RCC slab

1:02:04 118 cft


cement 20.79
sand 51.975
crush 103.95

cost 17931 151.8

steel
#3 53.7 kg
#4 71.8

cost 18825

flooring
64.0 cft
cement 6.07
sand and crush 91.0
cost 6823 106.6

Foundation

1:02:04 153.0
cost 23225

1:4;8 61.3
cost 6530 29756

foundation steel

#3 42.3 kg
#4 56.5

cost 14821

Masonry

masonry-cft 534.8
Bricks 6084
cost 91264

Mortar 107.0
cement 16.5
sand 120.3

cost 14111.7 131.9464

Plaster
1:4 mortar 89.1
cement 19.3
sand 96.3

cost 14920 167.4

Excavation

Qty-cft 619.5
cost 9292.5

Backfilling

Qty-cft 435.125
cost 4351.25

Labour cost

RCC roof 11813


Masonry walls 21390
Flooring 5760
1:4:8+1:2:4 in foundation 10712.5
Plaster 14260

286030
1210.71005223172