Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

ERAT TEMURUN SDN BHD

ESH WEEKLY INSPECTION CHECKLIST


INSPECTION DATE :

Not Not
Compl Not Not
Description Compl Description Comply Compl
y Appl. Appl.
y y
1.0 WORKPLACE SAFETY HAZARDS 8.0 FIRE PREVENTION
1. Access to workplace a) Fire fighting equipment
a) Access is clear of b) Means of escape is adequate and
obstruction
b) Adequate Overhead clear of obstruction
Protection Cover
c) Dangerous goods properly stored
2. Working Platform d) Gas cylinders in upright position and
a) Sound and stable Arrestor
b) Adequate Size and protection
9.0 EARTHWORK
2.0 MACHINERY a) Excavation with proper slope / or
Certificate validity (PMA/PMT): strutted, barricaded and sign posted
i. Tower cranes b) Trenches
ii. Mobile Cranes / Crawler Crane c) Caissons
iii. Passenger Hoist d) Tunnels
iv. Compressor e) Slopes
f) Others
3-.0 PERSONAL PROTECTIVE
EQUIPMENT
a) Provision and record 10.0 KONGSI
of PPE Distribution
b) Proper usage of PPE a) Kitchen
b) Power Supply
4.0 EXPOSED EDGES / FLOOR c) Housekeeping
OPENING
a) Guardrails and Toe d) Sanitary system
Boards
b) Securely fenced and e) Sewerage System /
Barricaded Outlet
c) Warnings Signs f) Hoarding / Fencing

5.0 DISPOSAL OF DEBRIS / WASTE 11.0 GENERAL


MATERIAL
a) Handled and a) Housekeeping
Disposal Safely
b) Regular Removal b) Safety nets and fences
( No open burning )
c) Stacking of materials
6.0 ELECTRICAL HAZARDS d) Passageway and access way
a) Proper Warning e) Lighting
Signs
b) Wiring in Good f) Ventilation
Condition and Safely Laid
c) Competent Person g) Others
d) Proper Power Point,
Plug and Others
12.0 OTHERS
7.0 SCAFFOLD a) First Aid Facilities
a) Scaffold are firm and b) Warning / Danger
stable Signs
b) Tag for scaffold is c) Emergency system
safe for use is intact and escape routes
c) Scaffold d) Housekeeping
base/foundation is firm and safe
e) Pest Control
Program

Remarks or recommendations:

_______________________________________________________________________________________________________________________
Inspected by (SSS ) Review by ( PM/CM/ENGINEER )

Signature : ……………………………………… Signature : …………………………………………

Name : ……………………………………… Name : …………………………………………

Date : ………………………………………. Date : …………………………………………

You might also like