KG101L-FN001A FNJ002 RFJ002
1710-KG101L-FN002A FNJ002 RFJ002 3) FOR GENERAL NOTES FOR CONCRETE WORKS REFER DWG. NO. 4124-AA-DX-200000001
FND 1710-KG101L-FN008A FNJ002 RFJ002 4) BAR BENDING SCHEDULE IS INDICATIVE .CIVIL SUB-CONTRACTOR IS RESPONSIBLE FOR CHECKING
6 1710-KG101L-FN009A FNJ002 RFJ002 REBAR QUANTITIES & DIMENSION ACCORDING TO DRAWINGS.
2300 -
==
400
25 THK.CEMENT BASE
== 300 NON-SHRINK GROUT
== AB-G 09Г2С-6-2a-M16-90-320
TO BE POURED AFTER FOUNDATIONS TYPE SCHEDULE
FINAL ERECTION .

P= 90
UNLESS OTHERWISE NOTED ITEM TAG F/W TYPE R/F TYPE

300

120
==

==
OF PED. 100.425 TOC 1710-KG101L-FN003A FNJ001 RFJ001
5 ABJ002 5

400
==
1710-KG101L-FN004A FNJ001 RFJ001
- -
OF PED.

710
6
ANCHOR BOLTS QUANTITY
2300

-
==

OF FND
DIA. OF ANCHOR BOLTS NO. OF ANCHOR BOLTS BOLT LENGTH [mm]
120.04° M16 24 410
400

400
==

==
400
400 == FN-008A
ABJ002 == ABJ002 FNJ002
RFJ002 ANCHOR BOLTS LAYOUT SCHEDULE
ANCHOR BOLTS LAYOUT TYPE QUANTITY NO. OF BOLTS BOLTS DIA. [mm]
ABJ002 12 24 16

SECTION 5
(SCALE: 1 : 25) - PRICE CODE
LIMITED SECTION EXCAVATION ABA02AC01/02/03
BACKFILLING FROM EXCAVATED MATERIAL ACA05AM01
VAPOUR BARRIER HEAVY DUTY POLYETHYLENE SHEET ADA16AB01
LEAN CONCRETE ADA08AA01
WATER PROOFING BY BITUMEN PAINT ADA16AA01 REFERENCE DRAWINGS
100.425 TOC FORMWORK FOR FOUNDATION ADA09AA01 EQUIPMENT LAYOUT AMMONIA PROCESS AND UTILITIES PLANT,NITROGEN PLANT,
4124-XX-DE-217100001
DEMI WATER STORAGE & POLISHER, CENTRAL HEATING AND WINTERIZATION PLAN AT EL. 99.800 AND ABOVE
FOUNDATION CONCRETE ADA08AB03
100.200 HPP
4124-AA-DX-200000001 CONCRETE WORKS GENERAL NOTES FOR CONCRETE WORKS
REINFORCED CONCRETE PAVING AEA08AG01
SUPPLY AND INSTALLATION OF STEEL REBARS ADA10AA03 4124-AA-DX-200000002 CONCRETE WORKS STANDARD DETAIL OF ANCHOR BOLTS
99.800 FGL NON-SHRINK GROUT ADA12AB01 PANT1,AREA 2.1.7.10(PART 1).
4124-AA-DA-217100001S01
NITROGEN PLANT,DEMI WATER STORAGE & POLISHER PILE LAYOUT
1625

FORMWORK FOR EXECUTION OF ANCHOR BOLT BOXES ADA09BA01


4124-FY-VD-LF17517L10100001 FOUNDATION LAYOUT WITH LOADS AND TRENCHES
INSTALLATION IN EXISTING BOXES OF ANCHOR BOLTS ADA11EB01
4124-AA-DC-21710L101S01 EQUIPMENTS FOUNDATION LAYOUT NITROGEN UNIT (1710-KG101L)
2425
800

98.000 BOF

P.Nair/
01 ISSUED FOR APPROVAL 20-Jul 2021 M.Mhatre D.Pushkar
G.Girardi
REV DATA PREPARED CHECKED APPROVED
DESCRIPTION -ОПИСАНИЕ
РЕД. ДАТА ПОДГОТОВИЛ ПРОВЕРИЛ УТВЕРДИЛ

Tecnimont
This copy of this document is LLC Eurochem Northwest-2's property and its copyright is vested in Tecnimont Spa. This document contains confidential information and cannot be copied to or used
by any party for any purpose without Tecnimont’s Spa and LLC Eurochem Northwest-2’s prior written consent. Additional restrictions are as stated in the above confidentiality and export label, if any.

Настоящая копия документа является собственностью OOО "ЕвроХим-Северо-Запад-2”, и авторские права на него закреплены за АО «Текнимонт». Данный документ содержит
конфиденциальную информацию и не может копироваться или использоваться никакой другой стороной ни для каких целей без предварительного письменного согласия АО
«Текнимонт» и OOО "ЕвроХим-Северо-Запад-2”. Возможные дополнительные ограничения указаны выше в метке конфиденциальности.

TCM DOCUMENT No.: DOCUMENT No:


Текнимонт номер документа 4124-AA-DC-21710L101S03 ДОКУМЕНТ №:

- - - - - - OWNER:
- - - - - -
ВЛАДЕЛЕЦ: LLC EUROCHEM NORTHWEST - 2
- - - - - - PROJECT:
ПРОЕКТ:
- - - - - - Ammonia and Urea Production, Kingisepp.
Изм.N Кол.уч. N Докум Лист Подпись Дата
REV. Num. count Doc. No Sheet Sign Date
Разработал ORIG. - - - - PLANT: Стадия Phase Лист Sheet Листов of
УСТАНОВКА: 3000 MTPD Ammonia
Проверил CHKD. - - - - LOCATION:
РАСПОЛОЖЕНИЕ:
Kingisepp - Russian Federation P 01 01
Утвердил APPR. - - - -
TITLE: SCALE:
НАИМЕНОВАНИЕ: МАСШТАБ:

A0 SHEET
F/W & R/F DETAILS OF PRE-PURIFIER VESSEL
NITROGEN UNIT (1710-KG101L) 1:100