1
Enterprise Resource Planning
3
BSNL-MP Telecom Circle, Bhopal.
1. Capital works :- Such as procurement of
ready to use items i.e. office equipments, furniture
etc.
Project
Network
Material
Req/Amt Overheads
Exp
Service
Req/Amt
1 2 3
N/W-1 1.Cable- 4 km
(Detailed 2. Jointing kit-4 nos
Estimate) Mat. Req for Cable 3. etc
Laying near AIIMS
1.Cable- 8 km
Int Proc Mat. Req for Cable
2. Jointing kit-16 nos
(Material Req) Laying near SBI
3. etc
N/W Creation
Financial
Concurrence
Project Approval
Budgeting
MIGO
Service-PO Release of N/W (Good Issue to
Creation
SLOC)
Asset Creation
Equipment Creation
BSNL-MP Telecom Circle, Bhopal.
9
WBS Creation WBS Modification N/W Creation
(CJ01) (CJ02) (CN21)
Service
(Ext. Prc) PO Creation Release SES MIRO
PR No
Zero Valued
WBS Status WBS and N/W
Asset Creation
Comm then CLSD Status TECO
Using Template
(CJ02) (CJ02/CN22)
(AS01)
Network profile,
Network type=ZPS2,
Plant ,
MRP controller=001.
(a) Internal processing (All the materials to be issued from BSNL stores)
(b) External Processing (Services to be hired from External Vendor)
(c) Primary costs (All other costs).
(d) Primary cost should be 10-20% of the total project cost.
(a) Internal processing (All the materials to be issued from BSNL stores)
Q. Can the user status be set to PEAP/AAES through user status updation tab ?
Q. In case of WBS of Project type CI/CW/EW/EC/EE ,why WBS is not getting released
even status is PEAP/AAES,BUDG and AVAC ?
PO will be Generated
1.Enter SLOC
2.Save
Vendor payment will be done and Misc cost postings will be done.
AGM Plg. Or Concerned SDE will chang the user status as per work done
i.e RECR,REAP, OFAT,PFCO, TKOV etc.
AGM Plg. Or Concerned SDE will chang the user status as per work done
i.e RECR,REAP, OFAT,PFCO, TKOV etc.
PM MDM Team will create respective equipment on the Basis of Template. Avb
at portal 10.197.216.213 under PM Module->PM BDC files->Equipment creation.