Custom Metalcrafters

Contact
Office # Mobile # Address

Email:
$ Comments
Bid Package ### Bid Date: Exterior Wall Leveled
February Date:
25, 2021
July 8, 2021

Bid Taker: Farhan Mudasir


Exterior Wall

1 Bid Documents
2 Prequalified Sub - Completed Prequal on TradeTapp P
3 UAG Project Manual Dated: To Follow O
4 UAG Document List Dated: To Follow O
5 EXHIBIT 1A: Safety 360 Dated: To Follow O
6 EXHIBIT A: Scope of Work Dated: To Follow O
7 EXHIBIT B: List of Alternates Dated: To Follow O
8 EXHIBIT C: Unit/Labor Prices Dated: To Follow O
9 EXHIBIT D: Insurance Dated: To Follow O
10 EXHIBIT F: Special Provisions Dated: To Follow O
11 EXHIBIT H: LEED Dated: To Follow O
12 EXHIBIT I: Scope Delineation Drawings Dated: To Follow O
13
14 Drawing Sets: Link to all CDs P
15 DD Drawings & Specifications Dated: 05-15-2020 P
16 Draft Enclosure Drawings & Specifications Dated: 04-09-2021 P
17 DD Revision 1 Drawings & Specifications Dated: 04-26-2021 P
18 DD Revision 1A Drawings & Specifications Dated: 05-14-2021 P
19 DD Revision 2 Drawings & Specifications Dated: 06-18-2021 P
20
21 Specifications: (All Divisions, as well as including below) : P
22 Division 1 - General Requirements (All sections) P
23 019100 - Exterior Enclosure Design Assist P
24 057300 - Decorative Railings P
25 078413 - Firestopping P
26 079201 - Joint Sealants P
27 079210 - Miscellaneous Joint Sealants P
28 084050 - Exterior Enclosures - General P
29 084126 - All Glass Entrances P
30 087100 - Door Hardware P
31 088000 - Glass and Glazing P
32 112423 - Façade Maintenance System P
33
Custom Metalcrafters
110 Protect adjacent buildings from this Subcontractor's and Sub-tier Vendor's activities. P
111 Protect all trees, light poles, etc. on sidewalk from this Subcontractor's and Sub-tier Vendor's activities. P
112 Protect existing work from spills, droppings, etc. P
113 Re-install any temporary protection removed by this trade for its work. P
114
115 Site Management
116 All trucking, deliveries, equipment, etc. to be coordinated with UAG Personnel (Super/PM). P
117 Include all certified/licensed flaggers and traffic controllers as needed for SOW. P
118 No parking onsite. P
119 Trailers/shanties by this Subcontractor. P
120 Include temporary power (If temp power is not setup at time of mobilization). P
121 Include all required temporary water including hoses, etc. P
122 Include all off-site storage as required to maintain schedule. P
123 Worker access to site via turn-stile system. Subcontractor responsible for all access cards as per Exhibit A. P
124 Place all debris directly in mini-containers centrally located on each floor. P
125 Subcontractor responsible to maintain clean and tidy work area. P
126
222 Provide fixed window wall at all areas as indicated on the Architectural Drawings. P
223 Meet all system parameters per Specifications (084050-1.16-B). P
224 Include interior aluminum cap, rounded to match profile per Dwgs. See e.g., 1/A-513. P
225 Include interior aluminum sill and header caps per Dwgs. See e.g., 1/A-513, 2/A-513, etc. P
Custom Metalcrafters
226 F&I all GR-01 laminated safety glass guardrails per Dwgs. See e.g., 1/A-202. P
227 Design and engineer cantilevered glass guardrails to meet all requirements per CDs and applicable Codes. P
228 Include top cap/hand rail per Dwgs. P
229 Include GR-02 cable guardrails at 12th floor and 16th floor setbacks per Dwgs. P
230 All glass pane, doors, operable unit sizes per Dwgs. P
231
232 EWS 01A - Operable Wall Panels at Terraces/Setbacks [Breakout Area // Cost:] P
233 Provide EWS-01A operable insulated glass panels at setbacks per Dwgs. P
234 Comply with all scope and requirements associated with EWS-01 per CDs. P
235 Include all hardware for garage style vertical operability of vents. P
236 Provide modified pre-engineered actuators, tracks, and operations hardware and controls per Specs. P
237 Submit proposed hardware drawings/sketches showing intent to qualify as complete bid. P
238
239 EWS 01B - Single Height Window with Double Swing Doors [Breakout Area // Cost:] P
240 Include EWS-01B double swing insulated glass doors at all locations per Dwgs. P
241 Comply with all scope and requirements associated with EWS-01 per CDs. P
242 Double swing doors to meet performance requirements without fixed, center mullion. P
243 All components and hardware to be ADA compliant (e.g., thresholds) per CDs. P
244 Include all coordination of threshold and sill heights with adjacent construction per Dwgs.
245
246 EWS 02 - Double Height Balcony Window Wall [Breakout Area // Cost:] P
247 Provide fixed window wall at all balcony areas as indicated on the Architectural Drawings. P
248 Meet all system parameters per Specifications (084050-1.16-C). P
249 Include opaque areas as shadow box assemblies with fixed glazing per Dwgs. See e.g., 3/A-524. P
250 Provide painted shadow box steel pane per Dwgs. P
251 Provide extruded rigid foam insulation [INS-01] at shadow box detail per Dwgs. P
252 Include all anchor coordination to structural concrete/steel at head of enclosure as required. See 3/A-525. P
253 Confirm if vertical steel post required at inside corner per 1/A-524. P
254 Include all fire stop (safing and smoke seal) at EWS-02 per Dwgs and at all locations required per Code. P
255 Include interior and exterior, vertical aluminum caps & panels at EWS-02 per Dwgs. See e.g., 1/A-524. P
256 F&I all mineral wool insulation required to prevent thermal bridging. P
257 Include interior steel sill and header caps per Dwgs. See e.g., 3/A-524, etc. P
258 Include all accessory fire-safing required to maintain 2-hour rated shaft wall assembly at slab edge per Dwgs. P
259 F&I all fascia and soffit painted metal panels as shown on Dwgs. See e.g., A-523, 3/A-525, etc. P
260 Include air/vapor barrier at all soffit locations per Dwgs. P
261 Include exterior rigid foam insulation at all soffit and fascia areas per Dwgs. P
262 Include all hangers, supports required to support soffit to building structure. P
263 Coordinate all penetrations (cameras, lights, sprinklers, etc.). P
264 Include all sill pan flashing at base of window wall per Dwgs. See e.g., 3/A-524. P
265 F&I all GR-01 laminated safety glass guardrails per Dwgs. See e.g., A-521. P
266 Design and engineer cantilevered glass guardrails to meet all requirements per CDs and applicable Codes. P
267 Include top cap/hand rail per Dwgs. P
268 All glass pane, doors, guardrails, & operable vent sizes and sub-divisions per Dwgs. P
269
270 EWS 02A - Operable Wall Panels at Balconies [Breakout Area // Cost:] P
271 Include EWS-02A operable insulated glass panels at all locations per Dwgs. P
272 Comply with all scope and requirements associated with EWS-02 per CDs. P
273 Include all hardware for garage style vertical operability of vents. P
274 Provide modified pre-engineered actuators, tracks, and operations hardware and controls per Specs. P
275 Submit proposed hardware drawings/sketches showing intent to qualify as complete bid. P
276
277 EWS 02B - Balcony Window Wall with Double Swing Doors [Breakout Area // Cost:] P
278 Include EWS-02B double swing insulated glass doors at all locations per Dwgs. P
279 Comply with all scope and requirements associated with EWS-02 per CDs. P
280 Double swing doors to meet performance requirements without fixed, center mullion. P
281 All components and hardware to be ADA compliant (e.g., thresholds) per CDs. P
282
283 EWS 03 - Single Height Office Fixed Glazing Wall [Breakout Area // Cost:] P
284 Provide EWS-03 Insulated Glazing Wall System at all locations per Dwgs. (West elevation, etc.) P
285 Meet all system parameters per Specifications (084050-1.16-D). P
286 Include painted aluminum cladding panels at glazing perimeter per Dwgs. See e.g., A-531, 2/A-533, etc. P
287 F&I aluminum cladding for perimeter of EWS-08A "EIFS @ West Infill" per Dwgs (A-581, A-583, etc.). P
288 F&I aluminum cladding for perimeter of EWS-08B "EIFS @ West Core" per Dwgs (A-586, etc.). P
289 Include all cladding profile, depth, etc. per Dwgs. P
290 Include all thermally isolated girt connections for the aluminum cladding per CDs. P
291 Include all air/vapor barrier application behind the aluminum cladding per CDs. P
292 Include all thermal insulation behind the aluminum cladding per CDs. P
293 Include all sealant application at perimeter of cladding & internal joints, whether shown on Dwgs or not. P
294 All unit, glass pane sizes and sub-divisions per Dwgs. P
295 Include all sequencing and coordination required to install all components of this system. P
296
297 EWS 04 - 2-HR Rated Glazing Wall [Breakout Area // Cost:] P
298 Provide EWS-04 2-Hour Fire Rated Transparent Wall System at all locations per Dwgs. (West elevation, etc.) P
299 Meet all system parameters per Specifications (084050-1.16-E). P
300 Provide specified glass make-up per Dwgs and Specifications (088000-2.6). P
301 All system subdivisions and dimensions per Dwgs. See e.g., A-542, etc. P
302 Include painted aluminum cladding panels at glazing perimeter per Dwgs. See e.g., A-531, 2/A-533, etc. P
303 Include all cladding profile, depth, etc. per Dwgs. P
304 Cladding to be integrated into glazing system for proper weeping per Dwgs. See e.g., 1/A-543, etc. P
305 Include all thermally isolated girt connections for the aluminum cladding per CDs. P
306 Include all air/vapor barrier application behind the aluminum cladding per CDs. P
307 Include all thermal insulation behind the aluminum cladding per CDs. P
308 Include all sealant application at perimeter of cladding & internal joints, whether shown on Dwgs or not. P
309 All unit, glass pane sizes and sub-divisions per Dwgs. P
310 Include all sequencing and coordination required to install all components of the double glazing wall system. P
311
312 EWS 05 - Retail Glazing Wall / Storefront [Breakout Area // Cost:] P
313 Provide storefront entrance system at all ground floor areas as indicated on the Architectural Drawings. P
314 Meet all system parameters per Specifications (084050-1.16-F). P
315 Include all internal steel reinforcement as required for system performance. See e.g., 1/A-553, etc. P
316 Include all coordination at overlapping of storefront system with UHPC cladding. P
317 Include all incidental metal flashing & seals required to ensure weathertight installation to superstructure concrete. P
318 Include all vertical structural glazing butt joints above door jambs per Dwgs. See e.g., 3/A-552. P
319 Include double swing insulated glass balanced doors and at all locations within EWS-05 per Dwgs. P
320 Double swing doors to meet performance requirements without fixed, center mullion. P
321 Double swing doors to be narrow stile doors with mirror polished finish per Dwgs. P
322 Provide overhead glass panes, structurally glazed over the entrance doors per Dwgs. P
323 All components and hardware to be ADA compliant (e.g., thresholds) per CDs. P
324 Include all coordination of threshold and sill heights with adjacent construction per Dwgs.
325 Include all provisions to allow for installation of magnetic locks, electric strikes, card readers, etc. per CDs. P
326 Provide all metal panel rainscreen in lobby entrance vestibule per Dwgs. P
327 Include soffit and vertical panels. P
328 Include all anchorage, attachment brackets, air/vapor barrier and insulation per Dwgs. P
329 F&I all storm resistant louvers LV-02 above the storefront sytem per Dwgs. P
330 Provide thermal insulation and galv. steel back-up panel at all locations per Dwgs. P
331 Provide "frame-less" louver to louver joints as indicated on the Dwgs. See e.g., 5/A-553. P
332 Include all anchor coordination to structural concrete/steel at head of storefront. See e.g., 1/A-553. P
333 F&I lobby entrance wall at Franklin Street per Dwgs. See e.g., A-101, A-441, etc. P
334 Include all fixed side lites, automatic sliding door and balanced door as shown on Dwgs. P
335 Include MTL01 metal panel soffit, substrate air/vapor barrier and thermal insulation per Dwgs. (1/A-443). P
336 Include all coordination, sequencing, comeback and tie-ins with adjacent systems per CDs. P
337 Include all cladding on steel beams per CDs. See e.g., 3/A-441, etc.
338 Include vestibule recessed stainless steel floor mat.
339 All glass pane, doors, louver sizes and sub-divisions per Dwgs. P
340
341 EWS 05A - Recessed Entrances on Church Street [Breakout Area // Cost:] P
342 Provide recessed storefront system at all retail entrances on Church Street per Architectural Drawings. P
343 Meet all system parameters per Specifications (084050-1.16-F). P
344 Include all internal steel reinforcement (horiz. & vert. steel channels) per Dwgs. See e.g., A-555, 3/A-556, etc. P
345 Include all stainless steel edge caps per Dwgs. See e.g., 1/A-556. P
346 Include all structural glazing joints at recessed entrances per Dwgs. See e.g., 4/A-556. P
347 Include all design, engineering for structural glass to provide lateral stability of vestibule per CDs. P
Custom Metalcrafters
349 Include double swing balanced insulated glass doors and at all locations within EWS-05A per Dwgs. P
350 Double swing doors to meet performance requirements without fixed, center mullion. P
351 Door stile, daylight openings, kicker height, etc. per Dwgs. P
352 All components and hardware to be ADA compliant (e.g., thresholds) per CDs. P
353 Include all coordination of threshold and sill heights with adjacent construction per Dwgs.
354 Include all provisions to allow for installation of magnetic locks, electric strikes, card readers, etc. per CDs. P
355 Provide all metal panel rainscreen in from face of building to recessed entrances per Dwgs (A-555, etc.). P
356 Include soffit and vertical panels. P
357 Include all anchorage, attachment brackets, air/vapor barrier and insulation per Dwgs. P
358 Include all anchor coordination to structural concrete/steel at head of storefront. See e.g., 5/A-556. P
359 Include all coordination for installation of lighting, sprinkler, fire alarm conduit runs in system (3/A-556). P
360 Include stainless steel walk-off mat within the vestibule per Dwgs. See e.g., 2/A-555.
361
362 EWS 05B - Operable Retail Walls & Side Entrance [Breakout Area // Cost:] P
363 Include operable insulated glass panels at all ground floor locations per Dwgs. P
364 Comply with all scope and requirements associated with EWS-05B per CDs. P
365 Include all hardware for garage style vertical operability of vents. P
366 Provide modified pre-engineered actuators, tracks, and operations hardware and controls per Specs. P
367 Submit proposed hardware drawings/sketches showing intent to qualify as complete bid. P
368 Provide storefront system behind operable panel for entrance into Retail B per Dwgs. See A-101. P
369 Meet all system parameters per Specifications (084050-1.16-F). P
370 Include insulated glass swing door as part of the operable wall panel per Dwgs. See 3/A-558.
371 Operable wall sill at swing door to meet ADA requirements. See e.g., 3/A-560. P
372 Include double swing balanced insulated glass doors and at all locations within EWS-05B per Dwgs. P
373 Double swing doors to meet performance requirements without fixed, center mullion. P
374 Door stile, daylight openings, kicker height, etc. per Dwgs. P
375 All components and hardware to be ADA compliant (e.g., thresholds) per CDs. P
376 Include all provisions to allow for installation of magnetic locks, electric strikes, card readers, etc. per CDs. P
377 Provide all metal panel rainscreen and caldding at all locations per Dwgs (A-557, etc.). P
378 Include soffit and vertical panels. P
379 Include all anchorage, attachment brackets, air/vapor barrier and insulation per Dwgs. P
380
381 EWS 06 - Lobby Glazing Wall [Breakout Area // Cost:] P
382 Provide lobby glazing wall system at all ground floor areas as indicated on the Architectural Dwgs (A-561, etc.). P
383 Meet all system parameters per Specifications (084050-1.16-G). P
384 All sloped insulated glass to meet performance requirements per CDs. P
385 Provide all head and sill glass anchorage to sufficiently support sloped insulated glass per Dwgs. P
386 No intermediate vertical supports per indicated design intent on Dwgs. P
387 Include structural silicone joint at all glass to glass joints per Dwgs. P
388 Design, engineer, F&I all coordinated custom anchor brackets for attachment to supporting structure (A-563). P
389 F&I all painted, matt black soffit metal panels at the lobby glazing wall per Dwgs. P
390 Include all back-up weather barrier and thermal insulation above the soffit per Dwgs (A-563). P
391 Include all isolating metal soffit framing from slab edge per Dwgs. P
392 Provide metal panel soffit slope as shown on Dwgs. P
393 Include front band at the soffit, drip edge profile and horizontal return leg (@UHPC interface) per Dwgs. P
394 Include both vertical returns at the lobby glazing wall on CMU substrate. See e.g., 1/A-562. P
395 Include c-channel shaped interior sill profile for interface with interior finishes per Dwgs. See 2/A-563. P
396 All glass pane and metal panel sizes, sub-divisions and profiles per Dwgs. P
397
398 EWS 07 - UHPC Rainscreen Cladding System [Breakout Area // Cost:] P
399 Provide curved and profiled UHPC rainscreen panels at all areas as indicated on the Architectural Drawings. P
400 Meet all system parameters per Specifications (084050-1.16-H). P
401 Provide all UHPC panel profiles, sizes and sub-divisions per Dwgs. P
402 Include all half-circle, 3/4 circle, and full circle column and spandrel covers as shown on Dwgs. P
403 Confirm no longitudinal joints on 1/2 and 3/4 circle cladding. P
404 Indicate panel break-up/longitudinal joints on full circle cladding as part of bid proposal. P
405 All cladding lengths per Dwgs. Indicate any joints included in proposal, not shown on CDs. P
406 Include custom shapes at 4-way column/slab and 3-way corner interfaces per Dwgs. See e.g., A-571.00. P
407 F&I all anchor brackets, girts, attachment systems required to attach rainscreen cladding to building substrate. P
408 All attachment hardware to be thermally broken per CDs. P
409 F&I air/vapor barrier (e.g., AVB-01) at all substrate areas behind the EWS-07 rainscreen system per Dwgs. P
410 Include all extensions of air/vapor barrier to glazing systems for full weathertight installation. P
411 F&I all mineral wool thermal insulation at all cavities behind the EWS-07 rainscreen system per Dwgs. P
412 Include all wet seals at panel to panel and panel to adjacent system joints per Dwgs. P
413 Include all extension membranes, flashings, closure pieces to ensure weather barrier continuity. P
414 Include metal flashing sheet for spandrel closure at EWS-02 metal panel soffits per Dwgs. See 3/A-523. P
415 All coordinated penetrations to be included in UHPC panels as part of the fabrication process. P
416 Include all finishes as indicated on the Contract Documents (See e.g., A-651). Incl@min: P
417 PNT-11 High Reflective White P
418 PNT-12 Light Grey (Locations to be confirmed) P
419
420 EWS 09 - Louver Cladding Screen Wall System [Breakout Area // Cost:] P
421 Provide louvered rainscreen and screen wall systems at all bulkhead areas as indicated on the Architectural Dwgs. P
422 Meet all system parameters per Specifications (084050-1.16-J). P
423 F&I all anchor brackets, girts, attachment systems required to attach rainscreen cladding to building substrate. P
424 Design system to accommodate all spans in substrate shown on the CDs. See e.g., S-161 thru S-181, etc. P
425 F&I air/vapor barrier (e.g., AVB-01) at all substrate areas behind the louver screen wall system per Dwgs. P
426 Include all extensions of air/vapor barrier to adjacent systems. P
427 F&I all extruded rigid foam insulation at all areas behind the louver screen wall system per Dwgs. P
428 F&I louvered doors as indicated on CDs to match adjacent louvers. See e.g., 084050-1.16-J-1.b.
429 Include all extension membranes, flashings, closure pieces per Dwgs. P
430 Include painted metal coping at the top of the louver cladding screen wall system per Dwgs. See A-592. P
431 Include vertical louver blade splice at all locations per Dwgs. See A-592. P
432 Include transition to all roofing systems on level 16. P
433 Include transition to roofing system on top of the Elevator Vestibule (See e.g., 3/A-596). P
434 Include transition to air/vapor barrier at the Elevator Vestibule wall terminations (See e.g., 2/A-597). P
435 Include all finishes as indicated on the Contract Documents. P
436 All louver blade profiles, sizes, separation distances, and sub-divisions per Dwgs. P
437
438 EWS 10 - Elevator Vestibule Glass Wall System [Breakout Area // Cost:] P
439 Provide insulated glass wall system at Elevator Vestibule as indicated on the Architectural Drawings. P
440 Meet all system parameters per Specifications (084050-1.16-K). P
441 Provide all balanced glass doors as shown on Dwgs. See A-595, A-596, A-597, etc. P
442 Include all hardware (handles, hinges, panic bars, etc.) per Contract Documents. P
443 Door system and anchorage to be fully integrated in the mullions per CDs (See e.g., 1/A-597). P
444 Maintain sightlines and day light openings as shown on Contract Documents. P
445 Include surface mounted door closer in accordance with Dwgs & Specs. See e.g., 5/A-597, etc. P
446 All components and hardware to be ADA compliant (e.g., thresholds) per CDs. P
447 Include coordination with all security/safety hardware as needed to be incorporated into doors.
448 Include all aluminum flashing and thermal insulation at sill of system per CDs. See e.g., 4/A-597. P
449 Include all transitions from pressure plate to aluminum flashing at door sill for weatherbarrier continuity. P
450 Include all coordination for engineering and design of glazing wall system with structural steel Subcontractor. P
451 This includes accommodating all tolerances, logistics, scheduling and sequencing associated with interface. P
452 Include all coordination with and attachment to structural steel elements provided by Others. See e.g., A-597, etc. P
453 F&I all spacers, seals, fillers to supporting steel in accordance with the Dwgs. P
454 Include all attachment of pressure plates back to structural steel per CDs. P
455 Include drip edge metal panel drip edge/flashing at the head of the glazing system per CDs. P
456 Drip edge extent and attachment shall be coordinated to tie-in with roofing system at vestibule roof. P
457 Include all thermal insulation behind drip edge as shown on CDs. P
458 Include mtl cladding and air/vapor barrier at both end jambs of elevator vestibule glazing system. See 2, 3/A-597. P
459 Include all transitions to the louver rainscreen and EIFS systems to ensure continuity of weatherbarrier. P
460 Include all structural seals and weatherproofing seals required for a complete weathertight glazing system. P
461 Include all glass to glass, glass to door and other system termination and transition seals. P
462 Include all incidental metal drip edges, weeps, flashings and closure plates to ensure weather barrier continuity. P
463 F&I coordinated brackets for signage (e.g., exit signs, etc.) whether or not shown currently on Dwgs. P
464 Include all finishes as indicated on the Contract Documents. P
465 All panel sizes, joint alignments, and sub-divisions per Dwgs. P
466
467 Performance Criteria P
468 LEED criteria per Specs (per 084050-1.5-E). P
469 Meet all performance requirements per Specs (See e.g., 084050-1.9). Incl@min: P
SCOPE SHEET Project 101 Franklin Street UAG
Service life requirements. P
Building movements. P
Structural loads. P
Air and water performance. P
Thermal movements and loads. P
Energy performance. P
Acoustic performance. P
All systems and materials shall comply with NFPA 285 per Specs (084050-2.1-C, etc.) P
Meet all fabrication and installation tolerances per Specifications. P

Project Submittals
Subcontractor's Schedule of Values (No subcontract or payments until approved SOV). P
List of all sub-tier Subcontractors, Vendors, Suppliers. Including their contacts and approx. value of work. P
Sub-tiers subject to UAG review for compliance with prequal. and insurance requirements. P
Detailed Subcontractor project schedule (No payments until approved schedule). P
Submit Manpower schedule for duration of Project to maintain baseline schedule and turnover date. P
A logistics plan with all Subcontractor’s proposed equipment & methodology of delivery, storage, installation. P
Include a full loading plan showing locations, loads and methodology for storage of materials on project. P
Include full crane logistics, list of permits and associated time frames with approval of these permits. P
Product data sheets and test reports per Specs (084050-1.11-D, 084050-1.11-R). P
Shop Drawings and Submittals per Specs. P
Drawings and calculations to be signed/sealed by NYS PE. P
Submit all samples per Specs. P
Quality control submittals per Specs. P
Provide sealant adhesion and compatibility test reports for each project substrate. P
Provide all STC assembly submittals and test reports per Specs (084050-1.11-C). P
Provide all LEED submittals per Specs (084050-1.11-E, 013500-1.6,). P
Provide 12" x 12" fabrication sample (desk model) of system intersection per Specs (084050-1.11-L). P
Provide energy performance certificates as required per Specs (084050-1.11-Q). P
Provide all glass & glazing documentation per Specs (084050-1.11-V). P
Provide samples of all special warranties per Specs (084050-1.11-U). P
Provide Asbestos & PCB certification per Specs prior to Substantial Completion (084050-1.11-Z). P

Out-Of-Sequence and Comeback Work


All fabrication/installation sequencing to support project schedule; e.g., floor-by-floor or area-by-area installation. P
Hoist bay glazing and cladding as comeback. P
Include separate mobilization for hoist bay work. P
Storefront glazing and cladding as comeback. P
Coordinated and sequenced with sidewalk bridge & protection. P
Include all coordination, sequencing and comeback with ground floor stone cladding system per Dwgs. P
EWS-03, EWS-04 & EWS-07 as sequenced with west elevation CMU, EIFS, roofing scope of work. P
West elevation scope sequenced to be coordinated with neighbors' roof protection scope. P

QA/QC, Testing, Close-Out & Maintenance P


VMU of full sized assemblies for each system per Specifications (e.g., 084050-1.5-D, 084050-1.5-M). P
PMU of full scope, tested in accordance with Specifications (e.g., 084050-1.10). P
OITC testing as required to meet submittal requirements per Specifications (e.g., 084050-1.11-C). P
All field testing per Specifications. P
Field acoustical testing in accordance with the Specifications (e.g., 084050-3.5-D). P
Field chamber tests for air/water testing. P
Field water spray hose testing. P
All field sealant adhesion testing per Specs and as directed by Design Team & Ownership. P
Provide necessary Personnel for all required inspections, tests and sign-offs. P
Maintain internal QA/QC program per Specifications. P
Compliance with Quality Assurance per Specs. P
Include visits from sealant Manufacturer's Representative per Specs and as directed by Design Team & Owner. P
Provide all attic stock (Extra Material) per Specifications (e.g., 084050-1.15). P
Provide all warranties as per the Contract Documents. P
Provide all operations & maintenance manuals and data per Specs (084050-1.11-T, 084050-1.11-W). P
Submit Certification of Application per Specs (084050-1.11-X). P

Exclusions
Heavy gauge metal studs and sheathing at enclosure locations. O
Furnish or installation of sprinklers, cameras or other MEP accessores outboard of the enclosure walls. O
Interior vestibules at storefront systems. See note on A-101. O
Roofing systems. O
CMU walls. O
2-HR Rated Blocking at EWS-04 perimeter (A-543). O
Stonewall cladding at Lobby Entrance (A-122). O
Hollow Metal Doors at Exterior (Ground floor, adjacent to EWS-05). O
ISA buttons. O
ISA support brackets in the EIFS areas. O

Warranty
All warranty starts and durations per Specifications. P
Warranties to cover all failures per Specifications. P

VE Options
VE #01: Eliminate garage style vertical operation windows at EWS-01A, EWS-02A. Provide fixed vision window wall with double doors per adjacent
P systems [EWS-01B & EWS-02B]

VE #02: Provide subdivided glazing at EWS-03 office glazing wall to match EWS-04 below on west elevation. P
VE #03: Provide subdivided glazing at EWS-01 and EWS-02 systems at the north elevation. P
VE #04: Provide subdivided glazing at EWS-01 and EWS-02 systems at the south elevation. P
VE #05: Provide subdivided glazing at EWS-01 and EWS-02 systems at the east elevation. P
VE #06: Provide frit pattern to meet LL15 - Bird Friendly Materials, in lieu of specified coating. P
VE #07: Provide acid etched or sandblasted UHPC finish in lieu of the specified high reflective (polish?) finish. P
VE #08: Provide subdivided UHPC panels into smaller segments for ease of installation. P
VE #09: Provide high reflective white GFRC column/spandrel cladding in lieu of specified UHPC panels. P
VE #10: Provide acid etched or sandblasted white GFRC column/spandrel cladding in lieu of specified UHPC panels. P
VE #13: Provide aluminum formed panels ilo UHPC panels @ EWS-07. Match all profiles and finishes. P
VE Total:

Exterior Wall SUBCONTRACT AMOUNT

ALTERNATES
ALT #01: Deduct for CCIP or OCIP program on project [WC & GL]. P
ALT #02: P&P Bond P

Custom Metalcrafters
P

P
P
P
P
P
P
P
P
P
P
None Accepted

$ -