BEKAPAI 3
SURFACE FACILITIES MODIFICATION AND
DOGLEG INSTALLATION (EPCIC)
CONTRACTOR
ORGANIZATION CHART
CLASS : 1
REVISION REVISION
SHEET SHEET
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
1 X 31
2 X 32
3 X 33
4 X 34
5 X 35
6 X 36
7 X 37
8 X 38
9 X 39
10 X 40
11 X 41
12 X 42
13 X 43
14 X 44
15 45
16 46
17 47
18 48
19 49
20 50
21 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
COMMENT TABULATION
1. INTRODUCTION.......................................................................................................................................5
1.1 Plant Description..................................................................................................................5
1.2 Project General Description and Purpose.........................................................................5
2. DOCUMENT SCOPE...................................................................................................................................7
1. INTRODUCTION
1.1. Plant Description
Bekapai is a COMPANY’s oil field located at offshore area in the Mahakam delta (East
Kalimantan) with water depths 30 – 40 meters and located about 40 kilometers south east of
the Senipah terminal.
COMPANY continues to develop of mature Bekapai offshore oil filed which was discovered in
1972 and start to production in 1974, with current facilities are:
Nine (9) satellite wellhead platforms & inter-platform pipelines;
Production (BP) & LQ platforms;
12” export pipeline to Senipah Terminal (BP1-SNP);
12” export pipeline to Peciko field SWP-K (BA-SWPK).
All effluents from satellite platforms are transported to BP1 and BA in order to have gas-oil-
water processing unit (separation, pumping, compression, and oily water treatment).
Production fluid from Bekapai field is routed to two (2) locations; multiphase production (mostly
gas and oil) is exported to Senipah Terminal (TPA) via 12” BP1-SNP pipeline and gas
production is exported to Peciko Field via 12” BA-SWPK Pipeline. The network of BEKAPAI
Platforms is shown in figure below.
BE & BH Platform
Project Purpose
Increase oil and gas reserves recovery by Reserve: 22.1 BcfGas & 2.8 MbblOil +
Condensate
Drilling of 5 new wells from existing BE & BH platforms, with :
- Modification of the existing BE & BH
- Reuse of existing 6" pipeline from BE to BG (3.6 km) & 6" pipeline from BH to BG (1.9 km)
- Modification and integration work at the BA, BG & BP platforms
2. DOCUMENT SCOPE
The purpose of this document is to describe Contractor Organization Chart to deliver the
Bekapai 3 Surface Facilities Modification and Dogleg Installation (EPCIC) project.