July 9-July 16 Concrete Division and Sink: 7,500 Concrete Division With Plaster Cement Chb4 10mm Counter With Sink Tiled Plastered Waterline Drainage
July 9-July 16 Concrete Division and Sink: 7,500 Concrete Division With Plaster Cement Chb4 10mm Counter With Sink Tiled Plastered Waterline Drainage
July 9-July 16 Concrete Division and Sink: 7,500 Concrete Division With Plaster Cement Chb4 10mm Counter With Sink Tiled Plastered Waterline Drainage
Project completed:
date:
accepted by:
July 18- July 28
Roofing 13,500
Roofing
ribtype
flashing
tubular
c purlins
Roofing @ CR
ribtype
flashing
c purlins
PVC Door @ CR
door
Door knob
counter plastered
Tiled and grouted
drainage
Water supply
Project Completed:
Date:
Accepted by:
July 29- Aug 3
CR 3,000
change waercloset
tiles floor
tiles wall
Electrical lights
Project completed:
date:
Accepted by: