Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

TÜV Rheinland INSPECTION RELESE

Arabia LLC NOTE


Report No.: xxx Date : May 16, 2020
Inspector: Muhammad Shoaib Anwar Page : 1 of 1

Client: SSEM Executing Country: Saudi Arabia


Project Name: Upgrade Water Handling System Aramco Dummy P.O. No.:
(GOSP-3) ABIK-459-04-A064-DA
IL No.: IL107000189301 PO No. 107-00301
MR. No.: 065 Rev.1 IAP. No.: 054
Place of Inspection: INDUSTRIAL
Supplier: SSEM ESTATE, Phase 4, St. # 404,
Jeddah, 21443, Saudi Arabia
Vendor/Manufacturer: AVK Saudi Valve Mfg. Co. Ltd. Date of Inspection: May 14, 2020

Released for:
Further processing: For packing: For shipment:

Item No. Quantity


Acc. to Ordered Inspected Material Description
Client PO
15-39067 03 03 Gate Valve – DN100 OS&Y GV A395 (ID # 5182, 5183, 5184)
15-39068 01 01 Gate Valve – DN150 OS&Y GV A395 (ID # 4573)

1. Dates of Delivery: to be advised

2. Check of Examinations: Pressure Test for shell, seat (upstream & downstream), Final Visual
Inspection, Documents Review

3. Scheduled Dates: 14-05-2020

4. Remarks: Satisfactory

Date: May 16, 2020 Signature:

Disclaimer:
This report reflects our findings during inspection in time and place according to the agreed scope of our performance
or deliverables and does not release buyer and/or seller from their contractual responsibilities. This report does not
construe any guarantee or warranty that the purchase contract between buyer and seller is fulfilled correctly and all
performances have been delivered without any defect. Furthermore the report and its results does not affect any
potential buyer’s right to claim for compensation or remedy towards the seller/supplier of apparent or hidden defects
not detected during our inspection or occurred afterwards

You might also like