Tender No.

: REMCL/CO/Solar/Phase-I/2021

Package 14
Singrauli TSS ECR, Dhanbad
Division, Madhya Pradesh
Disclaimer
1. This report has been prepared exclusively for the participating bidders for the tender issued by REMCL on 4th June 2021. (Tender No.:
REMCL/CO/Solar/Phase-I/2021).
2. This report is confidential and for the use of reference purposes only. It is not to be distributed, nor is to be copied, circulated, referred to or
quoted in correspondence, or discussed with any other party, in whole or in part, without our prior written consent.
3. While information is based on primary site surveys and other external sources, the same has not been verified for authenticity, accuracy or
completeness. The actual site conditions may differ in comparison to the information stated in the report. REMCL will assume no
responsibility for any information mentioned in the report. Hence, before acting on any such information, the bidder or the reader is advised
to undertake site visits and verify the information before bidding for the project and get necessary information first hand.
4. Specifically technical details such as connectivity details of the nearest STU/ CTU are for reference purposes only and the bidder has to
verify the bay availability and other necessary details before bidding.
5. Our views are not binding on any person, entity, authority or Court, and hence, no assurance is given that a position contrary to the
opinions expressed herein will not be asserted by any person, entity, authority and/or sustained by an appellate authority or a Court of law.
6. Neither REMCL nor any of its employees undertake responsibility in any way whatsoever to any person in respect of errors in this report.
7. In connection with our report or any part thereof, REMCL does not owe duty of care (whether in contract or in tort or under statute or
otherwise) to any person or party to whom the report is circulated to and REMCL shall not be liable to any party who uses or relies on this
report. REMCL thus disclaims all responsibility or liability for any costs, damages, losses, liabilities, expenses incurred by such third party
arising out of or in connection with the report or any part thereof.
8. By reading our report, the reader of the report shall be deemed to have accepted the terms mentioned hereinabove.

2
Site location (1/6)
Site Name Singrauli TSS ECR , Dhanbad Division

Site Location Longitude & Latitude- : 24°12'20.8"N 82°39'30.9"E

3
Site location (2/6)

The KMZ file is attached separately for ready reference.


4
Site location (3/6)

The KMZ file is attached separately for ready reference.


5
Site location (4/6)

6
Site location (5/6)

From TSS app 3 kms is the length and 689 is the max depth

7
Site location (6/6)

8
Capacity and connectivity
Area and capacity Connectivity

Approx. total area


without Tentative capacity
STU (kV) CTU (kV)
encroachment (MW)
(acre)

132/33 kV substation at Singaruli is at a 400/220kV substation at Vindhyanchal (Sasan)


445 83
distance of approx 10 kms. from station plot. is at a distance of approx.30 kms from the site.

The encroached area has not been included in the approx. total area mentioned above.

9
Land and local site features

1. The site is connected by Roads


2. The land parcel has uneven surface, which is covered with heavy shrubs & small trees all throughout the stretch.
3. Water logging and water drainage are the key issue identified on the land parcel. Hence, necessary provisions to
overcome waterlogging, may be considered during the designing of mounting structure.
4. Some temporary encroachments like houses, roads and small farms were found on the land parcel during survey.
However, as per the railway officials it can be removed easily before the work starts.
5. The approx. area without encroachment is 445 acres, which is arrived after removing the encroached area from the total
Railway land.
6. Yes, wildlife activities have been observed on the site.
7. Near by Power plants are the source of pollution, identified in the vicinity.
8. During the survey, it was found that construction of 4 lane highway is going on along the track.

10
Sample Indicative PV Syst Report (1/2)
Normalized Production (per Installed kWp) Performance Ratio PR

Result Summary
Produced Energy Specific Production Performance Ratio (PR)
(MWh/Year) (Kwh/kWp/Year)

175914 1688 79.57%


Sample PV Syst report is for reference purpose only. However, bidders are advised to carry out their own analysis. 12
Sample Indicative PV Syst Report (2/2)
Meteonorm 7.3 (1981-2010)
GlobHOR DiffHOR T_Amb GlobInc GlobEff Earray E_Grid PR

kWh/m2 kWh/m2 °C kWh/m2 kWh/m2 MWh MWh Ratio


January 134.3 38.38 16.18 186.4 177.4 16647 16423 0.845

February 145.3 44.21 20.03 182 9 174.3 16003 15783 0.828

March 185.9 64.28 25.47 208.2 197.4 17729 17486 0.806

April 193.7 76.50 30.42 193.3 182.2 16122 15902 0.789

May 212.0 89.87 32.74 194.5 183.0 16129 15901 0.784

June 177.6 92.69 30.98 158.1 148.3 13302 13102 0.795

July 147.4 89.65 29.01 132.7 124.0 11348 11176 0.808

August 149.5 87.42 28.59 142.7 133.9 12215 11193 0.752

September 148.6 76.33 27.80 154.8 145.9 13267 13079 0.810

October 153.4 61.90 26.16 181.1 171.9 15559 15343 0.813

November 137.5 40.80 21.33 185.7 176.8 16259 14619 0.755

December 137.0 27.98 17.45 200.9 191.5 17770 15908 0.760

Year 1922.1 790.00 25.54 2121.3 2006.5 182348 175914 0.796

Sample PV Syst report is for reference purpose only. However, bidders are advised to carry out their own analysis. 13
Site photographs (1/6)

14
Site photographs (2/6)

15
Site photographs (3/6)

House Encroachment on Railway Land


16
Site photographs (4/6)

House Encroachment on Railway Land


17
Site photographs (5/6)

18
Site photographs (6/6)

Development of Highway near the Railway Land


19
Survey summary

20