July 9-July 16 Concrete Division and Sink: 7,500 Concrete Division With Plaster Cement Chb4 10mm Counter With Sink Tiled Plastered Waterline Drainage

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

July 9- July 16

Concrete Division And sink: 7,500

Concrete division with plaster


cement
Chb4
10mm

Counter with sink


tiled
plastered
waterline
drainage

Project completed:
date:
accepted by:
July 18- July 28

Roofing 13,500

Roofing
ribtype
flashing
tubular
c purlins

Roofing @ CR
ribtype
flashing
c purlins

PVC Door @ CR
door
Door knob

Concrete Wall 11,000


7 walls *9 layer
7concrete Post
1 wall near CR *5 layer
1 Concrete post near CR

Counter with sink 1,500

counter plastered
Tiled and grouted
drainage
Water supply

Total conttract price:26,000


DP 3,000 5/18
2nd 7,000 5/20
3rd 8,000 5/25
4th 8,000

Project Completed:
Date:
Accepted by:
July 29- Aug 3

Flooring Bodega 4,000


gravel bed
rsb 10mm
sand
cement

Dry wall partition 3,000


dry wall partition
studs and tracks
hardiflex
electrical-lights

Additional wall 4,000

wall 1&2 2 layers


Wall 3 &4 5 layers
wall 5,6 &7 3 layers
wall near CR 5 layers
cement
10mm rsb
sand

CR 3,000
change waercloset
tiles floor
tiles wall
Electrical lights

total contract: 14,000

Project completed:
date:
Accepted by: