Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ll

Face of backwa

20" E

20" W
32

32
Sta 183+77.

Sta 185+97.
46.

13.
� Bent # 2
Abut # 1

49'

41'
N 1°

N 3°
18
4+ 0'
00 67
.50'67
.5

M atch line
� BUS 83 WB alignment

000'
54" Dia dr sh (Typ)

270'
Sta 185+52.949 (PBASE)
Offset 39.834' rt

17.

230' 5.
000'

Test Hole #B-5

~ Sta 186+
8.

� US 83 PEBML1 186+00
184+00

8.
185+00
000'
000'

10.
1.

000'

50
19.

42" Dia dr sh (Typ)

Face of backwa
Abut # 3
Sta 188+17.
N 9°
Sta 189+90.620 (PBASE)

12'
Offset 5.733' lt

12.
Test Hole #E-1
(not shown at actual location)

24" W
18" Dia dr sh

32

ll
18
7+
00 75
.00'

20.
150
.00'

17.
Wes u
tt rnaroundai
lgnment
M atch line ~ Sta 186+50

000'

000'
189+00

8.
000'
188+00
187+00

10.

1.
000'
000'
42" Dia dr sh (Typ)

19.
22.

000'
000'
18" Dia dr sh
GENERAL NOTES:

See Footing Details sheet for interior bent drilled shaft


details.
75
.00'

150
.00' See Common Foundation Details (FD) standard sheet for all
abutment foundation details and notes not shown.

See Bridge Layout for drilled shaft lengths and test hole
18 data.
8+
Sta 186+51.845 (PBASE) 00
Offset 128.408' rt
Test Hole #B-6
(not shown at actual location) HL93 LOADING

Bridge
Division

FOUNDATION LAYOUT FOUNDATION LAYOUT

US 83 W-EB OVERPASS
at BU 83
(PRIMARY BID)
FILE: DN: CK: DW: CK:

C TxDOT CONT SECT JOB HIGHWAY

REVISIONS
DATE:
FILE:

DIST COUNTY SHEET NO.

You might also like