Test Report

Report No.: EED31K003813 Page 1 of 10

Client : Shenzhen Green Light New Energy Co., Ltd


Address : The Third Floor, Building B, Jinbolong Industrial Park, Qingquan Road, Longhua
Street, Linghua New District, Shenzhen, Guangdong, China

Description of the submitted sample(s):


Sample Name : LED Flood Light
Model : GL-SPL-500W, GL-SPL-600W, GL-SPL-800W, GL-SPL-1000W,
GL-SPL-1200W
Ratings : 100-240Vac, 50/60Hz.
Test Item : IP66
Surrounding :23.5℃, 52.0%R.H.
State of Sample(s) : Normal
Sample Quantity : 1 pc
Manufacture : Shenzhen Green Light New Energy Co., Ltd
Address : The Third Floor, Building B, Jinbolong Industrial Park, Qingquan Road,
Longhua Street, Linghua New District, Shenzhen, Guangdong, China
Sample Received Date : Nov. 23, 2018
Sample tested Date : Dec. 19, 2018
Test Requested : EN 60598-1:2015+A1:2018, Section 9;
Remark : 1) The tested sample(s) and the sample information are provided by the client.
2) All models have the same construction of resistance to dust, solid objects
and moisture, the model GL-SPL-1000W are selected to perform the tests.

Test Results: PASS. Please refer to third page.

Compiled by:: Reviewed by:

Approved by: Date : Dec. 24, 2018


Amo Liu
Lab Supervisor Check No.: 2447600224
Centre Testing International Group Co., Ltd. Hongwei Industrial Zone, Bao’an 70 District, Shenzhen, Guangdong, China
Test Report
Report No.: EED31K003813 Page 2 of 10

Equipment list
Expiry Date of
Test Equipment Equipment Model Equipment No.
Calibration
Dust Tester KXT1410 EES-488 Aug. 14, 2019
Withstanding Voltage Tester AN9602M EES-182 Jul. 23, 2019
Temperature and humidity meter 175H1 EES-171 Feb. 28, 2019
Stopwatch TF807 EES-116 Feb. 25, 2019
Steel tape 5m EES-072 Sept. 16, 2020
Spray Nozzle Tester DS-1 EES-315 Feb. 01, 2020
Test Report
Report No.: EED31K003813 Page 3 of 10

1. IP6X test
1.1 Test procedure
1) The luminaire is suspended outside the dust chamber and operated at rated supply voltage until operating
temperature is achieved.
2) The luminaire, whilst still operating, is placed with the minimum disturbance in the dust chamber. The
chamber shall contain 2 kg of powder for every cubic metre of its volume.
3) The door of the dust chamber is closed.
4) The fan or blower causing the talcum powder to be in suspension is switched on.
5) After 1 min, the luminaire is switched off and allowed to cool for 3 h whilst the talcum powder remains in
suspension.

1.2 Evaluation of test results


1) No deposit of talcum powder inside enclosures for dust-tight luminaires.
2) After completion of the tests, the luminaire shall withstand the electric strength test.

1.3 Test results:


Sample No. Observations Verdict
After the test, no deposit of talcum powder inside enclosure of the
EED31K003813-01 P
dust-tight luminaire.

1.4 Electric strength test results:


Test voltage Test time
Sample No. Between Observations Verdict
(Vac) (min)
No flashover or
Input and metal
EED31K003813-01 1480 1 breakdown occurred P
enclosure
during the test.
Test Report
Report No.: EED31K003813 Page 4 of 10

2. IPX6 test
2.1 Test procedure
1) Normal operation at rated supply voltage until operating temperature is achieved.
2) The luminaire is switched off and immediately subjected to a water jet for 3 min from all directions by
means of a hose having a nozzle with the shade. The nozzle shall be held 3 m away form the sample.
3) The water pressure at the nozzle shall be adjusted to achieve a water flow rate of
100 L/min±5%(approximately 100 KN/m2).

2.2 Evaluation of test results


1) No trace of water on electrical connections, current carrying parts or on insulation where it could become a
hazard for the user or surroundings, for example where it could reduce the creepage distances below the
values specified in Section 11; the only exception to this is for SELV conductors where the voltage under
load does not exceed 12 V r.m.s. or 30 V ripple free d.c. and the conductors are protected from corrosion.
2) After completion of the tests, no trace of water having entered in any part of the luminaire.
3) After completion of the tests, test samples should withstand electric strength test.

2.3 Test results


Sample No. Test time Observations Verdict
EED31K003813- After the test, no trace of water having entered in
3min P
01 any part of the luminaire.

2.4 Electric strength test results:


Test voltage Test time
Sample No. Between Observations Verdict
(Vac) (min)
Input and metal No flashover and
EED31K003813-01 1480 1 Pass
enclosure breakdown happened.
Test Report
Report No.: EED31K003813 Page 5 of 10

Photos of the sample

Fig. 1 - Overall view

Fig. 2 - Overall view


Test Report
Report No.: EED31K003813 Page 6 of 10

Fig. 3 - Front view

Fig. 4 - Sample during IP6X test


Test Report
Report No.: EED31K003813 Page 7 of 10

Fig. 5 - Sample during IPX6 test

Fig. 6 - Sample after IP66 test(Model GL-SPL-1000W)


Test Report
Report No.: EED31K003813 Page 8 of 10

Fig. 7 - Sample after IP66 test(Model GL-SPL-1200W)

Fig. 8 - Sample after IP66 test(Model GL-SPL-1000W)


Test Report
Report No.: EED31K003813 Page 9 of 10

Fig. 9 - Sample after IP66 test(Model GL-SPL-1000W)

Fig. 10 - Sample after IP66 test(Model GL-SPL-1000W)


Test Report
Report No.: EED31K003813 Page 10 of 10

Fig. 11 - Sample after IP66 test(Model GL-SPL-1000W)

*** End of Report ***


The test report is effective only with both signature and specialized stamp. The result(s) shown in this report refer
only to the sample(s) tested. Without written approval of CTI, this report can’t be reproduced except in full.