PT PERTAMINA HULU MAHAKAM

BEKAPAI 3
SURFACE FACILITIES MODIFICATION AND
DOGLEG INSTALLATION (EPCIC)

CONTRACTOR
ORGANIZATION CHART

CLASS : 1

0.1 03-Aug-2021 IFC Issued for Comment IA SSA SG

Rev Date Status Revision memo Issued Checked Approved COMPANY


TABULATION OF REVIEW PAGES

REVISION REVISION
SHEET SHEET
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9

1 X 31

2 X 32

3 X 33

4 X 34

5 X 35

6 X 36

7 X 37

8 X 38

9 X 39

10 X 40

11 X 41

12 X 42

13 X 43

14 X 44

15 45

16 46

17 47

18 48

19 49

20 50

21 51

22 52

23 53

24 54

25 55

26 56

27 57

28 58

29 59

30 60
COMMENT TABULATION

No PHM COMMENT CONTRACTOR RESPONSE


TABLE OF CONTENTS

1. INTRODUCTION.......................................................................................................................................5
1.1 Plant Description..................................................................................................................5
1.2 Project General Description and Purpose.........................................................................5
2. DOCUMENT SCOPE...................................................................................................................................7
1. INTRODUCTION
1.1. Plant Description
Bekapai is a COMPANY’s oil field located at offshore area in the Mahakam delta (East
Kalimantan) with water depths 30 – 40 meters and located about 40 kilometers south east of
the Senipah terminal.
COMPANY continues to develop of mature Bekapai offshore oil filed which was discovered in
1972 and start to production in 1974, with current facilities are:
 Nine (9) satellite wellhead platforms & inter-platform pipelines;
 Production (BP) & LQ platforms;
 12” export pipeline to Senipah Terminal (BP1-SNP);
 12” export pipeline to Peciko field SWP-K (BA-SWPK).
All effluents from satellite platforms are transported to BP1 and BA in order to have gas-oil-
water processing unit (separation, pumping, compression, and oily water treatment).
Production fluid from Bekapai field is routed to two (2) locations; multiphase production (mostly
gas and oil) is exported to Senipah Terminal (TPA) via 12” BP1-SNP pipeline and gas
production is exported to Peciko Field via 12” BA-SWPK Pipeline. The network of BEKAPAI
Platforms is shown in figure below.

1.2. Project General Description and Purpose


General Description
Bekapai development phase 3 covers modifcation of existing production facilities in order to
accommodate drilling program of several new wells with potential oil and gas reserve from
Bekapai filed. Modification and intervention of the existing offshore production facilities are for:
 BE and BH as the main platforms;
 BG and BA as host platforms;
 Reutilization of existing 6” inter-platform pipelines between BH to BG and BE to BA.
With the current conditions:
 BH and BE as satellite wellhead platform, located at eastern of Bekapai field, with
minimum production and safety system without pressure relief system, where each
platform is hosting three (3) wells:
- One (1) BH well is still in production
- All BE wells are not in production
 BG is still in operating, latest development phase 2B was completed in 2015 with
additional production wells
 BA is a hub platform, gas export point to Peciko SWP-K without any wells in production
 6” pipeline from platform BE to BA are being preserved. The exsiting pipeline is not
equipped with dogleg
 6” pipeline from platform BH to BG is still in operating
In general, the new equipment under Bekapai 3 is illustrated below:

BE & BH Platform
Project Purpose
 Increase oil and gas reserves recovery by Reserve: 22.1 BcfGas & 2.8 MbblOil +
Condensate
 Drilling of 5 new wells from existing BE & BH platforms, with :
- Modification of the existing BE & BH
- Reuse of existing 6" pipeline from BE to BG (3.6 km) & 6" pipeline from BH to BG (1.9 km)
- Modification and integration work at the BA, BG & BP platforms

2. DOCUMENT SCOPE
The purpose of this document is to describe Contractor Organization Chart to deliver the
Bekapai 3 Surface Facilities Modification and Dogleg Installation (EPCIC) project.