Download as pdf
Download as pdf
You are on page 1of 8
RISK ASSESSMENT FORM — ACE BUILDING SERVICES PTE LTD ‘Approved by: Department: Signature: Process: Process/ Activity Location: ‘Reference Number: RAI, Rev: 01 ‘Original Assessment Date Name ‘andy Poh Last Review Date: Designation: | Director ‘Next Review Date 7 Rotineulaled | Flecwocuton! | -Al eectical toe to be Safe Work 772 [8 [ANDY PEW Dar0az ' | Use-ctelecsical tools | exposed pars elecirc shock | checked that there is no procedure (ning an custing) toworker | exposed parts ‘established on Protected by ELCB within contro of electrical ‘Sm length of wre from hazards pont of use -Workers to report any exposed wires Regular toolbox meeting ‘conducted on safety when Wire on oor Safe Work 7 [2 |e | aNoy PER osr08zo procedure feslablshed ‘contro of electrical hazard Exposures | Eyer PE estabished mt a Biting of employees on s yt ys RISK ASSESSMENT FORM — ACE BUILDING SERVICES PTE LTD Department Process: — racess/ Activity Location? Reference Number. RAI, Rev: 01 RA Member 3: Name: “Andy PRR RA Member 4: | Director 15/07/2020 Exposure | Nowe induced | mane PREIS TTT ae] ROvPER TSH igh Nose se | employees Briefing of nen Desires "PPE wom at al tines employees on PPE usage! 2 Tse orhandioots | Sharp abjeas! | Cuts, busses | Proper PPE hang PTT T- zie 4 Pointed edges. | to worker Tools fal by | Footinjunyto worker smishanding 3 | Use of Excavator | entanglement S]2 |® | Sateworktainng |S] 2} | ANDY PEN Tar0az crashing Faiauy 7 [2 |® | Banicadewoxana ®t 3 and place appropriate waming signs Siruckby jars 3 [2 | |-Setupbarierson 13] 26] ANDY PER aOoT the swing area 5 20 2 a 2 6 3. 2 ‘Medlin Rik 4 6 s 70 = 4 5 RISK ASSESSMENT FORM — ACE BUILDING SERVICES PTE LTD. Reference Number: RA 01, : a Rev ot “ 6 ri z : = [find Fe f at 15/07/2020 Secure he machine ‘propery before canying ‘tay work Fall from injuries, “Fasten seat bet atal [2 |2 [© | -Usehandholdsena |3 | 2 [© | ANDY PEH arose reghs” | fraaures | mes soos “Remain seated atl Maintain tree times points of contac t -Never allow others to ride ‘alénes onthe machine Noise Noise-induced | -Personal hearing a [2 78 “Regular rest breaks [4 [1 [4 | ANDY PEH ‘93709720 heating oss | protectors Ergonomics | Masao ~Aajustthe operators seat | > |? [© | vobrataon 32 e | anor THOTT seamen, | Regular rst breaks 4 | Lasng ofc Fang Bodiy inn. | Proper PPEtobe wom [> [2 |S |- ara aor objects, | sprains {safety helmet) egenemis “Fallow ste work prscetute 5 | working trcontnes | Asphyation | Fain ack of | Vaid enty port, 7 7/2 |e | ANY PER aoa ‘spaces lorena bs -Portabie gas detector gas” | Buddy system © | wert unter Tip or Sipisiy! | Felow coma procedure [> |? [2 |e | ANBYPEN——/as7a7 Mee tt ong | excessive | Bur heat | forvering outdoors ‘exposure ne Use appropriate PPE isunglases sunscreen, 5 10 2 3 22 6 2 2 * a 5 a0 . °C RISK ASSESSMENT FORM ~ ACE BUILDING SERVICES PTE LTD ‘Approved by: Reference Number: RA OI, t (OPERATIONS. RA Leader: Andy Peh Signature: - Revi FIRE HOSEREEL WORKS [RA Member 3: Subramanian Manikandan — FIRE HOSEREEL WORKS/PROJECT | RA Member 2: RA Member 3: Name! ‘Andy Peh Last Review Date: RA Member 4: ‘Designation: | Director ‘Next Review Date RA Member 5: Date: 15/07/2020, Tong clothing te Thlake and drinking facies 7 | Use of scissor tit Entanglement | Catching of S [2 [8 |-Be aware ofalthe [3 [2 [|e [ANDY PER ‘33709720 long hair, ‘safety signs on the foose clothing ‘machine, follow alt or fingers the safety instructions, ‘including those for maintenance Falling of Injures | “Only licensed personnel |S [2 [6 |. a [2 [6 materials who have been trained to operate ‘Scissor pack | Bodily injured | -Ensure NO personnel are |S |? 3 [2 [6 | ANOY PER ‘95709720 ‘collapsing working under raised hydraulic Exlosion Fatal injury | Ensure fuel is 7 |e 4 [7 _|# [ANDYPER ‘waver ‘aporoprataly stored Uneven Fatal injury to | -No operating alowed ton |* |? a [7 [4 [ANDY PER ‘03709720 ground workers: slope | = Operate machine on fim Process: RISK ASSESSMENT FORM — ACE BUILDING SERVICES PTE LTD RA Member 1: Subramanian Manikandan Proces/Aaty Location: FIRE HOSEREEL WORKS/PROIECT ‘Original Assessment Date Last Review Date: ‘Next Review Date Usage of’ Frame Ladders Jo fee] lafe ls anh ‘9esun ou omnsus oi J2ppe. “UoRIpLeD Pood royom | ur vonpuce ozworco naasowy |e 2] » | eaceouuomen | a] 2] »| emsepeicpansua | Anis mes ‘sun, ‘uy ye punou® ‘uy uo euypeu teed dos {0 1 pamoye Bunexed0 ON ga 0 98n pue Bled ospon vo 20n punoss venom 10p6 sioyon unos ozs waasow| o| z| | peoresoans | | 2] p| wopeensivepperemsua: | oi nes weno ‘spre peowano do osn pue ovo sion asc uBio 0 v0 ol son peowano He ozoz/L0/st “3360 is J00ueW ve exoz/co/vt 3160 M9M94 ON epeng | woReUsisea 1 AWAY ooz/LO/ST Teampay [Suen eRUwaN VE LIOR/CO/ST 3S :zioquew ve | __193roys/sw¥om7338350H 3 = ‘VepUEUED VEREUIGTE 1 1oGUN VE SyUOM TRISH HS tony 5 en Wea ABUY 39901 Va 'SNOUWEEdO “ro wy sequin 25u8:3}24 2h panauddy GILT 31d S3D1AWIS ONIGTIN 39V — WYO LNIWSSISSY NST RISK ASSESSMENT FORM - ACE BUILDING SERVICES PTE LTD Reference Number: RA Oi, Rev:01 (Original Assessment Date Andy Peh Last Review Date: Director ‘Next Review Date 35/07/2020 ® = Misalgned’ | Foot’ Hand | -Roliers are checked for 22 78 Use of oteys Defective injuries to. defective parts regularly rollers worker Workers to report any Getectve pans Buby “Proper PPE (Sey oat hand gloves] uses Equipment Bruises! Cuts | -Neat arrangement and 7? i* Toppe | towers | socang ofequpment rrterals “Ensure sauipmennateals nt Cerone on oes -Propr PRE (Stely totes hand doves] used Rolling along | Bruises/ Cuts | -Proper PPE (Safety ay? | tarow | towers | tone’ hand goves) used patos Protruding Bruises! Cuts | -Neat arrangement and 2/2 [4 cuenta | toworkers | sacking of Squpme! oben toler : Poor Sips tpeand [4 “SWF eaaoiated | F[2— [4] NOY PER 0 | ousekeoing ovsekoepng | faloto maar an housekeopng ome OO RISK ASSESSMENT FORM — ACE BUILDING SERVICES PTE LTD ‘Approved by: Reference Number: RA O1, ; sipnatre: - Revol Department “HAD process Process) Ray Location Orgad Assesment Date RAMenber Mamet [andy Peh Last Review Date za Dexgnstion | Director Text Review Date 5 Dat 15/07/2000 Talat and wrod Sft surtaces toe woes tnd deaned meet Bball Tap eas | Cas Tae opener PEE rea oto workers | protetve doves Dust Réspiatony | “Use of proper PPE- zz | 2 [2 |e oreaton | esses for | espators woke | ouskoopingtremove ‘Pike eee 3 Reaper FEF Taian [ares] ‘Protas sateaing [32 ; se Te mor Tae " Transport of workers " ‘culture ° check to ensure in car goods -No standing when vehicle vehicle in good ismeving ‘endison “footy tpttea seu int

You might also like