Indra: Field Coating Procedure For Welding Joints, Damages, and Non-Conformance Portions of Tsa Coated Items
Indra: Field Coating Procedure For Welding Joints, Damages, and Non-Conformance Portions of Tsa Coated Items
004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 1 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 2 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
Record of Revisions
Rev No Date Description
O1 26-Aug-16 Issued for Comment
O2 13-Sep-16 Issued for Comment
Incorporated comments from Company except for aluminum foil tape backing
thickness. (Aluminum backing thickness “50microns” is correct)
A1 4-Oct-16 Issued for Design
A2 26-Oct-16 Issued for Design
Incorporated comments from Company on the following project documents:
- Letter : KNPC-JGSK-CFP-MAA-L-16-11831
- Material Approval Request : P6011MAA.000.10.51.4349
F1 7-Nov-16 Issued Final
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 3 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
TABLE OF CONTENTS
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 4 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
2.0 REFEREMCE
2.1 Project Document
DEP 30.48.00.31-Gen. : Protective Coatings For Onshore Facilities
(January 2009)
30.48.00.31-P6000CFP- : Project Variation Painting And Coating Of New Equipment
000-PV Rev. J And Piping
P6011MAA.000.10.48.001 : Project Specification For External Coating Of Onshore
Facilities
MAA-WR-DD-622 : Waiver request for “Application of Liquid Coating for
Avoidance of TSA Application at Field”
KNPC-JGSK-CFP-MAA-L- : Letter for “Company Review on Contractor Documents
16-11831 (P6011MAA.000.10.48.004, S-000-1274-0001V)”
P6011MAA.000.10.51.4349 : Material Approval Request for “Aluminum Foil Tape 425 &
427”
3.0 DEFINITION
PMC/Principal : The party that initiates the project and ultimately pays for its design and
construction. The PMC/Principal will generally specify the technical
requirements. The PMC/Principal may also include an agent or
consultant, authorized to act for the
PMC/Principal. For CFP, “Principal” is same with “Company” which
means Kuwait National Petroleum Company (KNPC)
Contractor : The party that carries out all or part of the design, engineering,
procurement, construction, commissioning or management of a project
or operation of a facility. The PMC/Principal may undertake all or part of
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 5 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
Any discrepancy between this document and other CFP documents shall be brought to the
attention of the PMC/Principal for review and direction.
6.0 MATERIALS
6.1 Liquid Coating
The liquid coating product listed below table shall be used. Product data sheet is attached in
Appendix A.
Supplier Product
Interbond 1202UPC
International Paint
(Note-1)
Note-1: In case of alternative materials to be used, it shall be approved by PMC/Principal
after submitting the required test data and experience details.
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 6 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
7.0 APPLICATION
7.1 Liquid Coating
Liquid coating shall be applied in accordance with the following requirements:
a) The following portions shall be cleaned and feathered by means of abrasive blast cleaning
in compliance with SSPC-SP 10:
Weld joints and terminations of TSA coating
Damages and non-conformance portions found at field after erection of piping,
equipment, and tank, etc.
However, where surface preparation or feathering by abrasive blasting is considered
impracticable within the field construction conditions, e.g., due to limited access, risks of
damage to equipment, the proximity of electrical components or instrumentation, the use of
power tool cleaning (SSPC-SP 11) is acceptable at PMC/Principal agreed locations only.
The type or combination of types of power tool shall produce a minimum surface profile as
stated in paragraph 7.1 (c) and tested as stated in paragraph 8.1.
b) The following coating application methods are acceptable depending on the contour and
position of the surface to be coated:
Airless spray, and
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 7 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
Brush
c) Surface profile and Nominal DFT (NDFT) requirement for the liquid coatings shall be as
follows:
Item Requirement
d) Liquid coating shall be applied only on the prepared and feathered areas and a minimal
overlap (approx. 10 mm) shall be applied on to the unfeathered portion of TSA coating
e) Inspection shall be performed in accordance with paragraph 8.2. Following, aluminum foil
tape shall be applied in accordance with paragraph 7.2.
a) The liquid coated and TSA coated areas shall be free of mud, oil, grease or any other
foreign material. Visible oil and grease shall be removed with suitable solvent.
b) The weld joints coated by the liquid coating shall be wrapped by aluminum tape spirally with
minimum 50% overlaps. Where the wrapping starts and ends, the tape shall be adjusted, so
that the amount of overlap for the initial and last turns shall be 100% (i.e., double lap). End
of lap shall be between 3 o’clock and 6 o’clock position for horizontal piping.
On vertical/sloped piping the weld shall be wrapped from the bottom up so that the "open
edge" is always facing down.
c) The tape shall be applied with a minimum 25 mm overlap on to the TSA coating.
d) Where a single length of tape is insufficient to cover the length of piping to be wrapped, the
new tape shall overlap the end of the tape previously applied by at least 25 mm.
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 8 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
e) Thickness of aluminum layer in the tape shall be minimum 64 microns. However, the
required aluminum layer thickness (min. 64 microns) may be achieved by adjusting the
number of overlaps of the aluminum tape.
f) Typical drawing of aluminum tape application for welding joints is shown in Fig.1.
Weld Joint
Tape
Circumferential Turn
Fig.1 Typical drawing of aluminum tape application for welding joints (spiral wrap application)
g) The repaired areas shall be repaired by patch application as shown in shown in Fig.2. Same
application philosophy with welding joints shall be applied.
Depending on the location of the repaired areas, the aluminum tape shall be wrapped with
the seam position in such a way that the ingressed water (if any) is driven out. In other
words, edge of seams shall always face down to avoid any water ingress.
h) Inspection shall be performed in accordance with paragraph 8.3. After inspection, thermal
insulation system will be applied as required in the project specification
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 9 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
TSA Coating
Liquid Coating
(Repaired Area)
Gravity
Tape
- Double lap for Initial and Last Patches
- Min. 50% Overlap
- Min. 25 mm Overlap on TSA Coating
- Total Thickness of Aluminum Layer: Min. 64 microns
- Seam position during overlap shall ensure the expulsion
of any ingressed water by keeping edges facing down.
Fig.2 Typical drawing of aluminum tape application for repaired areas (patch application)
8.0 INSPECTION
a) Visual Inspection:
The coating shall be free from defects such as runs, sags, pinholes, voids, bubbles, orange
peel, grit, dust inclusions, flaking from substrate etc, and be of a good visual appearance.
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 10 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
d) Adhesion Test
Adhesion test shall be performed in accordance with the following philosophy:
Item Requirement
Carbon steel flat test plate (Not directly on the work piece) Test
Object
plate size : e.g., 100mm x 100mm x 6mm-thickness
a) Visual Inspection:
The finished wrapping/ patches shall be free of open seam and any sign of adhesion loss.
9.0 DOCUMENTATION
Sun-contractor shall submit the following documents related to field coating activities for
Contractor’s approval, but not limited to:
1) Product details (i.e., PDS, MSDS, Batch Certificate, etc.)
2) Inspection and Test Plan (ITP) for field application
3) Inspection report
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 11 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
2) 3M: High Temperature Aluminum Foil Tape 433 • 433L (Linered) (Total page no.: 2)
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 12 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 13 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 14 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 15 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 16 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 17 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
2) 3M: High Temperature Aluminum Foil Tape 433 • 433L (Linered) (Total page no.: 2)
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 18 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 19 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 20 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 21 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V
IN D R-20A
V
16
- N O
07
Kuwait National Petroleum Company (K.S.C.) P6011MAA.000.10.48.004
Clean Fuels Project (CFP) REV F1
KNPC Contract No. CFP/EPC/0054-MAA Page 22 of 22
Contractor JOB CODE : 0-6798-20-0000 S-000-1274-0001V