Royalty District Wise
Royalty District Wise
Royalty District Wise
Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, Package-2 from Mallampet (Km.35+000) to Dindigal (Km.46+000)
Cummulative
IPC Wise IPC-1 IPC-2 IPC-3 IPC-4 IPC-5 IPC-6 IPC-7 IPC-8 IPC-9 IPC-10 Total Quantity of the
Package
Bowrampet (Ranga Reddy District)
3.01 - - - - 6,506.800 10,646.800 18,847.288 708.646 7,583.387 185.564 44,478.485 56,155.485
3.02 - - - - - 2,787.014 19,178.470 1,898.806 9,557.186 2,005.120 35,426.596 44,059.596
4.04 (Maytas) - - - - - - 2,680.926 - - - 2,680.926 2,680.926
4.04 (Ramky) 2,703.224 - 2,703.224 2,703.224
4.04 (GPL) - 6,738.783 6,738.783 6,738.783
5.02 - - - - - - - - - - - 1,832.895
5.05 - - - - - 41.940 132.240 29.116 - - 203.296 705.519
5.06(a) - - - - - 108.000 345.702 31.660 - - 485.362 793.287
5.07(a) - - - - - 102.704 490.216 - - - 592.920 2,065.671
5.08(a) - - - - - 39.965 168.105 - - - 208.070 424.268
6.02 - - - - - - - - - - - 2,630.655
6.05(a) - - - - - 20.022 150.576 - - - 170.598 880.674
6.05(b) - - - - - 133.498 939.817 - - - 1,073.315 5,611.489
6.06(a)(i) - - - - - 249.614 752.328 138.974 - - 1,140.916 3,148.766
6.06(a)(ii) - - - - - - 156.806 - - - 156.806 638.301
6.07(a) - - - - - 526.331 576.732 - - - 1,103.063 1,677.416
8.06(a) - - - - - - 3,220.000 - - - 3,220.000 10,566.000
8.08© - - - - - 15.038 175.618 - - - 190.656 471.076
8.08(d) - - - - - 39.541 53.834 - - - 93.375 1,085.270
8.08(e) - - - - - 20.988 52.121 - - - 73.109 543.041
Certified Quantitis Bifurcated District Wise For EARTH WORK/ MORROM MATERIAL
Cummulative
IPC Wise IPC-1 IPC-2 IPC-3 IPC-4 IPC-5 IPC-6 IPC-7 IPC-8 IPC-9 IPC-10 Total Quantity of the
Package
Ranga reddy District
2.03 133,725.51 127,086.91 172,732.93 218,765.59 256,693.10 190,235.83 158,042.31 72,288.21 77,742.37 33,805.96 1,441,118.70 1,441,118.699
2.04 - - - 14,025.72 27,931.70 30,160.82 387.70 13,564.01 10,401.82 96,471.761 96,471.761
2.05 - - - - - - - - - -
2.06(a) 42,559.51 13,849.65 86,615.85 26,604.68 21,816.85 13,646.50 29,870.11 19,715.00 55,914.50 53,820.55 364,413.192 364,413.192
2.06(b) - - - - - 14,839.26 - 5,194.60 19,606.15 39,640.008 39,640.008
2.06© - - - - - 967.44 - 508.74 850.95 2,327.130 2,327.130
2.09 - - - - - 1,453.90 - - 292.95 1,746.850 1,746.850
Medak District
2.03 -
2.04 -
2.05 -
2.06(a) -
2.06(b) -
2.06© -
2.09 -
Name of Project : (Package -2) : Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, In the state of Andhra Pradesh, India in the stretches from Patancheru (Km.23+700) to Shamirpet (Km.61+700) Northern Arc Package-2 from Mallampet R
(Km.35+000) to Dindigal (Km.46+000) being takenup with the loan assistance from Japan International Cooperation Agency under Phase - 1 Programme, Contract Agreement No: CGM(T)/HGCL/27/08-09 C
C
MATERIAL CONSUMPTION STATEMENT FOR ROYALTY
P
i
Interim Payment Certificate No. 1 IPC-1 For the Month of May 2010
p
Factor Material Consumption e
This Bill Gravel 1
BOQ No. Description Unit Robo Sand Robo Sand 40mm 20mm 10mm Dust
Quantity Sand 40mm 20mm 10mm Dust GSB /Morrum GSB (MT) 2
Sand (Cu.m) (MT) (MT) (MT) (MT) (MT)
(Cu.m) 0
Consumed from Ranga Reddy District 0
2.03 Embankment with Borrow Cum 133,725.510 133,726 - - - - - -
2.04 Subgrade with approved material Cum - - - - - - - m
2.05 Shoulder with approved material Cum - - - - - - - m
2.06(a) Eambankment Reuse Cum - - - - - - - -
(
2.06(b) Subgrade Reuse Cum - - - - - - -
m
2.06© Shoulder Reuse Cum - - - - - -
)
2.09 Filling of median / island with appr Cum - - - - - - -
3.01 Granular Sub-base Cum - 2.230 - - - - - - -
3.02 Wet mix macadam Cum - 0.729 0.354 0.398 0.729 - - - - - -
4.04 DBM (Mytas mix) Cum - 0.437 0.459 0.391 0.988 - - - - - -
4.04 DBM(Ramky mix) Cum 0.451 0.427 0.427 0.923 - - - - - -
4.04 DBM Cum 0.971 0.428 0.834 - - - - - -
5.02 Sand filling in Foundation Cum - 1.0000 - - - - - -
5.05 PCC M 15 for leveling course Cum - 0.3352 0.2301 0.6661 0.5441 - - - - - -
5.06(a) PCC Grade M 20 Cum - 0.3315 0.2277 0.6594 0.5384 - - - - - -
5.06(b) PCC Grade M 25 Cum - 0.2980 0.2046 0.6448 0.5265 - - - - - -
5.07(a) RCC M 25 foundations & Substructu Cum - 0.2980 0.2046 0.6448 0.5265 - - - - - -
5.08(a) RCC M 25 superstructure Cum - 0.2980 0.2046 0.6448 0.5265 - - - - - -
6.02 Granular material Filling in Foundat Cum - 1.5950 - - - - - -
6.05(a) PCC M15 for foundation Cum - 0.3352 0.2301 0.6661 0.5441 - - - - - -
6.05(b) RCC M30 for foundation Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - -
6.06a(i) RCC M30 Upto 5m height Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - -
6.06a(ii) RCC M30 5m - 10m height Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - -
6.07(a) RCC M30 Super structure Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - -
6.07(b) RCC M35 Super structure Cum - - - - - - -
6.08 M15 for Approach slab Cum - 0.3352 0.2301 0.6661 0.5441 - - - - - -
6.09 M30 for Approach slab Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - -
8.06(a) M-20 Median Kerb "A" Lm - 0.0226 0.0241 0.0607 - - - - - -
8.08© PCC M15 grade Cum - 0.3352 0.2301 0.6661 0.5441 - - - - - -
8.08(d) RCC M30 for foundation Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - -
8.08(e) RCC M30 for Substructure Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - -
- - - - - -
Total Quantity from Ranga reddy District 133,725.510 - - - - - - ###
-
133,725.510 - ###
-
Interim Payment Certificate No. 10 IPC-10 For the Month of May 2010
Factor Material Consumption
Void
This Bill Gravel RCC Pipe
BOQ No. Description Unit Robo Sand Robo Sand 40mm 20mm 10mm Dust Bitumen Emulsion Cement Steel formers
Quantity Sand 40mm 20mm 10mm Dust GSB /Morrum GSB (MT) 600 mm
Sand (Cu.m) (MT) (MT) (MT) (MT) (MT) (MT) (MT) (MT) (MT) 1000mm
(Cu.m) (m)
dia (m)
Consumed from Ranga Reddy District
2.03 Embankment with Borrow Cum 33,805.960 33,806 - - - - - - - - -
2.04 Subgrade with approved material Cum 10,401.815 10,402 - - - - - - - - -
2.05 Shoulder with approved material Cum - - - - - - - - - -
2.06(a) Eambankment Reuse Cum 53,820.550 53,821 - - - - - - - - -
2.06(b) Subgrade Reuse Cum 19,606.150 19,606 - - - - - - - - -
2.06© Shoulder Reuse Cum 850.950 851 - - - - - - - -
2.09 Filling of median / island with appr Cum 292.950 293 - - - - - - - - -
3.01 Granular Sub-base Cum 185.564 2.230 - - - - - - 414 - - -
3.02 Wet mix macadam Cum 2,005.120 0.729 0.354 0.398 0.729 - - 1,462.334 709.010 797.637 1,462.334 - - -
4.04 DBM (Mytas mix) Cum - 0.437 0.459 0.391 0.988 - - - - - - - - - -
4.04 DBM(Ramky mix) Cum - 0.458 0.482 0.409 1.035 - - - - - - - - - -
4.04 DBM Cum 6,738.783 0.971 0.428 0.834 - - - 6,541.889 2,880.978 5,618.703 721.040 - 154.395 -
5.02 Sand filling in Foundation Cum - 1.0000 - - - - - - - - -
5.05 PCC M 15 for leveling course Cum - 0.3352 0.2301 0.6661 0.5441 - - - - - - - - -
5.06(a) PCC Grade M 20 Cum - 0.3315 0.2277 0.6594 0.5384 - - - - - - - - -
5.06(b) PCC Grade M 25 Cum - 0.2980 0.2046 0.6448 0.5265 - - - - - - - - -
5.07(a) RCC M 25 foundations & Substructu Cum - 0.2980 0.2046 0.6448 0.5265 - - - - - - - - -
5.08(a) RCC M 25 superstructure Cum - 0.2980 0.2046 0.6448 0.5265 - - - - - - - - -
6.02 Granular material Filling in Foundat Cum - 1.5950 - - - - - - - - -
6.03 Back filling with granular material Cum - - - - - - - - - -
6.04 Filter media behind abutments Cum - - - - - - - - - -
6.05(a) PCC M15 for foundation Cum - 0.3352 0.2301 0.6661 0.5441 - - - - - - - - -
6.05(b) RCC M30 for foundation Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - - - - -
6.06a(i) RCC M30 Upto 5m height Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - - - - -
6.06a(ii) RCC M30 5m - 10m height Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - - - - -
6.07(a) RCC M30 Super structure Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - - - - -
6.07(b) RCC M35 Super structure Cum - - - - - - - - - -
6.08 M15 for Approach slab Cum - 0.3352 0.2301 0.6661 0.5441 - - - - - - - - -
6.09 M30 for Approach slab Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - - - - -
8.06(a) M-20 Median Kerb "A" Lm - 0.0226 0.0241 0.0607 - - - - - - - - -
8.08© PCC M15 grade Cum - 0.3352 0.2301 0.6661 0.5441 - - - - - - - - -
8.08(d) RCC M30 for foundation Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - - - - -
8.08(e) RCC M30 for Substructure Cum - 0.2850 0.1958 0.6442 0.5261 - - - - - - - - -
- - - - - - - - -
Total Quantity from Ranga reddy District 118,778.375 - - 1,462.334 7,250.900 3,678.615 4,890.716 413.808 721.040 - 154.395 - - -
118,778.38 - 17,696.372 721.040 - 154.395 - - -
in No.s
Consumed from Medak District
2.03 Embankment with Borrow Cum - - - - - - - - - - -
2.04 Subgrade with approved material Cum - - - - - - - - - - -
2.05 Shoulder with approved material Cum - - - - - - - - - - -
2.06(a) Eambankment Reuse Cum - - - - - - - - - - -
2.06(b) Subgrade Reuse Cum - - - - - - - - - - -
2.06© Shoulder Reuse Cum - - - - - - - - - -
2.09 Filling of median / island with appr Cum - - - - - - - - - - -
3.01 Granular Sub-base Cum 9,345.000 2.230 - - - - - - 20,839 - - -
3.02 Wet mix macadam Cum 8,633.000 0.729 0.354 0.398 0.729 - - 6,296.047 3,052.629 3,434.207 6,296.047 - - -
4.04 DBM (Mytas mix) Cum 0.437 0.459 0.391 0.988 - - - - - - - - - -
4.04 DBM(Ramky mix) Cum 0.451 0.427 0.427 0.923 - - - - - - - - - -
4.04 DBM Cum 0.971 0.428 0.834 - - - - - - - - - -
5.02 Sand filling in Foundation Cum 23.694 1.000 23.694 - - - - - - - -
5.05 PCC M 15 for leveling course Cum 59.963 0.4806 0.6631 0.6611 28.818 - - 39.761 39.642 - - 16.190 -
5.06(a) PCC Grade M 20 Cum 23.031 0.4754 0.6560 0.6540 10.949 - - 15.108 15.062 - - 6.449 -
5.06(b) PCC Grade M 25 Cum - 0.4520 0.6244 0.6225 - - - - - - - - -
5.07(a) RCC M 25 foundations & Substructu Cum 390.388 0.4520 0.6244 0.6225 176.455 - - 243.739 242.997 - - 136.636 -
5.08(a) RCC M 25 superstructure Cum 39.777 0.4520 0.6244 0.6225 17.979 - - 24.835 24.759 - - 13.922 -
6.02 Granular material Filling in Foundat Cum 1,240.942 1.5950 - - - - - 1,979.302 - - -
6.03 Back filling with granular material Cum - - - - - - - - - -
6.04 Filter media behind abutments Cum - - - - - - - - -
6.05(a) PCC M15 for foundation Cum 178.943 0.4806 0.6631 0.6611 86.000 - - 118.657 118.299 - - 48.315 -
6.05(b) RCC M30 for foundation Cum 1,286.455 0.4450 0.6145 0.6126 572.472 - - 790.462 788.082 - - 488.853 -
6.06a(i) RCC M30 Upto 5m height Cum 463.692 0.4450 0.6145 0.6126 206.343 - - 284.916 284.058 - - 176.203 -
6.06a(ii) RCC M30 5m - 10m height Cum 176.359 0.4450 0.6145 0.6126 78.480 - - 108.364 108.038 - - 67.016 -
6.07(a) RCC M30 Super structure Cum - 0.4450 0.6145 0.6126 - - - - - - - - -
6.07(b) RCC M35 Super structure Cum - - - - - - - - - -
6.08 M15 for Approach slab Cum - 0.4806 0.6631 0.6611 - - - - - - - - -
6.09 M30 for Approach slab Cum - 0.4450 0.6145 0.6126 - - - - - - - - -
8.06(a) M-20 Median Kerb "A" Lm 3,000.000 0.0226 0.0245 0.0607 67.800 73.500 - - 182.093 - - 59.520 -
8.08© PCC M15 grade Cum 286.883 0.4806 0.6631 0.6611 137.876 - - 190.232 189.658 41.363 - 77.458 -
8.08(d) RCC M30 for foundation Cum 166.871 0.4450 0.6145 0.6126 74.258 - - 102.534 102.225 76.178 - 63.411 -
8.08(e) RCC M30 for Substructure Cum 297.975 0.4450 0.6145 0.6126 132.599 - - 183.091 182.539 18.087 - 113.231 -
- - - - - - - - -
Total Quantity from Medak District - 1,613.723 73.500 6,296.047 5,154.328 5,711.660 8,410.977 20,839.350 - - 1,267.203 - - -
- 1,613.723 46,485.862 - - 1,267.203 - - -
Name of Project : (Package -2) : Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, In the state of Andhra Pradesh, India in the stretches from Patancheru (Km.23+700) to Shamirpet (Km.61+700) Northern Arc Packag
324.300
324.300
324.300
-
in No.s
erabad City, In the state of Andhra Pradesh, India in the stretches from Patancheru (Km.23+700) to Shamirpet (Km.61+700) Northern Arc Packag
-
in No.s
-
Name of Project : (Package -2) : Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, In the state of Andhra Pradesh, India in the stretches from Patancheru (Km.23+700) to Shamirpet (Km.61+700) Northern Arc Packag R
C
C
MATERIAL CONSUMPTION STATEMENT
P
Interim Payment Certificate No. 12 For the Month of July 2010 i
Factor Material Consumption p
e
This Bill Gravel RCC Pipe RCC Pipe
BOQ No. Description Unit Robo Sand Robo Sand 40mm 20mm 10mm Dust Bitumen Emulsion Cement Steel 6
Quantity Sand 40mm 20mm 10mm Dust GSB Bitumen Emulsion Cement Steel /Morrum GSB (MT) 600 mm 1200 mm
Sand (Cu.m) (MT) (MT) (MT) (MT) (MT) (MT) (MT) (MT) (MT) 0
(Cu.m) (m) (m)
0
Consumed from Ranga Reddy District
2.03 Embankment with Borrow Cum 1,528,615.606 1,528,616 - - - - - - - - - - - m
2.04 Subgrade with approved material Cum 113,803.790 113,804 - - - - - - - - - - - m
2.05 Shoulder with approved material Cum 2,395.860 2,396 - - - - - - - - - - -
2.06(a) Eambankment Reuse Cum 387,614.067 387,614 - - - - - - - - - - - (
2.06(b) Subgrade Reuse Cum 40,949.043 40,949 - - - - - - - - - - - m
2.06© Shoulder Reuse Cum 3,573.450 3,573 - - - - - - - - - - - )
2.06(d) Median filling Reuse Cum 804.420 804 - - - - - - - - - - -
2.09 Filling of median / island with appr Cum 2,355.070 2,355 - - - - - - - - - - -
3.01 Granular Sub-base Cum 46,360.245 2.2300 - - - - - - 103,383 - - - -
3.02 Wet mix macadam Cum 35,426.596 0.7293 0.3536 0.3978 0.7293 - - 25,836.616 12,526.844 14,092.700 25,836.616 - - - - -
4.01 Prime Coat Sqm 214,663.840 0.001 - - - - - - - - 160.998 - -
4.02(a) Tack coat over granular surface Sqm 80,238.050 0.000 - - - - - - - - 22.065 - -
4.02(b) Tack coat over bitumen serface Sqm 20,440.000 0.000 - - - - - - - - 4.599 - -
4.03 BM Cum 39.875 0.4366 0.4594 0.3906 0.9880 0.110 0.0231 - - 17.408 18.320 15.574 39.397 - 4.398 - 0.922 -
4.04 DBM (Mytas mix) Cum 2,680.926 0.4366 0.4594 0.3906 0.9880 0.110 0.0231 - - 1,170.413 1,231.742 1,047.110 2,648.761 - 295.670 - 61.974 -
4.04 DBM(Ramky mix) Cum 2,703.224 0.4508 0.4272 0.4272 0.9228 0.109 0.0236 - - 1,218.505 1,154.709 1,154.709 2,494.427 - 293.462 - 63.796 -
4.04 DBM Cum 17,365.340 0.9708 0.4275 0.8338 0.107 0.0229 - - - 16,857.959 7,424.065 14,478.977 - 1,858.067 - 397.864 -
5.02 Sand filling in Foundation Cum 1,841.067 1.0000 1,841.067 - - - - - - - - - -
5.03 Back filling behind abutments Cum 209.752 209.752 - - - - - - - - - - -
5.04 Filter media Cum 81.989 0.6810 0.9080 0.6810 - - - 55.835 74.446 55.835 - - - - -
5.05 PCC M 15 for leveling course Cum 216.151 0.3352 0.2301 0.6661 0.5441 0.2700 72.454 49.736 - 143.978 117.608 - - - - 58.361 -
5.06(a) PCC Grade M 20 Cum 509.344 0.3315 0.2277 0.6594 0.5384 0.2800 168.848 115.978 - 335.861 274.231 - - - - 142.616 -
5.07(a) RCC M 25 foundations & Substructu Cum 809.433 0.2980 0.2046 0.6448 0.5265 0.3500 241.211 165.610 - 521.922 426.166 - - - - 283.302 -
5.08(a) RCC M 25 superstructure Cum 253.186 0.2980 0.2046 0.6448 0.5265 0.3500 75.449 51.802 - 163.254 133.302 - - - - 88.615 -
5.09(a) TMT for Foundation MT 124.678 1.0000 - - - - - - - - - - 124.678
5.09(b) TMT for Substructure MT 121.442 1.0000 - - - - - - - - - - 121.442
5.09(c) TMT for Superstructure MT 52.902 1.0000 - - - - - - - - - - 52.902
5.10 H.P NP-4, 1200 mm Dia Lm 354.908 - - - - - - - - - - - 354.908
6.02 Granular material Filling in Foundati Cum 3,022.839 1.5950 - 4,821.428 - - - - - - - - -
6.03 Back filling with granular material Cum 2,167.883 2,167.883 - - - - - - - - - - -
6.04 Filter media behind abutments Cum 1,256.456 0.6810 0.9080 0.6810 - - - 855.647 1,140.862 855.647 - - - - -
6.05(a) PCC M15 for foundation Cum 241.397 0.3352 0.2301 0.6661 0.5441 0.2700 80.916 55.545 - 160.795 131.344 - - - - 65.177 -
6.05(b) RCC M30 for foundation Cum 1,843.875 0.2850 0.1958 0.6442 0.5261 0.3800 525.504 361.031 - 1,187.824 970.063 - - - - 700.673 -
6.06a(i) RCC M30 Upto 5m height Cum 1,842.781 0.2850 0.1958 0.6442 0.5261 0.3800 525.193 360.817 - 1,187.120 969.487 - - - - 700.257 -
6.06a(ii) RCC M30 5m - 10m height Cum 287.175 0.2850 0.1958 0.6442 0.5261 0.3800 81.845 56.229 - 184.998 151.083 - - - - 109.127 -
6.07(a) RCC M30 Super structure Cum 1,557.698 0.2850 0.1958 0.6442 0.5261 0.3800 443.944 304.997 - 1,003.469 819.505 - - - - 591.925 -
6.15(a) TMT for Foundation MT 556.704 1.0000 - - - - - - - - - - 556.704
6.15(b) TMT for Substructure MT 281.610 1.0000 - - - - - - - - - - 281.610
6.15© TMT for Superstructure MT 142.510 1.0000 - - - - - - - - - - 142.510
8.05© Lined surface Toe drains Lm 200.000 0.1103 0.0757 0.2191 0.1790 0.0888 22.056 15.141 - 43.829 35.802 - - - - 17.766 -
8.06(a) M-20 Median Kerb "A" Lm 4,003.115 0.0226 0.0241 0.0607 0.0198 90.470 96.475 - - 242.979 - - - - 79.422 -
8.06(b) M-20 Median Kerb "L" Lm 146.885 0.0385 0.0411 0.1034 0.0338 5.655 6.037 - - 15.188 - - - - 4.965 -
8.08(b) filter material behind retaining wall Cum 224.100 0.6810 0.9080 0.6810 - - - 152.612 203.483 152.612 - - - - -
8.08© PCC M15 grade Cum 235.296 0.3352 0.2301 0.6661 0.5441 0.2700 78.871 54.142 - 156.731 128.025 - - - - 63.530 -
8.08(d) RCC M30 for foundation Cum 149.766 0.2850 0.1958 0.6442 0.5261 0.3800 42.683 29.324 - 96.479 78.792 - - - - 56.911 -
8.08(e) RCC M30 for Substructure Cum 152.792 0.2850 0.1958 0.6442 0.5261 0.3800 43.546 29.917 - 98.429 80.384 - - - - 58.061 -
8.08(f) TMT For foundation & substruc. Cum 129.347 1.0000 - - - - - - - - - - 129.347
9.17(a) NP2 600mm Dia Pipe Lm 271.030 - - - - - - - - - - - 271.0
SR Kerb M20 Inner Kerb "A" type Lm - 0.0201 0.0215 0.0541 0.0177 - - - - - - - - - - -
- - - - - - - - - - -
Total Cumulative Quantity 2,082,488.9 4,339.713 6,574.208 28,242.94 38,138.36 29,726.91 46,562.27 103,383.346 2,451.596 187.662 3,545.263 1,409.193 271.00 354.908
###
Upto Previous Bill Quantity 2,049,362.6 3,985.236 6,324.499 28,242.94 33,399.13 27,193.44 43,117.94 99,187.022 2,026.815 160.261 3,014.009 1,288.87 271.00 324.300
Balance Quantities 33,126.30 354.477 249.709 - 4,739.228 2,533.468 3,444.334 4,196.324 424.781 27.401 531.254 120.319 - 12.000
###
354.5 249.7 in No.s in No.s
Name of Project : (Package -2) : Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, In the state of Andhra Pradesh, India in the stretches from Patancheru (Km.23+700) to Shamirpet (Km.61+700) Northern Arc Packag R
C
C
MATERIAL CONSUMPTION STATEMENT
P
Interim Payment Certificate No. 12 For the Month of July 2010 i
Factor Material Consumption p
e
This Bill Gravel RCC Pipe RCC Pipe
BOQ No. Description Unit Robo Sand Robo Sand 40mm 20mm 10mm Dust Bitumen Emulsion Cement Steel 6
Quantity Sand 40mm 20mm 10mm Dust GSB Bitumen Emulsion Cement Steel /Morrum GSB (MT) 600 mm 1200 mm
Sand (Cu.m) (MT) (MT) (MT) (MT) (MT) (MT) (MT) (MT) (MT) 0
(Cu.m) (m) (m)
0
6.07(a) RCC M30 Super structure Cum 3,663.285 0.2850 0.1958 0.6442 0.5261 0.3800 1,044.036 717.271 - 2,359.888 1,927.254 - - - - 1,392.048 -
6.07(b) RCC M35 Super structure Cum 1,631.538 0.4389 0.5450 0.6640 0.4000 716.035 - - 889.188 1,083.341 - - - - 652.615 -
6.08 M15 for Approach slab Cum 68.745 0.3352 0.2301 0.6661 0.5441 0.2700 23.043 15.818 - 45.791 37.404 - - - - 18.561 -
6.09 M30 for Approach slab Cum 222.744 0.2850 0.1958 0.6442 0.5261 0.3800 63.482 43.613 - 143.492 117.186 - - - - 84.643 -
6.15(a) TMT for Foundation MT 556.704 1.0000 - - - - - - - - - - 556.70
6.15(b) TMT for Substructure MT 415.183 1.0000 - - - - - - - - - - 415.18
6.15© TMT for Superstructure MT 529.530 1.0000 - - - - - - - - - - 529.53
8.05© Lined surface Toe drains Lm 2,555.000 0.1103 0.0757 0.2191 0.1790 0.0888 281.767 193.421 - 559.920 457.368 - - - - 226.961 -
8.06(a) M-20 Median Kerb "A" Lm 8,113.115 0.0226 0.0241 0.0607 0.0198 183.356 195.526 - - 492.447 - - - - 160.964 -
8.06(b) M-20 Median Kerb "L" Lm 146.885 0.0385 0.0411 0.1034 0.0338 5.655 6.037 - - 15.188 - - - - 4.965 -
8.08(b) filter material behind retaining wall Cum 355.050 0.6810 0.9080 0.6810 - - - 241.789 322.385 241.789 - - - - -
8.08© PCC M15 grade Cum 535.516 0.3352 0.2301 0.6661 0.5441 0.2700 179.505 123.222 - 356.707 291.374 - - - - 144.589 -
8.08(d) RCC M30 for foundation Cum 825.403 0.2850 0.1958 0.6442 0.5261 0.3800 235.240 161.614 - 531.725 434.245 - - - - 313.653 -
8.08(e) RCC M30 for Substructure Cum 448.131 0.2850 0.1958 0.6442 0.5261 0.3800 127.717 87.744 - 288.686 235.762 - - - - 170.290 -
8.08(f) TMT For foundation & substruc. Cum 184.541 1.0000 - - - - - - - - - - 184.54
9.15(a) W-Beam Crash Barrier Lm 7,979.000 0.0275 0.0380 0.0379 0.0162 219.350 - - 303.585 302.659 - - - - 129.579 -
9.17(a) NP2 600mm Dia Pipe Lm 299.504 - - - - - - - - - - - 299.5
9.18(a) Dia 110mm ( a set of 8 pipes )SR Rm 5,159.000 41,272
9.18(b) Dia 110mm (Main Carriageway) Rm 9,240.000 9,240
SR Kerb M20 Inner Kerb "A" type Lm - 0.0201 0.0215 0.0541 0.0177 - - - - - - - - - - -
- - - - - - - - - - -
Total Cumulative Quantity 2,326,376.72 7,199.493 7,923.513 28,242.94 55,101.95 39,952.52 56,697.48 141,120.593 3,731.968 273.596 6,885.381 2,052.90 300.00 395.576 50,512
Upto Previous Bill Quantity 2,203,391.92 5,878.338 7,191.049 28,242.94 46,488.98 34,818.14 51,467.97 141,120.593 3,081.137 235.354 5,265.850 1,799.77 300.00 395.576 38,320
Balance Quantities 122,984.80 1,321.155 732.464 - 8,612.969 5,134.375 5,229.517 - 650.831 38.242 1,619.531 253.13 - - 12,192
1,321.2 732.5 in No.s in No.s
Name of Project : (Package -2) : Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, In the state of Andhra Pradesh, India in the stretches from Patancheru (Km.23+700) to Shamirpet (Km.61+700) Northern Arc Packag
- - - - - - - - -
Total Cumulative Quantity - 8,251.636 203.30 44,117.20 32,423.51 35,819.43 44,117.20 101,155.47 - - 6,695.145 - - - -
Upto Previous Bill Quantity - 7,535.600 203.30 37,737.15 28,440.96 31,256.07 37,737.15 81,605.11 - - 6,042.530 - - - -
Balance Quantities - 716.036000 - 6,380.04 3,982.54 4,563.36 6,380.04 19,550.35 - - 652.62 - - - -
- - 652.6 - in No.s in No.s
Balance Quantity in This Month 74,510.8 717.680 413.822 50,118.168 407.887 25.635 842.050 123.222 12.000 10.000 24,381.0
Name of Project : (Package -2) : Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, In the state of Andhra Pradesh, India in the stretches from Patancheru (Km.23+700) to Shamirpet (Km.61+700) Northern Arc Packag
- - - - - - - - -
Total Cumulative Quantity - 8,251.636 203.30 46,237.38 33,451.47 36,975.89 46,237.38 112,793.76 - - 6,695.145 - - - -
Upto Previous Bill Quantity - 8,251.636 203.30 44,117.20 32,423.51 35,819.43 44,117.20 101,155.47 - - 6,695.145 - - - -
Balance Quantities - - - 2,120.180 1,027.966 1,156.462 2,120.180 11,638.290 - - - - - - -
- - - - in No.s in No.s
Balance Quantity in This Month 73,418.5 700.276 281.208 42,757.425 1,214.604 40.504 1,002.251 39.293 42.000 - 6,824.0
Name of Project : (Package -2) : Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, In the state of Andhra Pradesh, India in the stretches from Patancheru (Km.23+700) to Shamirpet (Km.61+700) Northern Arc Packag
- - - - - - - - -
Total Cumulative Quantity - 8,338.158 203.30 52,660.54 36,673.18 40,610.34 52,660.54 132,294.12 - - 6,774.004 - - - -
Upto Previous Bill Quantity - 8,251.636 203.30 46,237.38 33,451.47 36,975.89 46,237.38 112,793.76 - - 6,695.145 - - - -
Balance Quantities - 86.522 - 6,423.166 3,221.707 3,634.450 6,423.166 19,500.364 - - 78.859 - - - -
- - 78.9 - in No.s in No.s
Balance Quantity in This Month 95,564.9 950.285 345.770 63,629.158 964.415 49.169 1,131.062 102.686 - - 8,000.0
HYDERABAD GROWTH CORRIDOR LIMITED
Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, Package-2 from Mallampet (Km.35+000) to Dindigal (Km.46+000)
S.No. Description Unit Rate IPC-1 IPC-2 IPC-3 IPC-4 IPC-5 IPC-6 IPC-7 IPC-8 IPC-9 IPC-10 IPC-11 IPC-12 IPC-13
1 Royalty on Earthwork/Morram material Cum 22.00 80,450.510 127,086.910 172,732.928 218,765.588 442,396.340 231,814.030 235,333.836 92,390.905 152,924.218 118,874.313 103,549.060 33,126.303 25,046.108
3 Royalty on Stone Material Used MT 33.00 - - - - 31,287.535 95,173.051 20,907.697 44,476.605 17,696.372 21,599.212 14,913.354 17,327.101
Total Amounts IPC Wise 2,835,411.22 2,795,912.02 3,800,124.42 4,812,842.94 10,128,099.48 6,132,397.32 8,318,055.07 2,722,553.90 4,832,060.76 3,199,215.16 2,990,853.32 1,220,919.35 1,122,808.71
S.No. Description Unit Rate IPC-1 IPC-2 IPC-3 IPC-4 IPC-5 IPC-6 IPC-7 IPC-8 IPC-9 IPC-10 IPC-11 IPC-12 IPC-13
3 Royalty on Stone Material Used MT 33.00 726.373 1,716.444 1,595.302 1,571.957 1,414.960 892.191 3,926.397 10,171.084 46,485.862 41,100.801 17,247.075 11,655.244
Total Amounts IPC Wise 2,547.18 23,970.32 56,642.66 52,644.97 51,874.57 46,693.67 29,442.31 129,571.09 335,645.78 1,534,033.44 1,356,326.43 569,153.48 384,623.05
S.No. Description Unit Rate IPC-1 IPC-2 IPC-3 IPC-4 IPC-5 IPC-6 IPC-7 IPC-8 IPC-9 IPC-10 IPC-11 IPC-12 IPC-13
2 Royalty on Sand Material Used Cum 40.00 263.552 622.566 723.875 570.087 1,345.302 2,592.220 (719.539) 1,937.966 2,043.07 724.61 607.45 778.97
Total Amounts IPC Wise 13,587.20 10,542.09 24,902.66 28,955.02 22,803.49 53,812.08 103,688.79 (28,781.55) 77,518.63 81,722.95 28,984.52 24,297.80 31,158.80
HYDERABAD GROWTH CORRIDOR LIMITED
Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, Package-2 from Mallampet (Km.35+000) to Dindigal (Km.46+000)
S.No. Description Unit Rate IPC-1 IPC-2 IPC-3 IPC-4 IPC-5 IPC-6 IPC-7 IPC-8 IPC-9 IPC-10 IPC-11 IPC-12 IPC-13
1 Royalty on Earthwork/Morram material Cum 22.00 80,450.510 127,086.910 172,732.928 218,765.588 442,396.340 231,814.030 235,333.836 92,390.905 152,924.218 118,874.313 103,549.060 33,126.303 25,046.108
2 Royalty on Sand Material Used Cum 40.00 - 263.565 622.566 723.875 570.084 1,345.302 2,592.220 (719.539) 1,937.961 2,043.074 724.613 607.445 778.970
3 Royalty on Stone Material Used MT 33.00 - 726.373 1,716.444 1,595.302 1,571.957 32,702.495 96,065.242 24,834.093 54,647.689 64,182.234 62,700.013 32,160.429 28,982.375
Total Amounts IPC Wise 2,851,545.53 2,830,424.93 3,881,669.71 4,894,442.90 10,202,777.42 6,232,903.08 8,451,186.18 2,823,343.42 5,245,224.97 4,814,971.57 4,376,164.27 1,814,370.62 1,538,591.55
HYDERABAD GROWTH CORRIDOR LIMITED
Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, Package-2 from Mallampet (Km.35+000) to Dindigal (Km.46+000)
S.No. Description Unit Rate IPC-14 IPC-15 IPC-16 IPC-17 IPC-18 IPC-19 IPC-20 Total Quantity Amount
- 1,460,880
1 Royalty on Earthwork/Morram material Cum 22.00 15,963.013 79,893.855 122,984.798 74,510.819 73,418.484 95,564.879 2,496,826.897 54,930,192
3 Royalty on Stone Material Used MT 33.00 8,942.243 29,815.458 18,976.861 9,261.827 24,413.139 24,080.535 378,870.990 12,502,743
67,432,934
Total Amounts IPC Wise 646,280.31 2,741,574.92 3,331,901.97 1,944,878.31 2,420,840.24 2,897,084.99 68,893,814
S.No. Description Unit Rate IPC-14 IPC-15 IPC-16 IPC-17 IPC-18 IPC-19 IPC-20 Total Quantity Amount
- 2,547
3 Royalty on Stone Material Used MT 33.00 10,270.441 19,171.473 56,872.761 41,270.193 18,344.286 39,548.623 323,981.467 10,691,388
10,691,388
Total Amounts IPC Wise 338,924.55 632,658.61 1,876,801.11 1,361,916.37 605,361.44 1,305,104.56 10,693,936
S.No. Description Unit Rate IPC-14 IPC-15 IPC-16 IPC-17 IPC-18 IPC-19 IPC-20 Total Quantity Amount
- 13,587
2 Royalty on Sand Material Used Cum 40.00 803.77 742.62 1,321.16 717.68 700.28 950.28 16,725.909 669,036
669,036
Total Amounts IPC Wise 32,150.60 29,704.64 52,846.20 28,707.20 28,011.04 38,011.40 682,624
HYDERABAD GROWTH CORRIDOR LIMITED
Construction of Eight - lane Access Controlled Expresway as Outer Ring Road to Hyderabad City, Package-2 from Mallampet (Km.35+000) to Dindigal (Km.46+000)
S.No. Description Unit Rate IPC-14 IPC-15 IPC-16 IPC-17 IPC-18 IPC-19 IPC-20 Total Quantity Amount
- 1,477,014
1 Royalty on Earthwork/Morram material Cum 22.00 15,963.013 79,893.855 122,984.798 74,510.819 73,418.484 95,564.879 2,496,826.897 54,930,192
2 Royalty on Sand Material Used Cum 40.00 803.766 742.616 1,321.156 717.679 700.276 950.285 16,725.914 669,037
3 Royalty on Stone Material Used MT 33.00 19,212.656 48,986.927 75,849.616 50,531.991 42,757.425 63,629.157 702,852.418 23,194,130
78,793,358
Total Amounts IPC Wise 1,017,354.57 3,403,938.04 5,261,549.12 3,335,500.88 3,054,212.71 4,240,200.92 80,270,372
-