Cidanau Dam

21. Potential Involuntary Resettlement


Based on the sub-project identification which have been established by RWS Consultant
then potential Involuntary Resettlement per sub-project starting from source to main
distribution pipeline can be explained as follows:

Name of Location Land Use Required Area


Potential RWS
No.
Infrastructure name of villages Subdistrict Regency Length Width Area
Component (M) (M) (M2)
C. Cidanau Dam
1. Intake Bantarwangi Cinangka Kab pertanian 80 60 2400
Serang lahan
kering
2. WTP Pasauran Cinangka Kab pertanian 225 192 43184
Serang lahan
kering
3. Reservoir Pasauran Cinangka Kab pertanian
Serang lahan
kering
4. Underground Pasaungan, Cinangka, Kab Pertanian 37354
Transmission Bulakan, Anyar, Serang, lahan
Piping (suplesi Karangsuraga, Ciwandan, Kota kering
waduk Cinangka, Citangkil Cilegon
Krenceng Sindanglaya,
Tahap 1) Kamasan (Kec
Cinangka, Kab
Serang),
Bandulu,
Tambangayam,
Cikoneng, Anyar
(Kec Anyar, Kab
Serang)
Gunungsugih,
Kepuh,
Randakari,
Tegalratu, (Kec
Ciwandan, Kota
Cilegon)
Samangraya,
Warnasari,
Kebonsari,
Citangkil (Kec
Citangkil, Kota
Cilegon)
Underground Citangkil (Kec Citangkil, Kota sawah 6974
Transmission Citangkil), Purwakarta Cilegon
Piping (offtake Ramanuju (Kec , Jombang,
Cilegon Tahap Purwakarta), Cibeber
1) Masigit,
Jombang Wetan,
Sukmajaya (Kec
Jombang),
Cibeber,
Name of Location Land Use Required Area
Potential RWS
No.
Infrastructure name of villages Subdistrict Regency Length Width Area
Component (M) (M) (M2)
Kedaleman (Kec
Cibeber)
Underground Kedaleman (Kec Cibeber, Kota sawah 5167
Transmission Cibeber, Kota Kramatwat Cilegon,
Piping (offtake Cilegon) u, Kab
Kab Serang Serdang, Terate Bojonegara Serang
Tahap 1&2) (Kec
Kramatwatu,
Kab Serang)
Mangkunegara
(Kec Bojonegara,
Kab Serang)
Underground Kedaleman, Cibeber, Kota Pemukima 15599
Transmission Kalitimbang, Cilegon, Cilegon, n
Piping (offtake Karangasem Citangkil, Kab
Kota Cilegon (Kec Cibeber, Ciwandan, Serang
Tahap 2) Kota Cilegon) Kramatwat
Bagendung, u
Ciwedus (Kec
Cilegon, Kota
Cilegon)
Tamanbaru,
Lebakdenok,
Dringo (Kec
Citangkil, Kota
Cilegon)
Banjarnegara,
Tegalratu,
Randakari,
Kepuh (Kec
Ciwandan, Kota
Cilegon)
Harjatani (Kec
Kramatwatu,
Kab Serang)
Underground Kedaleman (Kec Cibeber, Kota pertanian
Transmission Cibeber, Kota Kramatwat Cilegon, lahan
Piping (offtake Cilegon) u Kab kering
Kota Serang Serdang, Serang
Tahap 2) Wanayasa,
Pejaten,
Kramatwatu
(Kec
Kramatwatu,
Kab Serang)

21.1. Dam
The Cidanau River is one of the rivers included in the Cidanau Watershed (DAS), with an
area of 22,620 hectares. The Cidanau River has an important role in supporting the
sustainability of development in Banten Province. Apart from having very potential water
resources, the Cidanau watershed has an endemic conservation site, namely the Dano
Swamp. The Dano Swamp is a 2,500 hectare swamp area and is designated as a nature
reserve. The Cidanau Watershed has an average surface water discharge of 2,000 liters /
second.

The sub-project will utilize the available raw water from the Cidanau Dam infrastructure built
by the Government, by providing additional new and rehabilitated water supply infrastructure
and extend system coverage to expand access to safe water in 3 Regencies.
- New water supply system in Serang Regency, Serang City, and Cilegon City.
- New distribution zone in Serang Regency, Serang City, and Cilegon City.
- System expansion in Serang Regency, Serang City, and Cilegon City.

The LARAP document in this project has never been planned, DED, AMDAL, and LARAP
will be prepared under ESP in 2026-2027. Land acquisition might be conducted in 2026-
2027. The Cidanau Dam STT likely will start in 2027 and followed by the downstream
system in 2027 until 2030.

Works 2027 2028 2029 2030 2031 2032


Land Acquisition

Water Supply System AMDAL and LARAP study


preparation under APBN/APBD
RWS Intake and Transmission Construction by
BBWS Cidanau Ciujung Cidurian
Water Supply Production and Distribution System
Construction by DGHS

21.2. Intake
This is the proposed intake. The Intake location will be in Bantarwangi village Cinangka Sub
-district as well and near the Dam (see Figure below). To date has been completed the
process of land acquisition for dam construction then for the proposed intake location will
not require the land acquisition anymore. The area for the Intake building is planned
approximately 1,700 m2 with capacity of 2400 lps.

21.3. WTP
This is a proposed WTP. The WTP location proposed by the RWS Consultant is located in
Pasauran Village Cinangka Subdistrict. This location is paddies field owned by the
communities and there are no settlements in this location (see Figure below). A number of
landowners need to identified. The area for the WTP building is planned approximately
43184 m2 with capacity of 1500 lps. To obtain the required land area to be used as a WTP
area and access road to WTP, a land acquisition process is required through a mechanism
that refers to stipulate in the regulations.

21.4. Transmission and Main Distribution Pipeline


This is a proposed main distribution pipeline by RWS Consultant will pass several villages
and sub-district as follows:

Table XX. Location to be crossed by the proposed Main Distribution Pipeline


No Distribution Pipeline Village Sub-district Regency

1. Underground Transmission Pasaungan, Bulakan, Cinangka, Kab Serang,


Piping (suplesi waduk Karangsuraga, Cinangka,
Krenceng Tahap 1) Sindanglaya, Kamasan

Bandulu, Tambangayam, Anyar, Kab Serang


Cikoneng, Anyar

Gunungsugih, Kepuh, Ciwandan,


Randakari, Tegalratu, Kota Cilegon

Samangraya, Warnasari, Citangkil Kota Cilegon


Kebonsari, Citangkil
2 Underground Transmission Citangkil Citangkil, Kota Cilegon
Piping (offtake Cilegon Tahap Ramanuju Purwakarta,
1) Masigit, Jombang Wetan, Jombang,
Sukmajaya
Cibeber, Kedaleman Cibeber
3 Underground Transmission Kedaleman Cibeber, Kota Cilegon,
Piping (offtake Kab Serang Serdang, Terate Kramatwatu, Kab Serang
Tahap 1&2) Mangkunegara Bojonegara Kab Serang
4 Underground Transmission Kedaleman, Kalitimbang, Cibeber, Kota Cilegon,
Piping (offtake Kota Cilegon Karangasem
Tahap 2) Bagendung, Ciwedus Cilegon,
Tamanbaru, Lebakdenok, Citangkil,
Dringo Ciwandan,
Banjarnegara, Tegalratu,
Randakari, Kepuh Kramatwatu Kab Serang
Harjatani
5 Underground Transmission Kedaleman (Kec Cibeber, Cibeber, Kota Cilegon,
Piping (offtake Kota Serang Kota Cilegon)
Tahap 2) Serdang, Wanayasa, Pejaten, Kramatwatu Kab Serang
Kramatwatu

Type of occupation and school participation level of the communities along the transmission
and main distribution pipeline are are generally farmers or farm workers and Elementery
School graduate respectively.

The transmission pipeline will be planned to follow the main road from Intake to Reservoir
and WTP as well as among Reservoirs and pass through residential areas and agricultural
land. The same thing will be applied for the main distribution pipeline (see Figure below).
The impact of this sub-project work will be received by residents whose houses and land will
be passed by these pipeline. There is no need for involuntary resettlement due to the
installation of raw water supply pipeline. The impact that will be received by the residents
along the path is the obstruction of the movement of goods and people and other
environmental impacts such as dust and noise. But to mitigate the impact on the socio-
economic and cultural surrounding communities there will be an amount of things that need
to be considered by the project impelementer as follows:
a. The project implementer should have a close relationship with the surrounding
community,
b. Carry out safe development and does not cause the restlessness for the surrounding
community,
c. As much as possible to involve people who have the skills needed as workers at the
construction phase,
d. Establish intense communication to stakeholders such as village / sub-district officials
and community leaders.

21.5. Reservoir
This is a proposed reservoir where the location is the same as the location of the WTP,
which is located in Pasauran Village Cinangka Subdistrict with total capacity of 1500 lps and
require total land area of around 43.184 m2. This location is paddies field and there is no
settlement (see Figure below). A number of landowners need to be identified. To obtain the
land area that will be used as an area and access road to the reservoir, a land acquisition
process is needed through a mechanism that refers to stipulate in the regulations.

The map below describes the potential RWS System and land cover for RWS Cidanau Dam:
Figure XX. The Potential RWS System and Land Cover for RWS Cidanau Dam
22. Potential Indigenous people impact
Based on the definitions either ADB’s SPS (2009) and GoI regulation as well as AMAN no
IPs is found / identified in this RWS subproject of RWS Semantok Dam either in or having a
collective being bound to the subproject area so that the subproject will be considered as
category C for the protection of indigenous peoples.