Using following data calculate the cost of various item
i. Cement /bag= Rs. 600
ii. Sand and course aggregate= Rs. 35 per cft iii. Brick = Rs.15 per unit iv. Steel = Rs. 150 per kg (take unit weight of steel as 490 lb/ft 3
S. No Cost -Rs Option 1 Option 2 Option 3
Cost of 1:2:4 concrete used in roof 18,000 21,000 24,000 Cost of Steel used in roof 16,000 19,000 22,000 Cost of 1:4:8 flooring 7,000 9,000 11,000 Cost of concrete used in foundation 20,000 25,000 30,000 Cost of steel used in foundation 12,000 15,000 18,000 Cost of mortar used in masonry work 14,000 17,000 20,000 (assuming mortar constitute 20% of brick masonry) Cost of bricks used in masonry work 80,000 90,000 100,000 Cost of mortar used in plaster work 15,000 20, 00 25,000 Labor Cost of excavation @ Rs. 15/cft 8,000 10,000 12,000 Labor Cost of backfilling and compaction @ Rs. 4,500 6,000 7,500 10/cft Labor Cost of casting RCC roof @ Rs. 50/sft 10,000 12,000 14,000 Labor Cost of masonry work @ Rs. 30/sft wall 20,000 22,000 24,000 area Labor Cost of concreting and steel fixing in 8,000 11,000 14,000 foundation @ Rs. 50/cft of concrete Labor Cost of plaster @ Rs. 20/sft wall area 10,000 12,000 14,000