Professional Documents
Culture Documents
Gregg Schwartz 507-438-6703: ISO 18436-2 & ASNT Vibration Condition Monitoring Certifications
Gregg Schwartz 507-438-6703: ISO 18436-2 & ASNT Vibration Condition Monitoring Certifications
Gregg Schwartz 507-438-6703: ISO 18436-2 & ASNT Vibration Condition Monitoring Certifications
507-438-6703
gregg.d.schwartz@taepred.com
• Technical Associates of Charlotte, P.C. : Vibration Analyst Level II, III, & IV
(Advanced) as stated in SNT-TC-1A
• Vibration Institute: Vibration Analyst Category II & III Certification # 9905-
1652A & Certification # 0212-0698B
Provide financially sound services & solutions, which will result in a partnership
in reliability. These results oriented maintenance philosophies increases up
time, reduces operating costs, while increasing reliability and life expectancy of
your assets and environments.
PTI not only can diagnosis the root cause, but can Proactively
correct the problem. Whether it is rebuilding a fan, pump,
mill, compressor, etc, PTI’s expert personnel can perform.
During a plant outage timely repairs are needed, PTI can
rebuild the equipment, laser align, and dynamic balance right
on-site. After the repairs are performed we will bring back
on-line and verify the repairs were performed correctly before
putting back in service. Few companies perform this service
and fewer can do it right. Call PTI to schedule a pre-
shutdown analysis & use PTI to perform the repairs.
The Predictive Technologies Inc. (PTI) team tests existing or future areas for
unwanted building vibrations. Seismic transmissions have undesired effects on
MRI’s, microscopes, or other sensitive equipment. These may be transmitted
from such sources as fans, pumps, or other transient vibrations. PTI can not
only locate these sources, but also perform the necessary corrective actions.
Wear Analysis
Crankcase ( Dipstick)
Sample Port / Oil Drain
Diesel Engines 250-500 Hours / 12,000 – 15,000 Miles
Transmissions
Differentials / Drives
250-500 Hours / 12,000 – 15,000 Miles Dipstick / Fill Hole
Hydraulic Systems
Reservoir or Pressurized
Line or Return Gravity
Turbines (All) 750-1,000 Hours Feed
Reservoir