Compound Wall South Side - Revised
Compound Wall South Side - Revised
Compound Wall South Side - Revised
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
BABAR MAHAL, KATHMANDU, NEPAL
Abstract of Cost
F/Y: 2072/073
Project : Construction of Compound wall
Site : Civil service hospital Minbhawan, KTM
Amount
S.N. Description of Work Quantity Unit Rate Rs. Per
Rs
1 Dismantling of Dismentled brickwork in cement
mortar including disposal of the debris out of
site .
183.75 cum 1158.05 one 212,791.68
2 Earthwork in excavation in hard/boulder mix
soils in foundation including 10m hauling
distance and 1.5 m. lift all complete.
136.13 cum 393.84 one 53,613.43
3 Local flat brick soiling work with sand filling.
Abstract of Cost
F/Y: 2072/073
Project : Construction of Compound wall
Site : Civil service hospital Minbhawan, KTM
Amount
S.N. Description of Work Quantity Unit Rate Rs. Per
Rs
9 12.5mm thick cement sand plaster in (1:4) ratio
on wall of good finish including racking the
joint, wetting of surfaces & curing the work all
complete.
362.29 sqm 305.37 one 110,632.49
10 Fencing with 62mm X 62mm size mesh made
up of 7mm Ø rods framed on 25X25X4 mm
angles and 50mm Ø M.S. blackpipe Estimated
post by
in :2m Forwarded
Checked
by : by :
Name : Name Name : :
interval including jointting , fixing,Desingation
erection :and Desingation
Desingation
: :
primer painting with all necessary M.S. grills
and plates as per drawing and inst (USEING
OLD EXISTING MESH ) About 70.0 Sqm
DETAILED ESTIMATE
F/Y: 2072/073
2 Earthwork in excavation in
hard/boulder mix soils in foundation
including 10m hauling distance and
1.5 m. lift all complete.
DETAILED ESTIMATE
F/Y: 2072/073
Footing 12mm dia 150 c/c both way 1386 1.500 0.888 1846.15
Col 12mm dia 308 3.100 0.888 847.86
8mm dia sti 1386 0.870 0.395 476.29
FoundationTie 6 187.240 0.888 997.61
8mm dia sti 1176 0.870 0.395 404.13
Top Tie 6 162.240 0.888 864.41
8mm dia sti 1176 0.870 0.395 404.13
Total 5840.58 Kg
DETAILED ESTIMATE
F/Y: 2072/073
1 1.00
DETAILED ESTIMATE
F/Y: 2072/073
DETAILED ESTIMATE
F/Y: 2072/073
Abstract of Cost
F/Y: 2072/073
Project : Construction of Compound wall
Site : Civil service hospital Minbhawan, KTM
Amount
S.N. Description of Work Quantity Unit Rate Rs. Per
Rs
1 Dismantling of Dismentled brickwork in cement
mortar including disposal of the debris out of
site . 164.85 cum 1158.05 one 190,904.54
2 Earthwork in excavation in hard/boulder mix
soils in foundation including 10m hauling
distance and 1.5 m. lift all complete. 119.14 cum 393.84 one 46,922.09
3 Local flat brick soiling work with sand filling.
82.48 sqm 745.09 one 61,455.02
4 Pumping out of water from foundation or pit.
29.30 hr 172.50 one 5,054.25
5 Dry rubble masonry work in perfect line level
finish all complete.
9.76 cum 5813.49 one 56,739.66
6 Rubble masonry in 1:4 C/S mortar in perfect
line level finish including, racking the joints and
curing the work for at least 7 days all complete.
12.10 cum 12456.62 one 150,725.10
7 Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved
quality of cement and sand and crushed stone
aggregate including mixing, laying, curing etc
all complete in approval of site engineer.
Kathmandu E F
Bhaktapur E F
Lalitpur G H
1 Place the crussor under "Rate Rs." on Column "E" & Click
24500
roved by :
me :
ingation :
olb s'g} cfO6d ln:6 eGbf
aflx/sf] lbg k/]df sf]8df *
lbg'xf]nf / Description,
Unit / Unit rate df
;DjlGwt 8f6f lbg'xf]nf .
o;l/ lbOPsf 8f6f bill /
comparative chart df
. \cfk}m j:g] 5g
Government of Nepal
Ministry of Urban development
Department of Urban Development & Building Construction
BABAR MAHAL, KATHMANDU, NEPAL
9
Footing
Rectanglular 48 1.20 1.20 0.20 13.82
Trapizide 48 0.63 0.20 0.20 1.20
Col. At east portion 19 0.23 0.23 2.11 2.12
Col. At Middle south portion 29 0.23 0.23 2.10 3.22
FoundationTie 2 104.66 0.23 0.23 11.07
1 40.70 0.23 0.23 2.15
Top Tie 1 157.00 0.23 0.08 2.70
Total 36.28 Cum
Tor steel reinforcement bar of fe
415/500 grade including
straightening, cleaning, cutting,
binding & fixing in position with
annealed tying binding wire as per
drawing, design & instruction all
complete.
10
a Footing 12mm dia 150 c/c both way 48 20.320 0.888 866.11
b Col 12mm dia 192 3.100 0.888 528.53
8mm dia sti 864 0.870 0.395 296.91
c FoundationTie 8 127.940 0.888 908.88
4 52.220 0.888 185.48
8mm dia sti 1818 0.870 0.395 624.75
d Top Tie 2 169.240 0.888 300.57
8mm dia sti 1046 0.100 0.395 41.31
Total 3752.54 Kg
Formwork, shuttering, centering with
19mm thick waterproof ply board and
steel post for all works necessary
propping, scaffolding, staging,
supporting inclusive of wedging and
cutting holes for utilization till the
support if fully unyielding nett.
11
Footing 48 4.80 0.2 46.08
Col 48 0.92 2.1 92.73
FoundationTie 4 115.70 0.23 106.44
2 115.70 0.23 53.22
2 40.70 0.23 18.72
Top Tie 2 157.00 0.08 23.55
1 1.00 1.00
1 82.85 82.85
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
n
of] kmfOn original file xf] . s[kof tkfO{sf] sfd o; kmfO{ndf
save gug'{ xf]nf . File save_as u/L cs}{ gfddf save
. ug'{ xf]nf
x/]s cfO6dsf] hDdf nfO{ Name Box df uO{ gfd lbg' xf]nf .
F/Y: 2072/073
. Gffd lb+bf qt_(Code Number) u/L lbg' xf]nf
Abstract df Estimate sf] sequence df code number lbg'
. xf]nf . Quantity sell df "=qt_(Code Number)" lbg' xf]nf
Remarks
olb s'g} cfO6d ln:6 eGbf aflx/sf] lbg k/]df sf]8df * lbg'xf]nf /
Code . Description, Unit / Unit rate df ;DjlGwt 8f6f lbg'xf]nf
45+70.7+42+1.25=158.95
158-42-48*1.2=58.4 0.485
42+1.25=43.25
175-60*12-42=61
.
175-60*1.2=103
175-60*.23-42=119.20
158-42=116
296.91
17*.72+175-42=145.24
624.75
41.31
#REF!
xf]nf .
er lbg'
' xf]nf
'xf]nf /
]nf
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
BABAR MAHAL, KATHMANDU, NEPAL
Bill of Quantity
Page-34
Sno Description Quantity Unit Rate excluding VAT
In Figure In word
4 Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved quality
of cement and sand and crushed stone aggregate
including mixing, laying, curing etc all complete in
approval of site engineer.
9.730 cum
5 Good quality local chimney made Brickwork in 1:6
C/S mortar up to ground floor in perfect line level
finishe including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.
71.400 cum
6 Plain cement Concrete (PCC) for RCC works (1:2:4)
for slab/lintels with approved quality of cement and
sand and crushed stone aggregate including mixing,
laying, curing etc all complete in approval of site
engineer.
36.280 cum
7 Tor steel reinforcement bar of fe 415/500 grade
including straightening, cleaning, cutting, binding &
fixing in position with annealed tying binding wire as
per drawing, design & instruction all complete.
3752.540 Kg
8 Formwork, shuttering, centering with 19mm thick
waterproof ply board and steel post for all works
necessary propping, scaffolding, staging, supporting
inclusive of wedging and cutting holes for utilization
till the support if fully unyielding nett.
340.740 sqm
9 12.5mm thick cement sand plaster in (1:4) ratio on
wall of good finish including racking the joint, wetting
of surfaces & curing the work all complete.
597.840 sqm
Page-35
Sno Description Quantity Unit Rate excluding VAT
In Figure In word
10 Fencing with 62mm X 62mm size mesh made up of
7mm Ø rods framed on 25X25X4 mm angles and
50mm Ø M.S. blackpipe post in 2m interval including
jointting , fixing, erection and primer painting with all
necessary M.S. grills and plates as per drawing and
inst (USEING OLD EXISTING MESH ) About 70.0
Sqm
1.000 sqm
11 Fencing with 62mm X 62mm size mesh made up of
7mm Ø rods framed on 25X25X4 mm angles and
50mm Ø M.S. blackpipe post in 2m interval including
jointting , fixing, erection and primer painting with all
necessary M.S. grills and plates as per drawing and
inst (USEING NEW MESH )
82.850 sqm
12 Colouring with 2 coats waterproof cement paint of
approved colour to give uniform colouring after
rendering the surface all complete. 590.320 sqm
13 2 coats of ready made enamel paint of approved
colour over 1 coats of primer Painting over porperly
sanded wooden surface all complete 590.320 sqm
14 Site clearence work Before and after work,all
complete 1.000 Job
Total
Page-36
Government of Nepal
nistry of Urban Development
an Development & Building Construction
MAHAL, KATHMANDU, NEPAL
Bill of Quantity
Total Amount
Page-37
Total Amount
Page-38
Total Amount
Page-39