Commissioning Tool - Earthing Transformer

Project Summary Report - Earthing Transformer


Substation Name: Substation Designator:
Project Name:
Project Number: Customer:
Project Tool Name: Stage:
Stage Description: Phase:

Project Description:

Installed Plant/Equipment
Plant Identifier Manufacturer Serial Number Voltage Comments Year

Page 1 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-047Filename:536730056.xls
Commissioning Tool - Earthing Transformer

Page 2 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-047Filename:536730056.xls
Commissioning Tool - Earthing Transformer

ITP sheet name:


ITP Approved By:
ITP Approval Date:
Rerun flag: 0
Plant Manufacturer:
Plant Serial Num:
Rating:
Insulation:
Local supply winding?:
Primary Voltage:
Plant ID:
Secondary Voltage:
phase:
Year of Manufacture:
non standard test
record of non standard test
acceptance: 0
new sheet name:
Model:
Z0 Impedance:
project name:
project number:
commissioning rep:
approval date:
sub name:
sub alpha:
commissioning stage:
stage description:
project description:
Customer:
User Name:

Project Tool Name:


Project Tool opened (date):

Num Proj Stages:


Copy Tool Flag:

Project Tool Path:

Page 3 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-047Filename:536730056.xls
Commissioning Tool - Earthing Transformer

Commissioning Inspection and Test Plan - Earthing Transformer


CProject Name:
Approved By: Date: Phase: Stage:
Substation:
Earthing Transformer Identifier:
Legend: A = Action; H = Hold Point; W = Witness; V = Verify; N/A = Not Required
Action / Inspection Requirments
Item No. Item Description Acceptance Criteria Code Tested By Comments Comp Lvl

Test Verifications
Earthing Insulation Winding
Transf. Resist- Resist- Z0 Imped- SAT SIT Commissioning
Identifier ance ance ance Ratio Checklist Checklist sign off

Page 4 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-046Filename:536730056.xls
Commissioning Tool - Earthing Transformer

Page 5 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-046Filename:536730056.xls
Commissioning Tool - Earthing Transformer

Insulation
Insulation Resistance Resistance
Test Report - Earthing Test Report
Transformer - Earthing Transformer
Customer: Substation: Transformer Identifier:

Plant Details
Manufacturer: Serial No:
Model: Insulation:
Voltage: kV Z0 Impedance: Ω

Insulation Resistance: (all values in MΩ) ###


Instrument Used: Serial Number: Temperature: °C###
Earthing Transformer Rated Voltage: kV ###
Insulation Resistance Test Voltage = kV ###
###
###
PI will only be assessed if IR assessment
Test @1 min @5 min @10 min PI ###
level = C3
HV - E MΩ MΩ MΩ ###
Comments

Signature Block:
Tested By: Name: Date:
Checked By: Name: Date:

Page 6 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-047Filename:536730056.xls
Commissioning Tool - Earthing Transformer

Insulation
Insulation Resistance
Resistance Test Test Report
Report - Earthing/Local - Earthing/Local
Supply Transf. Supply Transf.
Customer: Substation: Transformer Identifier:

Plant Details
Manufacturer: Serial No:
Model: Insulation:
Pri Voltage: kV Z0 Impedance: Ω
Sec Voltage: V Rating: kVA
Insulation Resistance: (all values in MΩ) ###
Instrument Used: Serial Number: Temperature: °C###
Earthing Transformer Rated Voltage: kV ###
Insulation Resistance Test Voltage = kV (For HV windings only) ###
###
###
Test @1 min @5 min @10 min PI ###
HV - LV+E MΩ MΩ MΩ ###
HV - E MΩ MΩ MΩ PI will only be assessed if IR assessment
level = C3
LV - E @
1kV MΩ MΩ MΩ
Comments

Signature Block:
Tested By: Name: Date:
Checked By: Name: Date:

Page 7 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-047Filename:536730056.xls
Commissioning Tool - Earthing Transformer

Winding
Winding Resistance
Resistance and Z0
and Z0 Impedance TestImpedance Test
Report - Earthing Report - Earthing
Transf. Transf.
Customer: Substation: Transformer Identifier:

Plant Details
Manufacturer: Serial No:
Model: Insulation:
Voltage: kV Z0 Impedance: Ω

Winding Resistance:
Instrument Used: Serial Number: Temperature: °C
Winding Material:
Corrected to 75ᵒC
Connection A-n B-n C-n A-n B-n C-n C-n
Test Test Test
Resistance mΩ mΩ mΩ Temp? mΩ Temp? mΩ Temp? mΩ mΩ
Zero Sequence Impedance:
Instrument Used: Serial Number:

Test Configuration Applied Voltage Measured Current R X Z


3 Phase to Earth V ᵒ A ᵒ #DIV/0! Ω #DIV/0! Ω #DIV/0! Ω
A Phase to Earth V ᵒ A ᵒ #DIV/0! Ω #DIV/0! Ω #DIV/0! Ω
B Phase to Earth V ᵒ A ᵒ #DIV/0! Ω #DIV/0! Ω #DIV/0! Ω
C Phase to Earth V ᵒ A ᵒ #DIV/0! Ω #DIV/0! Ω #DIV/0! Ω
Comments

Signature Block:
Tested By: Name: Date:
Checked By: Name: Date:

Page 8 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-047Filename:536730056.xls
Commissioning Tool - Earthing Transformer

Winding
Winding Resistance
Resistance & Z0 Impedance
& Z0 Impedance Test ReportTest Report - Earthing/Local
- Earthing/Local SupplyTransf. SupplyTransf.
Customer: Substation: Transformer Identifier:

Plant Details
Manufacturer: Serial No:
Model: Insulation:
Pri Voltage: kV Z0 Impedance: Ω
Sec Voltage: V Rating: kVA
Winding Resistance:
Instrument Used: Serial Number: Temperature: °C
Winding Material: Winding M
ZigZag Winding ZigZag W
Measured Resistance Corrected to 75ᵒC
A-n B-n C-n A-n B-n C-n
Winding Test Test Test
Resistance mΩ mΩ mΩ Temp? mΩ Temp? mΩ Temp? mΩ
Zero Sequence Impedance:
Instrument Used: Serial Number:
Zigzag winding only
Test Configuration Applied Voltage Measured Current R X Z
3 Phase to Earth V ᵒ A ᵒ #DIV/0! Ω #DIV/0! Ω #DIV/0! Ω
A Phase to Earth V ᵒ A ᵒ #DIV/0! Ω #DIV/0! Ω #DIV/0! Ω
B Phase to Earth V ᵒ A ᵒ #DIV/0! Ω #DIV/0! Ω #DIV/0! Ω
C Phase to Earth V ᵒ A ᵒ #DIV/0! Ω #DIV/0! Ω #DIV/0! Ω
Comments

Signature Block:
Tested By: Name: Date:
Checked By: Name: Date:

Page 9 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-047Filename:536730056.xls
Commissioning Tool - Earthing Transformer

Ratio
Ratio Test Report Test Report
- Earthing/Local - Earthing/Local
Supply Transformer Supply Transformer
Customer: Substation: Transformer Identifier:

Plant Details
Manufacturer: Serial No:
Model: Insulation:
Pri Voltage: kV Z0 Impedance: Ω
Sec Voltage: V Rating: kVA
Ratio: Ratio:
Instrument Used: Serial Number: Vector Group: Vector Gr
Upper HV Voltage limit expected: V Lower HV Voltage limit expected: V
A-Phase B-Phase C-Phase
Name
Tap plate HV Secondary Volts (V) Measured Secondary Volts (V) Measured Secondary Volts (V)
Pos winding Measured
Voltage Ratio Ratio Ratio
Upper Lower Upper Lower Upper Lower
1
2
3
4
5
6
7
8
Tap position selected for Service: Select Tap that provides voltage level between 226-254V
allowing for Voltage drop of connected circuits.
Comments

Signature Block:
Tested By: Name: Date:
Checked By: Name: Date:

Page 10 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-047Filename:536730056.xls
Commissioning Tool - Earthing Transformer

Site Acceptance
Site Acceptance Testing
Testing Check Sheet Check
- Earthing Sheet -
Transformer Earthing Transformer
Customer: Substation: Transformer Identifier:

Plant Details
Manufacturer: Serial No:
Model: Insulation:
Voltage: kV Z0 Impedance: Ω

Site Acceptance Check List:


No. Check Item / test Comments Tested/Checked by Test Date
1 Confirm Gas pressure / oil level correct.

Confirm any CTs in earthing transformer


have SAT testing completed with results
2 recorded in CT commissioning tool.

Confirm HV cable has SAT testing


completed with results recorded in HV cable
3 commissioning tool.
Confirm HV cable termination complies with
4 HV clearances.

Confirm primary phase and earth


connections are correct and securely
5 affixed.

Page 11 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-047Filename:536730056.xls
Commissioning Tool - Earthing Transformer

Site Testing
Site Integration Integration Testing
Check Sheet Check
- Earthing Sheet
Transformer - Earthing Transformer
Customer: Substation: Transformer Identifier:

Plant Details
Manufacturer: Serial No:
Model: Insulation:
Voltage: kV Z0 Impedance: Ω

Site Integration Check List:


No. Check Item / test Comments Tested/Checked by Test Date
Confirm earthing transformer has been
1 included in transformer primary injection.

Confirm all alarms/indications from earthing


transformer have had full functional testing
2 completed.

Page 12 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-047Filename:536730056.xls
Commissioning Tool - Earthing Transformer

Site Integration
Site Integration Testing
Testing Check SheetCheck Sheet - Earthing/Local
- Earthing/Local Supply Transformer
Supply Transformer
Customer: Substation: Transformer Identifier:

Plant Details
Manufacturer: Serial No:
Model: Insulation:
Pri Voltage: kV Z0 Impedance: Ω
Sec Voltage: V Rating: kVA
Site Integration Check List:
No. Check Item / test Comments Tested/Checked by Test Date
Confirm earthing transformer has been
1 included in transformer primary injection.

Confirm all alarms/indications from


earthing/local transformer have had full
2 functional testing completed.

Page 13 of 13 Form MN000301F185 Ver 1


Check this is the latest Process Zone version before use.
00-047Filename:536730056.xls

You might also like