全体フロー

Nantsune engineering proposal overall flow

Discussion period Extent of the contract for detail design Order range
Proposal matters from our sales (Operating agreement/Non disclosure agreement) (Equipment ordering and delivery support on extension of outsourcing contract)

・ Introduction of Nantsune ・Rough estimation and proposal ・Conclusion of non ・Process analysis for detailed design ・Exchange of requirement The completion , hand over
Execution design and the
before contracting definition documents Operation
・ Hearing of customer's disclosure agreement ・Formulation of requirement definition construction
concept ・Conclusion of ・Submission of detailed design •We will carry out on-site
①Propose equipment (provisional) • Sim・Perform a volume analysis and •Hand over the basic design witnesses to check whether
operating agreement drawings to the contractor.
that fulfills customer's requirement propose the most suitable detailed the installed equipment
・Detailed explanation of the ・Hear detailed requests based prtforms correctly following
engineering proposals that what of production items and the design for our customers
・We will exchange on the proposed basic design. •Have regular meeting after by the manual and
Nantsune can do. capacity. designing excution and support specifications, and support
• (sim=Simulation integrated Reflect it to the detailed design.
②Propose a rough layout plan with confidential agreement clients to make their ideal until full operation starts.
to disclose important Manufacturing) facility.
・Hearing of customer's locating the necessary equipment ・Create the detailed design
in it. confidential information
concept and basic information related to your business requirement definition
by the sales representative. ③Estimate a service contract cost document and authoruze it by
and to disclose our
of analysis for detailed designing. know-how. both parties. After that,
・We will analyse additional amendments not
④In case of client asking for described in the requirement
necessart process for
consulting after hearing our definition document will be
detailed design on behalf
charged.
suggestion, start having contracts. of customers. We will
conclude an outsourcing
contract for that.

・Execute SIM ・Create a requirement definition ・Preapre electricity, drainage,


・We will confirm the style of the ・We will check the processing site if ・Outsourcing costs are
clearly stated in the ・Volume analysis document wiring plots and the design. ・Machine delivery
factory required by the customer, necessary.
such as new construction, outsourcing contract, then ・Prepare final equipment list ・Installation
・Submit the temporary equipment list ・Exchange requirement definition
relocation, and expansion. define the condition of
・If you already have a drawing, we may and arrange equipment order ・Consulting services
paid/ free services, so that ・Create a manufacturing process chart documents
borrow it. we can avoid the any (operational support) will be
・We will confirm the business ・Create a basic drawing
trouble later. charged additionally.
responsibility required by ・We will meet with the construction
customers.
company as needed.

・We will ask about production


・We will submit the list if necessary for
items, desired production volume,
process analysis. Among them, we will sort
completion time and the budget.
the tasks ; ones customer can carried out
by themselves, or , others which Nantsune
is responsible for. And will calculate the
commission fee.