Professional Documents
Culture Documents
BUS 83 WB Alignment: Foundation Layout
BUS 83 WB Alignment: Foundation Layout
Face of backwa
20" E
20" W
32
32
Sta 183+77.
Sta 185+97.
46.
13.
� Bent # 2
Abut # 1
49'
41'
N 1°
N 3°
18
4+ 0'
00 67
.50'67
.5
M atch line
� BUS 83 WB alignment
000'
54" Dia dr sh (Typ)
270'
Sta 185+52.949 (PBASE)
Offset 39.834' rt
17.
230' 5.
000'
~ Sta 186+
8.
� US 83 PEBML1 186+00
184+00
8.
185+00
000'
000'
10.
1.
000'
50
19.
Face of backwa
Abut # 3
Sta 188+17.
N 9°
Sta 189+90.620 (PBASE)
12'
Offset 5.733' lt
12.
Test Hole #E-1
(not shown at actual location)
24" W
18" Dia dr sh
32
ll
18
7+
00 75
.00'
20.
150
.00'
17.
Wes u
tt rnaroundai
lgnment
M atch line ~ Sta 186+50
000'
000'
189+00
8.
000'
188+00
187+00
10.
1.
000'
000'
42" Dia dr sh (Typ)
19.
22.
000'
000'
18" Dia dr sh
GENERAL NOTES:
150
.00' See Common Foundation Details (FD) standard sheet for all
abutment foundation details and notes not shown.
See Bridge Layout for drilled shaft lengths and test hole
18 data.
8+
Sta 186+51.845 (PBASE) 00
Offset 128.408' rt
Test Hole #B-6
(not shown at actual location) HL93 LOADING
Bridge
Division
US 83 W-EB OVERPASS
at BU 83
(PRIMARY BID)
FILE: DN: CK: DW: CK:
REVISIONS
DATE:
FILE: